Sol_140P5226R0009.pdf

PDF 622 KB Posted

Attached to
2026 WEEKEND CLEANUP CH ML AND LF Federal contract opportunity
Solicitation number
140P5226R0009
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a combined synopsis/solicitation for cleaning services at the Natchez Trace Parkway issued by the National Park Service, Contracting Operations East.

The contractor must provide all necessary supplies, labor, safety equipment, transportation, and supervision to thoroughly clean eleven restrooms, thirteen picnic areas, two pullouts with garbage cans, and one pavilion across three districts (Cherokee, Meriwether Lewis, and Leipers Fork) on the Natchez Trace Parkway. The contract is a firm fixed price award with a performance period from June 8, 2026 to December 30, 2026. The NAICS code is 561720 (housekeeping services), and this is not a small business set-aside. Quotations are due by 5:29 PM Central Time on May 29, 2026, with delivery required by December 15, 2026. A highly suggested site visit is scheduled for May 21, 2026 at 10:00 AM CT at Garrison Creek Mile Marker 427.3. Proposals will be evaluated based on cost, technical approach, and relevant experience. Bidders must provide a registered UEI number and references of applicable experience to receive award consideration. The contractor must submit bids electronically to tclark@ios.doi.gov. The Contracting Officer is Tara H. Clark (tclark@ios.doi.gov, 662-372-0363), and the Contracting Officer's Representative is Brett Johnson (joshua_b_johnson@nps.gov, 662-891-7233). The contract requires compliance with numerous federal regulations including Buy American Act requirements for construction materials, prevailing wage requirements, OSHA safety standards, and electronic invoicing through the Internet Payment Platform (IPP) system. Contractor liability insurance must include workers compensation at $1,000,000, general liability at $500,000 per person/$1,000,000 per occurrence, and property damage at $1,000,000, with the United States named as an insured party.

View the file

Other files for this federal contract opportunity

Other files attached to 2026 WEEKEND CLEANUP CH ML AND LF, newest first.
File Type Posted
B03_Meriwether_Lewis_Wages.pdf PDF
B03_Leipers_Fork_District_Wages.pdf PDF
B03_Cherokee_AL_Wages.pdf PDF
A04__PR_4404520_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26 Cleaning Services for Cherokee, Meriwether Lewis and Leipers Fork District on the Natchez Trace Parkway.

The National Park Service, Contracting Operations East, hereby issues a combined synopsis/solicitation for the Natchez Trace Parkway.

It is the intent of this service contract(s) to provide all necessary supplies, labor, safety equipment, transportation, and supervision to thoroughly clean eleven (11) restrooms, thirteen (13) picnic areas, two (2) pullouts with garbage cans, and one (1) pavilion on the Natchez Trace Parkway.

Please see the Statement of Work for more details.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

The NAICS code for this acquisition is 561720. It is the contractor's responsibility to be familiar with applicable clauses and provisions. This acquisition shall result in award of a firm fixed price contract.

**A highly suggested site visit is scheduled for May 21, 2026 at 10:00 CT at Garrison Creek Mile Marker 427.3**

The selection will be made by evaluating proposals based on cost, technical approach, and relevant experience.

Bidders must be able to provide a registered UEI# and references of applicable experience in order to receive the award.

Bids must arrive by electronical to tclark@ios.doi.gov by the closing date noted in this solicitation.

Brett Johnson, COR Civil Engineer Natchez Trace Parkway 662-891-7233 joshua_b_johnson@nps.gov

Tara H Clark Contracting Specialist

Contracting Operations (ConOps) East National Park Service, DOI 662-372-0363 Tclark@ios.doi.gov mailto:joshua_b_johnson@nps.gov mailto:Tclark@ios.doi.gov

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

c. CITY

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

Cherokee Maintenance 3204 Natchez Trace Parkway

NPS, SER - West MABO 2680 Natchez Trace Parkway Tupelo MS 38804

0044045250140P5226R0009

Tara Clark

372-0363 NPS, Natchez Trace Parkway

35616

05/12/2026

05/29/2026 1400 CD

12/15/2026

Cherokee

AL

Suggested Buyer/CO: TARA CLARK Header

Text: The Contractor shall furnish all necessary supplies, labor, safety equipment, transportation, and supervision to thoroughly clean el even (11) restrooms, thirteen (13) picnic areas, two (2) pullouts with garbage cans, and one (1) pavilion on the Natchez Trace Parkw ay.

Period of Performance: 06/08/2026 to

12/30/2026

00010 FY26 Weekend Cleanup CH ML and LF

Product/Service Code: S201

Product/Service Description:

HOUSEKEEPING-

Continued...

1 17

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P5226R0009

CUSTODIAL JANITORIAL

Delivery: 12/15/2026

Table of Contents

PART I - THE SCHEDULE A-1

SECTION A - SOLICITATION/CONTRACT FORM A-1

SF 1442 SOLICITATION, OFFER, AND AWARD NOTICE: SET-ASIDE FOR Small Businesses (Construction, Alteration, or Repair) A-1

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS B-1

B.1 PRICE/COST SCHEDULE B-1

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENTOF WORK C-1

C.1 STATEMENT OF WORK (SOW) C-1

SECTION D - PACKAGING AND MARKING D-2

D1. PAYMENT OF POSTAGE AND FEES D-1

D2. MARKING D-2

SECTION E - INSPECTION AND ACCEPTANCE E-1

SECTION F - DELIVERIES OR PERFORMANCE F-2

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE F-1

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK F-2

SECTION G - CONTRACT ADMINISTRATION DATA G-7

G.1 IDENTIFICATION OF GOVERNMENT OFFICIALS G-1

G.2 TECHNICAL DIRECTION G-2

G.3 CORESPONDENCE G-3

G.4 CONTRACT PAYMENTS G-4

G.5 JOB SITE ADMINISTRATION G-5

G.6 PAYROLL RECORDS G-6

G.7 SUBCONTRACTING G-7

SECTION H - SPECIAL CONTRACT REQUIREMENTS H-19

H.1 EXECUTIVE ORDER 13513 PROHIBITION ON TEXT MESSAGING AND USING ELECTRONIC EQUIP-

MENT SUPPLIED BY THE GOVERNMENT WHILE DRIVING H-1

H.2 GENERIC GENDER TERMINOLOGY H-2

H.3 SAFETY H-3

H.4 PROGRESS MEETINGS H-4

H.5 PAYROLLS H-5

H.6 OPERATION OF FACILITY DURING CONSTRUCTION H-6

H.7 WORK HOURS H-7

H.8 USE OF PREMISES H-8

H-9 MAXIMUM WORK WEEK H-9

H-10 SAMPLES AND CERTIFICATES H-10

H-11 EXCAVATION AND UTILITY CLEARANCES H-11

H-12 DISPOSAL H-12

H-13 CONTRACTOR EMPLOYEES H-13

H-14 PERMITS H-14

H-15 QUALITY OF WORK H-15

H-16 COMPLETION OF WORK H-16

H-17 MATERIAL APPROVAL SUBMITTALS H-17

H-18 ARCHEOLOGICAL FINDINGS H-18

H-19 DOI ELECTRONIC INVOICING H-19

PART II - CONTRACT CLAUSES I-6

SECTION I - CONTRACT CLAUSES I-6

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE I-1

I.2 1452.204-70 RELEASE OF CLAIMS I-2

I.3 1452.228-70 LIABILITY INSURANCE I-3

I.4 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS I-4

I.5 52.236-14 AVAILABIITY AND USE OF UTILITY SERVICES I-5

I.6 52.252-4 ALTERATIONS IN CONTRACT I-6

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS J-1

SECTION J - LIST OF ATTACHMENTS J-1

PART IV - REPRESENTATIONS AND INSTRUCTIONS K-3

Section B – Supplies or Services and Prices/Costs

B.1. Price/Cost Schedule

N/A

Section C – Description/Specifications/Statement of Work

C.1 See Attached Statement of Work

Section D – Packaging and Marking

D.1 Payment of Postage and Fees

All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.

D.2 Marking

All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.

Section E - Inspection and Acceptance

Section F – Deliveries or Performance

F.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet/far.gov

Clause Title Date

52.242-14 Suspension of Work April 1984

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 2008

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 90 days. * The time stated for completion shall include final cleanup of the premises.

(End of Clause) http://www.arnet/far.gov

Section G – Contract Administration Data

G. 1 IDENTIFICATION OF GOVERNMENT OFFICIALS

Contracting Officer’s Representative (COR) for this contract will be:

Contract Officer (CO) responsible for administering this contract:

Tara H. Clark, Contracting Officer Contracting Operations (ConOps) East tara_clark@nps.gov

G.2 TECHNICAL DIRECTION

The performance of the work required herein shall be subject to the technical direction and surveillance of the COR or his designee. As used herein, "technical direction" is direction to the Contractor which requires pursuit of certain lines of inquiry, filing in detail, or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:

(a) Must be issued in writing consistent with the general scope of the work set forth in the contract;

(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract;

(c) Shall not constitute a basis for extension of the contract delivery schedule.

Nothing contained in this part authorizes the Contractor to incur costs in excess of the contract price or other limitation of funds set forth in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless prior to commencing such work, the Contractor: 1) directly notifies the CO; 2) requests a formal contract modification; and 3) receives written authorization to proceed from the CO.

G.3 CORRESPONDENCE

Any correspondence initiated by the Contractor shall include the Contract Number and shall be addressed to the CO at tara_clark@nps.gov.

G.4 CONTRACT PAYMENTS

The Contractor shall submit invoices in two copies monthly to the Contracting Officer for the percentage of work completed. Contractor and COR at the site must agree on the percentage of work completed at the end of each month.

The COR must sign this invoice or it will be returned to the Contractor and will delay payment. A correctly signed invoice is reviewed by the COR and returns the payment request to the CO who approves and confirms vendor is authorized to submit the invoice in the Internet Payment Process (IPP) system for payment.

Payments are authorized by Clause 52.235-5, which requires that the Contractor certify with each payment request that he has paid or will pay with the proceeds of the payment his employees and subcontractors.

Listed on the Cover Sheet and Synposis taraclark Cross-Out taraclark Cross-Out taraclark Cross-Out

G.5 JOB SITE ADMINISTRATION

The Government will designate a Project Inspector (PI) who will be available at the site to inspect the work as it progresses. The PI will prepare an Inspector's Daily Log, detailing ground and weather conditions, work being performed, materials delivered, and notes of any problems or difficulties. At the end of every day of work on this contract, the Contractor's Superintendent, as defined below, shall contact the PI, review the daily log, and sign as the Contractor's Representative. Unless the Contractor's Superintendent makes notations to the contrary on a daily log, then the log shall be presumed to be accurate. The PI is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor's Superintendent must contact the COR regarding such decisions and directions.

The Contractor shall have a competent superintendent (hereinafter referred to as the "Contractor's Superintendent") who is

(i) deemed acceptable to the Government; (ii) authorized to act on the Contractor's behalf; and (iii) to be present on the job site at all times when contract work is being performed.

G.6 PAYROLL RECORDS

The Prime Contractor is responsible for furnishing the Contracting Officer with one copy of the Weekly Payroll Form WH-347 or equivalent to include payroll records for his/her subcontractor's. Payroll records shall be submitted within seven (7) days after the close of the payroll period and numbered in consecutive order. The Prime Contractor shall review all subcontractors' payroll and ensure that all employees are paid in accordance with the Wage Determination, which is a part of this contract.

The Prime Contractor shall ensure that compliance is met. The Contractor is subject to the Wage and Hour Dept., U.S.

Department of Labor, and may be subject to liquidated damage for non-compliance.

G.7 SUBCONTRACTING

The Prime Contractor shall complete a Standard Form (SF1413) for each subcontractor and submit the form to the Contracting Officer at the Pre-Construction meeting. No subcontractor shall be allowed on the site without an executed SF 1413. The Prime shall be held responsible for ensuring that his/her subcontractor's DO NOT subcontract any portion of this work. The Prime Contractor is responsible to ensure that all subcontractors carry sufficient insurance in accordance with this contract

Section H – Special Contract Requirements

H.1 Executive Order 13513 Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government While Driving as prescribed in Federal Leadership on Reducing Text Messaging While Driving

Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (Oct 2009)

This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government –supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.

(End of order)

H.2 GENERIC GENDER TERMINOLOGY

Except where stipulated by the Federal Acquisition Regulations, the use of terms such as he, she, his, and her are not to be interpreted as implying other than neutral gender terms such as "it" or “them”.

H.3 SAFETY

The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s) thereof; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right-to- Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).

H.4 PROGRESS MEETINGS

(a) The Contractor shall be available to meet with the CO or his/her representative at the job site during construction to discuss work progress.

(b) Meetings will be scheduled by the CO with timely notification to the Contractor.

(c) At the progress meetings, the Contractor shall give oral reports of the progress on the project to the CO. If the work is behind schedule, the Contractor shall be prepared to (i) discuss the work and any causes of work delay(s); (ii) present a plan to bring the work back into conformance with the schedule; or, if necessary (iii) to propose a revised work schedule.

H.5 PAYROLLS

The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, seven (7) days after close of payroll period.

H.6 OPERATION OF FACILITY DURING CONSTRUCTION

Construction activities shall not interrupt the function and day-to-day operations of the facility during construction. The contractor shall coordinate with the Project Inspector for any temporary measures. All temporary measures employed shall be at the Contractor's expense and shall be removed upon completion of the contract.

H.7 WORK HOURS

Normal work hours are from 7:00 a.m. through 4:00 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Sunday or legal holidays unless otherwise authorized by the CO.

H.8 USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Government land or lands administered by the Government, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor. Such permission, if granted, will be without charge to the Contractor.

(b) Unless provided otherwise, the Contractor shall provide and maintain sanitation facilities for the workforce at the site. Solid waste shall be disposed of in accordance with applicable Federal, State, and local regulations.

H.9 MAXIMUM WORK WEEK

The maximum workweek that will be approved is 40 hours. The Contractor's proposed hours of work are to include daily starting and stopping times.

H.10 SAMPLES AND CERTIFICATES

When required by the specifications or the contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the contracting Officer or his/her designated representative.

Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements. Samples shall be submitted in duplicate by the contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall both be used in the work until approved in writing by the Contracting Officer.

H.11 EXCAVATION AND UTILITY CLEARANCES

The Chief of Maintenance, for each park, shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the Contracting Officer no less than ten (10) calendar days prior to the date which he/she anticipates commencement of work. The Contractor will not proceed with excavation of any kind until such clearances have been issued. Clearances will be valid from the date of issue or completion of, or otherwise directed by the issuing authority.

H.12 DISPOSAL

Debris, rubbish, and non-usable material resulting from under this contract shall be disposed in a manner that meets federal, state and local laws.

H.13 CONTRACTOR EMPLOYEES

(a) The Contractor shall provide the Contracting Officer with the name(s) of the responsible supervisor authorized to act for the Contractor.

(b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.

(c) Contractor employees shall conduct themselves in a proper, efficient, courteous and business-like manner.

(d) The Contractor shall remove from the site any individual whose continued employment is deemed by the contracting Officer to be contrary to public interest or inconsistent with the National Park Service.

H.14 PERMITS

The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. The Contractor shall comply with federal, state and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer before work commences, or as requested.

H.15 QUALITY OF WORK

Workmanship shall be of the highest quality and best practices of the trade. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6 and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards. Substitute items shall be equal to or better than the original material and must be approved by the Government.

H.16 COMPLETION OF WORK

The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause "Commencement, Prosecution and Completion of Work", FAR 52.211-10 (APR 1984) Section F.

H.17 MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause herein entitles "Materials and Workmanship", FAR 52.236-5 (APR 1984), Section I, shall be submitted to the Contracting Officer through the COR in five (5) copies. The Denver Service Center Form (DSC-1) entitled "Transmittal USDI, National Park Service", shall be used. Contractor shall re-submit any disapproved submittals within seven (7) calendar days of disapproval.

H.18 ARCHEOLOGICAL FINDINGS

Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he will be compensated by an equitable adjustment under the General Provision of the Contract.

H.19 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP) APRIL 2013

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]:

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone

(866) 973-3131.

https://www.ipp.gov/ mailto:ippgroup@bos.frb.org

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

Section I – Contract Clauses

I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet/far.gov

Clause Title Date

1452.203-70 Restriction on Endorsements July 1996

1452.215-70 Examination of Records by the Department of the Interior April 1984

1452.224-01 Privacy Act Notification (July 1996) Deviation July 1996

1452.236-70 Prohibition Against Use of Lead-based Paint July 1996

52.204-13 System for Award Management Maintenance October 2018

52.204-18 Commercial and Government Entity Code Maintenance July 2016

52.204-19 Incorporation by Reference of Representations and Certifications December 2014

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015

52.213-04 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items) January 2020

52.215-08 Order of Precedence--Uniform Contract Format October 1997

52.219-06 Notice of Total Small Business Set-Aside March 2020

52.219-28 Post Award Small Business Program Representation March 2020

52.222-06 Construction Wage Rate Requirements August 2018

52.222-07 Withholding of Funds May 2014

52.222-08 Payrolls and Basic Records August 2018

52.222-09 Apprentices and Trainees July 2005

52.222-10 Compliance with Copeland Act Requirements February 1988

52.222-11 Subcontracts (Labor Standards) May 2014

52.222-12 Contract Termination-Debarment May 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations May 2014

52.222-14 Disputes Concerning Labor Standards February 1988

52.222-15 Certification of Eligibility May 2014

52.222-27 Affirmative Action Compliance Requirements for Construction April 2015

52.223-06 Drug-Free Workplace May 2001

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving August 2011

52.225-3 Alt II Buy American-Free Trade Agreements-Israeli Trade Act Alt I May 2014

52.227-04 Patent Indemnity – Construction Contracts December 2007

52.228-2 Additional Bond Security October 1997

52.228-11 Pledges of Assets August 2018

52.228-12 Prospective Subcontractor Requests for Bonds May 2014

52.232-05 Payments Under Fixed Price Construction Contracts May 2014

52.232-16 Alt I Progress Payments March 2000

52.232-23 Assignment of Claims May 2014

52.232-27 Prompt Payment for Construction Contracts January 2017

52.236-05 Material and Workmanship April 1984

52.236-07 Permits and Responsibilities November 1991

52.236-17 Layout of Work April 1984

52.236-26 Preconstruction Conference February 1995

52.237-4 Alt I Payment by Government to Contractor Alt I April 1984

52.243-5 Changes and Changed Conditions April 1984

52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements August 1996

I.2 1452.204-70 RELEASE OF CLAIMS-DEPARTMENT OF THE INTERIOR JULY 1996

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

I.3 1452.228-70 LIABILITY INSURANCE JULY 1996

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer.

The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

1. Worker’s compensation and employer’s liability: $1,000,000

2. General Liability: $500,000 each person and $1,000,000 each occurrence

3. Property Damage: $1,000,000

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(c) The contractor shall name the United States, Bureau of Indian Affairs, as the insured party(ties) on the liability insurance policy.

I.4 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS MAY 2014

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of Clause)

I.5 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES APRIL 1984

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

(1) The contractor can access electricity and water from the existing building. Water is available only from a standard garden hose style spigot.

(End of clause)

I.6 52.252-4 ALTERATIONS IN CONTRACT APRIL 1984

Portions of this contract are altered as follows:

(End of clause)

Request for quotations
Request number
Date issued
Requisition/purchase request number
CERT. FOR NAT. DEF. UNDER BDSA REG. 2 AND/OR DMS REG. 1
Issued by
For information call
Name
Telephone number
Area code
number
Deliver by (date)
Delivery
To:
Name
Company
Street address
City
State
Zip code
Destination
Name of consignee
Street address
City
State
Zip code
Please furnish quotations to the issuing office in block 5a on or before close of business
Schedule
Discount for prompt payment
10 calendar days (%)
20 calendar days (%)
30 calendar days (%)
Calendar days
Number
Percentage
Name and address of quoter
Name of quoter
Street address
County
City
State
Zip code
Signature of person authorized to sign quotation
Date of quotation
Signer
Name
Telephone
Area code
Number

Title

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition not usable
Standard form 18 (Rev. 6/1995)

File details come from the government source that posted it. Updated .