Sol_140P5126Q0043.pdf
PDF 441 KB Posted
- Attached to
- PRESERVATION MOVEMENT CONTEXT STUDY SE Federal contract opportunity
- Solicitation number
- 140P5126Q0043
About this file
This is a Combined Synopsis/Solicitation for Commercial Items and Request for Quotation (RFQ) issued by the National Park Service (NPS) Southeast Regional Office for a Historic Context Study on the Modern Historic Preservation Movement in the Southeastern United States.
The solicitation seeks a contractor to prepare a comprehensive historic context study approximately 150-200 pages in length addressing the modern historic preservation movement in the Southeastern U.S., with emphasis on the emergence of organized municipal- and district-scale preservation efforts during the early to mid-20th century. The study will support future National Historic Landmark (NHL) evaluations and updates by providing a comparative and analytical framework. Key deliverables include an annotated outline with preliminary bibliography, background history and theme development narrative, associated property types definitions, physical characteristics and integrity guidance, and a final historic context study in editable digital format with supporting documentation. The contractor must meet professional qualification standards under 36 CFR Appendix A and comply with Chicago Manual of Style (18th edition), NPS standards for thorough investigation, and plain language requirements. All work product becomes government property.
The solicitation is a 100% small business set-aside with NAICS code 541990 (All Other Professional, Scientific and Technical Services, $19.5 million size standard). The quote deadline is July 20, 2026 at 1700 EDT. The period of performance is 15 months from award, with delivery by July 20, 2027. Award will be made on a best-value basis with technical capability (70%) weighted more heavily than price (30%). Progress payments are structured at 5% (orientation call), 25% (30% submission), 50% (60% submission), 80% (90% submission), and 100% (final acceptance). The contractor must maintain certificates of insurance ($200,000 per person, $500,000 per occurrence, $20,000 per property), provide current representations and certifications, and register with SAM.gov with valid UEI. Offerors must submit technical proposals addressing understanding of requirements, technical approach, key personnel qualifications, and past performance on similar projects within the last five years, along with cost proposals in matrix format with hourly rates. All quotes should be submitted to keith_smith@ios.doi.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A04_-_Attachment_0001_-SOW_140P5126Q0043.pdf | ||
| B03_-_Attachment_0002_-_WDOL_Determination_140P5126Q0043.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6/1995)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NUMBER
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
c. CITY
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
Cultural Resources 100 Alabama Street, SW, 1924 Bldg
NPS SER EAST MABO
100 Alabama St., SW 1924 Building Atlanta GA 30303-8701
0044039169140P5126Q0043
Keith Smith
819-0793 NPS, Southeast Regional Office
30303-8701
06/29/2026
07/20/2026 1700 ED
07/20/2027
Atlanta
GA
Period of Performance: 07/30/2026 to
07/20/2027
00010 Historic Context Study
Product/Service Code: B521
Product/Service Description: SPECIAL
STUDIES/ANALYSIS- HISTORICAL
Delivery: 07/20/2027
1 22
Combined Synopsis/Solicitation for Commercial Items
FAR 12.603
General Information
Document Type: Combined Solicitation/Synopsis Solicitation Number: 140P5126Q0043 Posted Date: June 29, 2026 Original Response Date: July 20, 2026 Current Response Date: July 20, 2026 Product or Service Code: B521 Set Aside: 100% set aside to small businesses NAICS Code: 541990 – All Other Professional, Scientific and
Technical Services $19.5
Contracting Office Address National Park Service EAST Buying Office 100 Alabama Street SW, 1924 Bldg., 5th Floor Atlanta, GA 30303
Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; Quotes are being requested, and a written solicitation document will not be issued.
The National Park Service, Southeast Regional Office (SERO) Cultural Resources has a requirement for Historic Context Study: Modern Historic Preservation Movement in the Southeastern US at NPS, Southeast Regional Office (SERO) 100 Alabama Street SW 1924 Bldg., Atlanta, GA 30303-8701. This solicitation is a request for quote (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01. Effective Date 3/13/2026.
The associated North American Industrial Classification System (NAICS) code for this procurement is 541990, with a small business size standard of $19.5,000,000. The Product Service Code is B521; SPECIAL STUDIES/ANALYSIS- HISTORICAL.
In accordance with FAR Subpart 28, a certificate of insurance is required, and coverage must be at a minimum of: $200,000 per person; $500,000 per occurrence; and $20,000 per property. The insurance certificate must be submitted within 10 calendar days of receipt of the award.
The contractor must provide current Representation and Certifications, with quote.
All eligible and responsible sources may submit a quote, which if timely received, shall be considered by the Agency. Companies must have a valid Unique Entity ID and be registered with System for Award Management (www.sam.gov). SAM.gov offers free services. An offeror must ensure that they are self-certified under NAICS Code 541990 in the Representations and Certifications portion of SAM.gov.
Services
SCOPE OF WORK
National Historic Landmarks
Modern Historic Preservation Movement in the Southeastern United States
Historic Context Study
Scope
This scope of work directs the contractor to prepare a Historic Context Study addressing the modern historic preservation movement in the Southeastern United States, with particular emphasis on the emergence of organized, municipal- and district-scale preservation efforts during the early to mid-20th century.
This context study will inform future National Historic Landmark (NHL) evaluations and updates, including reassessment of existing NHL designations where preservation history may constitute an area of significance. The study will be used as a comparative and analytical framework, not as a nomination document.
The contractor shall provide all materials, supplies, labor, supervision, coordination, and management necessary to complete the work as and when required, as specified in this scope of services.
Confidentiality The information developed under this task order is the property of the U.S. government and shall be kept in strict confidence.
Performance Period The work shall begin following the issuance of the delivery/task order, proceed by the schedule for submittals, and be completed no later than 15 months after the award.
Points of Contact Contracting Specialist (CS): Keith Smith
Contracting Specialist Contracting Operations (ConOps) East
Interior Region 2 South Atlantic Gulf National Park Service (DOI) Keith_smith@ios.doi.gov 470-819-0793 Cell
Contracting Officer’s Representative (COR):
Alesha Cerny National Historic Landmarks ProgramI Interior Region 2-South Atlantic-Gulf Atlanta Federal Center-1924 Building 100 Alabama Street, SW Atlanta, GA 30303
(404) 276-5092 alesha_cerny@nps.gov
Purpose The purpose of this project is to develop an NHL-appropriate historic context for the modern historic preservation movement in the Unites States, focusing on the period during which preservation emerged as an organized, systematic, and increasingly institutionalized practice.
The study will examine the evolution of preservation from largely commemorative and private efforts into coordinated municipal, nonprofit, and governmental programs, with particular attention to district-scale preservation, local regulatory frameworks, and professionally informed preservation philosophies that developed during the early to mid-20th century. This context will define preservation activity itself as a historical phenomenon, distinct from the age, style, or associative significance of the historic resources that preservation efforts sought to protect.
The resulting historic context is intended to support comparative evaluation and thematic refinements for NHL designation, including future updates to existing NHL documentation. The study will provide analytical tools to assess how preservation planning, advocacy, regulation, restoration, and interpretation may constitute areas of historical significance. By establishing a framework and comparative baseline, the study will enable the National Park Service (NPS) to more fully evaluate the role of preservation history in NHL eligibility and to situate individual mailto:alesha_cerny@nps.gov cities, districts, organizations, and initiatives within a broader national narrative of modern historic preservation.
Project Background National Historic Landmarks are nationally significant historic places that possess exceptional ability to illustrate and interpret American cultural heritage. The NHL Program, established in 1935, is administered by the NPS on behalf of the Secretary of the Interior and is responsible for helping to preserve and protect the almost 2,600 NHLs nationwide. Through this program, the NPS works in partnership with preservation officials, private property owners, and other stakeholders to support the nomination, stewardship, and long-term preservation of nationally significant historic properties. The program’s emphasis on national significance requires a rigorous, analytical approach to evaluation that situates properties within broader patterns of American history and culture.
A distinguishing feature of the NHL Program is its reliance on comparative analysis developed from a national perspective. While National Register of Historic Places nominations must demonstrate that a property played an important role within a significant area of history, they do not necessarily require a comprehensive understanding of all comparable properties nationwide.
In contrast, NHL nominations are expected to include a complete and thoroughly researched analysis of all known similar properties within a defined historic context and to document the relative national significance of a nominated property in comparison to those resources. This expectation places a premium on well-developed historic contexts that clearly define themes, property types, periods of significance, and evaluative criteria at the national level.
Historic context studies are therefore essential tools for the NHL Program. They provide the analytical foundation necessary to identify and compare resources associated with a particular theme, movement, or historical development and to assess their relative importance with the national narrative. In the case of the modern historic preservation movement, a clearly articulated historic context is critical to evaluating how preservation planning, regulation, advocacy, restoration, and interpretation may themselves constitute areas of historical significance. This project background establishes the need for a focused historic context study to support consistent, defensible NHL evaluation and future updates to existing NHL documentation.
Statement of Work A historic context provides the political, social, cultural, and economic background necessary to understand a particular idea, event, movement, or individual within a specific time period. The completed study will apply this approach to the modern historic preservation movement in order to situate preservation-related properties within the national historical framework. A clearly articulated historic context enables evaluation of whether a property represents the best, or among the best, illustration of a nationally significant historic movement.
The research will meet NPS standards for a thorough investigation, meaning that research will be done in selected published and documentary sources of known or presumed relevance that are readily accessible without extensive travel and that promise expeditious extraction of relevant data.
The completed historic context study will be used by the NPS to support future NHL evaluations, updates, and thematic refinements by providing a national-level comparative framework for resources associated with the modern historic preservation movement. The study is intended solely as an analytical and comparative tool and will not, by itself, nominate, amend, or modify any NHL.
Tasks
1. Meetings and Coordination: Following the contract award, the contractor shall schedule and conduct an orientation and planning virtual meeting with the Project Team to discuss the project scope, roles and responsibilities, sources of information, and the proposed project schedule. The contractor shall also participate in virtual review meetings with the Project Team following the submission and review of each required deliverable. The contractor’s principal investigator shall be responsible for coordinating all product submittals, providing regular status updates, and remaining available for additional virtual meetings, as needed, with Project Team members throughout the period of performance.
2. Annotated Outline and Preliminary Bibliography: The contractor shall prepare an annotated outline that establishes the organizational structure and analytical direction of the historic context study. The outline shall identify the proposed themes or areas of significance, geographic parameters, and temporal limits associated with the modern historic preservation movement and shall include brief narrative annotations describing the intended content of each major section. As part of this task, the consultant shall identify and propose representative case-study locations that illustrate major preservation strategies, philosophies, or historical developments relevant to the context. The consultant shall also submit a preliminary bibliography of primary and secondary sources demonstrating reliance on existing documentation and scholarship.
3. Background History and Development of the Theme: Following approval of the outline, the contractor shall prepare narrative sections that provide the historical background necessary to understand the emergence and evolution of the modern historic preservation movement. This work will synthesize existing documentation to describe relevant political, social, cultural, economic, and institutional influences that shaped preservation practice during the defined period of significance. The narrative shall identify major organizations, initiatives, and historical developments that contributed to the movement’s growth and institutionalization at the national level.
4. Associated Property Types: Building on the approved narrative framework, the contractor shall identify and define the types of properties associated with the historic preservation movement addressed in the context. The contractor shall describe patterns of occurrence, distribution, and survival, and prepare a property type matrix and accompanying descriptions.
5. Physical Characteristics, Integrity, and Evaluation Guidance: The contractor shall develop guidance addressing the physical characteristics and integrity considerations applicable to resources associated with the preservation movement. This task will define the associative and physical attributes necessary for properties to convey significance within the established context and will address issues related to restored or reconstructed environments and evolving historic districts. The consultant shall also prepare a section providing analytical guidance for applying evaluation criteria within the context.
6. Final Historic Context Study: The contractor shall finalize the narrative, integrate all required components of the historic context, and complete supporting documentation, including a bibliography of sources consulted. The final submission shall consist of the completed historic context study and all associated materials in editable digital format suitable for future NPS use.
Deliverable Products The contractor will present the components in a detailed final Historic Context Study report, anticipated to be approximately 150-200 pages in length. The report will include appropriate maps, tables, and photographs to support the text and the author’s recommendations.
In addition to the professionally produced Historic Context Study, other deliverables include a well-organized copy of all research notes, photos, and electronic documents, except copies of photographs or documents for which another institution has either the copyright or, has placed restrictions on its distribution. The researcher’s final draft, including all photographs, maps, etc.
shall become the intellectual property of the NPS. The study will include a comprehensive list of references and a list of information repositories. Appendices, including relevant existing documentation, tables, maps, and sources will be included as noted above.
Report Format Frontmatter will include a concise executive summary that summarizes the historic context study in a clear and accessible manner that is useful to cultural resource professionals, NHL Program staff, and resource stewards, as well as the expected table of contents, list of illustrations, list of tables, acknowledgments, and list of abbreviations and/or acronyms that must include nonstandard abbreviations and acronyms used in the report. The spelled-out version of a term should be given the first time the term appears within the study but may be replaced by an acronym thereafter.
The main body of the historic context study must include an introduction and must include the components of a context. The historic context study will include a statement of context, background history, definition of the context, development of the theme or area of significance, associated property types, physical characteristics and integrity, relationship to the NHL Criteria, and a bibliography, as well as a clear conclusion with a closing statement that provides further comment, if appropriate, on the interpretation of the information found in the study.
The references must list the primary and secondary source materials researched and used for the preparation of the study broken into sections by kinds of materials (i.e., primary, and secondary sources, etc.) as directed in The Chicago Manual of Style (18th edition or later). Back matter includes appendices, including tables, assessment or inventory forms, copies of key documents, and geospatial data.
The researchers will deliver the final version of the historic context study to the NPS as a print-ready 508 compliant Adobe Acrobat formatted PDF file and as other electronic files (e.g., Microsoft Word). The general formatting of the document will be in portrait orientation with a single column of text to ease readability in electronic form, laid out with mirror margins:
1.25 inches inside; .75 inches top, bottom, and outside; and headers and footers should be
0.5 inches from the edge of the paper. The text should be left-justified, tabbed right in block paragraphs with no indent, set-in single-spaced lines with paragraphs double spaced
All illustrations used in the final document will be credited. If any of the illustrations carry restrictions (such as one-time-use limitations), the researchers will provide this information to the NPS. The electronic file(s) supplied to NPS will be adequate for transmission to a printer or for incorporation into a final file or files to be prepared by NPS for transmission to a printer to be selected by the NPS.
All photographs and other illustrations will be fully referenced to their source, including a catalog or accession number, drawing number, etc., if applicable. Appropriate permissions will be obtained for the use of all illustrations.
All digital images used in the document shall be individually scanned relative to the final image size in the report at a minimum of 300dpi, JPEG or TIF format, medium-high to high resolution.
The resolution of original files should not be increased to meet this requirement. Image files should be saved through FTP transfer in a folder entitled “IMAGES.” Image files should be named as follows: Subject, Figure #, Brief Description, Year taken.
Additional formatting guidance includes:
• Leading (space between lines of type in a paragraph) should be chosen for readability. In general, at least two extra points of leading (e.g., 12/14) are advised.
• All headings should be caps/lowercase; all upper-case headings are never to be used.
• The use of bold, underline, and italic type within the text should be limited.
• The traditional American form of dates will be used: August 18, 1978.
• In the text, the treatment of numbers will be consistent with the Chicago Manual of
Style.
• All numbers used with units of measurement will be numerals (e.g., windows measure 2 feet by 4 feet).
• Footnotes or notes at the end of each chapter may be used. Endnotes for the whole document will not be used.
• The most current edition of the Chicago Manual of Style should guide questions of style that are not addressed here. Most publications use the humanities-style notation (see Chapter 15). If the manual offers options or does not address an issue, consistent treatment within the document should be the rule.
• The latest edition of Webster’s Dictionary should be used for spelling.
• Acronyms should be introduced in parentheses after the full name at the first appearance of the full name. Acronyms may then be used for subsequent references.
Stipulations
1. The contractor and key team members will meet the requirements specified in 36 CFR Appendix A, Professional Qualification Standards, and the intent of Section 112 (a)(1)(of the National Historic Preservation Act of 1966, as Amended through1992.
(http://www.cr.nps.gov/local-law/arch_stnds_9.htm )
2. The contractor shall coordinate with the COR as necessary to complete the work as and when required and determine the appropriate point of contact. This coordination must http://www.cr.nps.gov/local-law/arch_stnds_9.htm include participating in consultant-led regular monthly conference calls and product review meetings.
3. All work shall be technically and legally defensible. In evaluating national significance within the developed context, the contractor shall apply the guidelines from the NHL Bulletin: Guidelines for Preparing National Historic Landmark Nominations. (NHL Bulletin
- National Historic Landmarks (U.S. National Park Service)
4. Contractor shall use Chicago Manual of Style, 18th edition or later.
5. The Historic Context Study should be written in Plain Language to the degree possible and make use of the Harper’s Ferry Center Editorial Style Guide to inform the use of language. (https://www.nps.gov/subjects/hfc/hfc-editorial-style-guide.htm)
6. Research will meet NPS standards for a thorough investigation, i.e., research will be done in readily available primary and secondary source material and perform on-site archival investigations as necessary in sources of known or presumed relevance. This study will require archival and primary source research at repositories.
7. All documentation (field and research notes, photographs and negatives, sketches, finished original drawings, narratives, computerized inventories, forms, assessments, GIS Shapefiles, and reports) produced by the contractor in connection with this project are to become the property of NPS (public domain). All documentation shall be delivered to the NPS upon completion of contract services. The completed documentation may be used and reproduced in any fashion that the NPS chooses, with appropriate credit given to the researcher. A researcher may publish articles based on the research covered under these contracts if appropriate credit is given to the NPS.
8. The contractor's quality control efforts shall ensure that all draft and final deliverables are completed documents, as specified, that have been reviewed for academic excellence, professional and copy quality and technical accuracy. Documents not displaying such efforts will not be accepted.
9. The Contractor shall disclose in writing any use of generative artificial intelligence (AI) tools in the development of deliverables. Disclosure shall include the name of the tool, the nature of the use (e.g. formatting, copyediting, outline structuring) and confirmation of human review and verification.
10. Generative AI tools shall not be used to generate historical analysis, research findings, citations, archival references, or interpretive conclusions. All research, interpretation, and citations must be based on verifiable primary and secondary sources reviewed by the Contractor.
https://www.nps.gov/subjects/nationalhistoriclandmarks/nhl-bulletin.htm https://www.nps.gov/subjects/nationalhistoriclandmarks/nhl-bulletin.htm https://www.nps.gov/subjects/hfc/hfc-editorial-style-guide.htm
11. All deliverables shall be prepared and reviewed by a professional Historian meeting the Secretary of the Interior’s Professional Qualification Standards. The Contractor remains responsible for the accuracy, originality, and scholarly integrity of all submitted work.
Project Schedule and Submission of Deliverables All work specified shall be completed in accordance with the following schedule, no later than one year from the contract award. The NPS will provide consolidated comments within 30 days of receipt:
DELIVERY ITEM DATE
Contract Award
Orientation and Planning Call Within 15 Days of the Award
Annotated Outline, Proposed Case Studies, and Preliminary Bibliography (30% Submission)
Within 60 Days of Orientation Call
NPS Technical Review No. 1 (30 days) 30 Days
Submit Draft Background History, Development of Theme, and Property Types (60% Submission)
Within 75 Days of Receipt of NPS Comments
NPS Review Technical Review No. 2 (30 days) 30 Days
Submit Complete Draft Historic Context Study, Including Integrity and Evaluation Guidance (90% Submission)
Within 75 Days of Receipt of NPS Comments
NPS / Peer Review Technical Review No. 3 (30 days)
60 Days
Submit Revised Final Historic Context Study (100% Submission)
Within 30 Days of Receipt of NPS Comments
Submit All Supporting Documentation and Editable Files Within 15 Days of Final Approval
Period of Performance 15 Months
Fee and Payment Progress payments to the contractor shall be made based on proper and acceptable invoices submitted consistent with the quality requirements described in Stipulation 6 above, according to the following schedule:
DELIVERABLE PERCENT OF TOTAL FEE
Orientation and Planning Call Up to 5% of Total
30% Submission (Annotated Outline, Bibliography, and Case Studies)
Up to 25% of Total
60% Submission (Narrative Draft Sections) Up to 50% of Total
90% Submission (Complete Draft Context Study))
Up to 80% of Total
Final Accepted Historic Context Study and Documentation
Up to 100% of Total
Appendix A - Glossary of NHL Documents Historic Context Study
A historic context study is a research and analytical document that organizes information around a defined theme, geographic area, and period of significance in order to explain patterns of development and provide the political, social, cultural, and economic background necessary to understand a particular idea, event, movement, or individual. By placing historic events and associated properties within this framework, the study enables evaluation of whether those properties are representative, exceptional, or influential within their historical setting. Such studies establish the framework used to assess relative national significance and support landmark evaluation and documentation. A historic context study may provide the analytical foundation upon which a future theme study is built.
National Historic Landmark (NHL)
National Historic Landmarks are nationally significant historic places designated by the Secretary of the Interior because they possess exceptional value in illustrating, interpreting, or commemorating the history of the United States. Acknowledged to be among the nation’s most important historic places, these buildings, sites, structures, objects, and districts adeptly communicate nationally significant themes and contexts in history, archeology, architecture, engineering, and culture. The NPS is the nominating authority for NHLs and the designation process is administered by the NHL Program. Nominations may be initiated by Federal agencies, State Historic Preservation Officers, Tribal Historic Preservation Officers, local governments, private property owners, scholars, and other interested organizations, and are prepared in consultation with the NHL program staff. Proposed designations are evaluated through a rigorous process that includes review by the National Park System Advisory Board, and final designation by the Secretary of the Interior. All NHLs are automatically listed in the National Register of Historic Places upon designation.
National Register of Historic Places The National Register is the nation's official list of districts, sites, buildings, structures, and objects in both public and private ownership that are significant in American history, architecture, archeology, engineering, and culture. National Register properties have significance to the history of their community, state, or the nation. Nominations for listing historic properties come from State Historic Preservation Officers, from Federal Preservation Officers for properties owned or controlled by the United States Government, and from Tribal Historic Preservation Officers for properties on Tribal lands. Private individuals and organizations, local governments, and American Indian tribes often initiate this process and prepare the necessary documentation. A professional review board in each state considers each property proposed for listing and makes a recommendation on its eligibility. National Historic Landmarks are a separate designation, but upon designation, NHLs are listed in the National Register of Historic Places if not already listed.
Theme Study A National Historic Landmark theme study is a substantial research and analytical document that examines a specific topic in American history or prehistory from a national perspective in order to identify and evaluate properties of exceptional national significance. Typically conducted at the direction of Congress, the Secretary of the Interior, or the Director of the NPS, theme studies provide a contextual framework and comparative analysis of properties associated with a defined historical theme. As described in 36 CFR Part 65.5, potential NHLs are identified primarily through theme studies, which assess the relative significance of related resources nationwide and determine which properties meet NHL criteria. Theme studies incorporate historic context but extend beyond them and frequently result in the nomination of properties for designation and serve as authoritative references for evaluating nationally significant historic places.
Appendix B - Criteria for Evaluating Proposals The project will be awarded on a best-value basis with technical factors more important than price. The technical factors are equal in importance to each other. The relative strengths, deficiencies, significant weaknesses, and risks supporting the proposal evaluation shall be documented in the Technical Evaluation Board report. Elements within each technical factor are also of equal importance within the factor.
1. Understanding of the Requirement: Sound and thorough understanding of the work to be performed, issues to be addressed, and problems that may be encountered.
2. Technical Approach:
• Appropriateness and completeness of methods and procedures.
• Schedules, including sequencing and duration of various phases, and allocation of time among project activities.
• Allotment of time among team members, including but not limited to key personnel defined for undertaking the documentary research, field investigation, analysis, and report preparation and editing.
3. Professional experience of key personnel in undertaking the identification and evaluation of architecturally and historically significant resources of similar magnitude, significance, and complexity. Resumes of project team members, examples of similar projects, and references should be provided for purposes of evaluation.
4. Management Capabilities and Organization of the firm as it relates to the ability to assemble multi-disciplinary teams and to meet the graphic and other technical requirements of the work.
5. Demonstrated Past Performance: Provide contact information (owner’s name, contact, and telephone number) and description for 3-5 similar projects completed within the last five years.
The SOW is understood to be unchanged except as proposed under Stipulations and Exclusions.
Please include any Stipulations to add detail to the SOW, for example, provide detail on the research approach to the project. Please address any Exclusions to identify work within the SOW that is proposed to be excluded and explain the impact on the project.
Project fees must include the entire scope of work and the final report as delivered, including tasks and subtasks. Fees shown shall include all costs and expenses (copying, mileage, photographs, testing and laboratory services, etc.) needed to complete the scope of work.
Requisition Number: 0044039169
Contracting Activity: Contracting Operations (ConOps) East 100 Alabama St. SW Bldg 1924
Atlanta, GA 30303
Government Representative: Mr. Keith Smith Phone: 470.819.0793 Keith_smith@ios.doi.gov
Request the purchase of the items/service listed below. Please provide a quote no later than: 20 July 2026 at 12:00 p.m. EDT.
ADDENDA TO 52.212-1:
OFFERORS SHALL COMPLETE THE FOLLOWING:
1. UEI Number :____________________________________________
2. Contractor Name _______________________________________________________
3. Payment Terms/Discount (i.e. Net 15, Net 30, etc.): 15 days for small business
4. Period of Performance: 07/30/2026 to 7/15/2027
5. Business Size (i.e. small business, women-owned, etc.): ________________________
6. POC Name: ___________________________________________________________
7. POC Phone / Fax Number: ______________________________________________
8. POC Email Address: ____________________________________________________
9. Date: ________________________________________________________________
LINE ITEM 0010: Historic Context Study – SERO $____________
TOTAL: $___________
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management APR 2026 52.204-16 52.204-18
Reserved Reserved
APR 2026
APR 2026
52.212-1 Instructions to Offerors--Commercial Items APR 2026 52.212-4 Contract Terms and Conditions--Commercial Items APR 2026 52.232-39 52.232-40
Unenforceability of Unauthorized Obligations Providing Accelerated Payments to Small Business Subcontractors
JUN 2013
MAR 2023
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (APR 2026)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The Government reserves the right to make a selection based upon initial offer without discussions; therefore, the offeror should submit their best terms in their initial offer. The Government also reserves the right to enter discussions and request revised offers if needed and may also determine to make no award.
The following factors shall be used to evaluate offers:
The project will be awarded on a best value basis with technical and past performance are more important than price. The following technical factors are equal in importance to each other. The relative strengths, deficiencies, significant weaknesses, and risks supporting the proposal evaluation shall be documented in the Technical Evaluation Board report. Elements within each technical factor are also of equal importance within the factor.
Technical Capability (70%)- Understanding of the SOW- Contractor should demonstrate in their proposal an understanding of the scope of services. Past performance will be evaluated as part of the technical factor
1. Understanding of the Requirement: Sound and thorough understanding of the work to be performed, issues to be addressed, and problems that may be encountered. Contractor should address the statement of work.
2. Professional experience of key personnel in aspects of similar magnitude, significance, and complexity as what is required in the SOW. See SOW section “Required Contractor Qualifications”
3. Demonstrated Past Performance: Provide examples of prior work of a similar nature
4. Price (30%)- Price must be determined fair, reasonable, affordable, and balanced which will be evaluated in accordance with FAR 13. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Price can also be determined reasonable by comparison with competitive offerors.
The technical proposal will be rated as follows:
Technical Ratings. The ratings below include the consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in an offeror’s proposal. These shall be used on all technical factors and sub-factors and sufficient documentation supporting these ratings shall be included with the ratings:
Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high. Proposal is unawardable without discussions.
Unacceptable Proposal does not meet requirements of the solicitation and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable without discussions.
Past Performance Evaluations/Documentation shall address the following three items.
(i) Recency: Recency is generally expressed as a time period during which past performance references are considered relevant and is critical to establishing the relevancy of past performance information.
(ii) Relevance: In establishing what is relevant for the acquisition, consideration should be given to those aspects of an offeror’s history of contract (or subcontract) performance that would provide the most context and give the greatest ability to measure whether the offeror will successfully satisfy the current requirement. Common aspects of relevancy include, but are not limited to, the following: similarity of product/service/support, complexity, dollar value, contract type, use of key personnel (for services), and extent of subcontracting/teaming.
(iii) Quality: The past performance evaluation conducted in support of a current source selection does not establish, create, or change the existing record and history of the offeror's past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts. Requirements for considering history of small business utilization are outlined at FAR 15.304(c)(3)(ii). The Past Performance Evaluation will review all past performance information collected and determine the quality of the offeror's performance, general trends, and usefulness of the information.
Once the past performance evaluation is completed, one of the following ratings shall be assigned.
Adjectival Rating Description Substantial Confidence Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror's recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror's recent/relevant performance record, the Government has little or no expectation that the offeror will be able to successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
52.222-90 Addressing DEI Discrimination by Federal Contractors.
As prescribed in 22.2203, insert the following clause:
ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION DATE)
(a) Definitions. As used in this clause—
Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.
Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.
(b) In connection with the performance of work under this contract, the Contractor agrees as follows:
(1) The Contractor will not engage in any racially discriminatory DEI activities;
(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;
(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;
(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and
(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.
(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).
(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
(End of clause)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of clause)
LOC-DOI ELECTRONIC INVOICING - Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [CO to edit and include the documentation required under this contract]: Contractor’s invoice
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
LOC-DOI AGENCY PROTESTS - Agency Protests
Insert the provision in all solicitations
Agency Protests
(a) Interested parties may request an independent review at a level above the Contracting Officer of protests filed directly with the agency. This review is available as an alternative to consideration of the protest by the Contracting Officer or as an appeal of the Contracting Officer's response to the protest. An interested party may:
(1) Protest to the Contracting Officer;
(2) Protest directly to the Bureau Procurement Chief without first protesting to the Contracting Officer; or
(3) Appeal a contracting officer’s decision to the Bureau Procurement Chief.
(4) Requests for Bureau Procurement Chief review should be addressed to:
Celinda M. Hicks Contracting Operations (ConOps) East National Park Service 100 SW Alabama St.
Atlanta, GA 30303 Email: celinda_hicks@nps.gov Phone: (404) 819-0814
(c) Requesting independent agency review will not extend the Government Accountability Office’s (GAO’s) timeliness requirements. Any subsequent protest to the GAO must be filed within ten days of knowledge of initial adverse agency action (see 4 CFR 21.2(a)(3).)
(End of Clause)
Submitting a Quote Quotes shall be submitted on the above Price Schedule, SF18 along with technical and cost proposals addressing the factors established in FAR 52.212-2 in this solicitation. Offers must acknowledge receipt of all solicitation amendments.
REQUIRED CONTENTS OF PROPOSAL
1. Technical Proposal: Statement of the proposal / Project approach addressing factors in FAR 52.212-2
a. Project team: Identify the assigned key personnel, with brief resumes confirming that relevant disciplines are part of the team and that key personnel.
2. Cost Proposal: Project fees must include the entire scope of work and final deliverables, in a matrix format with hourly rates for assigned staff, noting tasks and subtasks. A breakdown of costs are required to determine price fair and reasonableness.
Submit all quotes to keith_smith@ios.doi.gov
Evaluation of Quotes: Quotes will be evaluated using the procedures set forth in FAR Part 13, Simplified Acquisition Procedures and factors listed in FAR 52.212-2 in this solicitation. The Contracting Officer will make a best value determination under these guidelines.
mailto:celinda_hicks@nps.gov mailto:keith_smith@ios.doi.gov
| Request for quotations |
| Request number |
| Date issued |
| Requisition/purchase request number |
| CERT. FOR NAT. DEF. UNDER BDSA REG. 2 AND/OR DMS REG. 1 |
| Issued by |
| For information call |
| Name |
| Telephone number |
| Area code |
| number |
| Deliver by (date) |
| Delivery |
| To: |
| Name |
| Company |
| Street address |
| City |
| State |
| Zip code |
| Destination |
| Name of consignee |
| Street address |
| City |
| State |
| Zip code |
| Please furnish quotations to the issuing office in block 5a on or before close of business |
| Schedule |
| Discount for prompt payment |
| 10 calendar days (%) |
| 20 calendar days (%) |
| 30 calendar days (%) |
| Calendar days |
| Number |
| Percentage |
| Name and address of quoter |
| Name of quoter |
| Street address |
| County |
| City |
| State |
| Zip code |
| Signature of person authorized to sign quotation |
| Date of quotation |
| Signer |
| Name |
| Telephone |
| Area code |
| Number |
Title
| AUTHORIZED FOR LOCAL REPRODUCTION Previous edition not usable |
| Standard form 18 (Rev. 6/1995) |
File details come from the government source that posted it. Updated .