Sol_140P5425Q0026_Attach__0001-SOW.pdf

PDF 5 MB Posted

Attached to
SERVICES, FIRE SUPRESSION SYSTEM INSPECTION AND MA Federal contract opportunity
Solicitation number
140P5425Q0026
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This Statement of Work (SOW) details fire protection systems annual inspection, testing, and maintenance services for Everglades National Park across three counties in South Florida. The contract covers approximately 19-24 locations with 28 fire protection systems and 225 portable fire extinguishers, requiring comprehensive annual inspection and maintenance to ensure employee and visitor safety. The contract period spans a base year from August 2025 to July 2026, with four potential option years extending through July 2030.

The contractor must provide all labor, materials, and equipment to inspect fire alarm systems, clean agent extinguishing systems, fire pumps, sprinkler systems, and portable fire extinguishers at locations in Miami-Dade, Monroe, and Collier Counties. Key requirements include employing at least one NICET Level II Certified Inspector, performing inspections in accordance with NFPA and OSHA standards, providing detailed reports within 14 days of testing, and maintaining comprehensive documentation. The work will be performed primarily during weekdays between 7:00 AM and 4:30 PM, with prior approval required for work outside these hours.

View the file

Other files for this federal contract opportunity

Other files attached to SERVICES, FIRE SUPRESSION SYSTEM INSPECTION AND MA, newest first.
File Type Posted
Sol_140P5425Q0026_Attach__0003-_Q___A_0001.pdf PDF
Sol_140P5425Q0026_Attach__0004-_Updated_SOW_0001.pdf PDF
Sol_140P5425Q0026_Amd_0001.pdf PDF
Sol_140P5425Q0026.pdf PDF
Sol_140P5425Q0026_Attach__0002-WDs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVERGLADES NATIONAL PARK

Statement of Work (SOW):

Inspection, Testing, and Maintenance of Fire Protection Systems

DATED:

May 2025

NATIONAL PARK SERVICE

Interior Region 2: South Atlantic/Gulf

Major Acquisition Buying Office

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

STATEMENT OF WORK (SOW) FORMAT

1 Background 2 Objectives 3 Place of Performance 4 Period of Performance 5 General Scope 6 Tasks 7 Deliverables 8 Government Furnished Property 9 Safety 10 Security Considerations 11 Travel 12 Special Material and Other Unique Requirements 13 Quality Assurance Requirement 14 Project Personnel Appendix 1: Work Locations and Proposed Quantities Appendix 2: Maps Appendix 3: Fire Extinguisher Inventory

1.0 BACKGROUND

Everglades National Park covers more than 1.5 million acres across three counties in South Florida.

Approximately 19 to 24 individual locations, 28 systems, and 225 portable fire extinguishers require annual inspection, testing, and maintenance of fire protection systems to ensure employee and visitor safety.

The National Park Service (NPS) is requesting to contract these duties out to a non-NPS contractor who would be responsible for completing these tasks.

2.0 OBJECTIVES

The NPS seeks to hire a contractor to provide supervision, labor, materials, tools, and equipment to inspect, test, and maintain systems and sub-systems annually as outlined herein; existing fire protection systems are listed in Section 8: Government Furnished Equipment.

3.0 PLACE OF PERFORMANCE

The work will take place at multiple locations within Everglades National Park, in Miami-Dade County, Collier County, and Monroe County. Park Headquarters is located at 40001 State Road 9336, Homestead, Florida, 33034. A pre-award site visit is strongly recommended.

See Appendix 1: Work Locations and Appendix 2: Maps.

4.0 PERIOD OF PERFORMANCE

All tasks and deliverables are 90 days from date of award and must begin no later than 30 days from contract award. Days listed herein refer to calendar days.

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

The primary and approved work schedule is Monday through Friday between the hours of 7:00 AM and 4:30 PM, Eastern Standard Time (EST).

No work will be performed on weekends or federal holidays without prior approval from the Contracting Officer’s Representative (COR). Any days or hours outside the primary work schedule must be scheduled in advance and approved by the COR in advance. If there are any schedule delays due to lead time of materials, the COR should be notified immediately.

Contract Periods:

Base Year: August 2025 to July 2026 Option Year One (1): August 2026 to July 2027 Option Year Two (2): August 2027 to July 2028 Option Year Three (3): August 2028 to July 2029 Option Year Four (4): August 2029 to July 2030

5.0 GENERAL SCOPE

The contractor shall deliver the following service and provide a cost breakdown to include materials/equipment, labor, administrative, mobilization, and other fees. In accordance with the terms and conditions herein, the prime contractor or their sub-contractors shall perform the work of this contract for the NPS.

The contractor and all sub-contractors shall:

5.1 Have an on-site superintendent/foreman present at all times while work is being performed; there will always be an English-speaking person in a position of authority at the job site.

5.2 Furnish all labor, materials, equipment, tools, and supplies needed to perform fire protection system inspection, testing, and maintenance as described herein.

5.3 Provide cost estimating in conformity with the requirements herein.

5.4 Perform all work in accordance with applicable National Fire Protection Association

(NFPA) and Occupational Safety and Health administration (OSHA) codes and standards.

5.5 Employ at least one (1) National Institute for Certification in Engineering Technologies (NICET) Level II Certified Inspector to be on-site for each inspection.

5.5.1 Proof of certification must be provided by the Contractor upon the COR’s request.

5.6 Possess proven experience and expertise inspecting, testing, maintaining, and cost estimating fire protection systems.

5.7 Familiarize contracted and sub-contracted employees with existing systems, the components to be inspected, and critical exhibits and Park systems to be maintained during inspections and testing.

5.8 Verify the quantity of materials needed to complete the task identified.

5.9 Clean up worksite daily and rectify any damage caused by the application or the workmanship. It is suggested that before the commencement of work, the contractor together with the COR walk the project and make a list of all existing damage. Each party should keep a dated copy.

5.10 Maintain confidentiality: The information devolved herein is the property of the United

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

States Federal Government and shall be kept in strict confidence. All work generated by the contractor during this task order will remain the property of the government and must be returned to the government before final payment.

5.11 Provide a worksite and environment that is safe for employees, park visitors, and NPS staff. If necessary, the work area will be cordoned off and secured.

5.12 Notify the COR of any schedule changes or delays.

5.13 Not install or display company signs on government property.

5.14 Eat and smoke in areas designated by the COR.

5.15 Always wear appropriate clothing and will refrain from the use of profanity within the earshot of visitors and employees.

5.16 Obey all posted speed limits.

5.17 Notify COR of scheduled site visits to ensure access to secured areas.

5.18 Be knowledgeable of the site and required tasks and hazards prior to submitting a quote for the project.

6.0 TASKS

Under this contract the contractor shall complete the following tasks and requirements:

6.1 Confine the staging of materials, equipment, and vehicles, and all other operations in connection with this contract to the area designated by the COR. The contractor shall return all equipment and supplies to this agreed upon area daily throughout the workday and at the close of business.

6.1.1 The staging area is to be maintained free of trash, rubbish, derelict equipment, or other items deemed by the Park to be a potential hazard or eyesore. The contractor is responsible for the security of any project vehicles, equipment, and materials kept in the Park for the duration of the project.

6.2 Inspect, test, and maintain all fire protection systems and components in accordance with NFPA code/standards. See Appendix 1: Work Locations and Proposed Quantities.

6.3 Inspect and test all portable fire extinguishers. See Appendix 3: Portable Fire Extinguisher Inventory.

6.4 Provide the Park with written inspection and testing reports for each system in accordance with the National Fire Protection Association (NFPA) code and standards.

6.5 Provide the Park with corrective action reports, as needed, to include the following:

6.5.1 Cost to repair, replace, and/or install additional equipment, as recommended, with a high-quality common brand that is easy to purchase and install.

6.5.2 Indicate as needed, fire protection systems that should be reviewed for possible upgrade and/or replacement.

6.5.3 Notification of any additional NFPA-required system inspections not listed herein that need to be performed. A list of existing systems is included in Section 8: Government Furnished Property.

6.6 Properly dispose of offsite all equipment material and waste generated by the work of this contract unless otherwise directed by the COR.

6.7 Following each inspection, return the surrounding work site area to pre-inspection conditions.

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

FIRE ALARMS: ANNUAL INSPECTON, TESTING, AND MAINTENANCE

6.8 Scheduling: Schedule inspection with NPS COR prior to performing inspection. Ensure the fire alarm is in test mode prior to beginning testing.

6.9 Forms: Inspector/technician is required to provide the NPS with a final report utilizing the form identified in the 2016 NFPA 72, National Fire Alarm and Signaling Code, chapter 7, section 7.6 or an equivalent form containing the same information.

6.10 Performance: The annual fire alarm inspection, testing and maintenance shall be performed in accordance with 2016 NFPA 72, National Fire Alarm and Signaling Code, chapter 14. These tasks shall be performed by personnel who have developed competence through training and experience and have been licensed or certified by the state and have obtained NICET Level II certification or higher.

6.11 Documentation: The annual fire alarm inspection, testing and maintenance documentation shall be prepared in accordance with 2016 NFPA 72, National Fire Alarm and Signaling Code, Chapter 7, and shall be submitted to the Park Facility Manager.

6.12 Deficiencies: Shall be reported to the Park Facility Manager.

6.12.1 Deficiencies determined to be imminent threats to persons, or the resource shall be addressed immediately.

6.13 Close Out: Completed inspection forms shall be provided to the facility manager not later than fourteen days following the completion date of the testing.

EXTINGUISHING SYSTEMS: CLEAN AGENT: ANNUAL INSPECTION, TESTING, AND

MAINTENANCE

6.14 Scheduling: Schedule inspection with NPS prior to performing inspection.

6.15 Forms: Inspector/technician is required to provide the NPS with a final report meeting the criteria of 2015 NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, Chapter 7.

6.16 Performance: These tasks shall be performed by personnel who have developed competence through training and experience and have been licensed or certified by the state and have obtained NICET Level II certification or higher.

6.17 Inspection and Testing: The annual clean agent extinguishing system inspection, testing and maintenance shall be performed in accordance with the 2015 NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, Chapter 7.

6.18 Documentation: Inspector/technician is required to provide the NPS with a final report meeting the criteria of 2015 NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, Chapter 7

6.19 Deficiencies: Shall be reported to the Facility Manager.

6.19.1 Deficiencies determined to be imminent threats to persons, or the resource shall be addressed immediately.

6.20 Close Out: Completed inspection forms shall be provided to the Facility Manager not later than fourteen days following the completion date of the testing.

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

FIRE PUMPS: ANNUAL INSPECTION, TESTING, AND MAINTENANCE

6.21 Scheduling: Schedule inspection with NPS COR prior to performing inspection.

6.22 Forms: Inspector/technician is required to provide the NPS with a final report meeting the criteria of 2017 NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water- Based Fire Protection Systems.

6.23 Performance: These tasks shall be performed by personnel who have developed competence through training and experience and have been licensed or certified by the state and have obtained NICET Level II certification or higher.

6.24 Inspection and Testing: The annual fire pump inspection, testing and maintenance shall be performed in accordance with the 2017 NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

6.25 Close Out: Completed inspection forms shall be provided to the Facility Manager not

SPRINKLER SYSTEMS: WET PIPE: ANNUAL INSPECTION, TESTING, AND

MAINTENANCE

6.26 Scheduling: Schedule inspection with NPS COR prior to performing inspection.

6.27 Forms: Inspector/technician is required to provide the NPS with a final report meeting the criteria of 2017 NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water- Based Fire Protection Systems.

6.28 Performance: These tasks shall be performed by personnel who have developed competence through training and experience and have been licensed or certified by the state and have obtained NICET Level II certification or higher.

6.29 Inspection and Testing: The annual fire pump inspection, testing and maintenance shall be performed in accordance with the 2017 NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

6.30 Close Out: Completed inspection forms shall be provided to the facility manager not

PORTABLE FIRE EXTINGUISHERS: ANNUAL INSPECTION, TESTING, AND

MAINTENANCE

6.31 Scheduling: Schedule inspection with COR prior to performing inspection.

6.32 Forms: Inspector/technician is required to provide the NPS with a final report meeting the criteria of 2018 NFPA 10, Standard for Portable Fire Extinguishers and any State of Florida required certifications.

6.33 Performance: These tasks shall be performed by personnel who have developed competence through training and experience and have been licensed or certified by the state and have obtained NICET Level II certification or higher.

6.34 Inspection and Testing: The annual fire pump inspection, testing and maintenance shall be performed in accordance with the 2017 NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

6.35 Close Out: Completed inspection forms shall be provided to the facility manager not

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

7.0 DELIVERABLES

Before Performance

7.1 Provide a written narrative summary of how the contractor will execute the project within a timeline. The document will be referred to as the Annual Fire Protection Systems Inspection, Testing, and Maintenance Implementation Plan.

7.2 Provide a complete set of submittal samples at least one week prior to commencement of work. Submittals will require Park approval prior to the Contractor purchasing supplies for the project.

7.3 After award of the contract and prior to work starting, the contractor will participate in an on-site meeting to review the scope of the project, including where the work shall be conducted, the timing of the work, where the staging areas will be, tasks to be completed, and to identify landscape features, for example, structures or native vegetation, which shall be avoided and protected. The planning meeting will include site visits to view project locations. Project objectives, logistics, methods, equipment, staffing, scheduling, and regulations/guidance for working within the park will be discussed. The planning meeting should be attended by essential personnel from the contracting team.

7.4 Provide a safety plan as identified in Section 9: Safety

7.5 Provide proof of insurance and NICET Level II Certification.

Before Contract Close-Out

7.6 Provide one hard-bound copy of Operation and Maintenance (O&M) manuals to the park for all new equipment installed. Manuals are to include the manufacturer’s specifications and instructions for all new equipment.

7.7 Provide one hard-bound copy of all warranty information for new equipment installed, to include a list of all model and serial numbers.

7.8 Conduct a minimum one (1) day of training on new equipment and systems for Park personnel.

7.9 Provide extra specialty materials purchased to Park COR; extra materials will be packaged and labeled for storage.

Invoices and Payments

7.10 The contractor shall supply a complete invoice to the COR in a timely manner for payment. Payment shall be made through the government electronic payment system and may take up to 30 days.

7.10.1 The contractor must use the United States Department of the Treasury’s Invoicing Processing Platform (IPP).

7.10.1.1 The website address is https://www.ipp.gov.

7.10.1.1.1 The Contractor must use the IPP website to register, access, and use IPP for submitting requests for payment.

7.10.1.1.2 Assistance with enrollment can be obtained by

contacting the IPP Production Helpdesk via email at https://www.ipp.gov/

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract ippgroup@bos.frb.org or by telephone at (766) 973- 3131.

Adjustments for Inadequate Performance

7.11 Routine inspection shall be performed to minimize work improperly performed. Such inspections are designed only to assure that the NPS pays only for those services, which have been specified, and adequately competed by the contractor; and

7.12 In the event the contractor fails to successfully perform the required work, the NPS has the right to withhold partial payment.

Park Responsibilities and Point of Contact

7.13 The COR will be announced at the time the contract is awarded. The COR is responsible for:

7.13.1 Monitoring the vendor’s technical progress including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements.

7.13.2 Interpreting the Scope of Work.

7.13.3 Performing technical evaluation as required.

7.13.4 Performing technical inspections and acceptances required by this contract.

7.13.5 Assisting in the resolution of technical problems encountered during performance.

7.13.6 Approving invoices.

8.0 GOVERNMENT FURNISHED PROPERTY (GFP), MATERIAL (GFM), EQUIPMENT

(GFE), OR INFORMATION (GFI)

The Government will not supply any property, labor, materials, tools, or equipment to complete this project.

The Contractor is expected to provide and have an adequate amount of hand tools and other associated equipment that may be required to perform inspections, testing, and maintenance appropriately. As described by specific task order, flow testing is required of structural fire water systems. The contractor must provide the appropriate equipment to meet the requirements of this contact.

Systems to be inspected, tested, and maintained include the following:

MIAMI-DADE COUNTY

8.1 Park Headquarters

8.1.1 One (1) Simplex 4100U Fire Alarm Control System

8.1.2 One (1) Computer Terminal

8.1.3 Eighty (80) Photo Detectors

8.1.4 Two (2) Heat Detector

8.1.5 Six (6) Manual Fire Alarm Boxes

8.1.6 Twelve (12) Horn/Strobes

8.1.7 Nine (9) Strobes

8.2 Park Headquarters (Server Room)

mailto:ippgroup@bos.frb.org

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

8.2.1 One (1) Fike FM200 System

8.2.2 Two (2) Photo Detector/Ceiling

8.2.3 One (1) Pull Station

8.2.4 One (1) Abort Switch

8.2.5 One (1) Bell

8.2.6 One (1) Horn/Strobe

8.2.7 One (1) Strobe

8.2.8 One (1) Photo Detector/Sub Floor

8.3 Park Headquarters (Communication/Telephone Room)

8.3.1 One (1) Fike FM200 System

8.3.2 Two (2) Photo Detector/Ceiling

8.3.3 One (1) Pull Station

8.3.4 One (1) Abort Switch

8.3.5 One (1) Bell

8.3.6 One (1) Horn/Strobe

8.3.7 One (1) Strobe

8.3.8 One (1) Photo Detector/Sub Floor

8.4 Park Headquarters Pump House

8.4.1 One (1) Fire Pump System

8.4.1.1 One (1) Fire Pump <750 – Electric (without flow meter)

8.4.1.2 One (1) Fire Pump Controller

8.4.1.3 One (1) Jockey Pump

8.5 Ernest F Coe Visitor Center

8.5.1 One (1) Simplex 4100U Fire Alarm Control System

8.5.2 Eight (8) Manual Fire Alarm Boxes

8.5.3 Twenty-Two (22) Photo Detectors

8.5.4 Four (4) Duct Detectors

8.5.5 One (1) Heat Detector

8.5.6 Four (4) Strobes

8.5.7 Fifteen (15) Speakers

8.5.8 One (1) Wet Sprinkler System

8.5.9 One (1) Backflow Preventer-Fire

8.5.10 One (1) Water-flow Switches

8.5.11 Three (3) Supervisory Switches

8.6 Main Entrance Station

8.6.1 One (1) Simplex 4004/4005 Fire Alarm Control System

8.6.2 Three (3) Photo Detectors

8.6.3 One (1) Manual Fire Alarm Boxes

8.6.4 One (1) Horn/Strobe

8.7 Bill Robertson Center (Museum/Archives)

8.7.1 One (1) Simplex 4100U Fire Alarm Control System

8.7.2 Thirteen (13) Pull Stations

8.7.3 Eighty (80) Smoke Detectors

8.7.4 Two (2) Heat Detectors

8.7.5 Nineteen (19) Horn/Strobes

8.7.6 Ten (10) Strobes

8.8 Daniel Beard Center

8.8.1 One (1) Simplex 4100U Fire Alarm Control System

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

8.8.2 One (1) Clean Agent Fire Suppression System

8.8.3 Thirteen (13) Pull Stations

8.8.4 Eighty (80) Smoke Detectors

8.8.5 Two (2) Heat Detectors

8.8.6 Nineteen (19) Horn/Strobes

8.8.7 Ten (10) Strobes

8.9 Daniel Beard Center (Server Room)

8.9.1 One (1) Fike FM-200 Fire Suppression System

8.9.2 Two (2) Photo Detectors/Ceiling

8.9.3 One (1) Pull Station

8.9.4 Two (2) Abort Switch

8.9.5 One (1) Bell

8.9.6 One (1) Horn/Strobe

8.9.7 One (1) Strobe

8.9.8 Two (2) Sub-Floor Detectors

8.10 Daniel Beard Center (Museum)

8.10.1 One (1) Fire Alarm Control Panel

8.10.2 Two (2) Flouro K Clean Agent 200lb Cylinder

8.10.3 One (1) Flouro K Clean Agent 450lb Cylinder

8.10.4 One (1) Flouro K Clean Agent 450lb Cylinder

8.10.5 One (1) Flouro K Clean Agent 125lb Cylinder

8.10.6 Three (3) Booster Power Supply / Three (3) Expansion Cards

8.10.7 Twenty-seven (27) Photoelectric Smoke Detectors with Standard Base

8.10.8 Twenty-four (24) Addressable Input Modules

8.10.9 Two (2) Loop Isolators

8.10.10 Six (6) Conventional Abort Station Back Box, Red

8.10.11 Five (5) Key Maintenance Switch Back Boxes

8.10.12 Five (5) Pressure Switches

8.10.13 Twelve (12) Wall Mounted Strobe, Agent

8.10.14 Six (6) Bell 24DC, 6-inch

8.10.15 Six (6) Wall Mounted Horn/Strobe, Agent

8.11 Pine Island Housing Dormitory 105

8.11.1 One (1) Wet Sprinkler System

8.11.2 One (1) Supervisory Switch

8.11.3 One (1) Waterflow Switch

8.12 Pine Island Housing Quarters 119

8.12.1 One (1) Wet Sprinkler System

8.12.2 One (1) Supervisory Switch

8.12.3 One (1) Waterflow Switch

8.12.4 One (1) Backflow Preventor

8.13 Pine Island Housing Quarters 120

8.13.1 Installation of fire protection system scheduled in early 2026

8.13.1.1 Begin inspections in Option Year Three (3), or one year following services completion

8.14 Pine Island Housing Quarters 124

8.14.1 Installation of fire protection system scheduled in late 2025

8.14.1.1 Begin inspections in Option Year One (1), or one year following services completion

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

8.15 Pine Island Housing Quarters 155

8.15.1 One (1) Wet Sprinkler System

8.15.2 One (1) Supervisory Switch

8.15.3 One (1) Waterflow Switch

8.15.4 One (1) Backflow Preventor

8.16 Shark Valley Visitor Center

8.16.1 One (1) Notifier Fire Alarm Control System

8.16.2 Six (6) Pull Stations

8.16.3 One (1) Abort Switch

8.16.4 One (1) Bell

8.16.5 One (1) Horn/Strobe

8.16.6 One (1) Strobe

8.16.7 Two (2) Sub-Floor Detectors

MONROE COUNTY

8.17 Flamingo Guy Bradley Visitor Center

8.17.1 One (1) Honeywell NFS-320 Control Panel 1

8.17.2 One (1) Authenticator

8.17.3 Four (4) Batteries

8.17.4 Four (4) Elevator

8.17.5 One (1) Heat Detector

8.17.6 One (1) Horn/Strobe

8.17.7 One (1) Module

8.17.8 Six (6) Pull Stations

8.17.9 Three (3) Smoke Detectors

8.17.10 One (1) Voice Evacuation

8.17.11 One (1) Backflow preventer

8.17.12 Two (2) check valves

8.17.13 Four (4) control valves

8.17.14 Two (2) Drains

8.17.15 One (1) Fire Department Connection

8.17.16 Two (2) Gauges

8.17.17 One (1) Sprinkler Box

8.17.18 One (1) Sprinkler Box Spares

8.17.19 Five (5) Tamper Switch

8.17.20 Two (2) Waterflow Switch

8.17.21 One (1) Water Motor Gong

8.18 Flamingo Law Enforcement Offices

8.18.1 One (1) Backflow Preventer

8.18.2 Three (3) Check Valves

8.18.3 Five (5) Control Valves

8.18.4 Tw (2) Drains

8.18.5 One (1) Fire Department Connection

8.18.6 Two (2) Gauges

8.18.7 One (1) Sprinkler Box

8.18.8 One (1) Sprinkler Box Spares

8.18.9 Five (5) Tamper Switches

8.18.10 Two (2) Waterflow Switches

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

8.18.11 One (1) Wrenches

8.18.12 One (1) Control Panel by Honeywell NFS-320

8.18.13 Three (3) Pull Stations

8.18.14 Two (2) Smoke Detectors

8.18.15 Two (2) Sprinkler Waterflow Detectors

8.18.16 Two (2) Annunciators

8.18.17 One (1) Alarm Notification Device

8.18.18 Five (5) Strobes

8.19 Flamingo Maintenance Office

8.19.1 One (1) Notifier Fire Alarm Control System

8.19.2 One (1) Manual Fire Alarm Box

8.19.3 One (1) Photo Detector

8.19.4 One (1) Fire Sprinkler System

8.19.5 Two (2) Waterflow Switches

8.19.6 Two (2) Supervisory Switches

8.19.7 One (1) Bell

8.19.8 One (1) Horn/Strobe

8.19.9 One (1) Strobe

8.20 Flamingo Emergency Vehicle Storage

8.20.1 One (1) Bell

8.20.2 One (1) Horn/Strobe

8.20.3 One (1) Strobe

8.21 Flamingo Multiplex Housing Quarters 416 (A-B)

8.21.1 Installation of fire protection system scheduled in late 2025

8.21.1.1 Begin inspections in Option Year Two (2), or one year following services completion

8.22 Flamingo Multiplex Housing Quarters 445 (A-B)

8.22.1 Installation of fire protection system scheduled in late 2025

8.22.1.1 Begin inspections in Option Year Two (2), or one year following services completion

8.23 Key Largo Laboratory

8.23.1 One (1) Fire Alarm Control System

8.23.2 One (1) Photo Detector

8.23.3 One (1) Duct Detector

8.23.4 Two (2) Horn/Strobes

8.23.5 Three (3) Manual Fire Alarm Boxes

8.23.6 Three (3) Strobes

8.23.7 One (1) Wet Sprinkler System

8.23.8 One (1) Supervisory Switch

8.23.9 One (1) Waterflow Switch

8.23.10 One (1) Backflow Preventer

8.24 Key Largo Dormitory 507

8.24.1 One (1) Fire Alarm Control System

8.24.2 Nine (9) Photo Detectors

8.24.3 Two (2) Manual Fire Alarm Boxes

8.24.4 One (1) Horn/Strobe

8.24.5 Ten (10) Strobes

8.24.6 One (1) Wet Sprinkler System

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

8.24.7 One (1) Supervisory Switch

8.24.8 One (1) Waterflow Switch

8.24.9 One (1) Backflow Preventer

8.25 Key Largo Housing Quarters 501

8.25.1 One (1) Fire Alarm Control System

8.25.2 One (1) Audio/Visual Notification

8.25.3 One (1) Wet Sprinkler System

8.25.4 One (1) Supervisory Switch

8.25.5 One (1) Waterflow Switch

8.25.6 One (1) Backflow Preventer

8.25.7 Four (4) Smoke Detectors

COLLIER COUNTY

8.26 Loop Road Environmental Education Center

8.26.1 One (1) Fire Alarm Control System

8.26.2 One (1) Digital Alarm Communicator Transmitter

8.26.3 Six (6) Photo Detectors

8.26.4 Three (3) Pull Stations

8.26.5 Four (4) Horn/Strobes

8.26.6 One (1) Strobe

8.27 Big Cypress/Gulf Coast Housing Multiplex 604 (A-D)

8.27.1 One (1) Wet Sprinkler System, 13D, Pendent

8.27.2 Four (4) Fire/Smoke Detection Systems, Hardwired (A-D)

8.27.2.1 Installation of fire protection system scheduled in late 2025

8.27.2.2 Begin inspections in Option Year One (1) or one year following services completion

8.28 Marjory Stoneman Douglas Visitor Contact Site

8.28.1 Installation of fire protection system scheduled in late 2025

8.28.1.1 Begin inspections in Option Year One (1) or one year following services completion

9.0 SAFETY

9.1 Before onsite work begins the contractor must submit a site/project specific written safety and accident prevention program containing the following:

9.1.1 Name of responsible supervisor to carry out the program.

9.1.2 Site-specific information including emergency response contact information and emergency response protocols.

9.1.3 Provide and submit a safety plan outlining your safety program specific to this site.

9.1.4 Outline each phase of work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, NPS personnel, and contractor’s employees.

9.1.5 Hazardous materials (HAZMAT) to be used:

9.1.5.1 Copies of Safety Data Sheets (SDS) must be provided to the COR

9.1.5.2 Proper storage of hazmat

9.1.6 Personal Protective Equipment (PPE)

9.2 The contractor shall provide a safe and healthful workspace for all employees while on

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract the NPS site.

9.3 The contractor shall follow all Occupational Safety and Health Administration (OSHA) requirements, Environmental Protection Agency (EPA), Federal, State, and local safety and health requirements.

9.4 The contractor shall report all accidents to the Contracting Officer or Contract Specialist assigned to the contract immediately and assist the Contracting personnel and other officials as requested in the investigation of the accident. Accidents that occur outside of the allowed maintenance area, and cause damage to natural resources or museum collections shall be reported.

9.5 The contractor shall provide a level of public safety commensurate with exposure at a NPS worksite.

9.6 The contractor shall comply in rectifying all unsafe or unhealthful conditions called to their attention by the Contracting Officer; and

9.7 Job safety is the responsibility of the Contractor. The contractor shall allow for informal and formal, announced, and unannounced safety inspections by the COR, NPS Construction Inspector, and/or appropriate Safety Officer at the worksite.

10.0 SECURITY CONSIDERATIONS

10.1 The information developed in this Statement of Work is the property of the United States Government and shall be kept in strict confidence. Proprietary or copyrighted material may not be included into the contract unless otherwise approved by the Contracting Officer.

10.2 The United States Government shall provide a Security Escort for all personnel as required for the duration of the scheduled inspections/work.

11.0 TRAVEL

The contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.

12.0 SPECIAL MATERIAL OR OTHER UNIQUE REQUIREMENTS

12.1 Smoking is prohibited inside any government-owned facility and is not permitted within 25 feet of any facility entrance or exit points.

12.2 Firearms are not permitted inside any government facility.

12.3 The Contractor will be required to visit each identified asset to conduct the necessary condition assessment required for a comprehensive asset assessment.

12.4 The Contractor will be required to visit the locations identified in Appendix 3: Portable

Fire Extinguisher Inventory for portable fire extinguisher inspection, testing, and maintenance.

12.5 The Contractor shall work with designated staff to schedule the inspections of visitor occupied, administrative, and employee housing spaces to minimize disruptions.

12.5.1 To minimize conflicts with housing residents, the contractor shall provide the park a minimum 72 business hours advanced notice to allow park staff adequate time to notify and prepare residents.

12.6 The assessments may involve physical activities during extreme weather conditions and in harsh natural environments.

12.7 Responsibility regarding existing structures, utilities, existing plant material, and other landscape features:

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

12.7.1 The Contractor will be held responsible for any damages to, and for maintenance and protection of existing structures, and utilities.

12.7.2 The Contractor shall patch, repair or replace portions of sidewalks, curbs, gutters, streets, manholes, and the like that are damaged in connection with work under this contract or because of operations thereunder.

12.7.2.1 Materials and methods shall conform to the current standards for the area damaged, match existing on-site materials, shall meet the approval of all cognizant officials and the COR.

12.7.2.2 The vendor shall make all transitions to damaged areas smooth, satisfactory, and imperceptible transitions to existing adjacent work, and shall be performed without additional expense to the government.

12.8 Cleanup and Restoration:

12.8.1 The Contractor will be required to furnish all labor, materials, and equipment for daily cleanup and restoration of all disturbed areas or features, which have been damaged during this contract.

12.9 Salvage/Recycle Requirements:

12.9.1 It is the Government’s goal to salvage and recycle as much non-hazardous demolition waste as possible.

13.0 QUALITY ASSURANCE REQUIREMENT

13.1 The government will periodically evaluate the contractor’s performance in accordance with this statement of work.

13.2 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

13.3 All new equipment must conform to the manufacturer’s instructions and guidelines for installation and start-up.

13.4 The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum, the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work.

13.5 While performing work, the contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices as well as comply with the latest applicable versions of the following:

13.5.1 Work included within shall comply with applicable portions of the codes and standards below, unless otherwise specified by the COR. The following publications or applicable portions thereof are requirements of this section:

13.5.1.1 The Contractor must have the knowledge, skills, education, and experience, equal to that of a Fire Protection Engineer. They must be capable of conducting a comprehensive fire and life safety inspection, test, and maintenance in NPS buildings. They will be required to complete a standardized inspection form developed by NPS using NPS standards. They must be familiar with the current edition of the NFPA standards.

13.5.1.2 Conflicts: Where the applicable codes and standards differ, the more stringent requirement shall be applied. Where codes and

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract specifications conflict, the specification shall apply.

13.5.1.3 Some requirements of this specification are more than those states in the applicable codes and standards. These additional requirements are intentional, and shall be adhered to

13.5.1.4 Where items from the referenced Codes and Standards are repeated in this section, it is intended to call attention to them. It is not intended that other parts of the referenced Codes and Standards shall be assumed to be omitted if not repeated in this section.

13.6 Additional requirements:

13.6.1 Any damages, including natural and cultural resources impacts, by the contractor will be corrected and repaired where reasonable at no additional cost to the government.

14.0 PROJECT PERSONNEL

14.1 Contract Officer or Contract Specialist: To be determined at the time of award.

14.2 Park Point of Contact and COR: To be released at the time of award.

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Appendix 1: Work Locations and Proposed Quantities Miami-Dade County Park Headquarters 9,012 Square Feet (sf) 40001 State Road 9336 Homestead, Florida 33034 25.395735°, -80.583425°

Park Headquarters Pump House 196 sf 40001 State Road 9336 Homestead, Florida 33034 25.395807°, -80.583033°

Ernest F Coe Visitor Center 7,225 sf 40001 State Road 9336 Homestead, Florida 33034 25.395325°, -80.583072°

Main Entrance Station 2,475 sf 40001 State Road 9336 Homestead, Florida 33034 25.394597°, -80.590041°

Bill Robertson Center 9,076 sf 40001 State Road 9336 Homestead, Florida 33034 25.390010°, -80.680439°

Daniel Beard Center 17,136 sf 40001 State Road 9336 Homestead, Florida 33034 25.388704°, -80.682931°

Pine Island Housing Dormitory 105 2,160 sf 10 Parachute Key, Lot 105 Homestead, Florida 33034 25.384205°, -80.593795°

Pine Island Housing Quarters 119 1,206 sf 10 Parachute Key, Lot 119 Homestead, Florida 33034 25.383289°, -80.591190°

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Pine Island Housing Quarters 120 1,206 sf 10 Parachute Key, Lot 120 Homestead, Florida 33034 25.383003°, -80.590929°

Pine Island Housing Quarters 122 1,206 sf 10 Parachute Key, Lot 122 Homestead, Florida 33034 25.382552°°, -80.590747°

Pine Island Housing Quarters 124 1,206 sf 10 Parachute Key, Lot 124 Homestead, Florida 33034 25.381597°, -80.591414°

Pine Island Housing Multiplex 155 (A-D) 2,575 sf 10 Parachute Key, Lot 155 Homestead, Florida 33034 25.382711°, -80.592996°

Shark Valley Visitor Center 2,680 sf 36000 SW 8th Street Miami, Florida 33194 25.756960°, -80.765346°

Monroe County Guy Bradley Visitor Center 13,453 sf 1 Flamingo Lodge Highway, Florida 33034 25.140905°, -80.924111°

Flamingo Law Enforcement Offices 4,779 sf 1 Flamingo Lodge Highway, Florida 33034 25.141435°, -80.923769°

Flamingo Maintenance Offices 840 sf

25.143736°, -80.919843°

Flamingo Emergency Vehicle Storage 1,200 sf

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

25.143749°, -80.920762°

Flamingo Housing Multiplex 416 (A-D) 4,330 sf 1 Flamingo Lodge Highway, Unit 416 Florida 33034 25.141883°, -80.916223°

Flamingo Housing Duplex 445 (A-B) ≈ 1,830 sf 1 Flamingo Lodge Highway, Unit 445 Florida 33034 25.142062°, -80.914951°

Key Largo Laboratory 1,970 sf 98650 Overseas Highway Key Largo, Florida 33037 25.085161°, -80.452508°

Key Largo Dormitory 507 2,160 sf 98650 Overseas Highway Key Largo, Florida 33037 25.084832°, -80.452288°

Key Largo Housing Quarters 501 1,245 sf 98708 Overseas Highway Key Largo, Florida 33037 25.085681°, -80.451499°

Collier County Loop Road Environmental Education Center 960 sf HC 61 Box 69 Ochopee, Florida 34141

25.745955°, -80.948273°

Big Cypress Housing Multiplex 604 (A-D) 6,228 sf 33069 Mahogany Drive Ochopee, Florida 34141

25.897791°, -81.324502°

Marjory Stoneman Douglas Visitor Contact Site 5,649 sf 815 Oyster Bar Lane Everglades City, Florida 34139

25.845040°, -81.385886°

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Appendix 2: Maps

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Miami-Dade County Pine Island District

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Pine Island Housing

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Bill Robertson Center and Daniel Beard Center

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Shark Valley

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Monroe County Flamingo

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Key Largo

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Collier County Loop Road Environmental Education Center

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Big Cypress/Ochopee, Florida

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Everglades City

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

Appendix 3: Portable Fire Extinguisher Inventory

MIAMI-DADE COUNTY

14.3 Park Headquarters

14.3.1 Eleven (11) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.4 Park Headquarters (Server Room)

14.4.1 One (1) Portable Fire Extinguisher, Dry Chemical, Purple K, 20 LBS

14.5 Park Headquarters (Communication/Telephone Room)

14.5.1 One (1) Portable Fire Extinguisher, Dry Chemical, AB, 15 LBS

14.6 Park Headquarters Pump House

14.6.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.7 Park Headquarters Fire Pump Building

14.7.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.8 Ernest F Coe Visitor Center

14.8.1 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.9 Main Entrance Station

14.9.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.10 Royal Palm Visitor Center

14.10.1 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.11 Royal Palm Pump House

14.11.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.12 Bill Robertson Center (Museum/Archives?)

14.12.1 Ten (10) Portable Fire Extinguishers, Dry Chemical, ABC, 10 LBS

14.13 Bill Robertson Center Fire Cache

14.13.1 Six (6) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.14 Bill Robertson Center Pump House

14.14.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.15 Daniel Beard Center

14.15.1 Eight (8) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.16 Daniel Beard Center Pump House

14.16.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.17 Pine Island Maintenance Yard

14.17.1 One (1) Portable Fire Extinguishers, Dry Chemical, ABC, 5 LBS

14.18 Pine Island Information Technology/Telecommunications

14.18.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.19 Supply Building

14.19.1 Three (3) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.20 Maintenance Storage Bay/HVAC/Carpenter Shop

14.20.1 One (1) Portable Fire Extinguishers, Dry Chemical, ABC, 5 LBS

14.20.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.21 Recycling Building

14.21.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.21.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.22 Ranger’s Station

14.22.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.22.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.23 Gasoline/Diesel Fuel System

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

14.23.1 Two (2) Portable Fire Extinguisher, Purple, 10 LBS

14.24 Water Treatment Plant

14.24.1 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.25 Pine Island Housing Dormitory 105

14.25.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.26 Pine Island Housing Quarters 108

14.26.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.27 Pine Island Housing Quarters 110

14.27.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.28 Pine Island Housing Quarters 112

14.28.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.29 Pine Island Housing Quarters 119

14.29.1 Three (3) Portable Fire Extinguisher, Dry Chemical, ABC, 2.5 LBS

14.30 Pine Island Housing Quarters 120

14.30.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.31 Pine Island Housing Quarters 123

14.31.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.32 Pine Island Housing Quarters 124

14.32.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.33 Pine Island Housing Quarters 155

14.33.1 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.34 Pine Island Housing Quarters 157

14.34.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.35 Pine Island Housing Multiplex 185

14.35.1 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.36 Pine Island Housing Laundry Building and Bath House

14.36.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.37 Pine Island Housing Employee Pavillion 141

14.37.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.38 Pine Island Hidden Lake (Shelter, Camping Platforms, Comfort Station)

14.38.1 One (1) Portable Fire Extinguisher, C02, BC, 10 LBS – Shelter

14.38.2 One (1) Portable Fire Extinguisher, CO2, BC, 10 LBS – Camping Platforms

14.38.3 One (1) Portable Fire Extinguisher, CO2, BC, 10 LBS – Comfort Station

14.38.4 One (1) Portable Fire Extinguisher, Water, 9 LTR – Comfort Station

14.39 Pine Island Long Pine Key Entrance Station

14.39.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.40 Pine Island Long Pine Key Pump House

14.40.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.41 East Everglades Operations Center (Temporary Trailer)

14.41.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.42 Shark Valley Visitor Center

14.42.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.43 Shark Valley Entrance Station

14.43.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.44 Shark Valley Bio Diesel System

14.44.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.45 Shark Valley Administrative Bike Storage

14.45.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

14.46 Shark Valley Ranger Station

14.46.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.47 Shark Valley Administrative Pump House

14.47.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.48 Shark Valley Tower Pump House

14.48.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.49 Tamiami Trail Housing Quarters 345

14.49.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.50 Tamiami Trail Housing Quarters 346

14.50.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.51 Tamiami Trail Pole Barn

14.51.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

MONROE COUNTY

14.52 Flamingo Guy Bradley Visitor Center

14.52.1 Five (5) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.53 Flamingo Law Enforcement Offices

14.53.1 Five (5) Portable Fire Extinguishers, Dry Chemical, ABC, 5 LBS

14.53.2 Two (2) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.54 Flamingo Maintenance Office

14.54.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.54.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.55 Flamingo Boat Shop

14.55.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.55.2 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 20 LBS

14.56 Flamingo Emergency Vehicle Storage

14.56.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.56.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 20 LBS

14.57 Flamingo Maintenance Warehouse

14.57.1 Five (5) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.58 Flamingo HazMat Storage

14.58.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.59 Flamingo Water Treatment Plant

14.59.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.59.2 Three (3) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.59.3 Three (3) Portable Fire Extinguisher, Dry Chemical, ABC, 20 LBS

14.60 Flamingo Wastewater Treatment Plant

14.60.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.60.2 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.60.3 Two (2) Portable Fire Extinguisher, co2, 20 LBS

14.61 Flamingo MBR Equipment Building

14.61.1 One (1) Portable Fire Extinguisher, co2, 20 LBS

14.62 Flamingo Multiplex Housing Quarters 416 (A-B)

14.62.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.63 Flamingo Housing Multiplex 439 (A-D)

14.63.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.64 Flamingo Housing Multiplex 440 (A-D)

14.64.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

14.65 Flamingo Housing Quarters 441

14.65.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.66 Flamingo Housing Quarters 442

14.66.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.67 Flamingo Multiplex Housing Quarters 445 (A-B)

14.67.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.68 Flamingo Housing Quarters 498

14.68.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.69 Flamingo Housing Quarters 499

14.69.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.70 Flamingo Employee Pavillion

14.70.1 Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.71 Key Largo Laboratory

14.71.1 One (1) Portable Fire Extinguisher, Purple, 10 LBS

14.71.2 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.72 Key Largo Fuel Pump

14.72.1 One (1) Portable Fire Extinguisher, Purple, 20 LBS

14.73 Key Largo Marina Dock

14.73.1 One (1) Portable Fire Extinguisher, Purple, 20 LBS (Dock)

14.74 Key Largo Research Offices

14.74.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.75 Key Largo Ranger Station

14.75.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS (

14.76 Key Largo Dormitory 507

14.76.1 Three (3) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.77 Key Largo Housing Quarters 501

14.77.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

COLLIER COUNTY

14.78 Loop Road Environmental Education Center

14.78.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.79 Loop Road Comfort Station

14.79.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.80 Loop Road Pump House

14.80.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.81 Loop Road Storage Shed

14.81.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.82 Loop Road Housing Quarters 347

14.82.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

14.83 Trail Center Housing Quarters 350

14.83.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.84 Trail Center Housing Quarters 352

14.84.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.85 Trail Center Housing Quarters 353

14.85.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.86 Trail Center Housing Quarters 354

14.86.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.87 Trail Center Housing Laundry Building

STATEMENT OF WORK (SOW): Fire Protection Systems Annual Inspection, Testing, and Maintenance Service Contract

14.87.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.88 Trail Center Pump House

14.88.1 One (1) Portable Fire Extinguisher, Dry Chemical, ABC, 10 LBS

14.89 Big Cypress/Gulf Coast Housing Multiplex 604 (A-D)

14.89.1 Four (4) Portable Fire Extinguisher, Dry Chemical, ABC, 5 LBS

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .