B08_Solicitation_Attach_1_Project_Specifications.pdf
PDF 1 MB Posted
- Attached to
- REHAB QTRS #32 BADL FY21
- Solicitation number
- 140P6321B0009
About this file
This document provides project specifications for the complete rehabilitation of Quarter #32 at Badlands National Park. The scope of work includes interior demolition, removal and replacement of exterior doors and windows, excavation of sediment in the crawl space, replacing structural floor joists and subflooring, abatement of asbestos-containing materials, applying new thermal insulation, re-framing interior walls, and installing new electrical, HVAC, plumbing, and fire suppression systems. The project will also include new flooring, wall and ceiling finishes, casework, and interior doors. Exterior work consists of removing and replacing exterior doors and windows and exterior painting. The period of performance is approximately 115 days, with 60 days for shop drawings and materials and 45 days for on-site work to substantial completion.
The specifications provide requirements for preconstruction submittals, site access and storage, project closeout, selective demolition, asbestos abatement, and various technical specifications for different trades. The solicitation number is 140P6321B0009 for the complete rehabilitation of Quarter #32 at Badlands National Park to be performed under a single contract for the Department of the Interior National Park Service Midwest Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BADLANDS NATIONAL PARK
INTERIOR, SOUTH DAKOTA
REHAB QUARTERS #32
PMIS 152401
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
MARCH 19, 2021
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 19 – Selective Demolition Section 02 82 33 – Removal and Disposal of Asbestos Containing Materials
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Section 06 11 10 – Wood Framing and Sheathing Section 06 20 23 – Interior Finish Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 21 00 – Thermal Insulation Section 07 21 19 – Foamed-In-Place Insulation Section 07 26 00 – Vapor Retarders Section 07 41 13.16 – Standing Seam Metal Roof Section 07 92 00 – Joint Sealants
DIVISION 08 – OPENINGS
Section 08 14 16 – Flush Wood Doors Section 08 15 48 – Residential Fiberglass Doors & Storm Doors Section 08 52 00 – Aluminum-Clad Wood Windows Section 08 71 00 – Door Hardware
DIVISION 09 – FINISHES
Section 09 29 00 – Gypsum Board Section 09 64 00 – Wood Flooring Section 09 65 19 – Resilient Tile Flooring Section 09 91 13 – Exterior Painting Section 09 91 23 – Interior Painting Section 09 93 00 – Staining and Transparent Finishing
DIVISION 12 – FURNISHINGS
Section 12 35 30 – Residential Casework Section 12 36 61.16 – Solid Surface Countertops
DIVISION 27 – COMMUNICATIONS
Section 27 10 00 – Residential Phone and Internet Cabling
DRAWINGS
22” x 34” construction drawings are provided in separate document.
SECTION 01 10 00
DIVISION 01 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: This project will entail the complete rehabilitation of Quarters #32. The project will involve gutting and reconstructing the complete interior, including: Floor finishes, sub flooring, all interior wood frame stud partitions and finishes, ceilings, doors, fixtures, casework, floor joists, excavation of sediment in crawl space, electrical systems, plumbing systems, mechanical HVAC system, and the addition of fire sprinklers. Exterior work will consist of removing and replacing exterior doors and windows, and exterior painting. Project rehabilitation will address all applicable building and life safety codes and will address abatement for asbestos containing materials.
1.2 Work Covered by the Contract Documents:
A. Project Location: Quarters #32, Badlands National Park, 25216 Ben Refiel Road, Interior, South Dakota, 57750.
B. Work consists of the complete rehabilitation of Quarters #32 as depicted in the Construction Drawings and Contract Documents:
1. Interior demolition.
2. Removal and replacement of exterior doors and windows.
3. Excavation of sediment in crawl space.
4. Replace structural floor joists and subflooring.
5. Abatement of asbestos containing materials.
6. Apply new thermal insulation at foundation and exterior walls.
7. Re-framing all interior walls.
8. New electrical, HVAC, and plumbing components.
9. New fire suppression/sprinkler system.
10. New floor, wall, and ceiling finishes, casework, and interior doors.
C. All work will be performed under a single contract.
D. Period of Performance: Work shall be completed within approximately 115 days of contract award. 60 days for shop drawings and material delivery, 45 days on site to substantial completion (POP is inclusive of 5 weather days), 10 days for final completion.
1.3 Applicable Codes:
A. National Electrical Code (NEC) 2020 B. International Building Code (IBC) 2018 C. National Fire Protection Association (NFPA)
ITEM 2 - EXISTING UTILITIES
2.1 Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
2.3.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2.3.2 Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: For neighboring quarters, keep driveways, access roads, and entrances serving clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Limit site disturbance, including earthwork and clearing of vegetation, to:
a. 20 feet beyond building perimeter
b. 10 feet beyond surface walkways, patios, surface parking, and utilities less than 12 inches in diameter
c. 15 feet beyond primary roadway curbs and main utility branch trenches
d. 25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.
D. Security and Protection facilities installation:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
1. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
2. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.
3. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion.
Perform control operations lawfully, using environmentally safe materials.
4. Site Enclosure Fence: Before construction operations begin, furnish and install portable chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.
a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage
b. Locate vehicular gates to avoid interference with traffic on public thoroughfares.
c. Locate pedestrian entrance gates as required to provide controlled personnel entry.
d. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.
5. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.
6. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project area. Coordinate locations with COR at the preconstruction meeting.
3.5 Hauling Restrictions: Match State and County road requirements for all park work/access.
3.6 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.
B. Dispose of waste materials legally using park dumpsters on site.
3.7 Photo Documentation:
All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days or as approved by COR.
A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with enough overall field view to show location and then details.
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.8 Fire and Life Safety:
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.
A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data
Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.9 Noise and Acoustics Management:
A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.
B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
1. Do not exceed the following dB(A) limitations at 50 feet:
Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour
2. Maximum permissible construction equipment noise levels at 50 feet:
EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75
C. Ambient Noise:
1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:
a. Residential receiving area :
Daytime: 65 dB Nighttime: 45 dB
b. Commercial/Industrial receiving area:
Daytime: 67 dB Nighttime: 65 dB
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
(Block 11 of the SF 1442 or relevant section of the award document)
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit. Please see FAR 52.236-27 - Site Visit (Construction).
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the following website: https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.
7.2 Submittals:
A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:
1. Name of responsible supervisor to carry out the program
2. First aid procedures
3. Training, both initial and continuing
4. Planning for possible emergency situations
5. Contractor to identify nearest location of medical facility for emergencies
6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26
ITEM 9 - SUBMITTALS
9.1 General Submittal Procedures:
A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit to COR.
B. Submittal List: See individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the specification section submittal list.
C. Preconstruction Conference Submittal: The following items shall be submitted within 14 days after award, and a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Shop Drawings: Indicate all materials, connection details, anchorage spacing, hardware locations, and installation details specified within each individual Specification Sections.
B. Product Data: Provide component construction, anchorage method, hardware, etc.
C. Samples: Submit samples specified in each individual Specification Sections.
D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.
E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content. Submit Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
A sample Schedule of Values will be provided by the Contracting Officer.
ITEM 10 – TEMPORARY SERVICES
10.1 Description: The work of this section consists of providing temporary services required for
Contractor's performance of the work of this Contract.
10.2 Fire Prevention and Protection:
A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be substantially complete, following the final inspection, the.
Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.
B. If the work is not determined to be substantially complete following the final inspection, the
Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, documented weather permitting.
D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.
F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
G. Disposition of any permits and warranties required by the specifications in this section.
11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of Substantial Completion.
B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.
C. Information shall include operation and maintenance manuals for each warranted material.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1. To be disposed of in an offsite landfill
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to NPS that may be uncovered during demolition remain the property of NPS.
1. Carefully salvage in a manner to prevent damage and promptly return to NPS.
1.3 PREINSTALLATION MEETINGS
A. Pre-demolition Conference: Conduct conference at Project site.
1.4 INFORMATIONAL SUBMITTALS
A. Engineering Survey: Submit engineering survey of condition of building
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of selective demolition activities with starting and ending dates for each activity.
D. Pre-demolition photographs or video.
E. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
1.5 CLOSEOUT SUBMITTALS
A. Inventory of items that have been removed and salvaged.
1.6 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
SELECTIVE DEMOLITION 024119 - 2
1.7 FIELD CONDITIONS
A. NPS will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Park’s operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by NPS as far as practical.
1. Before selective demolition, NPS will remove the following items:
a. Salvage HVAC Unit and parts.
b. NPS to remove all kitchen and laundry appliances.
C. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb, immediately notify the COR. Hazardous materials will be removed by NPS under a separate contract.
E. Storage or sale of removed items or materials on site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire protection facilities in service during selective demolition operations.
G. Arrange selective demolition schedule so as not to interfere with NPS operations.
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
SELECTIVE DEMOLITION 024119 - 3
B. Perform and Engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
C. Inventory and record the condition of items to be removed and salvaged.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing: Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing: Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. COR will arrange to shut off indicated services/systems when requested by Contractor.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to NPS.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent building and facilities to remain.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
C. Remove temporary barricades and protections where hazards no longer exist.
SELECTIVE DEMOLITION 024119 - 4
3.5 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 4 hours after flame-cutting operations.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
6. Dispose of demolished items and materials promptly. Comply with requirements in section
017419 “Construction Waste Management and Disposal.”
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to NPS.
4. Transport items to NPS storage area designated by COR.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by COR, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demotion operations are complete.
3.6 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction off-site.
B. Do not allow demolished materials to accumulate on site.
SELECTIVE DEMOLITION 024119 - 5
1. Remove and transport debris in a matter that will prevent spillage on adjacent surfaces and areas.
2. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
3. Comply with requirements specified in Section 01 10 00 “Division 01 General Requirements” for Construction Waste Management and Disposal.
C. Burning: Do not burn demolished materials.
D. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
02 82 33 - 1
REMOVAL AND DISPOSAL OF ASBESTOS CONTAINING MATERIALS
SECTION 02 82 33
REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes: Minimum requirements for hazardous materials handling, control, and abatement activities, as applicable, including, but not necessarily limited to:
1. Hazardous materials controls.
2. Handling and disposal of asbestos-containing building materials (ACBM).
3. Demolition associated with access to hazardous materials.
4. Criteria for abatement zone clearance testing.
5. Criteria for re-occupancy clearance.
6. Test section removals of asbestos-containing materials.
B. Asbestos abatement Scope of Work shall include the following:
1. Abatement and disposal of:
a. Mudded Pipe Joint (MPJ) – Located throughout the crawlspace; Quarters #32.
b. Thermal System Insulation (TSI) – Located in the crawlspace; Quarters #32.
c. Linoleum/Floor Tile – Located in kitchen Quarters #32.
d. Coordinate ACBM removal with Contractor; abatement may be simplified with full component removal (pipe, flooring, and subflooring) due to extent of demolition within scope of work.
2. Preparation of Work Plans to be submitted to the National Park Service for review and acceptance.
1.2 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. E84: "Test Method for Surface Burning Characteristics of Building Materials."
2. E119: “Standard Method for Fire Tests of Building Construction and Materials.”
3. E849: Safety and Health Requirements Relating to Occupational Exposure to Asbestos.”
B. American National Standards Institute (ANSI):
1. Z9.2: “Fundamentals Governing the Design and Operation of Local Exhaust Systems.”
2. Z41.1: “Men’s Safety Toe Footwear.”
3. Z86.1: “Commodity Specification for Air.”
4. Z87.1: “Practice for Occupational and Educational Eye and Face Protection.”
5. Z88.2: “Practices for Respiratory Protection.”
02 82 33 - 2
6. Z88.6: “Respiratory Protection - Respiratory Use Physical Qualifications for Personnel.”
7. Z89.1: “Requirements for Industrial Head Protection.”
C. National Fire Protection Association (NFPA):
1. Standard 10: “Fire Extinguishers.”
2. Standard 70: “National Electric Code.”
3. Standard 90A: “Fire Rating of Sprayed-On Fireproofing.”
4. Standard 701: "Small Scale Fire Test for Flame Resistant Textiles and Films."
D. South Dakota Department of Environment & Natural Resources (DENR):
1. State Notification Form for Demolition and Renovation Projects.
2. Asbestos Handling and Disposal Requirements.
3. HTTPS://DENR.SD.GOV/DES/WM/ASB/ASBREGGUIDE.ASPX
1.3 DEFINITIONS
A. Asbestos Work Class: Activities for removing asbestos materials by categories are as follows:
1. Work Class I: Activity involving removal of TSI and surfacing asbestos-containing materials
(ACM) or friable presumed asbestos-containing materials (PACM).
2. Work Class II: Activity involving removal of TSI and surfacing asbestos-containing materials
(ACM) or friable presumed asbestos-containing materials (PACM).
3. Work Class III: Repair and maintenance operations where TSI or surfacing is likely to be disturbed, which fits within one standard glovebag or waste container under sixty (60) inches.
4. Work Class IV: Maintenance and custodial activities during which employees contact but do not disturb PACM or ACM and activities to clean-up dust, waste and debris resulting from Work
Class I, II, and III activities.
1.4 SUBMITTALS
A. Asbestos:
1. Submit the following, in accordance with Section 01 10 00, Division 01 General Requirements, prior to Commencement of the Abatement Work:
a. Proof of current Asbestos Contractor's license (CSLB).
b. Worker documentation, including:
1). Current AHERA training certifications - supervisor/competent persons.
2). Current AHERA training certifications - workers.
3). Respiratory fit test records within the past 12 months minimum, or in compliance with
8 CCR 5144.
4). Medical examination approvals for respirator use within the past 12 months, or in compliance with 8 CCR 5144.
c. Material Safety Data Sheets (MSDS) for chemicals used.
d. Emergency phone number and pager listing.
02 82 33 - 3
e. DOP testing of negative pressure units and HEPA-filtered vacuums.
f. Rotameter calibration data within past six (6) months.
2. Submit the following, in accordance with Section 01 10 00, Division 01 General Requirements, within five (5) calendar days of the request by the Government or within five (5) calendar days of completion of the abatement or hazard control work.
a. Contractor daily personal air-monitoring data.
b. Updated worker documentation, as needed.
c. Daily boundary access logs.
d. Daily negative pressure records, as applicable.
e. Copies of updated schedules and notices to regulatory agencies, as needed.
f. Receipt and weight tickets from landfill operator or incinerator, as applicable.
g. Copies of completed uniform waste manifests.
h. Certification of Completion.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Asbestos Abatement Work: Only qualified persons shall engage in asbestos abatement activities. All abatement workers shall have AHERA training with annual 8-hour refresher training, current medical exams for the use of respiratory protection, and current fit test of appropriate respirators.
B. Regulatory Requirements: The Contractor shall be alerted to and familiar with the following laws and regulations regarding the hazards, control measures, management, characterizing, transport and disposal of hazardous wastes:
1. Asbestos Abatement Work: All labor, materials, facilities, equipment, services, employees and training, and testing necessary to perform the work required for asbestos abatement and disposal of waste shall be in accordance with these Specifications and the most current regulations, including but not limited to:
a. Environmental Protection Agency NESHAP and AHERA regulations (40 CFR Part 763, as applicable).
b. Occupational Safety and Health Administration (inclusive of OSHA 29 CFR 1926.1101)
c. Other applicable federal, state, and local governmental regulations pertaining to asbestos-containing materials (ACM) and asbestos waste.
C. Meetings:
1. Pre-Abatement Meeting:
a. Prior to any abatement work, the Contractor is to attend a pre-construction meeting to be attended by representatives of the Government, the Government’s Consultants, the
Contractor, the Hazardous Materials Abatement Subcontractor, and other Subcontractors whose work may be affected. The meeting agenda shall include the following considerations:
1). Review of the Specifications and Plans in detail related to the abatement and hazards work. All conflicts and ambiguities, if any, shall be discussed.
02 82 33 - 4
2). Review the project conditions, schedule, construction sequencing, abatement application requirements, and quality of completed work. Review test removal areas.
3). Review in detail the means of protecting adjoining areas, protect of Contractor’s, Subcontractor’s, Government’s workers, and completed work during the abatement activities. Review test removal areas.
4). Pre-job submittals requirements.
5). Site security requirements.
1.6 TIME LIMITATION AND DELAY CHARGES
A. Complete all asbestos hazard work specified in this Section in no more than the allotted calendar days or work shifts as outlined in the Abatement Work Plan or as otherwise specified in the Contract
Documents.
PART 2 – PRODUCTS
2.1 ASBESTOS WORK - MATERIALS AND EQUIPMENT
A. Protective Devices:
1. Temporary wash stations or showers, disposable clothing, respirators, gloves, hard hats, and other required items.
2. Respirators shall protect against asbestos and other appropriate dusts, fumes and mists as approved by:
a. The Mine Safety and Health Administration (MSHA).
b. The National Institute for Occupational Safety and Health (NIOSH) under provisions of 30
CFR Part 11.
B. Waste Receptacles: Conform to federal and State regulations, with 6-mil minimum thickness for glove bags or waste bags.
C. Sealants and Polyethylene Sheeting:
1. Polyethylene sheeting shall be flame-retardant and approved and listed by the State Fire
Marshal.
a. Thickness and Size: twelve (12) mil thick minimum, unless otherwise specified, sized to minimize the frequency of joints.
b. Flammability: Comply with NFPA Standard 701 with a flame spread rating of no greater than five (<5) and a smoke development rating of no more than seventy (<70) when tested in accordance with ASTM E84 procedures.
2. Sealing Tape shall conform to the following:
a. 2-inches or wider, capable of sealing joints of adjacent sheets of polyethylene and attaching polyethylene sheet to finished or unfinished surfaces or similar materials.
b. Tape shall be capable of adhering under dry and wet conditions, including use of amended water.
3. Preservation Sealing Tape: Type specifically designed for adhering to critical or sensitive surfaces without damage to surface; 3M or equal.
02 82 33 - 5
4. Spray adhesives shall not contain methylene chloride or methyl chloroform (1,1,1-trichloroethane) compounds.
5. Fire resistant sealants shall be compatible with concrete, metals, wood, cable jacketing and other materials capable of preventing fire, smoke, water and toxic fumes from penetrating through sealants.
a. Sealants shall be asbestos free and shall have a flame spread, smoke and fuel contribution of zero.
b. Sealants shall be ASTM- and UL-rated for three (3) hours for standard method of fire test for firestop systems.
6. Lagging sealer for enclosing and sealing raw exposed edges of piping, fitting, equipment and duct insulation (as applicable) shall meet the requirements of NFPA 90A. Sealed lagging left in place must be labeled regarding its asbestos content.
D. Surfactants and Encapsulants:
1. Wetting agents or surfactants shall be effective and compatible with the ACM and ACBM being wetted. Review project test section removals.
2. Bridging or penetrating type encapsulants shall have the following characteristics:
a. Water based. Do not utilize an organic solvent in which the solid parts of the encapsulant are suspended.
b. Non-flammable with no methylene chloride.
c. U.L. listed encapsulants, in full-scale ASTM E119 fire test, compatible with W.R. Grace
"Retroguard, RG-1" fireproofing with "Spatterkote" Type SKII" bonding treatment for structural and decking widths exceeding twenty four (24) inches.
d. Compatible with replacement materials, especially mastics, fireproofing, and adhesives.
E. Mastic Removers shall conform to the following:
1. Non-flammable solvent or gel, with a flash point above one hundred and forty degrees
Fahrenheit (>140 deg. F.).
2. Solvent waste shall not result in the generation of hazardous waste as described under 22
CCR, Division 4.
3. Removers shall not contain methylene chloride, halogenated hydrocarbons, or any of the following glycol ethers:
02 82 33 - 6
Common Name Abbrev. CAS# Chemical Name ethylene glycol methyl ether EGME 109-86-4 2-methoxyethanol ethylene glycol methyl ether acetate
EGMEA 110-49-6 2-methoxyethyl acetate ethylene glycol ethyl ether EGEE 110-80-5 2-ethoxyethanol ethylene glycol ethyl ether acetate
EGEEA 111-15-9 2-ethoxyethyl acetate ethylene glycol dimethyl ether EGDME 110-71-4 1,2 dimethoxyethane ethylene glycol diethyl ether EGDEE 629-14-1 1,2 diethoxyethane diethylene glycol DEG 111-46-6 2,2 dihydroxyethyl ether diethylene glycol methyl ether DEGME 111-77-3 2-(2-methoxyethoxy) ethanol diethylene glycol ethyl ether DEGEE 111-90-0 2-(2-ethoxyethoxy) ethanol diethylene glycol dimethyl ether DEGDME 111-90-6 bis(2-methoxyethoxy) ether triethylene glycol dimethyl ether TEGDME 112-49-2 2,5,8,11 tetraoxadodecane dipropylene glycol DPG 110-98-5 2,2 dihydroxyisopropyl ether
F. Vacuums and Negative Pressure Units (NPUs) used for clean-up of materials and detail shall be
HEPA-filtered. Provide DOP testing on-site for all units, unless otherwise noted in the Contract
Documents.
2.2 OTHER HAZARDOUS MATERIALS - MATERIAL AND EQUIPMENT
A. Waste Containers:
1. Provide sealable metal drums, 55-gallon capacity, with sealable lids. Label the drums in accordance with EPA and DTSC requirements, including the Generator I.D. or location identification and manifest number. Drums shall be air and watertight.
2. Manage rinsate water separately from solids
PART 3 – EXECUTION
3.1 EXAMINATION
A. Review the hazardous material report(s) to familiarize oneself with hazardous material locations and conditions, and previous abatement by others, as applicable.
B. Review site conditions to verify quantities, work zones, available utilities, security, etc.
3.2 PREPARATION
A. Minimum Protective Procedures for Asbestos Work:
1. Protection of Visitors and Other Site Personnel: Cordon off the abatement area(s) with appropriate signs, and provide temporary tunneling or scaffolding, as applicable.
2. Respiratory Protection: Use respirators approved by the National Institute for Occupational
Safety and Health (NIOSH).
02 82 33 - 7
3. Provide site security to assure that no member of the public is able to gain access to the asbestos work area at any time. Maintain access and egress routes at all times.
4. Provide worker training, respiratory protection, and medical examinations to meet applicable regulations.
5. Provide temporary lighting and power to work areas, including installation of ground fault interrupters.
6. Fully ground all equipment within the work zone and decontamination assemblies.
7. Establish negative pressure in work area(s). Note that where approved by the Industrial
Hygienist, negative pressure units may be removed overnight from unoccupied building where site security and equipment are at risk. Under such conditions, the Contractor shall be responsible for sealing all openings and the decontamination assembly before completion of the day’s work and reestablishing negative pressurization of the zone before abatement commences.
8. Construct enclosure system(s) for worker and equipment decontamination.
9. Provide workers with sufficient sets of protective full-body clothing to be worn in the designated work area and…