Sol_140P6326Q0021.pdf
PDF 487 KB Posted
- Attached to
- PAIS FY26 EXHAUST FAN REPLACEMENT
- Solicitation number
- 140P6326Q0021
About this file
This is a Request for Quotation (RFQ) for construction services issued by the National Park Service (NPS) for Padre Island National Seashore. The solicitation number is 140P6326Q0021, issued on May 14, 2026, with quotes due by May 27, 2026 at 12:00 PM local time. The contract is a firm fixed-price construction contract with an estimated value of $19 million, anticipated for completion within 90 calendar days after Notice to Proceed. The work involves replacement of an existing rooftop laboratory exhaust blower fan serving a laboratory chemical fume hood, including subsequent inspection, testing, and certification of the fume hood to ensure compliance with applicable laboratory ventilation standards at Padre Island National Seashore, Division of Sea Turtle Science & Recovery in Corpus Christi, Texas. This is a 100% Total Small Business Set-Aside under NAICS Code 238220 (exhaust system installation). The contractor must begin performance within 10 calendar days of receiving the Notice to Proceed and complete all work within 90 calendar days, including final cleanup.
Contractor requirements include maintaining performance and payment bonds, compliance with Davis-Bacon wage rate determinations, Buy American requirements for construction materials, OSHA safety standards, and liability insurance with minimum coverage of $50,000 per person and $100,000 per occurrence for contracts under $100,000. Quotes must be submitted electronically via email to joseph_kirk@nps.gov and should include a completed SF 1442 with lump sum pricing in Block 17, UEI number in Block 14, and acknowledgment of any solicitation amendments in Block 19. The Government will evaluate quotations based on technical capability and price through an efficient, minimally burdensome process under FAR Part 13 simplified acquisition procedures, with the contract awarded to the responsible small business offeror offering the best value to the Government. Offerors must demonstrate past performance in removing and replacing exhaust fans within the past five years with project references, points of contact, and contract prices. The contracting officer is Joseph Kirk (Joseph_Kirk@nps.gov, 605.574.0510).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6326Q0021_Amd_0001.pdf | ||
| B08_Solicitation_attach_3_Experience_Questionaire.xls | XLS spreadsheet | |
| B08_Solicitation_Attach_2_WD.pdf | ||
| B08_Solicitation_Attach_1_SPECS__Exhaust_Fan_Replacement__Lab_Fan.pdf | ||
| B08_Solicitation_Attach_4_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P6326Q0021
NPS, MWR - NEKOTA MABO
DOI, NPS, MWR - NEKOTA MABO
820 Columbus St Rapid City SD 57701
Joseph Kirk Joseph_Kirk@ios.doi.gov
0044037373
PMN
Joseph Kirk 6055740510
05/14/2026
05/27/2026
10 90 52.211-10
This is a request for quotation. The resulting contract is expected to be a firm fixed price construction contract.
Project Description: Replacement of an existing rooftop laboratory exhaust blower fan serving a laboratory chemical fume hood, and subsequent inspection, testing, and certification of the fume hood to ensure safe operation and compliance with applicable laboratory ventilation standards.
Project Location: Padre Island National Seashore
Division of Sea Turtle Science & Recovery 20300 Park Rd 22
Corpus Christi, TX 78418
Set-asides:100% Total Small Business Set Aside (52.219-6 Notice of Total Small Business Set Aside (Nov
2020))
NAICS Code: 238220 Exhaust system (e.g., kitchens, industrial work areas) installation, Standard Size
Continued...
1 37
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, MWR - NEKOTA MABO
DOI, NPS, MWR - NEKOTA MABO
820 Columbus St Rapid City SD 57701
PMN
Joseph Kirk
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P6326Q0021
$19 million.
Schedule: The Government anticipates that the work will be completed in 90 calendar days after issuance of the Notice to Proceed.
Wage Rates: Wage rate determinations
(Construction) formerly known as the Davis
Bacon Act are incorporated into the terms and conditions as an attachment.
System for Award Management (SAM): The successful offeror must be registered in SAM and have current online Representation and
Certifications. Please access http:.//www.sam.gov to update your records prior to submitting final offer.
Method and Instructions for Submitting Bids:
Refer to Section L. Complete quote package shall be emailed directly to the Contract
Specialist
Questions: All questions pertaining to this solicitation shall be submitted IN WRITING via email joseph_kirk@ios.doi.gov.
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: 0011283261
NPS, Padre Island NS
20301 Park Rd. 22
Corpus Christi TX 78418 US
Period of Performance: 06/01/2026 to
09/04/2026
00010 Replace Exhaust Fan per attached SOW and SPEC
Product/Service Code: Z2QA
Product/Service Description: REPAIR OR
ALTERATION
OF RESTORATION OF REAL PROPERTY (PUBLIC OR
PRIVATE)
140P6326Q0021 Removal/Replace Exhaust Fan Page 4 of 37 Padre Island National Seashore
Part I – The Schedule SECTION A – Solicitation/Contract Form Special Notice for Bidders SECTION B – Bid Schedule SECTION C – Specifications/Drawings SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) SECTION F - Deliveries or Performance 52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984) 52.242-14 -- Suspension of Work (Apr 1984) SECTION G - Contract Administration Data 1452.201-70 Authorities and Delegations (Sep 2011) Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) Submittal Process Request for Information (RFIs) Construction Contract Administration Compliance with recent Executive Orders 14148/14208 SECTION H - Special Contract Requirements Part II—Contract Clauses Section I: Contract Clauses 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) (Deviation Jan 2026) 52.219-28 Post-Award Small Business Program Representation. (Jan 2025) 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds. (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees. (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements. (Feb 1988) 52.222-11 Subcontracts (Labor Standards). (May 2014) 52.222-12 Contract Termination - Debarment. (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014)...13 52.222-14 Disputes Concerning Labor Standards. (Feb 1988) 52.222-15 Certification of Eligibility. (May 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction. (Apr 2015) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.223-6 Drug-Free Workplace (May 2024) 52.225-9 Buy American Act - Construction Materials (Oct 2022) 52.227-1 Authorization and Consent (Jun 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) 52.227-4 Patent Indemnity -- Construction Contracts (Dec 2007) 52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014) 52.232-16 Progress Payments (Nov 2021) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.236-2 Differing Site Conditions (Apr 1984) DEVIATION (Jan 2026) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) DEVIATION (Jan 2026) 52.236-5 Material and Workmanship (Apr 1984) DEVIATION (Jan 2026) 52.236-6 Superintendence by the Contractor (Apr 1984) DEVIATION (Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) DEVIATION (Jan 2026) 52.236-8 Other Contracts (Apr 1984) DEVIATION (Jan 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) DEVIATION (Jan 2026) 52.236-10 Operations and Storage Areas (Apr 1984) DEVIATION (Jan 2026) 52.236-11 Use and Possession Prior to Completion (Apr 1984) DEVIATION (Jan 2026)
140P6326Q0021 Removal/Replace Exhaust Fan Page 5 of 37
52.236-12 Cleaning Up (Apr 1984) DEVIATION (Jan 2026) 52.236-13 Accident Prevention. (NOV 1991) (DEVIATION JAN 2026) - Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION JAN 2026) 52.236-17 Layout of Work (Apr 1984) (DEVIATION JAN 2026) 52.236-21 Specifications and Drawings for Construction (Feb 1997) (DEVIATION JAN 2026) 52.242-13 Bankruptcy (July 1995) 52.243-5 - Changes and Changed Conditions (APR 1984) 52.245-1 Government Property(Sep 2021) 52.246-21 Warranty of Construction. (Mar 1994) 52.248-3 Value Engineering—Construction (Oct 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) & Alternate I (Sep 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 1452.203-70 Restrictions on Endorsements- Department of Interior (Jul 1996) 1452.204-70 Release of Claims Department of Interior (Jul 1996) 1452.228-70 Liability Insurance Department of Interior (Jul 1996) Part III— List of Documents, Exhibits, and Other Attachments SECTION J – List of Attachments Part IV – Representations and Instructions SECTION K - Representations, Certifications, and Other Statements of Offerors 52.203-18 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements - Representation (Jan 2017) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) SECTION L - Instructions, Conditions, and Notices to Offerors Required Submissions:
52.204-7 System for Award Management (Nov 2024) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) Electronic Submissions of Quotes 52.216-1 – Type of Contract (Apr 1984) 52.222-5 -- Construction Wage Rate Requirements—Secondary Site of the Work (May 2014) 52.225-10 -- Notice of Buy American Requirement--Construction Materials (May 2014) 52.233-2 Service of Protest Department of the Interior (Sep 2006) (DEVIATION) (Jul 1996) 52.252-1 – Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 – Authorized Deviations in Provisions (Nov 2020) 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (APR 1984)
SECTION M - EVALUATION FACTORS FOR AWARD
140P6326Q0021 Removal/Replace Exhaust Fan Page 6 of 37
Part I – The Schedule
SECTION A – Solicitation/Contract Form
This email solicitation is a Request for Quote (RFQ), in accordance with the Specifications/Drawings and is issued on Standard Form (SF) 1442. Award of this contract will be made according to FAR Part 13 Simplified Acquisition Procedures. All references to “proposal” or “bid” in this solicitation shall be understood to mean “quotation.” The Government will evaluate all Quotations in an impartial manner and consideration will be given to those with the highest perceived value to the government based on responses to the evaluation factors identified in Section M.
Reference Department of Interior Acquisition Regulation (DIAR) Part 1436, 1436.270-1 Uniform Contract Format.
Special Notice for Bidders
Signing of the offer shall be deemed to be a representation by the quoter that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Quoted price must include all materials/labor/work/taxes to complete work outlined in the Specifications.
SECTION B – Bid Schedule
Complete the Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20. Offerors shall include their SAM registered UEI number in Block 14 of the SF1442 when submitting offer. Offeror must include original signature of individual authorized to sign for the company. Indicate the lump sum for the base item as proposed in Block 17. Contractors are also encouraged to offer pricing for the alternative line. A detailed breakdown of the offeror’s proposal price (e.g., labor, materials, profit, overhead, and other pricing elements) are not requested at this time; however, may be requested by the Contracting Officer during the pre-award process. Offerors must acknowledge all solicitation amendments when submitting final quotes. See Required Submissions in Section L.
SECTION C – Specifications/Drawings
“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”
Please replace any mention of “substantial completion” with “final completion” throughout the entire specification document.
SECTION D - Packaging and Marking
No clauses included.
SECTION E - Inspection and Acceptance
52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
140P6326Q0021 Removal/Replace Exhaust Fan Page 7 of 37
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph
(i) of this section.
(d) The presence or absence of a government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of Clause)
SECTION F - Deliveries or Performance
Work shall be completed by skilled personnel per industry standards and manufacturer specifications.
52.211-10 -- Commencement, Prosecution, and Completion or Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
140P6326Q0021 Removal/Replace Exhaust Fan Page 8 of 37
52.242-14 -- Suspension of Work (Apr 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly.
However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed—
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
(End of clause)
SECTION G - Contract Administration Data
(a) Contact Information:
The Contract Specialist/Contracting Officer administrating the Contract:
Joseph Kirk Joseph_Kirk@nps.gov 605.574.0510 National Park Service-NEKOTA MABO 820 Columbus Street Rapid City, SD 57702
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
(d) Any request for contract changes/modifications shall be submitted to the CO.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items.
All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
FINAL PAYMENT
mailto:Joseph_Kirk@nps.gov
140P6326Q0021 Removal/Replace Exhaust Fan Page 9 of 37
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, warranty of construction, release of claims and any other documents requested by the contracting office as applicable. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
AVAILABILITY OF UTILITIES SERVICES
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
UTILITIES CONSERVATION
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS
The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.
1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR’s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
140P6326Q0021 Removal/Replace Exhaust Fan Page 10 of 37
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.
(End of Local Clause)
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Copy of vendor invoice document in PDF format, completed on the pay application document provided by contracting, which shows pricing breakdown for all line items. Once all signatures (Contractor’s / COR / CO) and approvals are completed on the pay application, the vendor can then upload this document into IPP as their invoice attachment.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date.
Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Submittal Process
(a) This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.
(b) Submittal List: A submittal list is included in the scope of work document. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the scope of work and contract terms and conditions still apply regardless of what is shown on the submittal list.
(c) Processing Time: Allow enough time for submittal review, including time for re-submittals. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the contract time will be authorized because of failure to transmit submittals enough in advance of the work to permit processing, including re-submittals. Allow 15 business days for review of each submittal and resubmittal.
Allow additional time if coordination with subsequent submittals is required.
(d) Transmittal: All material submittals shall be transmitted using National Park Service form CM-16 (attached). Package each submittal individually and appropriately for transmittal and handling. Submittals received from sources other than the Contractor will be returned without review.
(e) The Contractor shall number each submittal sequentially. Revised submittals (resubmittals) shall include an appropriate revision number.
(f) (f) Re-submit submittals until they are marked “Approved” or “Approved with notations.” Use only final submittals with mark indicating “Approved” or “Approved with notations.”
https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
140P6326Q0021 Removal/Replace Exhaust Fan Page 11 of 37
Request for Information (RFIs)
(a) Immediately on discovery of the need for additional information or interpretation of the contract documents, Contractor shall prepare and submit an RFI utilizing the form provided by the CO (attached) or one created by the Contractor that is approved by the CO. The content of the RFI shall include a detailed description of elements requiring clarification. Include all relevant facts and circumstances in the RFI. The Contractor shall sequentially number each RFI.
(1) CO will not respond to RFIs submitted by other entities controlled by Contractor.
(2) Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
(b) Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
(1) RFI number, numbered sequentially.
(2) Date.
(3) RFI subject.
(4) Specification Section number and title and related paragraphs, as appropriate.
(5) Drawing number and detail references, as appropriate.
(6) Field dimensions and conditions, as appropriate.
(7) Contractor's suggested resolution. If Contractor's suggested resolution impacts the contract time or the contract amount, Contractor shall state impact in the RFI.
(8) Contractor's signature.
(9) Attachments: Include sketches, descriptions, measurements, photos, product data, shop drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
(c) Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly. The following are not considered to be RFIs and will receive no action:
(1) Requests for approval of submittals.
(2) Requests for approval of substitutions.
(3) Incomplete RFIs or inaccurately prepared RFIs.
(d) CO's action on RFIs may result in the need for a change to the contract time or the contract amount. All contract changes will be processed following the terms and conditions of the contract.
Construction Contract Administration
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: Construction Contract Administration | U.S. Department of the Interior (doi.gov)
Compliance with recent Executive Orders 14148/14208
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph
(t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM."
SECTION H - Special Contract Requirements n/a https://www.doi.gov/pam/acquisition/policy/constructioncontract
140P6326Q0021 Removal/Replace Exhaust Fan Page 12 of 37
Part II—Contract Clauses
Section I: Contract Clauses
52.204-13 System for Award Management Maintenance (Oct 2018)
52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.213-4 Terms and Conditions—Simplified Acquisitions (Noncommercial) (Mar 2026) Deviation (Mar 2026)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(c) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(d) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(e) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(End of clause)
52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) (Deviation Jan 2026)
140P6326Q0021 Removal/Replace Exhaust Fan Page 13 of 37
(a) Definition. Small business concern, as used in this clause-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(2) Affiliates, as used in paragraph (a)(1) of this clause, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) Applicability. This clause applies only to-
(1) Contracts that have been set aside for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.4 and 16.5.
(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
(End of clause)
52.219-28 Post-Award Small Business Program Representation. (Jan 2025)
52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation (May 2018)
52.222-6 Construction Wage Rate Requirements (Aug 2018)
52.222-7 Withholding of Funds. (May 2014)
52.222-8 Payrolls and Basic Records (Jul 2021)
52.222-9 Apprentices and Trainees. (Jul 2005)
52.222-10 Compliance with Copeland Act Requirements. (Feb 1988)
52.222-11 Subcontracts (Labor Standards). (May 2014)
52.222-12 Contract Termination - Debarment. (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (May 2014)
52.222-14 Disputes Concerning Labor Standards. (Feb 1988)
52.222-15 Certification of Eligibility. (May 2014)
52.222-27 Affirmative Action Compliance Requirements for Construction. (Apr 2015)
52.222-50 Combating Trafficking in Persons (Nov 2021)
52.223-6 Drug-Free Workplace (May 2024)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)
52.225-9 Buy American Act - Construction Materials (Oct 2022) javascript:void(0) javascript:void(0)
140P6326Q0021 Removal/Replace Exhaust Fan Page 14 of 37
a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S.
supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/25.105#FAR_25_105
140P6326Q0021 Removal/Replace Exhaust Fan Page 15 of 37 origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: None
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i)The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/12.505#FAR_12_505
140P6326Q0021 Removal/Replace Exhaust Fan Page 16 of 37
(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the…