This statement of work outlines the requirements for a federal contract to construct five wooden 18th century style cannon carriages for display at two National Park Service sites in Florida. The contractor will visit each site to inspect conditions, measure existing cannons, and develop design drawings for approval. They will then manufacture off-site and deliver the completed carriages, installing three at Castillo de San Marcos and two at Fort Matanzas. The contractor is responsible for disassembling and removing existing carriages, and reassembling one off-site. All work must be completed within one year of award. The contractor must have expertise in historical carriage reproduction and follow preservation standards.

View the file

Other files for this federal contract opportunity

Other files attached to BUILD FIVE 18TH CENTURY CANNON CARRIAGES, newest first.
File Type Posted
Sol_140P5424Q0004_Amend_001_Attach__0002-_Additional_Specs_0001.pdf PDF
Sol_140P5424Q0004_Amd_0001.pdf PDF
Sol_140P5424Q0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Construct five wooden cannon carriages to display reproduction 18th-century cannon at Castillo de San Marcos and Fort Matanzas

National Monuments

Castillo de San Marcos & Fort Matanzas National Monuments National Park Service

October 25, 2023

Construct five wooden cannon carriages to display reproduction 18th century cannon at Castillo de San Marcos and Fort Matanzas

National Monuments

NPS PMIS #336666

Castillo de San Marcos National Monument and Fort Matanzas National Monument Saint Augustine, Florida

SECTION 1—STATEMENT OF WORK INTRODUCTION

1.1. Project Location and Identification. This project for which supplies are contracted is at two locations 14 miles apart. These locations are Castillo de San Marcos and Fort Matanzas National Monuments both located in Saint Augustine, Florida.

1.2. Site Background.

Castillo de San Marcos and Fort Matanzas National Monuments are nationally significant because their historic features and significance in the pre and post-colonial history of the United States. Castillo de San Marcos is the oldest masonry fortification in the continental United States and Fort Matanzas is the only example of a fortified watchtower of Spanish design within the United States. The purpose of these forts was to protect the city from attack. Fort Matanzas is only accessible by boat.

1.3. Required Services. The purpose of this contract is to provide supplies necessary for the reproduction of FIVE (5) garrison cannon carriages for the reproduction of six-pounder cannons exhibited on the gundecks of the parks. THREE (3) garrison carriages are for Castillo de San Marcos and TWO (2) garrison carriages are for Fort Matanzas. (ATTACHMENTS A & B).

The Contractor shall provide all project management, labor, tools, equipment, shipping, transport, and materials required to execute the work as described in this SOW. The work area and work requirements for this contract are described herein.

1.4. Project Background. Current reproduction six-pounder cannons are used for firing demonstrations. This type of cannon was used both on warships and fortresses. Traditionally, cannons like this would have been mounted on wooden garrison cannon carriages. Three cannons are located at Castillo de San Marcos and two cannons are at Fort Matanzas. These cannons need new garrison carriages for proper display to more accurately represent how they were used historically. Iron banding was commonly used for the wheels of garrison cannon carriages, this is different from cannon carriages traditionally used on vessels.

NOTE: The five cannons for which the carriages will be made are similar, however, they are not identical. The cannons have slight differences in both their dimensions and weights.

1.5. Situation Analysis as of 2023

The carriages currently supporting the guns are observed to be poorly constructed.

The wood has begun to buckle and split. Some of the hardware is experiencing separations at the welded joints. New carriages to be built will be expected to stand up to the deteriorating effects of nature and will be subjected to constant direct exposure to salt air, rain, tropical sun, and hurricanes. All metal parts will need custom fabrication and should be treated or primed before top-coat painting.

1.6. Terms

Castillo de San Marcos National Monument (CASA) Fort Matanzas National Monument (FOMA) Contracting Officer (CO) Contracting Officer’s Representative (COR)

1.7. Attachments.

ATTACHMENT A. LOCATION FOR BASE SERVICES

1.8. Contractor Responsibilities:

A. Contractor shall provide, in writing, documentation of expertise and success in reproducing wooden and metal cannon carriages or similar equivalent.

B. Contractor shall conduct on-site visit(s) to inspect current work conditions and to take accurate measurements and documentation of existing conditions to accurately reproduce six-pounder carriages. Design/construction drawings will be submitted for NPS review and acceptance before the commencement of carriage construction as-built design drawings will be submitted after work. NPS will provide examples of cannon carriage drawings of Spanish period cannon carriages, currently housed at the NPS CASA archives for guidance to contractors.

C. Contractor shall provide, in writing, an agreed-upon safety plan and work schedule to be established with the NPS before delivery/assembly.

D. Contractor shall provide necessary project management, labor, tools, equipment, shipping, transport to the park, and onto the fort gundeck for final display. The contractor shall provide all materials and insurance, to perform work to reproduce and install FIVE (5) garrison-style cannon carriages for the six-pounder cannons at the parks.

E. Contractor is responsible for the safe transportation of the carriages to the parks and onto the fort gundecks, mounting the cannon tubes onto the carriages and moving them into their final positions on the fort gundecks. All costs for loading and unloading of carriage components and tools for assembly and delivery shall be the responsibility of the contractor.

1.9. Work Restrictions.

A. WORK HOURS: Work may be performed on-site between 8:00 a.m. and 5:00 p.m. Monday through Friday except for Federal holidays. This is for cannon installation work. Construction of carriages must primarily take place off-site.

B. TERM OF CONTRACT: The term of this contract is for 3 6 5 calendar days (12 months) from the date of award.

C. OTHER RESTRICTIONS: All transportation to and work at the fort sites is subject to park safety regulations and possible closure due to inclement weather.

The ferry service and fort gundecks are subject to closure when weather conditions or other factors make it unsafe to use or remain at the site. All safety closures apply to the contractor and their employees. The Parks shall not be held financially liable for any work delays or stoppages, or any costs incurred by the contractor, as a result of these safety stoppages.

1.10. Management.

The Contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

1.11. Safety & Environmental Compliance.

A. The Contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), state, and local safety laws and regulations.

B. The Contractor shall comply with pertinent local, state, and federal environmental protection laws and regulations.

C. The Contracting Officer has the authority to issue restraint or cease-and-desist orders to the Contractor when violations or unsafe acts are present and threaten Government and Contractor employees or damage to Government property.

D. The Contractor shall immediately report to the COR all accidents resulting in employee injury or death or damage to property while performing this contract.

1.12. Insurance.

The Contractor shall be insured, and insurance will be valid for work provided. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

A. Workers Compensation: The Contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman’s Compensation Laws.

B. Liability: The Contractor shall maintain a level of insurance that will protect the Contractor and the Government from any claims because of bodily injury (including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the Contracting Officer.

1.13. Field Verification.

The cannon/carriages conditions (situation analysis) are approximate and provided for information only. The Contractor shall verify work conditions and design specifications to reproduce the cannon carriages.

1.14. Replacement of Contractor Employee for Security Reasons.

The Government retains the right to request removal of the Contractor’s employee(s), regardless of prior clearances.

1.15. Inspection.

The government representative will conduct inspections periodically and upon completion of the required supplies. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

1.16. Contractor’s documentation deliverables.

The following deliverables are to be submitted in writing upon acceptance of the offer:

A. Documentation of expertise and success in reproducing wooden and metal cannon carriages or similar equivalents.

B. Design/construction drawings will be submitted for NPS review and acceptance before the commencement of carriage construction.

C. Description of work plan activities and schedule to perform required delivery and assembly.

D. Contractor safety plan/accident prevention plan.

E. As-built design drawings will be submitted after work. These will include type and treatment of lumber, type and treatment of metal fastenings, and paint types (UV, marine grade, rust-resistant-type). The contractor shall submit documentation of material specifications of the highest quality and longest-lasting materials.

SECTION 2 - SUMMARY OF WORK (SOW) Details

2.0. SUMMARY

This Section includes the following:

Work covered by the Contract Documents Contractor use of site Public use of site Work Schedule Deliverables

SERVICE CASTILLO DE SAN MARCOS CARRIAGES LOCATION

BASE

SUPPLIES

Construct and deliver Three (3) complete, six-pounder Garrison Carriages

Gun Deck at Castillo de

San Marcos

FORT MATANZAS CARRIAGES

BASE

SUPPLIES

Construct and deliver Two (2) complete, six-pounder Garrison Carriages

Gun Deck at Fort Matanzas

2.1. WORK COVERED BY CONTRACT DOCUMENTS

Project Locations:

National Park Service Castillo de San Marcos National Monument 1 South Castillo Drive, St. Augustine, Florida, 32084

National Park Service Fort Matanzas National Monument 8635 A1A South, St. Augustine, Florida, 32080

PROJECT TASKS FOR BASE SUPPLIES—MANUFACTURE DELIVER AND

INSTALL GARRISON TYPE CANNON CARRIAGE FOR FIVE (5) SIX-POUNDER

CANNON ON GUN DECKS AT CASTILLO DE SAN MARCOS (3 carriages) AND FORT MATANZAS (2 carriages).

TASK 1: SITE VISITS TO ASSESS WORK/SAFETY CONDITIONS. TAKE

MEASUREMENTS OF 5 CANNON TUBES, ASSESS EXISTING CONDITIONS

AND TO DEVELOP DESIGN/ MANUFACTURE DRAWINGS.

Contractor shall conduct onsite visit to inspect cannon tubes and existing conditions and to take necessary measurements and documentation to develop design/construction drawings for reproduction of carriages. Drawings will be submitted to NPS for review and acceptance prior to commencement of manufacture of cannon carriages.

Contractor shall submit documentation of material specifications of highest quality and longest lasting materials as part of this task. Carriages are in a subtropical marine environment under high heat and UV exposure. Material and specifications will include as built drawings, type and treatment of lumber, metal fastenings of ductile iron, paint types (UV, marine grade, rust-resistant-type) to match for carriages of Spanish design.

Wood components will be mahogany or equivalent providing long lasting durability in the subtropical environment. Upon completion of the carriages, the contractor will treat all wood with two coats of a 50/50 mix of linseed oil and turpentine.

All metal will receive a minimum of three coats of paint. (One primer and two overcoats) The first coat shall be that of oil-based rust inhibiting primer, in a contrasting color to the top black overcoat. (This will allow for visual confirmation when the topcoat has worn through and a recoat is required before the metal begins to experience rust formation.) The second and third coat shall be of an oil-based rust inhibitive topcoat, durable exterior grade semi-gloss black for all metal materials; submittal for approval will be required for all materials.

TASK 2: DELIVER COMPLETED REPRODUCTION CARRIAGES TO SITES,

ASSEMBLE GARRISON CARRIAGES ON GUNDECKS AT RESPECTIVE

LOCATIONS, HOIST CANNON TUBES FROM EXISTING CARRIAGES AND

PLACE THEM UPON THE NEWLY CONSTRUCTED CARRIAGES.

Contractor shall deliver FIVE (5) reproduction garrison cannon carriages to the gundecks of the two parks. Three (3) to Castillo de San Marcos and Two (2) to Fort Matanzas. Contractor will make final adjustments of the carriages in place on the respective gundecks. Contractor is responsible for safely hoisting cannon tubes from existing carriages and placing them upon the new carriages taking care to avoid damage to the cannon tubes and carriages.

Note: Fort Matanzas is only accessible by NPS ferry.

TASK 3: DISASSEMBLY AND REMOVAL OF CARRIAGES FROM THE TWO PARK

SITES. DISASSEMBLY AND REASSEMBLY OF ONE CANNON CARRIAGE AT

FORT MATANZAS.

Disassemble, remove and properly dispose of the three existing older 6 pounder cannon carriage from Castillo de San Marcos.

At Fort Matanzas National Monument, one existing 6 pounder cannon carriage will be disassembled and disposed of by the contractor. The other older 6 pounder cannon carriage will be disassembled, removed from the fort and fully reassembled by the contractor behind the park's visitor center located 500 yards away at a location assigned by the COR.

Note: Fort Matanzas is only accessible by NPS ferry. This will necessitate coordination with the COR to determine when the ferry can be used for transporting the carriage parts to and from the fort.

CONTRACTOR USE OF SITES

General: Contractor shall have full use of the areas designated for manufacturing and assembly operations. Contractor's use of the areas designated for assembly are limited only by the Government's right to perform work or to retain other contractors on portions of Project. For this project, on-site activities are only permitted during installation of cannon carriages.

Storage of Materials: Confine storage of materials to areas designated by the CO and approved by COR at meeting. The National Park Service is not responsible for safety of stored materials or tools. The Park will be open to the public during project. For this project, on-site storage is only permitted during installation of cannon carriages.

Preservation of Historic Features: Historic Preservation Treatment Program: Submit a written work plan for each phase of project, including protection of contract crew, visitors and NPS staff (establish work area; restricted access), and surrounding historic materials/structures during operations. Describe in detail materials, methods, and equipment to be used in each phase of work.

Alternative Methods and Materials: If alternative methods and materials to those indicated are proposed for any phase of work, provide a written description including evidence of successful use on other, comparable projects, and program of testing to demonstrate effectiveness for use on this Project.

PUBLIC USE OF SITE

Contractor shall always conduct his operations to ensure the least inconvenience to the visiting public. Castillo de San Marcos and Fort Matanzas may be open to the public during carriage installation, therefore appropriate safety measures must be taken during hours of operation.

Partial Government Occupancy: The government may access the designated areas retrieve necessary supplies and equipment, for security purposes, and to inspect work, and the government will have access to Castillo de San Marcos and Fort Matanzas during the period of assembly for visitor operations including NPS staff and public viewing of the areas.

WORK SCHEDULE

The contractor shall complete all on-site assembly work within one year of contract award. A schedule will be established during the first meeting.

All work shall be completed, and final deliverables submitted within 365 days after award document is distributed.

On-Site Work Hours: Work shall be generally performed during normal business working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday (adjust days as necessary), except when otherwise indicated. The on-site work area (gun deck) must remain accessible for visitor use.

Evening and weekend hours: No on-site work will occur during evenings and weekends, unless approved by the park representative.

Holidays: No on-site work will occur on Federal Holidays. This site work is for cannon installation work only. Manufacture of carriages must primarily take place off-site.

All transportation to and work at the fort sites is subject to park safety regulations and possible closure due to inclement weather. The ferry service and forts are subject to closure when weather conditions or other factors make it unsafe to use or remain at the site. All safety closures apply to the contractor and their employees. The Parks shall not be held financially libel for any work delays or stoppages or for any costs incurred by the contractor, as a result of these safety stoppages.

DELIVERABLES

Documentation of expertise and success in reproducing wooden and metal cannon carriages or similar equivalent.

Design/construction drawings will be submitted for NPS review and acceptance prior to the commencement of carriage construction.

Description of work plan activities and schedule o f delivery and assembly.

Contractor safety plan/accident prevention plans.

As-built design drawings will be submitted at the completion of work. These will include type and treatment of lumber, type and treatment of metal fastenings, paint types (UV, marine grade, rust-resistant-type). Contractor shall submit documentation of material specifications of highest quality and longest lasting materials.

ATTACHMENT A. LOCATION FOR BASE SUPPLIES (Castillo de San Marcos)

Figure A.1. Castillo de San Marcos site plan with location where the reproduction carriages will be place is the upper left corner or bastion of the fort, 2nd floor. This area must be accessed via a concrete staircase.

ATTACHEMENT B. LOCATION FOR BASE SUPPLIES (Fort Matanzas)

Figure B.1. Fort Matanzas site plan with location where the reproduction carriages will be placed on the gun deck. This area must be accessed via wooden staircase.