This is a Statement of Work for reinforcement of holding-cell doors at the U.S. Park Police District 1 Substation located at 1000 Ohio Drive SW, Washington, DC 20242. The contractor shall reinforce the lower glass area of four holding-cell doors by installing stainless-steel plates measuring 21 inches wide by 30 inches high by 1/4 inch thick on each side of each door, resulting in eight total installed plates. Work must commence within 10 calendar days of written notice to proceed and be completed within 30 calendar days. The contractor shall furnish all labor, supervision, supplies, materials, equipment, tools, and transportation necessary to complete the work, with the Government providing only existing electrical outlets. The stainless-steel plates shall be new material suitable for secure interior institutional use, attached via continuous Metal Inert Gas welding around the full perimeter, with all exposed edges and welds buffed, sanded, or ground smooth and free of burrs or sharp corners.
The contractor must conduct post-award field verification of all four doors to confirm dimensions, alignment, existing materials, and attachment method compatibility before fabrication. Key submittals include the proposed work schedule, stainless-steel product data, plate layout based on field verification, welding procedure with welder qualifications, and an accident-prevention and hot-work plan covering grinding, welding, paint-dust control, and fire prevention for the active police facility. The contractor is responsible for all surface preparation, paint removal, dust and debris containment, edge treatment, finish restoration, door function demonstration, site cleanup, and correction of any work defects at no increase to contract price. Final acceptance requires verification that each door operates through its full range, closes and latches without binding, locks securely, and meets all tamper-resistance requirements through visual inspection and functional demonstration. The firm-fixed price includes all adjustments and corrective work required due to the contractor's means, methods, welding, or installation procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P3026Q0039_Amd_0001.pdf | ||
| Sol_140P3026Q0039.pdf | ||
| B08_Attachment_4_Architecture.pdf | ||
| B08_Attachment_3_RFO_Deviation_Text.docx | DOCX document | |
| Attachment_2_DC20260002.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
USPP District 1 Substation Holding-Cell Door Plate Reinforcement Requiring Activity: National Mall and Memorial Parks Project Location: USPP District 1 Substation, 1000 Ohio Drive SW, Washington, DC 20242
1. Background The U.S. Park Police District 1 Substation supports officer deployment, emergency response, detainee holding, critical communications, and law-enforcement operations within National Mall and Memorial Parks.
2. Purpose The Contractor shall reinforce the lower glass area of four holding-cell doors. The Contractor shall install stainless-steel plates over the designated lower door-window area to reduce the risk of future glass damage while preserving safe door movement and locking function.
3. Period of Performance and Work Hours The Contractor shall commence work within 10 calendar days after written notice to proceed and shall complete all work within 30 calendar days after written notice to proceed.
Onsite work shall occur on a schedule proposed by the Contractor and accepted in writing by the Contracting Officer's Representative (COR). The Contractor shall coordinate the work schedule sufficiently in advance to permit secure access and continued police operations.
4. Site Access, Field Verification, Security, and Operational Coordination No prequotation site visit is scheduled.
After award and before fabrication or installation, the Contractor shall inspect all four holding-cell doors and verify the Government-designated plate locations, door dimensions, alignment, existing materials, available electrical service, and compatibility with the required attachment method.
If the Contractor discovers an actual concealed condition that materially differs from the conditions indicated in the contract or makes the specified installation infeasible, the Contractor shall stop the affected work and notify the Contracting Officer and COR in writing. FAR 52.243-5 governs changes and changed conditions. Only written Contracting Officer direction authorizes changed work, price, or time.
The Contractor shall submit all postaward scheduling and access requests in writing to the COR at the email address identified at award. The Contractor shall follow facility-entry and security instructions. The Government will control access to the affected holding cells.
The Contractor shall not begin work in an area until the Government has provided access and the COR has confirmed the accepted schedule in writing. Only the Contracting Officer may change the contract requirements, price, or period of performance.
The Contractor shall notify the Contracting Officer and COR in writing of any concealed condition, dimensional discrepancy, unsafe condition, or material incompatibility before proceeding with affected work. The Contractor shall not fabricate a plate until it has verified the applicable field dimensions.
5. Contractor-Furnished Resources and Government Utilities The Contractor shall furnish all labor, supervision, supplies, materials, equipment, tools, transportation, and travel necessary to complete the work. The Government will furnish no property under this contract.
The Government will make the building's existing electrical outlets available for contractor use without charge. The Contractor shall verify compatibility with its equipment and furnish all adapters, extension equipment, distribution equipment, temporary connections, and additional or temporary power needed when the existing outlets do not suit its equipment.
6. Technical Requirements
6.1 Pre-Work Verification
The Government will identify the four doors and the required lower-window coverage before work begins.
The Contractor shall verify existing door construction, coatings, glass, hinges, closers, locks, frames, clearances, wiring, and other conditions reasonably ascertainable during the postaward inspection.
The firm-fixed price includes adjustments and corrective work required because of the Contractor's means, methods, welding, or plate installation. If postaward verification identifies an existing condition that materially differs from the conditions indicated in the contract or makes the specified installation infeasible, the Contractor shall stop the affected work and notify the Contracting Officer and COR in writing. The Contractor shall not proceed until the Contracting Officer issues written direction. Work outside the stated scope is not authorized without a written change.
6.2 Surface Preparation
The Contractor shall remove the painted surface around the designated lower glass-frame area on both sides of each door. Paint removal shall fully expose sound underlying metal for welding. The Contractor may use sanding, grinding, or another mechanical method permitted by the contract.
The Contractor shall remove dust, debris, oils, rust, and other contaminants from all prepared surfaces. The Contractor shall contain and collect paint dust and swarf so no residue remains on floors, walls, doors, windows, fixtures, equipment, or adjacent surfaces.
The Contractor shall inspect the existing coatings, use controls appropriate to the observed conditions and applicable law, and prevent uncontrolled release of paint dust, metal particles, fumes, and waste. If the Contractor encounters a suspected hazardous material or an unsafe concealed condition, it shall stop the affected work and notify the Contracting Officer and COR in writing before disturbing the condition.
6.3 Stainless-Steel Plates
The Contractor shall furnish and install one stainless-steel plate measuring 21 inches wide by 30 inches high by 1/4 inch thick on each side of four doors. The completed work shall contain eight installed plates.
The plates shall be new stainless steel suitable for secure interior institutional use. The Contractor shall identify the proposed grade, finish, and basis for compatibility with the existing doors in its quotation. The Contractor shall select compatible filler metal and consumables and provide product data with its postaward submittal.
Construction materials brought to the site for incorporation into the work shall comply with FAR 52.225-9 and any exception expressly listed in the purchase order. The Government lists no excepted foreign construction material. Products incorporated into the work shall also comply with the sustainable-products requirements of the contract.
6.4 Welding
The Contractor shall attach each plate by Metal Inert Gas welding. Each plate shall receive a continuous, full-perimeter weld. Welds shall be uniform, fully bonded, and free of visible gaps, voids, cracks, undercut, incomplete fusion, and other defects prohibited by the contract acceptance standard.
Personnel qualified for the process and materials used shall perform the welding in accordance with the Contractor's written welding procedure and applicable law. The Contractor is responsible for selecting compatible filler metal, shielding gas, heat controls, equipment, and means and methods that produce the required completed work.
The Contractor shall control welding heat and protect glass panes, locking hardware, hinges, closers, seals, frames, coatings, wiring, and other adjacent components from damage. The Contractor may perform the work in place or remove and reinstall a door, subject to Government review and acceptance of the work plan. The Contractor is responsible for all temporary support, handling, protection, removal, and reinstallation needed for its selected method.
6.5 Edge Treatment and Finish
After installation, the Contractor shall buff, sand, or grind every exposed plate edge and weld seam. The completed surfaces shall contain no burrs, sharp corners, projections, gaps, or other hazards. Weld seams shall be smooth and continuous.
The Contractor shall clean the stainless steel and restore surfaces disturbed by the work to a corrosion-resistant, safe, and finished condition. Restored coatings shall be compatible with the existing substrate and reasonably match the adjacent finish.
6.6 Door Function
After installation, the Contractor shall demonstrate that each door moves through its full operating range, closes and latches without binding, and locks and unlocks securely using the existing operating controls. The Contractor shall correct, at no increase in contract price, alignment or hardware conditions caused by the welding or plate installation.
6.7 Tamper Resistance
The completed plates and continuous perimeter welds shall form a secure, tamper-resistant barrier over the designated lower window area. The completed work shall contain no loose edge, exposed gap, incomplete weld, or accessible projection that permits ordinary hand prying or creates a detainee safety hazard. Acceptance will be based on visual inspection and the functional demonstration in section 6.6. Destructive testing is not required.
6.8 Site Cleanup
The Contractor shall remove all debris, paint dust, metal shavings, swarf, welding residue, waste, temporary protection, and equipment from the worksite. The Contractor shall return each affected area to a safe and clean condition suitable for continued police operations.
7. Safety and Hot Work The Contractor shall maintain the work area in a clean and safe condition. The Contractor shall use barricades, ropes, signs, audible signals, or other controls required by the accepted safety plan to protect Government personnel, detainees, visitors, property, and the work.
For an accident, fire, injury, property-damage event, or security event, the Contractor shall immediately initiate the facility emergency-response procedure and take actions necessary to protect life and property. The Contractor shall then notify the Contracting Officer and COR in writing as soon as practicable and within the time required by the accepted safety plan.
Before beginning onsite work, the Contractor shall submit an accident-prevention and hot-work plan appropriate to grinding, welding, heavy plate handling, paint-dust control, ventilation, fire prevention, and work inside an active police facility. The Contractor shall obtain and comply with the facility's hot-work permit and fire-watch requirements. The Government will provide the facility permit process during postaward coordination. Government review and acceptance of the plan does not transfer responsibility for the Contractor's means, methods, personnel, or safety compliance.
8. Submittals and Closeout Records Before fabrication or onsite work, as applicable, the Contractor shall submit to the COR:
1. The proposed work schedule.
2. Stainless-steel plate product data.
3. The proposed plate layout based on field verification.
4. The welding procedure and evidence of welder qualifications.
5. The accident-prevention and hot-work plan.
After completing the work, the Contractor shall provide photographs if photography is authorized, material records, and a short written record of the door-function demonstration.
Government review of a submittal does not relieve the Contractor of responsibility for compliance with the contract. Government review does not constitute approval of the Contractor's means, methods, safety practices, welding-procedure development, or other responsibilities assigned to the Contractor.
9. Inspection and Acceptance The COR will inspect the completed work and verify compliance with the contract specifications. Acceptance will be documented in writing after all work, testing, corrections, cleanup, and required closeout submissions are complete.
At a minimum, each completed door shall meet all of the following requirements:
1. The specified plate is installed on each side of the door at the Government-designated location.
2. Each weld is continuous around the full plate perimeter and satisfies the stated welding acceptance criteria.
3. Every exposed edge and weld seam is smooth and free of burrs, sharp corners, projections, gaps, and other hazards.
4. The installation has not damaged the glass, door leaf, hinges, closer, lock, frame, coatings, wiring, or adjacent property.
5. The door completes the required movement, closing, latching, locking, and tamper-resistance tests.
6. Required finish restoration and corrosion protection are complete.
7. The work area is clean and suitable for continued police operations.
The Contractor shall correct rejected work and repeat the affected demonstration before final acceptance.
10. Warranty and Correction of Defects The warranties and correction rights in FAR 52.212-4 and the other terms of the purchase order apply. A commercial warranty included in the Contractor's quotation becomes part of the purchase order only if the Contracting Officer expressly accepts it.
11. Contracting Officer and COR Authority The Contracting Officer has sole authority to change the contract requirements, terms, conditions, price, or period of performance. The COR may monitor performance, conduct technical inspections, document acceptance within the written delegation, and coordinate access and scheduling.
COR direction is valid only when it is consistent with the contract and within the COR's written delegation. The Contractor shall notify the Contracting Officer in writing before acting on any direction that the Contractor believes changes the contract.
12. Insurance and Responsibility for Damage The Contractor is responsible for damage caused by its fault or negligence as provided by FAR 52.236-7 and the other terms of the contract. No acquisition-specific insurance clause or coverage limit is imposed.
13. Travel The Contractor is responsible for all travel necessary to complete the work described in this Statement of Work.
14. Invoice Requirements After Government acceptance, the Contractor shall submit one itemized final invoice through https://www.ipp.gov in accordance with the contract's invoicing and payment terms. The invoice shall identify the purchase-order number, contract line item, work location, completed work, and any other information required by the contract. An invoice not submitted through IPP may be rejected unless the Contracting Officer authorizes another method in writing.