Sol_140P6321B0009.pdf
PDF 394 KB Posted
- Attached to
- REHAB QTRS #32 BADL FY21
- Solicitation number
- 140P6321B0009
About this file
This solicitation is for a construction contract to rehabilitate Quarters #32 at Badlands National Park. The project involves gutting and reconstructing the interior of the building, including floor finishes, subflooring, interior partitions and finishes, ceilings, doors, fixtures, casework, floor joists, excavation of sediment in the crawl space, electrical and plumbing systems, HVAC system, and the addition of a fire sprinkler system. The solicitation is set aside 100% for Service Disabled Veteran Owned Small Businesses. Bids are due by July 7, 2021. The performance period is from August 19, 2021 to December 13, 2021. The contract will be awarded to the responsive, responsible bidder offering the lowest price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040528641
NPS, MWR - NEKOTA MABO
24290 Doane Mountain Road
Keystone SD 57751-4401
PMN
Joseph Kirk
NPS NEKOTA MABO
24290 Doane Mountain Road Keystone, SD 57751
Joseph Kirk 6055743150 x
06/07/2021
140P6321B0009
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Rehab Quarters #32 at Badlands National Park
Contractor must comply with CDC guidelines regarding COVID-19 while working on federal facilities.
Change to attached specifications: Throughout the entire specification document (B08
Solicitation_Attach_1_Project Specifications.pdf), delete the term "substantial
Completion" and replace it with "final completion.
This solicitation is an Invitation for Bid (IFB) for construction work at Badlands
National Park. The complete specifications, drawings, provisions, and clauses are available on Sam.GOV.
PROJECT DESCRIPTION:
Complete rehabilitation of Quarters #32 The project will involve gutting and reconstructing the complete interior ,including: Floor finishes, sub flooring, all interior wood frame stud partitions and finishes, ceilings ,doors, fixtures, casework, floor joists, excavation of sediment in crawl space, electrical systems, plumbing systems, mechanical HVAC system, and the addition of fire sprinklers.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 115 calendar days and complete it within ________________ ________________ calendar days after receiving
07/07/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, MWR - NEKOTA MABO
24290 Doane Mountain Road
Keystone SD 57751-4401
PMN
Brian Peck
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 43
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6321B0009
Exterior work will consist of removing and replacing exterior doors and windows, and exterior painting. Project rehabilitation will address all applicable building and life safety codes and will address abatement for asbestos containing materials.
Asbestos Containing Materials:
Abatement and asbestos containing materials are
1. Mudded Pipe Joint located throughout the crawlspace. 2. Thermal System Insulation located in the crawlspace. Last the Linoleum/Floor Tile located in the kitchen. The abatement may be simplified with full component removal (pipe, flooring and subflooring) due to the extent of demolition within the scope of work.
PERFORMANCE PERIOD: No work is allowed on site prior to 19 August 2021. All work to be completed by 13 December 2021 See 52.211-10 Commencement, Prosecution, and Completion of Work Alternate I.
The Performance period dates are contingent on issuance of the notice to proceed.
The IFB and resulting contract include liquidated damages. See FAR clause 52.211-12, Liquidated
Damages-Construction.
MAGNITUDE OF PROJECT: Between $250,000 and
$500,000.
BONDS: A bid guarantee is required. Performance and payment bonds are required.
NAICS CODE: The associated NAICS code is 236118, Residential Remodelers. The small business size standard is $39.5 million.
NOTICE OF SET ASIDE: This project is set-aside
100% for Service Disabled Veteran Owned Small
Business concerns. See FAR clause 52.219-27
SITE VISIT: A site visit is highly encouraged.
For details, see the provision 52.236-27, Site
Visit (Construction), Alternate 1.
WAGE RATES: Wage rate determinations
(construction) (formerly known as the Davis Bacon
Act)are incorporated into the terms and
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 43
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P6321B0009 conditions as attachments.
SYSTEM FOR AWARD MANAGEMENT (SAM): The successful offeror must be registered in SAM and have current online Representations and
Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer.
METHOD AND INSTRUCTIONS FOR SUBMITTING OFFER:
This acquisition is conducted using FAR Part 14, Sealed Bidding. See Section B, Bid Schedule, and
Section L, Instructions, Conditions, and Notices to Bidders
QUESTIONS: All questions pertaining to this solicitation shall be submitted via email no later than 4 business days after the site visit.
Address questions to joseph_kirk@nps.gov.
Delivery: 12/12/2021
Delivery Location Code: 0009060356
NPS, MWR, Badlands NP
Badlands Nat. Park Maintenance Shop
25291 Ben Reifel Road
Interior SD 57750 US
Period of Performance: 08/19/2021 to 12/12/2021
00010 Complete Rehabilitation of Quarters #32 at
Badlands NP
Product/Service Code: Z2FA
Product/Service Description: REPAIR OR ALTERATION
OF FAMILY HOUSING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
140P6320B0009 Rehab Quarters #32 Page 5 of 42 Badlands National Park
Part I—The Schedule Section A: Solicitation/Contract Form Special Notice for Bidders Section B: Bid Schedule Section C: Specifications/Drawings Section D: Packaging and Marking Section E: Inspection and Acceptance 52.246-12 Inspection of Construction (AUG 1996) Section F: Deliveries or Performance 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) 52.211-12 Liquidated Damages-Construction (Sept 2000) 52.211-13 Time Extensions (Sept 2000) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.242-14 Suspension of Work. (APR 1984) Section G: Contract Administration Data Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013) 1452.201-70 Authorities and delegations. (SEP 2011) Section H: Special Contract Requirements Part II--Contract Clauses Section I: Contract Clauses 52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (Oct 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015) 52.214-29 Order of Precedence -- Sealed Bidding (JAN 1986) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-14 Limitations on Subcontracting (MAR 2020) 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) 52.219-28 Post-Award Small Business Program Representation. (NOV 2020) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation. (MAY 2018) 52.222-6 Construction Wage Rate Requirements. (AUG 2018) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (AUG 2018) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014)
140P6320B0009 Rehab Quarters #32 Page 6 of 42
52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of Segregated Facilities. (APR 2015) 52.222-23 -- Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999) 52.222-26 Equal Opportunity. (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-35 Equal Opportunity for Veterans. (JUN 2020) 52.222-36 – Equal Opportunity for Workers with Disabilities. (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items. (MAY 2008) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foam (JUN 2016) 52.225-9 Buy American Act - Construction Materials (FEB 2021) 52.225-10 Notice of Buy American Act Requirement - Construction Materials (MAY 2014) - Alternate I (May 2014) 52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance -- Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (FEB 2021) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) 52.228-15 Performance and Payment Bonds -- Construction (DEVIATION APR 2020) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payment to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes. (MAY 2014) - Alternate I (DEC 1991)) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts -- (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984)
140P6320B0009 Rehab Quarters #32 Page 7 of 42
52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (NOV 2020) 52.246-21 Warranty of Construction. (MAR 1994) 52.248-3 Value Engineering—Construction (Oct 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) & Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.252-2 Clauses Incorporated by Reference (FEB 1998) 52.252-6 Authorized Deviations in Clauses (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991) 1452.203-70 Restrictions on Endorsements (JUL 1996) 1452.204-70 Release of Claims (JUL 1996) 1452.228-70 Liability Insurance (JUL 1996) Part III—List of Documents, Exhibits, and Other Attachments Section J: List of Attachments Part IV—Representations and Instructions Section K: Representations, certifications, and other statements of offerors 52.204-8 Annual Representations and Certifications. (MAR 2020) 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020)
52.204-20 PREDECESSOR OF OFFEROR (AUG 2020)
52.204-26 Covered Telecommunications Equipment or Services-Representation (OCT 2020) 52.222-22 Previous Contracts and Compliance Reports (Feb 1999) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan-Certification (Aug 2009) Section L: Instructions, Conditions, and Notices to Bidders 52.204-7 System for Award Management (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-22 Alternative Line Item Proposal (JAN 2017) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (DEC 2019) 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (JUN 1988) 52.211-6 Brand Name or Equal (AUG 1999) 52.214-3 Amendments to Invitations for Bids (DEC 2016) 52.214-4 False Statements in Bids (APR 1984) 52.214-5 Submission of Bids (DEC 2016) 52.214-6 Explanation to Prospective Bidders (APR 1984) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (NOV 1999) 52.214-12 Preparation of Bids (APR 1984) 52.214-18 Preparation of Bids -- Construction (APR 1984) 52.214-19 Contract Award -- Sealed Bidding -- Construction (AUG 1996) 52.214-34 Submission of Offers in the English Language (APR 1991) 52.214-35 Submission of Offers in U.S. Currency (APR 1991) 52.216-1 Type of Contract (APR 1984) 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014) 52.228-1 Bid Guarantee (SEP 1996) 52.228-17 Individual Surety—Pledge of Assets (Feb 2021) 52.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation) 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) 52.252-5 Authorized Deviations in Provisions (APR 1984)
BID DUE DATE
Section M: Evaluation factors for award
140P6320B0009 Rehab Quarters #32 Page 8 of 42
140P6320B0009 Rehab Quarters #32 Page 9 of 42
Part I—The Schedule
Section A: Solicitation/Contract Form
Invitation for Bids (IFB), 140P6320B0009, Solicitation for construction to rehabilitate Quarters #32 at Badlands National Park.
Reference DIAR 1436.270-1 for Uniform Contract Format information.
Special Notice for Bidders
A Contracting Officer will be in the office on (bid opening date) starting at 9:00 AM MT to receive bids.
It's recommended that bids be mailed via the United States Postal Service (USPS) as to be delivered on or before the date of bid opening. Other delivery services not delivering to the USPS mailbox address provided for the NEKOTA MABO may be used if delivery will be on the date specified for bid opening and between 9:00 AM MT and the time designated for bid opening. Hand delivered bids may also be received on the date of bid opening between 9:00 AM MT and the time designated for bid opening.
Signing of the bid shall be deemed to be a representation by the bidder that:
1.) Bidder is a construction contractor who owns, operates, or maintains a place of business, regularly engaged in the work described herein; or
2.) If newly entering into a construction activity, bidder has made all necessary arrangements for personnel, construction equipment, and required licenses to perform construction work as specified; and
3.) Upon request, prior to award, bidder will promptly furnish to the Government a statement of facts in detail as to bidder’s previous experience (including recent and current contracts), organization (including company officers), technical qualifications, financial resources and facilities available to perform the contemplated work.
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
Section B: Bid Schedule
Preparation of Bids: The Government will not be responsible for any costs incurred by offeror in the research, preparation, or submission of its bid.
Complete Standard Form (SF) 1442: Offeror is to complete Blocks 14 through 20. Bidders shall include their SAM registered DUNS number in Block 14 of the SF1442 when submitting their offer.
Offeror must include original signatures of individual(s) authorized to sign for the company in accordance with FAR 4.102.
Indicate the lump sum (total ) proposal price in Block 17.
o A detailed breakdown of the offeror’s proposal price (e.g., labor, materials, profit, overhead and other pricing elements) are not requested at this time; however, may be requested by the Contracting Officer during the pre-award process.
Bidders must acknowledge all solicitation amendments when submitting final bids.
Bid bonds must be provided as originals with seals.
o Because a Bid Guarantee is required, Bid packages will only be accepted in hard copy via hand delivery or mail/express delivery to the address in Block 8 (Keystone, SD) of the form SF1442. Electronic submissions will not be accepted.
Section C: Specifications/Drawings
140P6320B0009 Rehab Quarters #32 Page 10 of 42
See attached drawings and specifications for work outlined in block 10 of the SF 1442. Specifications and Drawings are attached and hereby incorporated into this section (see Section J).
Section D: Packaging and Marking
Not Applicable
Section E: Inspection and Acceptance
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
Final Inspection, Substantial Completion, and Acceptance Procedures
(a) Request a final inspection in writing when a project or designated portion of a project is substantially complete. The Contracting Officer will proceed with the inspection within 10 days of receipt of the written request or will advise the Contractor of items that prevent the project from being substantially complete.
(b) If the work is determined to be substantially complete, following the final inspection. Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.
(c) If the work is not determined to be substantially complete following the final inspection, Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
(d) Contractor shall complete the Punch List within 30 calendar days, documented weather permitting unless the Contracting Officer agrees to a different time period.
(e) If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of Final Acceptance.
(f) If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
52.246-12 Inspection of Construction (AUG 1996)
Section F: Deliveries or Performance
Work shall be completed by skilled personnel per industry standards and manufacturer specifications.
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 115 days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $112.38 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
140P6320B0009 Rehab Quarters #32 Page 11 of 42
(End of clause)
52.211-13 Time Extensions (Sept 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
(End of clause)
52.236-15 Schedules for Construction Contracts (Apr 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(End of clause)
52.242-14 Suspension of Work. (APR 1984)
Section G: Contract Administration Data
The Contracting Specialist:
Joseph Kirk National Park Service-NEKOTA MABO 24290 Doane Mt Road.
Keystone, SD 57751
(605) 574-3150
(b) The Contracting Officer (CO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO. In the event the contractor effects any such change at the direction of any person other than the CO, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
(c) Contractual problems, of any nature, which might occur during the life of the contract, must be handled in conformance with very specific public laws and regulations (e.g., Federal Acquisition Regulation), and must be referred to the CO for resolution. Only the CO is authorized to formally resolve such problems. Therefore, the contractor is hereby directed to bring all such contractual problems to the immediate attention of the CO.
140P6320B0009 Rehab Quarters #32 Page 12 of 42
(d) Any request for contract changes/modifications shall be submitted to the CO.
(e) The contractor and the Government may agree to perform a no-cost field change. Field changes are made when the change appears to be mutually beneficial to all parties and would not require changing the negotiated line items. An example of a field change is: rerouting planned location of a sidewalk to avoid a tree (when quantities are not changed). All field changes must be approved by the CO prior to execution.
(f) All correspondence concerning this contract, such as requests for information (RFI), explanation of terms, and contract interpretation, shall be submitted to the CO.
FINAL PAYMENT
Final payment will be made only after receipt of all payrolls to include subcontractors, SF 1413 Statement of Acknowledgement for each subcontractor, project schedule, updated progress reports, material submittals, test reports, as-built drawings, and release of claims. Contractor must provide a signed copy of the 'Release of Claims' to the Contract Administrator upon submittal of final invoice.
AVAILABILITY OF UTILITIES SERVICES
Notwithstanding the provisions of contract clause FAR 52.236-14, Availability and Use of Utility Services, all reasonable required amounts of water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing systems, outlets, and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor's own expense.
UTILITIES CONSERVATION
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) INSPECTIONS
The contractor shall be subject to inspections under the OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) program by inspectors of the Department of Labor.
LEGAL HOLIDAYS
The Federal holidays throughout the year are observed by the National Park Service:
Note: Any of the Federal holidays falling on a Saturday will be observed on the preceding Friday; holiday falling on Sunday will be observed on the following Monday.
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (APR 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Payment Application submitted in compliance with approved Schedule of Values for Contracting Officers Approval.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb .org or phone
(866) 973-3131.
140P6320B0009 Rehab Quarters #32 Page 13 of 42
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation. (End of Local Clause)
1452.201-70 Authorities and delegations. (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
Section H: Special Contract Requirements Not Used
Part II--Contract Clauses
Section I: Contract Clauses
All provisions and clauses provided by number and title only are hereby incorporated by reference, with the same force and effect as if they were given in full text. See 52.252-1 and 52.252-2.
140P6320B0009 Rehab Quarters #32 Page 14 of 42
52.202-1 Definitions (NOV 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020)
52.203-7 Anti-Kickback Procedures (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (JUN 2020)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)
52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-14 Service Contract Reporting Requirements (Oct 2016)
52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (JUN 2016)
(a) Definitions. As used in this clause–
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
140P6320B0009 Rehab Quarters #32 Page 15 of 42
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(End of clause)
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)
140P6320B0009 Rehab Quarters #32 Page 16 of 42
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)
52.214-29 Order of Precedence -- Sealed Bidding (JAN 1986)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2020
52.219-8 Utilization of Small Business Concerns (OCT 2018)
52.219-14 Limitations on Subcontracting (MAR 2020)
52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020)
52.219-28 Post-Award Small Business Program Representation. (NOV 2020)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation. (MAY 2018)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of Segregated Facilities. (APR 2015)
52.222-23 -- Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(b) Goals for Minority Participation for each trade Goals for Female Participation for each trade
7.9% 6.9%
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is South Dakota, Jackson County, and Interior
140P6320B0009 Rehab Quarters #32 Page 17 of 42
52.222-26 Equal Opportunity. (SEP 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)
((a) Definitions. As used in this clause-
"Active duty wartime or campaign badge veteran," "Armed Forces service medal veteran," "disabled veteran," "protected veteran," "qualified disabled veteran," and "recently separated veteran" have the meanings given at Federal Acquisition Regulation
(FAR)22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60- 300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.222-36 – Equal Opportunity for Workers with Disabilities. (JUN 2020)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause) 52.222-37 Employment Reports on Veterans (JUN 2020)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
52.222-50 Combating Trafficking in Persons (OCT 2020)
52.222-54 Employment Eligibility Verification (OCT 2015)
52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
52.223-3 Hazardous Material Identification and Material Safety Data (FEB 2021)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items. (MAY 2008)
140P6320B0009 Rehab Quarters #32 Page 18 of 42
(a) Definitions. As used in this clause—
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to the Contracting Officer.
(End of clause)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020)
52.223-20 Aerosols (JUN 2016)
52.223-21 Foam (JUN 2016)
52.225-9 Buy American Act - Construction Materials (FEB 2021)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.