INDE-REPLACEMENT OF DUPLEX VERTICAL MULT
Solicitation number
140P4226Q0060
Issued by

About this file

This is a Request for Quote (RFQ) solicitation for the replacement of duplex vertical multistage variable-speed booster pump systems at Independence National Historical Park in Philadelphia, Pennsylvania.

The National Park Service seeks firm fixed-price quotes for the removal and replacement of domestic water booster pump systems at two locations: the Merchants' Exchange Building and the Second Bank of the United States, both located at 143 S. 3rd Street and 420 Chestnut Street, respectively, in Philadelphia, PA 19106. The project includes all labor, materials, tools, equipment, transportation, supervision, testing, commissioning, and documentation necessary to remove existing systems and install two new duplex vertical multistage variable-speed booster pump systems with integrated VFDs, PLC-based controls, and stainless steel wetted parts. Minimum specifications require target 200 GPM capacity per system, discharge pressure of 60–90 PSI, high-efficiency TEFC motors, automatic lead/lag rotation, pressure transducers, and flow sensing for automatic speed control. The contractor must maintain continuous domestic water service during normal business hours through sequential replacement methodology and provide temporary bypass equipment if existing systems cannot safely operate. The contract includes a base performance period from October 15, 2026, to February 15, 2027, with delivery required by February 15, 2027, and incorporates an option to extend services for up to six months under FAR 52.217-8. The solicitation is set aside for Women-Owned Small Businesses (WOSB) under NAICS Code 238220. Quotes must be submitted electronically via email to wendy_deleon@ios.doi.gov by 5:00 PM Eastern Time on September 22, 2026, with technical questions due by September 14, 2026. Evaluation will use the Lowest Price Technically Acceptable (LPTA) process, requiring offerors to demonstrate technical capability, relevant project experience within the past five years, contractor responsibility and compliance, active SAM registration, and biobased product certification. The contractor must pass federal background checks, provide comprehensive commissioning with functional testing demonstrating stable pressure control within ±3 PSI, conduct on-site training for NPS staff, and submit as-built drawings, O&M manuals, and waste management reports. Government-furnished property includes only as-constructed utility rehabilitation plumbing sheets. Contractor liability insurance must be maintained at minimum $200,000 per person, $500,000 per occurrence, and $20,000 property damage, with the Government named as insured.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3.AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.

FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

DATED.

OFFER

ADDENDA

ADDENDA

140P4226Q0060

See Schedule See Schedule

DOI, NPS, NERO & NER SOUTH MABO

National Park Service Northeast Regional Contracting South/Philadelphia MABO 1234 Market Street, 20th Floor Philadelphia PA 19107

09/22/2026 1700 ED

0044038684

Wendy De Leon 6175994957

PNC 100.00

PNC

Wendy De Leon

238220

$19

09/09/2026

0011283495

ADMINISTERED BY:

DOI, NPS, NERO & NER SOUTH MABO

National Park Service

Northeast Regional Contracting

South/Philadelphia MABO

1234 Market Street, 20th Floor

Continued...

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

ACCEPTED,

Philadelphia PA 19107 US

DELIVER TO:

NPS, Independence NHP

Independence Natl. Hist. Park

143 S. 3rd. Street

Philadelphia PA 19106 US

Request for firm fixed price quote for

Replacement of Duplex Vertical Multistage

Variable Speed Booster Pump Systems at

Independence National Historical Park in as described in Section C

Description/specifications/requirements.

Contractor must have an active SAM registration at the time of award. www.SAM.gov

SITE VISIT: To schedule a site visit please contact Ricardo Nieves at 267-250-1457 or ricardo_nieves@nps.gov

Delivery: 02/15/2027

Period of Performance: 10/15/2026 to

02/15/2027

00010 Replacement of Duplex Vertical Multistage

Variable Speed Booster Pump Systems

Product/Service Code: R499

Product/Service Description: SUPPORT-

PROFESSIONAL: OTHER

CONTINUATION

SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

PAGE OF

SECTION A - TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

PART I – The Schedule A Solicitation/Contract Form 1 B Schedule of Items 4 C Description/specifications/requirements 5 D Packaging and Marking 19 E Inspection and Acceptance 19 F Deliveries or Performance 19 G Contract Administration Data 20 H Special Contract Requirements 25

PART II – Contract Clauses I Contract Clauses 28

PART III – List of Documents, Exhibits, and Other Attachments J List of Attachments 40

PART IV – Representations and Instructions K Representations, Certifications, and Other Statements of Offerors 41 L Instructions, Conditions, and Notices to Offerors 50 M Evaluation Factors for Award 58

SECTION B - SCHEDULE OF SERVICES

Removal and Replacement of all Sprinkler Heads in the Merchant Exchange Building

Description Cost General Conditions Labor Material Equipment Commissioning

TOTAL

NOTE: This acquisition utilizes Revolutionary FAR Updates (RFO) FAR 12 Acquisition of Commercial Products and Commercial Services – Specifically RFO FAR 12.201-1 – Simplified Procedures.

The contract includes the FAR Clause 52.217-8 – Option to Extend Services for up to six (6) months. If the Government elects to exercise FAR 52.217-8 – Option to Extend Services after the base period, the contractor is hereby notified that the Government will require continued performance of any services within the limits and at the unit prices specified in the Schedule of Services above, unless any of the unit prices require adjustment per revisions to the prevailing labor rates provided by the Secretary of Labor. The prices under this clause are hereby considered to be evaluated at the time of award of the base contract.

SECTION C – DESCRIPTION/SPECIFICATION/REQUIREMENTS

C.0 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The National Park System currently has 433 units (often referred to as parks), covering more than 85 million acres in all 50 states, the District of Columbia, and US territories.

The NPS also has more than 150 related areas that are linked in importance and purpose to places managed directly by the National Park Service by preserving important segments of the nation's natural and cultural heritage. They are designated by acts of Congress or by the Secretary of the Interior (affiliated areas). The majority of related areas are not units of the National Park Service and are managed by other government agencies or non-government organizations and landowners.

The National Park Service is involved in related areas by directly managing the entire or sections of a related area, or by providing technical or financial assistance.

The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS – Business Service Contracting Division (BSCD) – Contracting Operations – Northeast Region – Philadephia MABO. The NPS – BSCD-Northeast issues contracts through the Federal Acquisition Regulation’s (FAR) for supplies, services, construction, A&E for Northeast Regional Parks only.

C.1 INDEPENDENCE NATIONAL HISTORICAL PARK (INDE)

Independent National Historical Park (INDE) is a park that represents the founding ideals of the nation and preserves national and international symbols of freedom and democracy, located in Philadelphia, PA. INDE is the home of the Liberty Bell Center, which houses the famous Liberty Bell. The Liberty Bell cracked with its first ring and later became a symbol of liberty in the 19th century.

INDE is also home to Independence Square, which includes the notable Independence Hall and Congress Hall. Congress Hall was the home to the U.S. Congress from 1790 to 1800 when Philadelphia served as the temporary capital of the United States. Independence Hall, is the location where both The Declaration of Independence and US Constitution were debated and signed and is also designated as a UNESCO World Heritage Site.

Besides the two most notable structures stated above, you can visit the Old City Hall which was the home to the Supreme Court from 1791-1800, the Merchants’ Exchange Building, Franklin Court Sites, Declaration House where Thomas Jefferson drafted the Declaration of Independence and Washington Square to name a few. INDE also includes several gardens that you can walk through and enjoy, including the 18th Century Garden, Rose Garden, Magnolia Garden and the Benjamin Rush Garden. For more information, please visits INDE’s website at: https://www.nps.gov/inde/index.htm

C.2 SCOPE OF WORK: Replacement of Duplex Vertical Multistage Variable Speed Booster Pump Systems

C2.1 Project Objective Replace existing domestic water booster pump systems at the Merchants’ Exchange Building and the Second Bank of the United States with new duplex vertical multistage variable-speed booster pump systems and associated components. The new systems shall provide stable domestic water pressure meeting the performance and commissioning requirements in Section C.2.3.5.

C.2.2 Scope of Work The Contractor shall provide all labor, materials, tools, equipment, transportation, supervision, testing, commissioning, and documentation necessary to remove existing systems and install, start up, and commission two (2) new booster pump systems (one per building). All work shall comply with applicable codes, standards, and NPS requirements noted in Section C.8.

https://www.nps.gov/inde/index.htm

C.2.3 Contractor Responsibilities

C.2.3.1 Preconstruction submittals (prior to procurement):

• Product Data & cut sheets; proposed model selections and options

• Scope Boundary Confirmation Package: annotated photos and a piping/electrical one-line showing demarcation points (see Section 2.3.4 “Project Boundaries”) for COR approval before ordering equipment

• Temporary Domestic Water Service Plan (see 3.2) with outage windows and contingency measures

• Project schedule identifying mobilization, outages, milestones, and commissioning

• Site Safety Plan (OSHA-compliant) for COR approval prior to mobilization

• Division 01 Management Plans as applicable to NPS projects (e.g., Contractor Quality Control Plan CQCP), Waste Management Plan WMP.

• Coordinate with the government Contracting Officer Representative (COR) to ensure work minimizes disruption to building operations.

• Protect all adjacent finishes, surfaces, and historic elements during the work.

C.2.3.2 Temporary Domestic Water Service & Outage Control To minimize disruption to building operations and visitors:

• Maintain continuous domestic water service during normal public/business hours.

• Employ sequential replacement: keep one existing pump/system online while installing and proving the first new pump; then switch over and replace the second. If existing equipment condition prevents safe operation, provide a temporary booster/bypass skid. (Directly addresses the question about expectations for temporary service.)

• Outages: Limit to off-hours or approved windows; minimum 72-hour notice to COR for any planned shutdown affecting water service.

• Include backflow protection continuity and safe isolation procedures in the plan.

C.2.3.3 Removal & Disposal

• Safely disconnect, isolate, and remove existing pumps, piping, valves, and controls necessary for replacement.

• Cap and secure utilities during demolition to prevent leaks/damage.

• Off-site disposal of all debris in compliance with federal, state, and local environmental regulations. No use of government waste bins/dumpsters.

• Submit a Waste Management Report (WMR) documenting waste streams, quantities, destinations, and recycling rates. A standard WMR template is provided in Appendix A

C.2.3.4 Installation of New Equipment A. Provide and install two (2) duplex vertical multistage variable speed booster pump systems (one at each building) including all associated equipment. Minimum specifications:

• Configuration: Duplex (2 pumps per system)

• Type: Vertical multistage centrifugal

• Capacity: Target 200 GPM per system. Upon field verification, Contractor may propose a lower capacity if justified by actual demand and building conditions; any change requires COR approval via Product Data submittal. (Language incorporated as suggested.)

• Discharge Pressure: Maintain 60–90 PSI at design conditions.

• Motors: High-efficiency TEFC, VFD-rated

• Drives: Integrated VFDs with automatic lead/lag rotation and soft-start

• Controls: PLC-based control panel; local HMI touchscreen

• Instrumentation: Pressure transducers (suction & discharge), flow sensing for automatic speed control;

lead/lag alternation; alarm/fault logging

• Materials: Stainless steel wetted parts

• Power: Match verified building service; provide new feeders/breakers/disconnects and short-circuit current rating (SCCR) compliance labeling. (Specificity handled via verification + submittal requirements.)

• BMS Integration (if available): Provide dry contacts and/or BACnet/IP gateway points list (run status, lead/lag, alarm, discharge pressure) as approved by COR.

B. Project Boundaries (defined):

• Piping: From suction tie-in downstream of the existing domestic water backflow preventer to discharge tie-in at the first downstream distribution header/tee, including isolation valves, checks, and relief valves within the pump skid/header.

• Electrical: From the existing distribution panel feeding the booster system to the pump VFDs (feeder, breaker, conduit, wire, and fused/non-fused disconnects); include equipment grounding and arc-flash labels.

• Controls: Local PLC/HMI and interfaces noted above; no replacement of building-wide BMS unless specifically authorized.

• Contractor shall submit annotated boundary diagrams in the Scope Boundary Confirmation Package for COR approval prior to procurement

• Provide and install all associated equipment, including:

o Isolation valves, check valves, backflow and pressure relief valves o Suction and discharge headers and fittings o Electrical wiring, conduit, and breakers as required

• Integrate with existing building utilities (water and electrical) while ensuring compliance with current codes.

C.2.3.5 Testing, Commissioning & Training

• Commissioning Approach: Contractor-led commissioning witnessed by COR/third-party commissioning is required.

• Baseline Measurements (pre-demolition): Record static and dynamic pressures at suction & discharge, and— where feasible—flow and pump status under typical load. Document current control setpoints/logic.

• Functional Tests (post-installation):

o Verify phase rotation, vibration, and alignment.

o Pressure Performance: Maintain ≥60 PSI at building distribution under normal demand; demonstrate stable control (±3 PSI band) across typical flow range with one pump running and with lead/lag rotation.

o Flow Capability: Demonstrate design flow (up to 200 GPM) within the 60–90 PSI discharge range (using calibrated instrumentation or temporary flow meter).

o Controls & Safety: Lead/lag alternation; auto changeover on fault; alarm annunciation; emergency stop;

relief valve operation; low-suction and high-pressure protection.

o Reliability Test: 2-hour continuous run under simulated demand; capture trend logs (pressures, speeds, lead/lag state).

• Documentation: Provide a Commissioning Report with test procedures, data sheets, calibrated instrument certificates, setpoints, alarm/fault matrix, and final control narrative.

• Training: Conduct on-site training (min. 2 hours per site) for NPS staff covering operation, routine maintenance, troubleshooting, and safety. Provide quick-reference schematics.

C.2.3.6 Documentation & Closeout

• As-built drawings (PDF + native CAD) updated to reflect final installations.

• O&M manuals, warranties, preventive maintenance schedule.

• Waste Management Report (WMR) (Appendix A fields completed), disposal tickets/manifests.

• Punchlist: Correct all items before final acceptance.

C.2.4 Deliverables and QASP Table C.2.4.1 Purpose: Define how the Government (COR) will monitor contractor performance against the SOW and accept deliverables for this project (historic, occupied NPS facilities).

Deliverable Performance Objective

Acceptance Criteria Surveillance Method Frequency

Product Data & shop drawings; one-line diagrams

Boundary clarity Approved Scope Boundary Package prior to procurement

Submittal review Pre-procurement

Approved project schedule & updates

Schedule adherence Milestones met; outages occur in approved windows

Schedule review;

progress meetings

Weekly

Division 01 plans (CQCP, CCxP, WMP, etc.)

Safety & compliance OSHA/ICC/NEC/NFPA/ASME;

approved Site Safety Plan

Document review;

safety audits

Pre-mob + periodic

Scope Boundary Confirmation Package

Boundary clarity Approved by COR before ordering equipment

Submittal review Pre-procurement

Temporary Domestic Water Service Plan

Temporary domestic service

Continuous service during public hours; outages per plan

Observation during changeovers

As scheduled

Site Safety Plan Safety & compliance Approved by COR; staff background checks cleared

Safety audits;

credential checks

Pre-mob + periodic

Commissioning Report and test data

Pump performance & controls

≥60 PSI; stable control ±3 PSI;

design flow up to 200 GPM;

pass functional tests

Witnessed tests; data log review

At commissioning

Training sessions & materials

Training Min. 2 hours per site;

ops/maintenance/troubleshooting covered

Observe session; sign-in sheet

Post-commissioning

As-built drawings

(PDF + CAD); O&M

manuals; warranties

Documentation quality Complete and accurate Document review At closeout

Waste Management Report (Appendix A)

Waste management WMR submitted with tickets/manifests; offsite disposal; landfill diversion reported

Document review Demob + closeout

C.2.4.2 Surveillance Methods:

• 100% inspection for critical activities (outages, commissioning, training).

• Random sampling for documentation reviews.

• On-site observation and photo documentation to confirm historic protection and safety compliance.

C.2.4.3 Data & Evidence:

• Baseline and post-install pressure/flow data, controller trend logs, test sheets, photos, manifests, training sign-ins.

• COR keeps a QASP file with findings and decisions.

C2.5. Appendices

• Appendix A – Waste Management Report (WMR) Template Fields to complete: Project, Site, Date; Waste type (metal, piping, valves, packaging); Quantity/weight;

Destination facility & address; Disposal method (recycle/landfill); Tickets/manifests; % diverted from landfill;

Authorized signatory. (Aligned with NPS “Waste Management Plan” practice—Division 01.)

• Appendix B – Scope Boundary Diagram Contractor to submit annotated photographs and simple one-line diagrams of the mechanical and electrical demarcation points for COR approval prior to procurement.

• Appendix C – Commissioning Checklists & Forms Pre-demo baseline form, functional test sheets (pressure/flow/controls), 2-hour run log, training sign-in sheet.

C.2.6 Constraints and Park Requirements

• Contractor must comply with all Independence National Historic Park Service regulations and guidelines.

• Work areas must be properly protected to avoid damage to historic features.

• No use of government-furnished trash bins for debris disposal.

• All restoration work must match the original finish and appearance.

• Contractor shall coordinate with park staff to minimize disruptions.

C.3 PLACE OF PERFORMANCE AND HOURS OF OPERATION

The project location is at two Locations within Independence National Historical Park:

1. Merchant Exchange Building, 143 S. 3rd Street Philadelphia, PA 19106

2. Second Bank of the United States, 420 Chestnut Street Philadelphia, PA 19106

C.4 SCHEDULING AND COORDINATION

The COR will be responsible for acting on behalf of the Contracting Officer (CO) on all matters of work within the scope of the contract. Approval of all work beyond the scope of the contract is reserved for the CO. The contractor is responsible for notifying the COR in writing all work that is beyond the scope of the contract.

C.5 GENERAL CONTRACTOR RESPONSIBLITIES

• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry.

• Contractor must have adequate liability insurance and proper license to perform all work stated herein.

• All employees of the Contractor when reporting for work and while working in the Parks shall be required to wear a Photographic Identification Badge in plain view. These badges are to be supplied by the Contractor. In addition, all employee vehicles of the Contractor should be labeled to identify them as such.

• The Contractor may complete unscheduled tasks on weekends or after normal duty hours only if the Contracting Officer’s Technical Representative agrees to this in writing.

C.6 CONTRACTOR/EMPLOYEE QUALIFICATIONS

• Demonstrated experience installing commercial/industrial duplex booster pump systems with VFD controls.

• Licensed trades; comply with OSHA.

• Background checks: All contractor’s and subcontractor’s staff must pass a federal background check prior to unescorted access.

C.7 EQUIPMENT REQUIREMENTS

• All equipment/tools shall only be used within the limits of the manufacturer’s recommendations.

• All tools/machinery/equipment/vehicles shall be safeguarded from the public.

Tools/machinery/equipment/vehicles shall not be left unattended. All tools/equipment shall not be allowed to lie around except in the immediate work area.

• Any tools not in immediate use shall be staged or stowed in such manner so as not to create a hazard. The government and contractor will agree on delineating the work area around the project.

• Any damaged caused to NPS property through equipment use shall be restored and/or repair to original conditions at contractor expense.

C.8 SAFETY

• The Contractor shall be responsible for the safe conduct of all operations, shall adhere to applicable OSHA standards (29 CFR 1910.266), and be subject to inspection by NPS Safety Officer.

• The Contractor shall be responsible for any door/gate keys assigned to them. Lost or stolen keys shall be reported to the park immediately and the Contractor shall be responsible for the cost of re-keying the locks.

Addition, during the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:

• 29 CFR 1910 – OSHA General Industry Regulations & Standards.

• NFPA (National Fire Protection Association) standards

• 2024 International Code Council (ICC) family of codes

• ASME (American Society of Mechanical Engineers) codes for pressure piping

• 2023 NEC (National Electrical Code)

• Local Philadelphia building and plumbing codes

• Secretary of the Interior’s Standards for the Treatment of Historic Properties (for protection of historic fabric).

• NPS Denver Service Center Division 01 management plan requirements (CQCP, CCxP, WMP, UPPP/SWPPP, HPTP, IAQ)

• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference Manual

50B: NPS Occupational Safety and Health Program

• Contractor or employee conduct is subject to park rules and regulations concerning: littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36 (eCFR :: 36 CFR Part 2 -- Resource Protection, Public Use and Recreation).

• Work area shall always be maintained in a clean and safe condition.

• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).

• All on-site vehicles will also be marked with the company name (if applicable).

• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.

• All personnel shall wear high-visibility clothing, eye and hearing protection, gloves, and other appropriate PPE.

• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.

C.9 PERSONAL PROTECTIVE EQUIPMENT (PPE)

• The Contractor shall furnish personal protective equipment (PPE) to crew members respective of the type of work being.

• The contractor shall train workers in the safe operation and use of equipment that they will be using to accomplish the work under this contract. Occupation Safety & Health Administration (OSHA) standards PPE shall be followed; information can be found at OSHA PPE Standards.

• PPE, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.

• Defective or damaged PPE shall not be used and shall be either repaired or replaced.

C.10 ACCIDENT REPORTING

The contractor shall report emergency situations, such as accidents involving property and/or personal injury or other unforeseen circumstances and shall follow required emergency reporting procedures according to the CO/COR approved Safety Plan. In the event of an emergency the contractor shall dial 911.

• Accident Reporting: Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires.

1. Notify COR/POC and CO immediately in the event of a reportable accident.

2. Fill out and forward an Accident/Property Damage report Form (CM-22) to COR/POC and CO within 7 days of a reportable accident. Obtain form from COR/POC or CO.

• All Other Accidents: The Contractor shall report all other accidents to the CO as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.ecfr.gov/current/title-36/chapter-I/part-2

C.11 FIRE PREVENTION AND PROTECTION

• Any accidental fire starts shall be reported immediately to COR. Should the fire exceed the size of a campfire and threaten workers safety, the contractor should depart the area and call 911 immediately.

• Hazard Control: Take all necessary precautions to prevent fire during construction. Keep flammable substances or materials at a safe distance from use of volatile or noxious substances.

• Smoking is prohibited in the work areas in sites designated for the contractor’s use. Designate a space away from the work area be used for smoking. Cigarette butts must be disposed of properly.

• Protection Equipment Required: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof and a sufficient number to meet the requirement that a travel distance from any workstation to the nearest extinguisher shall not exceed 75 feet. Fire extinguisher shall be of type and size appropriate for the work but no less than 10lb.

C.12 GLOBAL POSITIONING SYSTEM (GPS)

Not Applicable

C.13 DRONES/UNMANNED AERIAL VEHICLE (UAV) USAGE

The use of drones and/or UAVs are not authorized at any NPS location during performance of this contract.

C.14 PROHIBITION OF WEAPONS/FIREARMS

18 USC 930 is Federal law that supersedes Section 512 of Public Law 111-24 and prohibits the possession of a firearm or other dangerous weapon in a Federal facility. Federal facilities are buildings or parts thereof owned or leased by the Federal Government, where Federal employees are regularly present for the purpose of performing official duties. No weapon or firearms are authorized within FOMC/HAMP at any time.

C.15 GENERAL COMMUNICATION REQUIREMENTS

The Contractor shall provide contact information for the supervisor and all employees that will perform the work to the COR prior to the start of work.

C.16 PROJECT MEETINGS

Contractor Conference: Before start of planting, the Project Manager/COR will arrange an on-site meeting with Contractor which may include visual inspection of the contracted work at the conclusion of the meeting. The meeting agenda will include the following at a minimum:

• Correspondence procedures

• Designation of responsible personnel

• Labor standards provisions

• Changes

• Payments to Contractor

• Subcontractors

• National Park Service regulations

• Accident prevention program (including name of responsible Supervisor)

• Accident reporting

• Documents required under the contract

• Park rules and regulations

• Park Access

• Working hours and days

• Safety program (compliance with the "Accident Prevention" clause of the General Provisions)

• Tentative work schedule.

C.17 TEMPORARY FACILITIES/WORK AREA

• ACCESS: Access to related buildings will be provided by INDE COR/POC. All other areas are open to general public.

• PARKING: Onsite parking will not be provided by the government and must be found at the contractor’s expense. There is city of Philadelphia street parking across the street from the project location. All material is to be loaded into the building from the street.

• STORAGE: The NPS will provide on-site material storage and loading of materials, and the contractor shall coordinate with COR/POC. The contractor is responsible for securing all property, from loss, damage, and/or theft. The Government will not be held responsible for any loss, damage, and/or theft of any materials, equipment, etc. used and/or provided in performance of this contract.:

• RESTROOMS: Restroom facility is available onsite for the contractor’s use.

• TELEPHONE: No telephone service is available on site for the contractor’s use.

• WATER: Water from existing water system, where available, may be available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C.18 LANDSCAPE PRESERVATION

Not Applicable

C.19 RESOURCE DAMAGE

All conduct outside of the specified work is subject to park rules and regulations concerning littering, wildlife harassment, collecting, resource damage and other topics as specified for the NPS in the Code of Federal Regulations title 36, which can be found at http://www.gpoaccess.gov/ecfr/

C.20 SITE MANAGEMENT

Maintain work areas to be free of all debris, equipment, and materials daily. Always maintain site free of hazards.

Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. All historical and/or archeological issues shall be addressed as needed and stated in the contract and its attachments.

C.21 KEY PERSONNEL

The contractor shall provide a supervisor who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

The installer must have experience installing commercial/industrial duplex booster pump systems with VFD controls.

Qualifications for all key personnel shall be provided.

C.22 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT

ADMINISTRATION

• Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.

• Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;

http://www.gpoaccess.gov/ecfr/

(A) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

(B) Requesting removal of unsuitable contractor employees;

(C) Ensuring adequacy of schedule and Quality Control Plan, including changes;

(D) Ordering re-performance of unacceptable work or performance by other mean, etc.

• Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.

C.23 CONTRACTOR'S REPRESENTATIVE

The Contractor shall provide a contract representative for the performance of the work. The name of this person and an alternate(s) who act for the contractor when the Contractor is absent shall be designated in writing to the CO. The Contractor representative or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contractor representative and alternate(s) must be able to read, write, speak, and understand English without use of a translator. Under no circumstances shall any documents, Statement of Work, Work Schedules, Contractor submittals, Contractor plans, etc., be translated. All documentation shall be submitted in the English language.

C.24 UNDOCUMENTED WORKERS

This contract involves the employment of unskilled labor working under arduous field conditions. Such employment may be attractive to persons coming from foreign countries, sometimes illegally. Offerors are reminded that it is a crime to bring into the United States, transport within the United States, and to harbor aliens who do not have a proper visa for entry and working in this country (8 U.S.C. § 1323-1325). If violations are suspected by the COR during the performance of work on this (these) project(s) they shall be reported to the U.S. Immigration and Naturalization Service for investigation and appropriate action. Conviction of the Contractor for commission of a criminal offense referred to herein shall be deemed sufficient cause for default and the initiation of debarment or suspension proceedings to prevent the Contractor from receiving future Government contracts.

C.25 INTERRUPTION OF WORK

ENVIRONMENTAL - The Contracting Officer, by issuance of a stop work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor shall be given a resume work order, which shall document the date the stop work order ended. An allowance has been included in the contract time for short-term environmental delays up to one day at a time. The count of contract time shall therefore continue during stop work of one day or less, but the count of contract time shall stop during stop work orders in excess of one day at a time. All periods of stop work by the Government shall be documented. Actions taken under this paragraph shall be subject to Special Clause 1 – Stop Work.

SPECIAL EVENTS - The Government may direct the Contractor to stop work and all operations in the event of a scheduled or unscheduled events at INDE. The work may also just be restricted to certain locations at the discretion of the

COR.

HISTORICAl/ARCHEOLOGICAL/CULTURE RESOURCES – see C.27 below.

C.26 ENVIRONMENTAL REGULATIONS

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:

• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;

• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);

• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);

• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);

• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);

• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);

• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).

Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

C.27 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES

• Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.

• The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.

• Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the CO.

• Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

• The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

C.28 HAZARDOUS MATERIALS 223-9

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.

If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.

C.29 HAZARDOUS MATERIAL IDENTIFICATION

Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.

C.30 MATERIAL & EQUIPMENT TRANSPORTATION, HANDLING AND STORAGE

• Contactor shall have a representative on site to receive material deliveries, and the contractor shall remain responsible for all material deliveries whether their representative is on site at the time of delivery or not.

• Government-owned equipment is not available for Contractor’s use to accomplish any Work, and Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools.

• Transport, handle, and store materials and equipment in accordance with the manufacturer’s written instructions, and in a secure manner.

• Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. Protect liquids from freezing.

• The Contractor may leave its equipment and Government-furnished property at the work site. The Contractor shall be responsible for the Contractor's equipment and Government-furnished property if it should be lost, stolen or damaged.

• Promptly remove from the project site any materials or equipment that are damaged or are otherwise unsuitable.

C.31 GOVERNMENT FURNISHED PROPERTY/INFORMATION

The Government will make available the As-Constructed Drawings-Utility Rehabilitation plumbing sheet.

C.32 LOSS OR DAMAGES

The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.

If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this contract, the contractor shall be responsible for the same. The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.

C.33 WORK BY THE GOVERNMENT

The Government reserves the right to undertake performance by Government forces or other Contractors, the same type of similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.

C.34 OTHER CONTRACTS

The Government may undertake work with its own forces or award other contracts for additional work, and the Contractor shall fully cooperate with such other Contractors and Government employees and carefully fit its own work to such additional work as may be directed by the CO. The Contractor shall not commit or permit any act, which shall interfere with the performance of work by any other Contractor or by Government employees.

C.35 EXTENT OF OBLIGATION

The Government obligation for performance of this contract beyond the award price is contingent upon the availability of funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the amount that has been authorized through the issuance of a contract modification or change order by the CO.

C.36 POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

C.37 BIOBASED AND SUSTAINABLE PRODUCTS

The Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential0 Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.

All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.

The following is a list of categories for biopreferred products that may be required in performance of this contract:

• 2-Cycle Engine Oil – 34% Minimum Biobased Content

• Adhesive and Mastic Removers – 58% Minimum Biobased Content

• Blast Media – 94% Minimum Biobased Content

• Cleaning Tools - 22% Minimum Biobased Content

• Clothing – Utility Gloves – 25% Minimum Biobased Content

• Corrosion Preventatives – 53% Minimum Biobased Content

• Dust Suppressants – 85% Minimum Biobased Content

• Electronic Components Cleaners – 91% Minimum Biobased Content

• Greases – Truck – 71% Minimum Biobased Content

• Metal Cleaners and Corrosion Removers – Corrosion Removers – 71% Minimum Biobased Content

• Mobile Equipment Hydraulic Fluids – 44% Minimum Biobased Content

• Pneumatic Equipment Lubricants – 67% Minimum Biobased Content

• Safety Equipment – 25% Minimum Biobased Content

• Special Precision Cleaners and Solvents – 56% Minimum Biobased Content

For more information including definition of terms with regard to the Department of Agriculture Biobased Program go to:

https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml

C.38 DEFINITIONS (Not included in Federal Acquisition Regulations) Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

Bathroom and Spa Cleaners - Products that are designed to clean and/or prevent deposits on surfaces found in bathrooms and spas including, but not necessarily limited to, bath tubs and spas, shower stalls, shower doors, shower curtains, and bathroom walls, floors, doors, and counter and sink tops. Products in this category may be designed to be applied to a specific type of surface or to multiple surface types. They are available both in concentrated and ready-to-use forms.

Calendar Days - Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.

Cleaning Tools - Objects that are used to clean or assist in cleaning a variety of surfaces or items and can be used multiple times. This category includes tools such as brushes, scrapers, and abrasive pads that are used for cleaning. This category excludes the expendable materials used in cleaning, such as glass cleaners, single use wipes, all-purpose cleaners, and gloves.

Contract Pay Item - A pay item designated on the bid schedule and described by a specification.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plans, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.

Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml tools and apparatus necessary for the proper construction and acceptable completion of the work.

Eyewear – Products that are worn over the eyes, either to provide protection (from the sun, impact, chemicals, etc.) or to enhance vision. Eyewear consists of frames and lenses, either separately or together. This category includes contact lenses.

Floor Cleaners - Cleaning solutions for either direct application or use in floor scrubbers for wood, vinyl, tile, or similar hard surface floors.

Floor Coverings (non-carpet) - Cleaning solutions for either direct application or use in floor scrubbers for wood, vinyl, tile, or similar hard surface floors.

Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.

General Purpose Household Cleaners - Products designed to clean multiple common household surfaces. This designated item does not include products that are formulated for use as disinfectants. This category excludes Task-Specific Cleaning products, such as Spot and Stain Removers, Upholstery Cleaners, Bathroom and Spa Cleaners, Glass Cleaners, Industrial Cleaners, etc. as these types of products are included in other categories.

Glass Cleaners - Cleaning products designed specifically for use in cleaning glass surfaces, such as windows, mirrors, car windows, and computer monitors.

Industrial Cleaners - Products used to remove contaminants, such as adhesives, inks, paint, dirt, soil, from parts, products, tools, machinery, equipment, vessels, floors, walls, and other production-related…