SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040566849

NPS, NCR - Regional Contracting

Acquisition Management Division

1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001

PCR

Craig Madison 2029133810

310257

04/05/2022

140P3022Q0023

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Attachment 1 - Cedar Shake and Shingle Bureau Roof Manual 2020

Attachment 2 - WD MD20220036 Washington effective 3-11-22

Attachment 3 - WD MD20220042 Frederick effective 3-11-22

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 180 calendar days and complete it within ________________ ________________ calendar days after receiving

05/11/2022

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, NCR - Regional Contracting Acquisition Management Division

1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001

PCR

Craig Madison

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 60

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P3022Q0023

Request for Quote (RFQ) 140P3022Q0023 is for

Chesapeake and Ohio Canal National Historical

Park Reroofing of Lock Houses 28, 31, 49, and the

Dam 4 Winch House. The Cedar Shake and Shingle

Manual and wage determination are provided as separate attachments in accordance with section C of this document.

Legacy Doc #: NPS

Delivery: 04/28/2023

Delivery Location Code: 0009060137

NPS, C&O Canal NHP

C&O Canal Park Headquarters

142 West Potomac Street

Hagerstown MD 21740 US

00010 Reroofing of Lock Houses 28, 31, 49, and the Dam

4 Winch House

Product/Service Code: Z2AZ

Product/Service Description: REPAIR OR ALTERATION

OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE

BUILDINGS

Period of Performance: 05/30/2022 to 04/28/2023

POC Information

Contracting Officer Representative is Richard

Fallon at richard_fallon@nps.gov or 240-291-8397.

Contracting Officer is Craig Madison at craig_madison@nps.gov or 202-913-3810.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140P3022Q0023

PAGE OF

5 | 61

PART I - THE SCHEDULE

SECTION B – BID SCHEDULE

Chesapeake and Ohio Canal National Historical Park Lockhouse 28, 31, 49 and Dam 4 Winch House Roof Replacements

Frederick and Washington Counties, Maryland

Item Method of No. Description Measurement Total

BASE ITEM – LOCKHOUSE 28

001 Mobilization/Demobilization Lump Sum $

002 Equipment Lump Sum $

003 Materials Lump Sum $

004 Labor Lump Sum $

005 Overhead Lump Sum $

006 Profit Lump Sum $

LOCKHOUSE 28 TOTAL $

Item Method of No. Description Measurement Total

BASE ITEM – LOCKHOUSE 31

007 Mobilization/Demobilization Lump Sum $

008 Equipment Lump Sum $

009 Materials Lump Sum $

010 Labor Lump Sum $

011 Overhead Lump Sum $

012 Profit Lump Sum $

LOCKHOUSE 31 TOTAL $

140P3022Q0023

6 | 61

Item Method of No. Description Measurement Total

BASE ITEM – LOCKHOUSE 49

013 Mobilization/Demobilization Lump Sum $

014 Equipment Lump Sum $

015 Materials Lump Sum $

016 Labor Lump Sum $

017 Overhead Lump Sum $

018 Profit Lump Sum $

LOCKHOUSE 49 TOTAL $

Item Method of No. Description Measurement Total

BASE ITEM – DAM 4 WINCH HOUSE

019 Mobilization/Demobilization Lump Sum $

020 Equipment Lump Sum $

021 Materials Lump Sum $

022 Labor Lump Sum $

023 Overhead Lump Sum $

024 Profit Lump Sum $

DAM 4 WINCH HOUSE TOTAL $

TOTAL FOR ALL BASE ITEMS $

Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

140P3022Q0023

7 | 61

FAR 36.204 Disclosure of the magnitude of construction projects

The Government’s estimate is:

Between $100,000 and $250,000.

140P3022Q0023

8 | 61

SECTION C – SPECIFICATIONS

C.0 BACKGROUND

C.0.1 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include: Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.

C.0.2 BACKGROUND

Preserving America's early transportation history, the C&O Canal began as a 184.5-mile dream of passage to Western wealth. Operating for nearly 100 years the canal was a lifeline for communities along the Potomac River as coal, lumber, and agricultural products floated down the waterway to market. Today it endures as a pathway for discovering historical, natural, and recreational treasures.

The Chesapeake and Ohio Canal National Historical Park preserves the rich history of the canal. Within the canal, there are many classified structures listed on the National Register of Historic Places. Four of these structures are in need of new wood shingle roofs: Lockhouses 28, 31, 49 and Dam 4 Winch House. For more detailed and general information checkout the website at: Chesapeake & Ohio Canal National Historical Park (U.S. National Park Service) (nps.gov)

C.1 PURPOSE

The DOI – NPS - NCA – has a requirement to replace the roofs at Lockhouses 28, 31, 49 and Dam 4 Winch House.

Replacement of the roofing materials will address the deferred maintenance backlog, re-establish the life cycle of the roofing components, protect the investment that the National Park Service and our partner organization the Canal Trust, has made to these structures, and continue to provide the opportunity for visitors to enjoy and stay in an historic lockhouse.

C.2 SCOPE OF WORK

The contractor shall provide for all labor, materials, supplies, equipment, transportation, supervision, ancillary services, and all other necessary items to complete this project, performing all work in complete compliance with this Scope of Work, and any plans, drawings, and specifications issued or directed through this solicitation and award in order to ensure quality workmanship. At a minimum, the supplies and materials shall be of a quality to conform to all specifications.

At the three lockhouses, remove the wood shingle roof, remove water-damaged sheathing (estimate 10% replacement), and any water-damaged rake boards and fascia. Remove and retain the gutters and rainwater leaders as needed to proceed with work. Install replacement sheathing, wood shingle, waterproofing, rake boards and fascia. Reinstall the gutters and leaders.

https://www.nps.gov/choh/index.htm

140P3022Q0023

9 | 61

At the Dam 4 Winch House, remove the rotted shingle roof and any water damaged sheathing (estimate 20% replacement), as well as any compromised rake boards and fascia. Install new sheathing, rake boards and fascia as needed, and a new wood shingle roof.

Work shall be performed on Lock Houses 28, 31, 49 and Dam 4 Winch House within the boundaries of the C and O Canal National Historic Park. The total surface area of all four buildings to be shingled is approximately 4000 sf. The following table summarizes the particulars of each location:

Lockhouse 28 Lockhouse 31 Winch House at Dam 4 Lockhouse 49 Year Constructed

1833 1835 Reconstructed 1971 1839

Mile Marker 48.93 58.0 84.6 108.7 Address Point-of-Rocks, MD

Knoxville, MD Sharpsburg, MD Clear Spring, MD

County Frederick Frederick Washington Washington GPS Coord 39.281915 N -

77.547833 W

39.32962 N -

77.68052 W

39.495839 N -

77.547833 W

39.61584 N -

77.94860 W

Access to site Access via the towpath at Point of Rocks where NPS has boat ramp and parking. Drive to site

Park at Appalachian Trailhead parking lot.

Cross RR track, House is to your left.

Red. Grass driveway. May need to cut back vegetation to get trucks close to structure.

Access off Dam 4 road.

Parking lot off Dam 4 road. Road has narrow spots.

Drive to site. Plenty of room for parking, dumpster.

Site Specific Conditions

This lock house is in the Canal Quarters program.

Do not park vehicles or equipment near canal walls

This site will require crossing of active railway.

This structure is set on a bridge. Debris from roof must be kept out of canal.

This lock house is in the Canal Quarters program. Tall building will require tall ladders to access roof

Safety Contractor will ensure safe passage of persons in and out of building at all times.

Driveway has well head and electrical box on side of driveway. Flagged summer ’21. As you enter driveway, they are on the right side of driveway.

Contractor will be required to use adaptive methods of staging to access roof safely.

Contractor required to use 4 way flashers and not exceed 15mph on towpath. Yield right of way to cyclists and pedestrians.

Contractor will ensure safe passage of persons in and out of building at all times.

Approximate SF 1,000 1,100 900 1,000 Notes Contractor will work with the COR to schedule work during least disruptive time when building is

Highly visible site.

Protect public before, during, and after work. Contractor must notify COR before work begins

Dam 4 Winch House, while a reconstruction, is the sole remaining winch house at the C&O Canal NHP.

Contractor will work with the COR to schedule work during least disruptive time when building is not occupied.

140P3022Q0023

10 | 61 not occupied. so lawn will be mowed. Metal roof not being replaced.

The work shall consist of what is stated below:

Remove wood shingle roofs.

Remove water damaged sheathing (estimate 20%).

Removed any water damaged fascia and/or rakeboards.

Remove, retain, and reinstall gutters and rainwater leaders as needed.

Install replacement sheathing.

Install new flashing as needed.

Install wood shingles.

Install ascia and/or rakeboards as needed.

C.3 SPECIAL PROJECT SPECIFICATIONS

There is limited parking available on some of the sites so the contractor should car pool as much as possible to reduce impact to the lawn areas.

Electrical power will NOT be furnished by the Government. It is essential that the contactors use portable generators to operate such equipment as is necessary in the conduct of their work.

No water will NOT be furnished by the Government.

The existing historic structures are not designed for heavy loading. Do not place heavy equipment or store materials on the roofs.

Apply roofing only in dry weather. Do not apply roofing materials during precipitation or in the event there is a possibility of precipitation during application. Take adequate precautions to ensure that materials, applied roofing, and building structures are protected from possible moisture damage or contamination.

The contractor shall take into consideration the use of existing ancillary equipment, building support systems, and operating environment in order to complete the work as required.

The contractor shall take care as to not damage existing infrastructure. The contractor shall be held liable for cost of all repairs to existing infrastructure that result from the performance of this contract. There are no above-ground utility lines connected to any of these structures.

The determination of the total daily productive man hour requirements, and total quantity of materials for the performance of all construction specified herein is the sole responsibility of the contractor. It is of the utmost importance that the contractor utilizes skilled and productive manpower in order to satisfactorily furnish the required level of service specified in this contract.

The contractor shall take into consideration the potential existence of unknown structures, utilities, and ancillary infrastructure. The Park Service in not aware of any underground voids, dry wells, or cavities in and around the work areas. However, contractor shall take into consideration the potential existence of such hazards while driving and working on this project.

The contractor shall provide all necessary supervision, safety protection devices, and personal protective equipment (PPE), required for complete and safe operations on site. Protective measures shall prevent injury to the public, Federal employees, the contractor’s employees, and damage to or contamination of surrounding property and/or the environment.

Contractor shall investigate existing conditions, review any applicable specification, and make necessary calculations, recommendations, and modifications to achieve compliant and working roof systems.

Contractor is responsible for obtaining any and all required permits and meeting all OSHA and industry regulations that apply for working on roofs, and working around/with electrical equipment. Contractor personnel shall possess

140P3022Q0023

11 | 61 and maintain all required certifications, contractor is responsible for ensuring that appropriate certifications are in place.

No welding or hotwork is anticipated as a part of this scope. Hotwork requires a separate NPS permit. The contractor is responsible for coordinating with the Contracting Officer’s Representative (COR) if hotwork is planned.

Contractor shall coordinate and dispose of all refuse materials. Worksite is to be maintained in a tidy manner, with debris removed each day. A dumpster may be staged on site at a predetermined location for the duration of work.

Contractor shall ensure that job site is free of construction debris, especially nails, during the course of and at the completion of the project.

NPS does not provide for storage of contractor materials or equipment on site. Any materials left overnight are the sole responsibility of contractor. The work area is not secured.

Contractor must field verify all quantities and dimensions affecting the work of this contract.

Contractor shall protect all exposed surfaces from adverse weather conditions during course of work to prevent water infiltration and damage to existing structure.

Remove fall protection and/or scaffold Remove construction barriers, signage, and all construction debris including pieces of felt paper, nails, plastic, cups, etc.

Make repairs to any grass areas as needed. Demobilize from site.

Clean gutters of any job debris. Ensure gutters are clean and functioning as intended.

C.4 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS

All work shall comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and the Secretary of Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.

The Contractor shall utilize the most stringent code requirement, regardless of the code source or the version adopted by a jurisdiction.

o All work shall comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and the Secretary of Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.

o The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.

o All work shall be conducted according to 29 CFR 1926 Subpart M - Fall Protection.

o All work shall performed in accordance with the Specifications, appropriate Department of Labor Wage

Determinations, and conform to the Cedar Shake and Shingle Bureau (CSSB) Manual. This publication may be obtained from: http://www.cedarbureau.org/cms-assets/documents/4997-210747.roof-manual.pdf.

Contractors shall provide the Site Supervisor’s contact information to the CO and COR. Contact information should include office and mobile phone number and email address. During working hours, Site Supervisor shall be available to COR for work discussions.

Contractor shall research and verify, and at all times comply with all applicable laws, life safety codes, ordinances, rules, regulations, and orders of authority having jurisdiction.

Contractor shall be responsible for obtaining all required permits (if applicable) and scheduling all applicable inspections. All inspections must be signed off and completed prior to receipt of final payment. All applicable submittals required, which may include warranty, production information, operation and maintenance documentation, etc. as defined throughout various sections of Special Project Specifications must be provided to COR and CO prior to submission of final invoice. Invoice will be rejected until are required documentation is submitted. Please refer to each Section C.6 for required submittals.

The Contractor shall not use any materials which the COR determines would be unsuitable for the purpose or harmful to any part of the buildings, the contents, equipment or persons.

140P3022Q0023

12 | 61

All materials and equipment are to be installed per manufacturer’s installation guidance.

Contractor must have adequate liability insurance and proper license to perform all work stated herein.

Roofing Shingles: New Western Red Cedar 16” Number 1 Blue Label shingles, premium grade with 100% heartwood, 100% clear and 100% edge grain. All bundles of shingles will be as manufactured and graded only by a CSSB member with attached Certi-Label and Certi-Last labels. Shingles will be installed per Cedar Shake and Shingle Bureau standards with a double starter course, 5” exposure and 316 stainless steel ring shank single nails, 2 per shingle.

Use 30-pound (not #30) ASTM D226 Type II or No. 30 ASTM D4869 Type IV asphalt saturated organic roofing felt.

Use 16 oz/22 mil. copper for all flashings. Flashings shall be installed as indicated in the CSSB manual Figure 13c.

Projections through the roofs to be flashed as per CSSB Manual Figures 14a and 14e.

Use of 316 stainless steel ring shank single nails is required unless otherwise noted.

All exterior trim board being replaced shall be Eastern White Pine. Pine shall be dense (older growth) with a ring count of at least 6 rings per inch(measured along a radial line.) Pine shall be Rift or Quarter Sawn as shown in illustration below(fig 1). Contractor should note such quality lumber may not be readily available at commercial lumber yards and plan ahead to procure the correct material.

Where a piece of a longer board is replaced, Contractor must exercise great care to conceal the union with a dutchman repair. After the repair, contractor may sand smooth, or use epoxy to fill any voids. Finished product will appear to be a single piece of wood after painting.

Figure 1: Sawing Methods

140P3022Q0023

13 | 61

C.4.1 - General Sequence of Work: (each site is slightly different) Plan work at each site thoughtfully: minimize impact to lawn area, trees, and canal features. Contractor is responsible for any damages to park property outside of normal impacts of roofing.

Walk through job site, evaluate job site and note conditions. Determine if tree limbs must be removed for access to site.

If necessary, carefully prune back limbs from access way with clean cuts to next branch. Move limb out of sight and into adjacent woods.

Deliver portable bathroom to job site prior to the start of work.

Deliver dumpster to job site or make plan for using dump truck for debris.

Mobilize to job location, establish work zones, and flag off any hazardous job site conditions.

Erect barriers and or signage to prevent public access to job site.

Stage tools, equipment and materials on site. Contractor is responsible for securing any items left on site. No storage of tools, equipment, or materials will be allowed on site.

Photo document all existing conditions in detail prior to start of work. Each photo must be clearly labeled.

Setup staging or pump jack system.

Establish Fall Protection Systems.

Ensure PPE is worn and OSHA regulations are followed.

Document existing configuration of shingle courses including number of rows and spacing.

Remove all existing shingles and felt paper. Every old nail must be removed: use a tarp and/or nail sweep to capture each nail.

Document condition of roof deck with detailed photos and notes.

Where roof deck is compromised, replace in kind. Estimate 20% for replacement.

Carefully fold back flashings. Evaluate and document condition of flashings with notes and labeled photos.

If flashing is compromised, replace in kind. Estimate 20% for replacement.

Document condition of any wood trim members (rake boards, soffit, fascia) which roof will be nailed to with detailed photos and notes.

Replace any compromised wooden trim elements in kind. Estimate 20% for replacement.

Install 30 pound felt paper as directed in CSSB Manual. Note carefully: #30 felt (number 30 felt) vs. 30# (30 pound felt paper). #30 is a lesser product and will not be used. Do not use Ice and Water shield, or other brands of adhesive backed underlayments anywhere on roof field.

Around chimney, install adhesive backed underlayment directly onto roof deck, 3’ from walls of chimney.

Install Cedar Breather.

Ensure cedar breather is not visible after roof is finished.

Install shingles as outlined in CSSB Manual. Use only 2 nails per shingle. Ensure that shingles are fastened according to CSSB guidelines.

For final two (2) courses of roof, cap shingles with Vycor or equal adhesive backed self-sealing membrane.

For final roof course, apply rolled copper sheating fastened with copper nails.

At ridge, finish roof with a combed ridge as noted at beginning of project. Prior to installation of combed ridge, top layers should be covered with Vycor or equal.

Remove fall protection and/or scaffold Remove construction barriers, signage, and all construction debris including pieces of felt paper, nails, plastic, cups, etc.

Make repairs to any grass areas as needed. Demobilize from site.

Clean gutters of any job debris. Ensure gutters are clean and functioning as intended.

C.4.2 – Contractor Employee Conduct and Appearance Professionalism:

140P3022Q0023

14 | 61 o The Contractor's employees shall wear a shirt, coveralls, or other uniform item of a distinctive color bearing their identification. The uniform shall bear the Contractor’s name or logo and employee clothing shall be kept reasonably clean and neat in appearance.

o The contractor’s employees SHALL, always, while on the job site, whether on or off duty, conduct themselves in a professional, orderly, and safe manner. Rudeness, fighting, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct.

o All contract employees SHALL display professionalism in all interactions with the public and Government employees. The Contracting Officer (CO) may require the contractor to remove, from the job site, any employee working under this requirement for reasons of misconduct and security, or if found to be (or suspected to be) under the influence of alcohol, drugs, or other incapacitating agent(s).

o A contractor’s employee SHALL be subject to removal from the premises upon determination by the Contracting Officer that such action is in the best interests of the Government. Such removal from the job site or dismissal from the premises SHALL not relieve the contractor of the requirement to provide sufficient personnel to perform the service as specified.

o Contractor employees shall not loiter in any working or patron area. Upon completion of their assigned work, employees shall promptly depart from the public areas.

All areas used by the contractor within park boundaries SHALL be kept neat and organized. All equipment MUST be properly maintained and secured at the end of each day. Any fluid leaks from equipment or vehicles that leave stains or renders damage will be cleaned or repaired by the contractor to the satisfaction of the COR/POC at no additional cost to the Government. The contractor SHALL not leave any tools, parts and/or supplies unattended in at any time while performing services.

All inquiries from the public or press SHALL be immediately directed to the COR/POC.

C.4.3 – Meetings and Reports Pre-performance meeting. A Pre-performance meeting may be held before any work begins involving the

Contractor, a representative from the Contracting Office, the Contracting Officer Representative (COR), and the Safety Officer. Areas to be covered will include a review of the scope of work as well as various regulations governing the job and any requirements that need to be followed by all contractor employees.

o The Contractor shall designate in writing at this meeting the names, telephone numbers, and email addresses of the Project Manager and Site Superintendant as well as any alternates. The Project Manager, Site Superintendant,any alternates, or their supervisor shall be available at all times when the contract work is in progress to receive notices, reports or requests from the CO or the COR.

o The contractor shall provide to the COR a complete list of all employees under this contract. The list shall include individual tours of duty and schedules of work assignmentsand shall be submitted at least five (5) days prior to the start of the contract and as any personnel or schedule changes are made.

Progress meetings. Performance progress meetings shall be held with the contractor, Contracting Officer, and the COR at least bi-weekly or as necessary. The time and location will be mutually agreed upon. The government reserves the right to change the frequency of the meetings depending on the quality of service provided by the contractor. These meetings will be used to establish a partnering relationship with the contractor to address overall performance, performance problems encountered and their resolution. The government will prepare and distribute meeting minutes to all attendees. Should the contractor disagree with any portion of the minutes, the contractor shall notify the Contracting Officer Representative and Contracting Officer in writing, prior to the next scheduled meeting.

Scheduled and unscheduled meetings. The Contractor shall attend and participate in scheduled and unscheduled meetings to provide effective communication and discuss necessary information relevant to the terms and conditions of the Contract or Letter of Obligation. These meetings may be held at on‐site or off‐site locations. The contractor shall appoint an alternate to act for the Project Manager (PM) if the PM is unavailable for any reason.

The contractor shall notify the COR in advance of such appointment stating the period of time the alternate will be

140P3022Q0023

15 | 61 in place. The CO shall be notified in writing within five (5) business days of any changes in the individuals designated as key personnel. In the event of the absence or resignation of key personnel (e.g., the PM) the contractor shall immediately inform the CO and shall propose an interim replacement of key personnel within one

(1) business day, and permanent replacement within 30 days.

Reports. The contractor shall maintain a daily work log recording the quantities of work performed, the locations, and photo documentation of progress. A copy of this work log shall be filed with the COR on a daily basis.

o The contractor shall note and report to the CO and COR in writing the presence of any conditions that need to be addressed and cannot be corrected within the scope of work described herein. If so directed by the COR the contractor shall provide a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, and equipment required to perform the task(s). The COR will evaluate the proposal and if valid will seek approval from the Contracting Officer. Failure of the contractor to obtain the approval of the Contracting Officer for work beyond the scope of the contract will release the government from any liability for damages or obligation to pay for services claimed.

C.5 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION

National Capital Area (NCA) Chesapeake and Ohio Canal National Historical Park – Mile Markers 48.93, 58.0, 84.6, and 108.7 within the park.

Normal operational hours are approximately from 06:00 am to 4:30 PM Eastern Time, Monday through Friday.

No work shall occur on the following Federal Holidays:

New Year’s Day – January 1st

Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th

Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th

Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th

Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.

Work to be performed on weekends must be scheduled at least 48 hours in advance with written approval from the COR.

Scheduling of all work must be approved in writing by the COR. Required shutdown of utilities or building areas shall be scheduled with the COR at least 48 hours in advance so that building operations are not disrupted.

C.6 LIST OF REQUIRED SUBMITTALS

Before any work commences, the COR must approve all submittals and must include the required CM-16 transmittal form.

Administrative Submittals o Bid, Payment, and Performance Bonds shall be completed, signed, and emailed to the CO.

o Certificate of Insurance shall be completed and emailed to the CO.

140P3022Q0023

16 | 61 o List of Subcontractors to be used shall be completed, signed, and emailed to the CO and COR.

o SF-1413 for each subcontractor shall be completed, signed, and emailed to the CO.

Product Data:

o Submit manufacturer’s data for all materials.

o Product data shall include technical specifications, instructions for application and use, and Safety Data

Sheets (SDS).

Material Samples:

o Submit full documentation on the source and grading of the wood shingles.

o Submit samples of lead-coated copper and felt.

Plan Documents (prior to commencement of work) o Detailed work plan – must include methodology of work to be performed, and any other pertinent data necessary for complete repairs.

o Site Safety Plan.

o Quality Control Plan o Building protection plan.

o Site Staging Plan – must identify proposed staging of sanitary facilities, equipment storage, material storage, construction fence, refuse receptacle, dumpster requirements, etc.

o Construction Schedule o Schedule of Values

The required submittals shall include, but are not limited to, the following:

Submittal Type Specification Reference Description Documentation C.6 and FAR 52.228-15 Payment and Performance Bonds Documentation C.6 Certificate of Insurance Written Plan C.6 List of subcontractors to be used.

Documentation C.6 SF 1413 - Statement and Acknowledgement

Form Documentation C.6 and C.9 Product Data Documentation/Physical Samples C.6 Material Samples Written Plan C.6 Detailed Work Plan Written Plan C.6 Quality Control Plan Written Plan C.6 and C.9 Site Safety Plan Written Plan C.6 Building Protection Plan Written Plan C.6 Site Staging Plan Written Plan C.6 and C.15 Schedule of Values Written Plan C.6 and C.15 Construction Schedule Written Plan C.6 Site Superintendant

C.7 SITE MANAGEMENT

Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. All historical and/or archeological issues shall be addressed as needed.

C.8 RECYCLING AND DISPOSAL OF REFUSE

140P3022Q0023

17 | 61

With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of. All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing, or sale of materials and/or equipment shall be allowed on Government property.

C.9 SAFETY

During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction or the US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 dated November 30, 2014 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ ) whichever is more stringent.

All work, including contact with and handling of hazardous materials, the disturbance or dismantling of structures containing hazardous materials, and/or the transport and disposal of hazardous materials shall comply with the applicable requirements of 29 CFR 1910/1926, and 40 CFR 761/260-271.

General Requirements:

Work area shall always be maintained in a clean and safe condition.

All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).

All on-site vehicles will also be marked with the company name (if applicable).

Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.

Any accident or incident, regarding the work under this contract, shall be reported immediately.

o In the event of a reported physical injury, repeated service interruption, or an accident involving damage or equipment fire has occurred, the Contractor shall immediately secure the site and notify the CO, COR, and the National Capital Area Communications Center (866-677-6677).

o In the event the contractor becomes involved in any incident or accident involving a Park Visitor, or Park Property, the contractor must notify the CO, COR and USPP, so an investigation and record can be made.

All damage to government property caused by the Contractor shall be reported to the CO, COR, and the National Capital Area Communications Center (866-677-6677).

Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking area if requested.

The Contractor shall submit a job specific safety plan for NPS approval prior to the start of work.

The Contractor shall at all times comply with Accident Prevention and Safety Requirements as outlined per contract specifications.

The Contractor shall conduct their operations to prevent accidents, injuries and damages; shall observe all fire, safety and traffic regulations. The Contractor shall provide all PPE including but not limited to rubber gloves, face masks, safety shoes/boots, hard hats and eye and ear protection as required under the documented Safety Plan and by product manufacturer's recommendations. The Contractor shall also be responsible for all safety communication and training requirements for the safe use of all equipment and materials. All protective equipment must meet ANSI standards and used as required by OSHA and as directed by the COR.

The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR 1910, and 1926; the National Fire Protection Association (NFPA). Work shall conform to the latest edition of the International Building Code (IBC) and family of International Codes including but not limited to: International Plumbing Code, International Electrical Code and International Mechanical Code; work shall conform to the Life Safety Code.; ANSI; and any pertinent federal and local codes and requirements. All https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

140P3022Q0023

18 | 61

OSHA requirements may be obtained without cost to the general public at www.osha.gov . The Contracting Officer (CO), Safety Officer, or Risk Manager may include additional measures if determined necessary or required by other Federal, State or local law, or park policy.

All work shall meet IBC (International Building Code), NFPA 101(National Fire Protection Association), NFPA 72, NFPA 13, NFPA 70, and other applicable codes, standards, and building codes.

The Contractor shall have a Hazard Communication Program in place as required by 29 CFR 1910.1200 where Safety Data Sheets (SDS) / Technical Data Sheets shall be obtained by the contractor for all hazardous materials to be used in the performance of this contract. This plan shall be furnished to the NPS prior to the start of work. These SDS’s and an inventory of hazardous materials must be provided to the CO or COR prior to bringing the material on site. SDS shall be maintained at any jobsite where a substance requiring a SDS is being used. These SDS will be available to all employees of the Contractor, employees of the Park, concessionaires and the public when any member of these groups might come in contact with, or be exposed to, any substance requiring a SDS due to its hazardous status.

Contractors are subject to safety inspections performed by Park personnel or local/state/federal authorized officials.

These inspections may be routine, unannounced, or based on reports of unsafe or unhealthy working conditions.

Safety violations will be reported to the CO, COR, and the park’s Safety Officer. If a violation is deemed to be immediately dangerous to health, life, or serious in nature, the CO, COR, or park Safety Officer has the authority to stop work until the matter may be resolved to the CO’s satisfaction.

Health Requirements:

The contractor must adhere to all policy or regulation resulting from Executive Order 13999 – Protecting Worker Health and Safety regarding COVID-19 safety precautions and/or any other health and safety risk they may develop through-out performance of this contract. This requirement also includes any supplemental policy or regulation implemented at the NPS Park Level in response to this Executive Order, and/or any future Executive Order. This may include, but is not limited to:

Social Distancing Personal Protective Equipment such as masks, eye protection, gloves, etc. being worn at all times while working on

Federal Property.

Limiting the number personal, in tight or confined quarters, etc.

C.10 WARRANTY

The contractor shall furnish the NPS with all manufacturer warranty information for materials and parts provided under the terms of the scope of work.

The contractor shall warranty all shingle roofing for five years from the date of completion and acceptance by the government.

Workmanship and labor are to have a minimum warranty of 1 year.

All fascia and rake board work not covered by the above warranty shall carry a ten-year warranty.

C.11 TEMPORARY FACILITIES

(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with COR/POC, and contractor must be present when any materials are delivered to ensure proper placement in directed location. The Government will provide adequate staging area as close to the construction site as practicable.

The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes

140P3022Q0023

19 | 61 no responsibility for material or equipment left in the storage area.

(b) SANITARY FACILITIES: Toilet facilities will not be provided by the Government.

(c) WATER, AND ELECTRICITY: Water and 120V electricity will not be available to the Contractor. The contractor shall provide these services as needed to perform the required work.

(d) TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the construction sites.

C.12 ENVIRONMENTAL AND LANDSCAPE PRESERVATION

The Contractor shall comply with all existing Federal and Maryland regulations pertaining to hazardous material use, storage and disposal. Materials and chemicals shall be stored, used and disposed of in such a manner as to not endanger or threaten the environment and the health and safety of the Maryland, Park employees and visitors. All generated waste shall be disposed of legally at the completion of each day's work and shall be the responsibility of the contractor. Dumpsters and other waste disposal arrangements will be made separately from those used by the NPS for daily operations.

The Contractor shall comply with Executive Order 13693, pertaining to Sustainability, work shall incorporate the following: Construct or renovate buildings in accordance with sustainability strategies, including resource conservation, reduction, and use; siting; and indoor environmental quality. Reduce water consumption intensity.

Purchase (specify) environmentally sound goods. Reduce waste and implement recycling programs.

The contractor shall confine operations to within the work zone limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.

Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged within park boundaries and shall be disposed of offsite in compliance with local, state, and federal regulations.

Wash water shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

C.13 EXISTING UTILITIES

The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by potholing. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

C.14 CONSTRUCTION SCHEDULE/VALUES

Within two (2) weeks after approval or award of contract and/or other time as agreed to, the contractor shall prepare a construction schedule of activities indicating labor, materials and activity proposed for each day. A schedule of values linking the payment items to the Construction Schedule shall be prepared for each task. This spreadsheet shall describe multiple activities being proposed from start to finish of the project and show construction work completion in %.

The construction schedule shall define the overall time required to perform the identified work. This time schedule shall determine the overall level of effort by discipline for the task. Each major task, including beginning time and ending time, shall be identified within the schedule. Notify the Contracting Officer whenever there are significant departures from the

140P3022Q0023

20 | 61 approved Construction Schedule. Submit any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.

C.15 HAZARDOUS MATERIAL IDENTIFICATION

Submit Safety Data Sheets (SDS) for any materials defined as hazardous under the most current revision of Federal Standard 313. Each SDS shall be submitted to the COR/POC before delivery to the site.

C.16 PROJECT MANAGER

It shall be the responsibility of the contractor to provide a responsible project manager to represent the contractor in all matters pertaining to work under this contract. The project manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. They shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours.

The contractor shall provide a detailed resume of project manager for review and approval by the Contracting Officer. If during the term of this contract, the contractor changes or replaces the project manager, approval by the Contracting Officer is required.

C.17 SITE SUPERINTENDENT

It shall be the responsibility of the contractor to provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel.