Sol_140P3026Q0039.pdf

PDF 288 KB Posted

Attached to
NCR-NAMA: HOLDING CELL DOOR REPAIR
Solicitation number
140P3026Q0039
Issued by

About this file

This is a Request for Quotation (RFQ) for reinforcement work on holding-cell doors at the U.S. Park Police District 1 Substation located at 1000 Ohio Drive SW, Washington, DC 20242.

The National Park Service seeks a firm-fixed-price quotation to reinforce four holding-cell doors with eight stainless-steel plates measuring 21 inches by 30 inches by 1/4 inch each. The work includes field verification, continuous full-perimeter Metal Inert Gas welding, surface preparation, compatible plate and filler materials, protection of existing hardware and finishes, hot-work and fire controls, edge finishing, door-function testing, cleanup, and all associated labor, equipment, and transportation. The RFQ is a total small business set-aside restricted to concerns under NAICS 238190 (Other Foundation, Structure, and Building Exterior Contractors) with a $19.0 million size standard. The contract type is firm-fixed-price purchase order with low-price technically acceptable evaluation. The contractor must commence work within 10 calendar days after written notice to proceed and complete all work within 30 calendar days. The quotation deadline is September 17, 2026 at 5:00 PM EDT, with a delivery date of September 4, 2026. Quotations must be submitted by email to casey_winters@ios.doi.gov and must remain firm for 60 calendar days after the deadline. The quoter must confirm active SAM registration, provide price breakdowns for labor and materials, demonstrate technical competency addressing welding methodology and material compatibility, and submit all required federal representations and certifications. The Government will not pay a premium for technical superiority and intends to award without exchanges to the responsible quoter offering the lowest-priced technically acceptable quotation.

View the file

Other files

File Type Posted
Sol_140P3026Q0039_Amd_0001.pdf PDF
B08_Attachment_3_RFO_Deviation_Text.docx DOCX document
Attachment_2_DC20260002.txt TXT text file
B08_Attachment_4_Architecture.pdf PDF
B08_Attachment_1_SOW_Cell_Door_Repair_Open_Market.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

c. CITY

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

East Potomac Maintenance Yard 1100 Buckeye Drive, SW

NPS, WASO - WCP Contracting P.O.Box 25287 MS WCP Denver CO 80225

0044056624140P3026Q0039

Casey Winters

354-3980 NPS, National Mall & Mem Parks

20024-2000

09/11/2026

09/17/2026 1700 ED

09/04/2026

Washington

DC

Repairs to holding cell window door frames.

Firm Fixed Price purchase order.

Low price technically acceptable evaluation.

Site visit available on Tuesday, 15

September at 11AM EST.

Contract Specialist: Casey Winters, casey_winters@ios.gov

Site Visit POC - Scott Sommers

Period of Performance: 09/21/2026 to

11/05/2026

00010 Holding Cell Door Repair

Product/Service Code: Z2QA

Continued...

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P3026Q0039

Product/Service Description: REPAIR OR

ALTERATION

OF RESTORATION OF REAL PROPERTY (PUBLIC OR

PRIVATE)

Delivery: 09/04/2026

REQUEST FOR QUOTATIONS

USPP District 1 Substation Holding-Cell Door Plate Reinforcement

Department of the Interior Contract Operations, National

Requiring activity: National Park Service / U.S. Park Police

RFQ information Detail

RFQ number

Acquisition method Open-market request for quotations published in SAM.gov and supplemented by direct email under the DOI RFO FAR Part 12 commercial acquisition framework

Primary NAICS 238190, Other Foundation, Structure, and Building Exterior Contractors

Small-business size standard $19.0 million

PSC Z2FF, Repair or Alteration of Penal Facilities

Competition Total small business set-aside

Contract type Firm-fixed-price purchase order

Contract Specialist Casey J. Winters, Contract Specialist

Email casey_winters@ios.doi.gov

1. Request and Legal Effect

The National Park Service requests quotations to reinforce four holding-cell doors at the U.S. Park Police District 1 Substation, 1000 Ohio Drive SW, Washington, DC 20242.

This RFQ is a total small business set-aside. Quotations are solicited only from small business concerns under NAICS 238190 and the $19.0 million size standard. The selected concern must have an active registration in the System for Award Management and be otherwise eligible for award. The solicitation notice and every amendment are published in SAM.gov. Supplemental email outreach does not replace or change the official SAM.gov record.

The Government intends to issue one firm-fixed-price purchase order for the complete work described in Attachment 1.

A quotation is not an offer and cannot be accepted by the Government to form a binding contract. The Government's signed purchase order is the Government's offer. A binding contract results only when the selected supplier accepts the purchase order in writing or begins substantial performance. No work may begin before the Contracting Officer issues both the purchase order and written notice to proceed.

2. Price Schedule

The firm-fixed price shall include field verification; labor; supervision; eight stainless-steel plates; consumables; equipment; tools; protection; welding; surface preparation;

finish work; testing; cleanup; transportation; travel; overhead; profit; and every incidental cost necessary for a complete result.

CLIN Description Quantity Unit Firm-fixed price

00010

Complete holding-cell door reinforcement in accordance with Attachment 1

1 Job $__________

Total evaluated firm-fixed price: $__________

The price breakdown requested in section 6 is informational and does not create separate payment items. One final invoice may be submitted after completion and Government acceptance.

3. Place and Period of Performance

Work will be performed at the USPP District 1 Substation, 1000 Ohio Drive SW, Washington, DC 20242.

The Contractor shall commence work within 10 calendar days after written notice to proceed and complete all work within 30 calendar days after written notice to proceed.

Onsite work shall occur on a schedule proposed by the Contractor and accepted in writing by the Contracting Officer's Representative.

No prequotation site visit is scheduled. After award and before fabrication, the Contractor shall verify the field conditions and dimensions required by Attachment 1.

4. Written Questions and Amendments

Email questions to casey_winters@ios.doi.gov. Questions must be submitted in writing.

The Government will publish every substantive question and answer through a written solicitation amendment in SAM.gov and furnish that amendment at the same time to every known solicitation recipient and every prospective source that requested the solicitation. A private communication, oral statement, or response from any other source does not change this RFQ.

A question received after the deadline may be answered only if the Contracting Officer determines that the answer will benefit all quoters and time permits issuance of a written amendment before closing. Each quoter shall acknowledge every amendment in its quotation.

5. Quotation Submission

Email the complete quotation to casey_winters@ios.doi.gov. The SAM.gov solicitation notice is the official source for amendments and deadline changes.

The email subject shall state the final assigned RFQ number and "USPP D1 Cell Door Reinforcement." The quoter is responsible for timely receipt. Prices shall remain firm for 60 calendar days after the quotation deadline.

Submit one signed PDF quotation. Clearly identify any additional product-data attachment.

6. Required Quotation Contents

The quotation shall include:

1. Legal business name, address, email address, Unique Entity Identifier, and signature of a person authorized to bind the concern.

2. Confirmation that the concern is actively registered in SAM and its size representation under NAICS 238190.

3. The completed CLIN 00010 price and total firm-fixed price.

4. An informational price breakdown for labor, stainless-steel plates and other materials, equipment, travel, and other direct costs.

5. A concise technical approach addressing the Statement of Work; field verification; exact plate quantity and dimensions; surface preparation; continuous full-perimeter Metal Inert Gas welding; compatible plate and filler materials; protection of glass, hardware, finishes, and police operations; hot-work and fire controls; edge finishing; door-function testing; and cleanup.

6. Confirmation that the quotation covers four doors and eight plates, each plate measuring 21 inches by 30 inches by 1/4 inch.

7. The proposed stainless-steel grade and finish and the basis for compatibility with the existing doors.

8. A proposed schedule showing completion within 30 calendar days after notice to proceed.

9. Identification of each proposed subcontractor and its work, or a statement that no subcontractor is proposed.

10. A statement identifying whether the quoter intends to perform work at a secondary site of the work as described in FAR 52.222-5. If yes, identify the location and the work to be performed there.

11. Identification of the country of manufacture for each stainless-steel plate and confirmation whether it is domestic construction material under FAR 52.225-9. A request to use foreign construction material shall include the information required by FAR 52.225-9 and FAR 52.225-10.

12. Acknowledgment of every solicitation amendment.

13. Identification of every exception or assumption. Silence means the quotation takes no exception to the RFQ and Attachment 1.

14. Each completed representation or disclosure required by FAR 52.209-2, FAR 52.209-11, FAR 52.219-1, and FAR 52.240-90 in Attachment 4, except information the applicable provision permits the quoter to supply through its current SAM representations.

7. Evaluation and Selection

The Government will select the responsible quoter submitting the lowest-priced technically acceptable quotation.

7.1 Technical Acceptability

The Government will rate technical acceptability as Acceptable or Unacceptable. A quotation is Acceptable only if it:

1. Takes no material exception to this RFQ or any attachment and satisfies every material solicitation requirement.

2. Covers all four doors and eight plates at the exact stated dimensions.

3. Commits to continuous full-perimeter Metal Inert Gas welds and compatible materials.

4. Provides a feasible approach, consistent with the Statement of Work, for field verification, surface preparation, welding, protection, finishing, door-function testing, hot-work control, and cleanup.

5. Commits to complete performance within 30 calendar days after notice to proceed.

A quotation rated Unacceptable is ineligible for award. The Government will not pay a premium for technical superiority.

7.2 Price

The Government will evaluate the total firm-fixed price for CLIN 00010 and determine price reasonableness. The Government may use competition, the informational price breakdown, the independent Government estimate, historical prices adjusted for relevant differences, available market information, or any combination of those methods.

If a quotation requests use of foreign construction material based on unreasonable cost, the Government will apply FAR 52.225-10.

7.3 Responsibility and Eligibility

Before award, the Government will verify the prospective contractor's active SAM registration, exclusions, responsibility, and size representation under NAICS 238190.

Small-business status under the assigned NAICS is an award-eligibility condition.

Quotations from concerns that are not small businesses will be rejected under FAR 52.219-6.

7.4 Exchanges and Purchase-Order Issuance

The Government intends to evaluate quotations and issue the purchase order without exchanges. Each initial quotation should contain the quoter's best terms. The Government may conduct fair exchanges, request a revised quotation, reject any or all quotations, or waive informalities and minor irregularities when the Contracting Officer determines that action is in the Government's interest.

8. Order Administration

The Contract Specialist is the preaward solicitation contact. Casey J. Winters is not the Contracting Officer.

Only the Contracting Officer may issue the purchase order, authorize performance, change the requirement, change the price or completion period, accept nonconforming work, or modify the resulting purchase order.

The Contracting Officer will designate a COR at award. The COR may coordinate access and scheduling, monitor performance, inspect the work, and document acceptance within the written delegation. The COR may not change the purchase order.

The Government will not pay for quotation preparation or work performed without authorization.

8.1 Federal Contract Information

The Contractor shall safeguard nonpublic Government information received or generated during contract performance in accordance with FAR 52.240-93 in Attachment 4. The Government will provide facility-entry and security instructions during postaward coordination under the Statement of Work.

SECTION I - CONTRACT CLAUSES

FAR 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (MAR 2026) (DEVIATION)

(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable;

(D) Contractor point of contact; and

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(5) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the

Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.

(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services;

(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) Other contract clauses incorporated in the solicitation or contract;

(4) Addenda to this solicitation or contract;

(5) Solicitation provisions incorporated in the solicitation;

(6) Other paragraphs of this clause;

(7) Other documents, exhibits, and attachments; and

(8) The specification.

(s) Unauthorized obligations.

(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(u) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:

https://www.acquisition.gov

(End of clause)

Clause Title Date

52.203-17 Contractor Employee Whistleblower Rights NOV 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements JAN 2017

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations MAY 2014

52.222-15 Certification of Eligibility MAY 2014

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024

52.225-9 Buy American—Construction Materials OCT 2022

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving MAY 2024

52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.232-33 Payment by Electronic Funds Transfer- System for Award Management OCT 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors MAR 2023

52.233-1 Alternate I Disputes—Alternate I

MAY 2014;

Alternate I DEC

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

The current DOI-adopted RFO full text for FAR 52.204-9, 52.204-13, 52.204-19, 52.209- 10, 52.219-6, 52.219-28, 52.222-3, 52.222-6 through 52.222-11, 52.222-14, 52.222-50, 52.222-62, 52.222-90, 52.223-23, 52.236-5, 52.236-7, 52.236-13 Alternate I, 52.236-14, 52.240-91, 52.240-93, 52.243-5, and 52.244-6 is set forth in Attachment 4 and forms part of this solicitation and resulting purchase order.

For FAR 52.225-9 paragraph (b)(2), the Government lists no excepted foreign construction material: None.

FAR 52.222-55 Minimum Wages for Contractor Workers Under Executive Order

14026 (MAY 2026) (DEVIATION)

Minimum Wages for Contractor Workers Under Executive Order 14026 (MAY 2026)

(DEVIATION)

(a) Definitions. As used in this clause—

United States means the 50 states, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.).

Worker—

(1)

(i) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 14026, and —

(A) Whose wages under such contract are governed by the Fair Labor Standards Act (29 U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV);

(B) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541; and

(C) Regardless of the contractual relationship alleged to exist between the individual and the employer.

(ii) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).

(iii) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.

(2)

(i) A worker performs on a contract if the worker directly performs the specific services called for by the contract; and

(ii) A worker performs in connection with a contract if the worker's work activities are necessary to the performance of a contract but are not the specific services called for by the contract.

(b) Executive Order minimum wage rate.

(1) The Contractor must pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $15.00 per hour beginning January 30, 2022.

(2) The Contractor must adjust the minimum wage paid, if necessary, beginning January 1, 2023, and annually thereafter, to meet the applicable annual E.O. minimum wage. The Administrator of the Department of Labor's Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on https://www.sam.gov (or any successor Web site), and a general notice on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, that will provide information on the E.O.

minimum wage and how to obtain annual updates. The applicable published E.O.

minimum wage is incorporated by reference into this contract.

(3)

(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O. minimum wage determination. Prices will be adjusted only for increased labor costs (including subcontractor labor costs) as a result of an increase in the annual E.O. minimum wage, and for associated labor costs (including those for subcontractors). Associated labor costs must include increases or decreases that result from changes in social security and unemployment taxes and workers' compensation insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.

(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2). Contractors must consider any subcontractor requests for such price adjustment.

(iii) The Contracting Officer must not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and must not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.

(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any applicable law or other requirement under this contract establishing a shorter pay period. Workers must be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.

(6) The Contractor must pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker's wages below the E.O. minimum wage rate only if done in accordance with 29 CFR 23.230, Deductions.

(7) The Contractor must not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.

(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance or any applicable contract establishing a minimum wage higher than the E.O.

14026 minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.

(9) The Contractor must pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.

(10) The Contractor must follow the policies and procedures in 29 CFR 23.240(b) and

23.280 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.

(c)

(1) This clause applies to workers as defined in paragraph (a). As provided in that definition—

(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;

(ii) Workers with disabilities whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c) are covered; and

(iii) Workers who are registered in a bona fide apprenticeship program or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship, are covered.

(2) This clause does not apply to—

(i) Fair Labor Standards Act (FLSA)-covered individuals performing in connection with contracts covered by the E.O., i.e. those individuals who perform duties necessary to the performance of the contract, but who are not directly engaged in performing the specific work called for by the contract, and who spend less than 20 percent of their hours worked in a particular workweek performing in connection with such contracts;

(ii) Individuals exempted from the minimum wage requirements of the FLSA under 29 U.S.C. 213(a) and 214(a) and (b), unless otherwise covered by the Service Contract Labor Standards statute, or the Wage Rate Requirements (Construction) statute. These individuals include but are not limited to—

(A) Learners, apprentices, or messengers whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(a);

(B) Students whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(b); and

(C) Those employed in a bona fide executive, administrative, or professional capacity (29 U.S.C. 213(a)(1) and 29 CFR part 541).

(d) Notice. The Contractor must notify all workers performing work on, or in connection with, this contract of the applicable E.O. minimum wage rate under this clause. With respect to workers covered by the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, the Contractor may meet this requirement by posting, in a prominent and accessible place at the worksite, the applicable wage determination under those statutes. With respect to workers whose wages are governed by the FLSA, the Contractor must post notice, utilizing the poster provided by the Administrator, which can be obtained at www.dol.gov/agencies/whd/government-contracts, in a prominent and accessible place at the worksite. Contractors that customarily post notices to workers electronically may post the notice electronically provided the electronic posting is displayed prominently on any Web site that is maintained by the contractor, whether external or internal, and customarily used for notices to workers about terms and conditions of employment.

(e) Payroll Records.

(1) The Contractor must make and maintain records, for three years after completion of the work, containing the following information for each worker:

(i) Name, address, and social security number;

(ii) The worker's occupation(s) or classification(s);

(iii) The rate or rates of wages paid;

(iv) The number of daily and weekly hours worked by each worker;

(v) Any deductions made; and

(vi) Total wages paid.

(2) The Contractor must make records pursuant to paragraph (e)(1) of this clause available for inspection and transcription by authorized representatives of the

Administrator. The Contractor must also make such records available upon request of the Contracting Officer.

(3) The Contractor must make a copy of the contract available, as applicable, for inspection or transcription by authorized representatives of the Administrator.

(4) Failure to comply with this paragraph (e) shall be a violation of 29 CFR 23.260 and this contract. Upon direction of the Administrator or upon the Contracting Officer's own action, payment must be withheld until such time as the noncompliance is corrected.

(5) Nothing in this clause limits or otherwise modifies the Contractor's payroll and recordkeeping obligations, if any, under the Service Contract Labor Standards statute, the Wage Rate Requirements (Construction) statute, the Fair Labor Standards Act, or any other applicable law.

(f) Access. The Contractor must permit authorized representatives of the Administrator to conduct investigations, including interviewing workers at the worksite during normal working hours.

(g) Withholding. The Contracting Officer, upon his or her own action or upon written request of the Administrator, must withhold funds or cause funds to be withheld, from the Contractor under this or any other Federal contract with the same Contractor, sufficient to pay workers the full amount of wages required by this clause.

(h) Disputes. Department of Labor has set forth in 29 CFR 23.510, Disputes concerning contractor compliance, the procedures for resolving disputes concerning a contractor's compliance with Department of Labor regulations at 29 CFR part 23. Such disputes must be resolved in accordance with those procedures and not the Disputes clause of this contract. These disputes include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the Department of Labor, or the workers or their representatives.

(i) Antiretaliation. The Contractor must not discharge or in any other manner discriminate against any worker because such worker has filed any complaint or instituted or caused to be instituted any proceeding under or related to compliance with the E.O. or this clause, or has testified or is about to testify in any such proceeding.

(j) Subcontractor compliance. The Contractor is responsible for subcontractor compliance with the requirements of this clause and may be held liable for unpaid wages due subcontractor workers.

(k) Subcontracts. The Contractor must include the substance of this clause, including this paragraph (k) in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, and are to be performed in whole or in part in the United States.

(End of clause)

FAR 52.252-6 Authorized Deviations in Clauses (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

DOI-AAAP-0028 Electronic Invoicing and Payment Requirements-Invoice Processing Platform (APR 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified by FAR 52.212-4 and any other payment instructions in this contract. The IPP website address is https://www.ipp.gov.

Under this purchase order, the Contractor shall submit a copy of the invoice and any supporting documentation required by the COR or Contracting Officer as an attachment to the IPP invoice.

The Contractor must use the IPP website to register, access, and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact listed in SAM will receive enrollment instructions after award. Contractor assistance with enrollment may be obtained through the IPP Customer Support desk.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer.

(End of local clause)

DIAR 1452.201-70 Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

SECTION II - SOLICITATION PROVISIONS

FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

https://www.acquisition.gov

(End of provision)

Provision Title Date

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation

JAN 2017

52.225-10 Notice of Buy American Requirement- Construction Materials MAY 2014

The current DOI-adopted RFO full text for FAR 52.204-7, 52.209-2, 52.209-11, 52.219- 1, 52.212-1, and 52.240-90 is set forth in Attachment 4 and forms part of this solicitation.

Addendum to FAR 52.212-1

The following paragraphs replace paragraphs (a) through (d) of FAR 52.212-1 for this

RFQ:

(a) Submission of quotations. Submit a signed quotation by email to casey_winters@ios.doi.gov. Eastern Time. The quotation shall contain the information required by sections 5 and 6 of this RFQ and identify the final assigned RFQ number.

(b) Quotation validity. The quoter shall hold its price firm for 60 calendar days after the quotation deadline.

(c) Late submissions, revisions, and withdrawals.

(1) The quoter is responsible for timely receipt at the designated email address.

(2) A late quotation or revision may be considered only before purchase-order issuance and only when the Contracting Officer determines that consideration will not unduly delay the acquisition. A late revision that makes an otherwise successful quotation more favorable may be considered before purchase-order issuance.

(3) If an emergency or unanticipated event interrupts normal Government email receipt, the Government may extend the deadline by written amendment.

(4) A quoter may withdraw its quotation by written notice received before purchase-order issuance.

(d) Purchase-order formation. A quotation is not an offer. The Government's signed purchase order is the Government's offer and becomes binding only upon the supplier's written acceptance or commencement of substantial performance. The Government intends to evaluate without exchanges but may conduct fair exchanges, request revised quotations, reject any or all quotations, and waive minor irregularities when in the Government's interest.

Paragraph (e) of FAR 52.212-1 remains unchanged.

(End of addendum)

FAR 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work

(MAY 2026) (DEVIATION)

Construction Wage Rate Requirements-Secondary Site of the Work (MAY 2026)

(DEVIATION)

(a)

(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate…

This is the start of the file's text. The full file is on GovTribe.