This is a Request for Quote (RFQ) for hazard tree mitigation and assessment services at Harpers Ferry National Historical Park (HAFE).
The National Park Service seeks a single firm-fixed-price contract for comprehensive arboricultural services to perform tree risk assessments and hazard tree mitigation across approximately 158 trees spanning multiple trail systems and boundary areas. The base requirement (CLIN 00010) involves mitigating approximately 93 trees (4 prune, 89 fell/buck) along Maryland Heights and conducting 80 hours of Level 2 tree risk assessments per ISA standards. Three options address additional trail systems: Option 1 (Bolivar Heights, ~27 trees), Option 2 (Potoma Wayside, ~16 trees), and Option 3 (Appalachian Trail, ~22 trees). The contractor must provide all labor, supervision, materials, equipment, traffic control, barricades, and woody debris removal. Work locations span Jefferson County (West Virginia), Loudoun County (Virginia), and Washington County (Maryland). The period of performance runs September 14, 2026 through March 26, 2027, with work hours 0700–1730 ET, Monday through Friday, excluding federal holidays.
This is a small business set-aside under NAICS code 561730 (Landscaping Services) with a $9.5 million size standard. Quotes are due by 2:00 PM EDT on June 8, 2026, submitted electronically to brian_thornton@nps.gov. Award evaluation follows a lowest-price technically acceptable approach, with evaluation criteria including valid ISA Certified Arborist certification and a two-page project narrative demonstrating capability to meet statement of work requirements. All contractors must be registered in SAM.gov. Mandatory submittals include an Operational Safety Plan with comprehensive traffic control procedures and a credentialed personnel checklist before work commences. The contractor must maintain weekly communication with the Contracting Officer's Representative and comply with ANSI A300 (performance standard) and ANSI Z133 (safety standard). SCA wage determination 2015-4285 (Attachment 3) applies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2126Q0103_Amd_0002.pdf | ||
| Sol_140P2126Q0103_Amd_0001.pdf | ||
| Attachment_3__SCA_WD_2015-4285_(3-30-2026).pdf | ||
| Attachment_1_2026_Tree_Data_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment_2_Maps_(Site_Specific).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice to Offeror(s)/Supplier(s): The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs."
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation Number 140P2126Q0103 is issued as a Request for Quote (RFQ) which constitutes the entire solicitation. This acquisition will be conducted pursuant to FAR Part 13. This solicitation document incorporates all mandatory commercial item provisions and clauses in effect through Federal Acquisition Circular 2026-01, effective 3 March 2026. This is a small business set-aside. The North American Industry Classification System (NAICS) code is 561730, Landscaping Services and the related small business size standard is $9.5M.
The government anticipates award of one (1), firm-fixed price contract.
REQUIREMENT: Independently, and not as an agent of the government, the contractor shall provide all labor, supervision, materials, tools, supplies, transportation, barricades, signs, traffic control measures/coordination and equipment incidental to and necessary to execute safe full spectrum tree care operations and woody debris removal along trails, roads, and park boundary as well as provide full spectrum tree assessment operations and tagging in and around the work location areas listed for Harpers Ferry National Historical Park.
Due to space limitations, the complete commercial item specifications are contained in Solicitation Number 140P2126Q0103. Interested contractors should download this document. The National Park Service is not responsible for locating or securing any information that is not identified in the proposal.
The following Federal Acquisition Regulation (FAR) clauses and provisions are applicable to this announcement and are available at www.acquisition.gov.
52.212-1 Instructions to Offerors-Commercial Products and Commercial Services and addendum;
52.212-2 Evaluation-Commercial Products and Commercial Services and addendum; 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services; 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services; 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services; 52.232-33 Payment by Electronic Funds Transfer-System for Award Management; 52.233-4 Applicable Law for Breach of Contract Claim; and 52.245-1 Government Property.
Questions shall be sent via email to brian_thornton@nps.gov by 2:00 pm EST 11 May 2026. Questions submitted using any other method will not be entertained. The Point of Contact for this requirement is Brian Thornton, Contracting Officer. Offerors who contact anyone outside of the Office of Acquisition Management regarding this requirement may automatically be excluded from competition.
All quote information shall be submitted for receipt no later than 2:00 pm ED, on 8 June 2026. Offerors are hereby notified that if your quote is not received by the date/time and at the location specified in this announcement, that it will be considered late. The proposal shall be submitted electronically via email to brian_thornton@nps.gov with the subject line clearly identifying “Solicitation Number 140P2126Q0103 – HAFE Tree Thinning.” Offers by telephone, transmitted via facsimile (fax), or submitted using any other method will not be accepted.
All contractors must be registered in www.SAM.gov to be considered eligible for award.
http://www.sam.gov/
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140P2126Q0103
See Schedule See Schedule
NPS, WASO - WCP Contracting P.O.Box 25287 MS WCP Denver CO 80225
06/08/2026 1400 ED
0044043606
Brian Thornton 2402208104
PWA 100.00
PWA
Brian Thornton
561730
$9.5
05/05/2026
0011282915
ADMINISTERED BY:
NPS, WASO - WCP Contracting
P.O.Box 25287 MS WCP
Denver CO 80225 US
DELIVER TO:
NPS, Harpers Ferry NHP
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
230B Zachary Taylor Place
Harpers Ferry WV 25425 US
The contractor shall provide all labor, supervision, materials, tools, supplies, transportation, barricades, signs, traffic control measures/coordination and equipment incidental to and necessary to execute safe full spectrum tree care operations and woody debris removal along trails, roads, and park boundary as well as provide full spectrum tree assessment operations and tagging in and around the work location areas listed for Harpers
Ferry National
Historical Park.
Delivery: 03/26/2027
Period of Performance: 09/14/2026 to
03/26/2027
00010 Hazard Tree Mitigation
Product/Service Code: F014
Product/Service Description: NATURAL
RESOURCES/CONSERVATION- TREE THINNING
Period of Performance: 09/21/2026 to
03/31/2027
Solicitation 140P2126Q0103
TABLE OF CONTENTS
SCOPE 4
BACKGROUND, PURPOSE 4
GENERAL REQUIREMENTS & RESPONSIBILITIES 5
TASKS 7
BASE & OPTIONS 9
DEFINITIONS (Not in FAR) 14
PERIOD OF PERFORMANCE 18
LIST OF ATTACHMENTS 20
PAYMENT SCHEDULE/CLIN STRUCTURE 21
INSTRUCTIONS TO OFFERORS & AWARD SELECTION PROCESS 22
CLAUSES 24
PROVISIONS 34
PERFORMANCE WORK STATEMENT
Harper Ferry National Historical Park (HAFE)
Hazard Tree Mitigation & Assessment
D.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
D.1 BACKGROUND
Harpers Ferry National Historical Park (HAFE) was established in 1944 to “be a public national memorial commemorating historical events at or near Harpers Ferry”. Located at the confluence of the Shenandoah and Potomac Rivers, the park contains 3,645 acres of riparian habitats, floodplains, agricultural fields, geologic exposures, developed areas and upland forests. The forested areas routinely require tree felling, pruning and other landscape management services due to stresses from pests and climate change. The areas that generally require tree felling and pruning are along trails, park boundary and places with high visitation, along with cultural resource features that require delicate care. There are 22 miles of trail that are connected to the Appalachian Trail system and encompasses areas in three states: i.e., West Virginia, Virginia, and Maryland. Due to stressors like the Emerald Ash Borer and others, numerous hardwood trees are dead in place and pose a risk to the safety of visitors and staff along the trails and to infrastructure and utilities such as powerlines and pump stations. The terrain in some areas is steep, rocky, primitive, and often wet. Vehicular access is restricted to the trail heads and access points only and parking along the trails is prohibited. Up to two miles of hiking may be required at some locations in order to perform work. Separate attachments are included that list specific details about the trees that are to be assessed or felled and bucked up or pruned in their current location or removed from site. Tree photos will be provided via a thumb drive following contract being awarded to assist with proper identification on trees slated for pruning or removal. Trees that are assessed as a threat by the contractor as part of this contract shall be tagged, GPS’d and photographed.
D.2 PURPOSE
The NPS – National Capital Area (NCA), on behalf of Harpers Ferry National Historical Park is soliciting arboreal services to perform hazard tree mitigation and assessment in targeted areas of the park.
The contractor shall provide all labor, supervision, materials, tools, supplies, transportation, barricades, signs, traffic control measures/coordination and equipment incidental to and necessary to execute safe full spectrum tree care operations and woody debris removal along trails, roads, and park boundary. The contractor shall also provide full spectrum tree assessment operations and tagging in and around the work location areas listed below and on the maps.
The single contract will be awarded, and the period of performance will be 14 September 2026 – 26 March 2027.
D.3 LOCATION
All work is in the NPS – Harpers Ferry National Historical Park (HAFE) within Jefferson County, West Virginia, Loudoun County, Virginia and Washington County, Maryland.
D.4 GENERAL CONTRACTOR RESPONSIBLITIES
• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry.
• Contractor must have adequate liability insurance and proper license to perform all work stated herein.
• The contractor must aid and/or work directly with all Department of the Interior (DOI) – employees, National Park Service employees, state inspector employees and other contractor personnel as necessary in the performance of the work. Some of the work may include attending meetings, site visits, providing recommendations, additional reports/summaries, etc.
as requested.
• The contractor must clean gear and equipment prior to entering the park to minimize the chance of spreading invasive seeds into the park and near worksites.
• Contractor must stay in constant communication with COR to communicate work location and accomplishments. This should be done on a weekly basis.
D.4.1 - Conduct The contractor’s employees shall, at all times while on the job site, whether on or off duty, conduct themselves in a professional, orderly, and safe manner. Rudeness, fighting, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct.
Contractor employees shall not loiter in any working or patron area. Upon completion of their assigned work, employees shall promptly depart from the public areas. All contract employees shall display professionalism in all interactions with the public and Government employees.
The Contracting Officer may require the contractor to remove from the job site any employee working under this contract for reasons of misconduct and security, or if found to be (or suspected to be) under the influence of alcohol, drugs, or other incapacitating agent(s). A contractor employee shall be subject to removal from the premises upon determination by the Contracting Officer that such action is in the best interests of the Government. Such removal from the job site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform this contract as specified.
D.4.2 - On-site Supervisor
a. As a minimum, the contractor must provide one on-site supervisor to direct all task order personnel and maintenance operations.
b. The on-site supervisor shall be fluent in the English language to effectively communicate with the contractor’s employees and/or subcontractors as well as the COR and other Government personnel.
c. If the on-site supervisor is not present or absent due to illness or other reasons, the contractor shall provide an alternate supervisor to manage and direct all task order personnel and operations. The alternate supervisor shall possess the same qualifications as the on-site supervisor.
d. The on-site supervisor shall have a means of direct communication available such as phone or personal electronic device. The supervisor shall be able to respond to communications relayed through the contractor’s management channels.
e. The contractor is required to establish a primary point of contact for communication with the COR. The point of contact shall be responsible for coordinating with the COR and shall possess the managerial authority to make decisions and act on behalf of the contractor. The primary point of contact shall be reasonably available during business hours to field calls and correspondence from the COR and shall be responsive.
The primary point of contact is not required to be on-site during work execution.
f. The government has elected to require the presence of a current ISA Certified Arborist and licensed state specific Tree Expert on the jobsite at all times. The credentials may be held by different employees if the requirement to have credentialed personnel on the jobsite is met. The contractor shall provide the arborist’s certification ID and state specific Tree Expert license information for verification before work begins, and any time there is a change in the onsite arborist. Certification and currency will be subject to verification by the government utilizing the ISA and State Department of Natural Resources (DNR) databases.
D.4.3 – Site Maintenance
a. The contractor shall maintain the work site in a safe, neat, and orderly manner.
All supplies and equipment on the project site shall be stored to preclude any damage.
b. Limited space may be provided for the storage of materials, which shall be stored in a clean and neat condition as approved by the COR. This is not guaranteed; thus, the contractor must be prepared to transit the entire operational footprint daily.
c. All mud, dirt, debris, foreign objects, or spills of any kind from the contractor’s operations shall be cleaned up daily or as requested by the COR.
d. All contractor generated refuse and waste shall be hauled from the work site daily. Refuse and waste material shall be hauled in trucks with tight fitting covers to prevent spillage on roadways.
e. It shall be the contractor’s responsibility to take whatever measures necessary to assure the protection of the Government assets and to perform the work to cause minimal disruption of ongoing activities near occupied areas. Any government assets damaged as a result of this work shall be restored to previous condition at no cost to the government.
D.5 MANDATORY SUBMITTALS
a. Operational Safety Plan (OSP) (upon award/ before work execution)
1. Shall include comprehensive traffic control plan for pedestrian and cyclists traffic detailing standard operating procedures that shall be followed during the duration of performance. No work shall be authorized to commence without submission of this plan.
b. Completion and certification of credentialed personnel checklist. Including copies of each employees credentials.
D.6 TASKS
Independently, and not as an agent of the government, the contractor shall furnish all supplies, materials, equipment, labor, labor supervision, tools, barricades, signs, and travel, necessary to perform the work safely.
Tree Risk Mitigation:
Most trees have been tagged, mapped and photo documented to facilitate the contractor in locating the specimens. Tags however are an aid, and subject to removal by the public or environmental effects outside of the NPS staff’s control. The presence of a tag or the lack thereof does not determine the work obligation. The contractor’s work obligation is solely contained in the attached material (Attachment 1 &
2) in conjunction with this Performance Work Statement. The contractor shall use available support tables, documents, and electronic aids, as well as other resources as necessary to locate specimens in the field. Use of the “Field Maps” app is recommended for location and during assessment. Collect data in
NAD 83 (2011).
Tree photos will be given upon contract award via a thumb drive to ensure that trees can be accurately identified.
All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
Tree tags are to be removed as the risk has been mitigated on the felled trees only and given to the COR monthly or at the completion of the project. Tags on trees marked as “prune” shall be left in place.
Weekly updates of issues, concerns and progress shall be reported. Weekly meetings if necessary or to speak with the COR or Cultural Resource Specialist if remediation is needed or concerns are warranted at a specific location.
Perform “Level 2” tree risk assessments (80 hrs.) – boundary & trail:
a. Provide a Level 2 Assessment as defined in the International Society of Arboriculture’s (ISA) Best Management Practices for Tree Risk Assessment and ANSI A300 Tree Risk Assessment
Standards.
b. Tree location mapping shall use resource-grade or survey-grade GPS/GNSS receiver capable of achieving horizontal accuracy less than 1 meter using one or a combination of: Satellite-based Augmentation System (SBAS), differential corrections, a Real-time Kinematic (RTK), or a Real-time Network (RTN). Horizontal accuracy values shall be recorded in the GPS/GNSS Metadata fields provided in the Government Furnished Geodatabase. The contractor shall review and verify in the tabular data that the recorded horizontal accuracy values are less than 1 meter and recapture points not meeting the horizontal accuracy requirements. Collect using NAD 83 (2011).
c. The digital file for all tree(s) with a rating of “Moderate” and above shall contain a minimum of two (2) photos in the digital file (one of the lower trunks and one of the crowns). Photos shall be taken in a manner that optimizes distinct features of the specimen and its background to aid field identification.
d. All data shall use the file geodatabase format and be compatible with ESRI ArcGIS applications.
e. The digital assessment format shall be designed and developed in manner that enables print on demand capability of the data/report, or selected portions thereof.
f. The digital file shall be searchable.
g. All trees with a risk rating of “Moderate” or above shall receive an identifying tag of a type common to the forestry/arboricultural trades. The tag shall be constructed of aesthetic and resilient material, and contain the inspection year and tree ID information (TASK 2 (i)(1)
h. Rights to all information, digital and printed, shall be conveyed to the government.
i. At a minimum, GPS tabulated data shall include:
1) Tag/ID number
2) Common Name
3) Scientific Name
4) DBH
5) Number of stems
6) Target – trail/road/structure, etc.
7) Defect(s)
8) Tree pest damage
9) Disease/health observations
10) Risk rating – low, medium, high, extreme
11) Treatment recommendation (prune, remove or further assessment)
12) Vines present
13) Notes
j. All tree(s) receiving a rating of “Extreme” shall be reported to the government point of contact within 24 hours and shall include the data in TASK 2 (b) and (i).
k. Trees with a risk rating of “Low” shall not receive individual documentation but shall receive a risk assessment.
Tree risk report:
a. Written summary of procedures used in risk assessment.
b. Map of tree locations
c. Photos of trees
d. A description of the trees that were identified as needing pruning, removal or further assessment including;
I. Tree species (common & botanical)
II. Date of inspection III. Primary target of the tree or tree parts
IV. Description of tree parts V. Overall risk rating
VI. Mitigation recommendations
e. A digital copy of the report and risk assessment tabulated data shall convey to the government in
PDF and MS Office Suite formats.
f. A digital copy of exported shapefiles and supporting files that can be used in ArcMap Pro.
D.6.1 – BASE: Perform trail tree risk mitigation along Maryland Hts. (~93 trees: 4 Prune & 89 Fell/Buck) and perform 80 hrs. of Level 2 tree risk assessments at sites included in attachment 2 and provide tree risk report. (See info above for specifics)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade unless taller poles (minimum of 10 feet) may be left for wildlife habitat such that the risk to visitors or property is mitigated.
• Assess trees in areas along the boundary following Tree Risk Assessment (a-k) guidance discussed above.
D.6.3 - OPTION 1: Perform trail tree risk mitigation along the Bolivar Hts. trail in accordance with the tree risk assessment data. (~27 trees: 10 Prune & 17 Fell/Buck)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors. Fell trees onto park property.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible in order to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade, unless taller poles (minimum of 10 feet) may be left for wildlife habitat such that the risk to visitors or property is mitigated.
D.6.4 - OPTION 2: Perform tree risk mitigation along Potoma Wayside trail in accordance with the tree risk assessment data. (~16 trees: 10 Fell/Buck & 6 Prune)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade unless taller poles
D.6.5 - OPTION 3: Perform tree risk mitigation along Appalachian Trail in accordance with the tree risk assessment data. (~22 trees: 2 Prune & 20 Fell/Buck)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade unless taller poles
D.6.8 Additional Work that is required
The requirement(s) for all TASK(S) are conveyed in the attachments. Furthermore, the following requirements shall be adhered to:
• The contractor shall, without additional expense to the Government, be responsible for obtaining and renewing all necessary licenses, certifications, and permits. Contractor is required to submit a copy of licenses prior to work start.
• Upon award and before the execution of work may begin, the Contractor shall provide and maintain a COR approved Operational Safety Plan.
• The ANSI A300 (most current revisions) shall be the performance standard.
• The ANSI Z133 (most current revision) shall be the safety standard.
• The contractor shall make every effort to mitigate damage to surrounding trees during the performance of the work. Damage shall be mitigated by the contractor at no additional charge to the government through the reasonable application of arboricultural techniques in accordance with industry standards and best practices. The contractor is not authorized to fell trees not contained within the work specifications. The contractor may remove necessary brush and ground shrubbery around the base of trees to facilitate safe work performance in accordance with ANSI Z133 standards.
• The contractor shall perform a cursory inspection for live nesting birds and bats before performing tree removals or pruning. This inspection may be performed from the ground on trees that do not require aerial access for work performance (the use of an aid such as field binoculars is highly encouraged). In instances where an aerial lift or climber is employed, the contractor shall also execute a simple aerial inspection. If a nesting site containing live birds or bats is identified, the contractor shall provide notification to the COR in writing and shall include the tree tag number and general disposition. The notification shall be submitted within three (3) business days of the inspection. The contractor shall not perform work on trees identified by inspection as avian nesting sites earlier than 6 SEPTEMBER unless otherwise cleared by the
COR.
• In some cases, the government has elected to leave standing spars (minimum of 10 feet) in lieu of removing all trunk-wood from a tree site in order to increase retained biomass in the ecosystem and encourage the development of wildlife habitat.
• All applicable woody debris and biomass twelve (12) inches in diameter and under can be chipped and hauled to the local landfill if applicable.
• Depending on site and conditions, woody debris over twelve (12) inches may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), impede cultural resources, or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 6” from ground). All non-chipped debris is required to be a minimum of fifteen (15) feet off the trail shoulders and shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public.
• The contractor, at the contractor’s discretion, may elect to haul woody debris when doing so is more efficient for meeting the task objective at no additional costs to the government. The contractor is responsible for ensuring compliance with all federal, state, and local statues related to resources acquired from government/public lands.
• The contractor is required to coordinate workflow / schedules with the COR to deconflict operations with other park operations.
TAGS: Most trees have been tagged to facilitate the contractor in locating the specimens. Tags however are an aid, and subject to removal by the public or environmental effects outside of the NPS staff’s control. The presence of a tag or the lack thereof does not determine the work obligation. The contractor’s work obligation is solely contained in the Attachments in conjunction with this Performance Work Statement. The contractor shall use available support tables, documents, and electronic aids, as well as other resources as necessary to locate specimens in the field. Tree tags (felled only) are to be removed as the risk has been mitigated and given to the COR on a monthly basis or at the completion of the project.
WEIGHT LIMITS AND LOAD RATINGS: Since Harpers Ferry is a historical thoroughfare, it contains many structures such as bridges, waste weirs, culverts, etc. The contractor shall inspect all such structures before crossing them with equipment and vehicles. The contractor shall assess the suitability of each trafficable structure and determine what equipment or vehicles can safely traverse. The contractor is highly encouraged to use bridging and weight dispersion techniques, such as laying timber/steel plates, to facilitate load dispersion when crossing structures. Because weight limits cannot be provided for waste weirs particularly, the contractor shall not leave any vehicle or piece of equipment in a static state on them (maintain motion). It is the sole responsibility of the contractor to take all measures necessary to safely transit trafficable structures (including the CCT) without compromising structural integrity.
WORKING IN CONSTRICTED / RESTRICTED SPACES: The area of operations consists of elements of modern and historical infrastructure that may constrict or prevent access of heavy equipment. It is solely the responsibility of the contractor to assess the environment and implement methods and means supported by equipment arrays that are suitable to the unique working conditions. The contractor’s methods and means shall not compromise the structural integrity of infrastructure, to include (but not limited to) paved surfaces, bridges, and retaining walls.
STAGED / STORED EQUIPMENT: Harpers Ferry NHP is not responsible for any property the contractor choses to stage on the park during the execution of this task order. The task order does not require any contractor property to be staged. Contractors storing equipment do so at their own discretion while assuming all risk and liability. Equipment storage/staging shall be coordinated with, and approved by, the COR in writing.
TRAFFIC CONTROL, SAFETY, AND PEDESTRIANS: The identified work areas represent major thoroughfares with dense pedestrian and cyclist traffic. Furthermore, Harpers Ferry NHP represents a major commuter artery for cyclists in the region. The contractor shall be responsible for executing the assigned work in a manner that ensures both sustained trafficability and safety for park users.
Signage shall be posted at the nearest point on either side of the work zone.
Work along roadways shall include traffic control measures that conform to US Department of Transportation (US DOT), Federal Highway Administration (FHWA), and CFR 29 requirements, as well as specifications in the Manual on Uniform Traffic Control Devices (MUTCD). It is the sole responsibility of the contractor to take all necessary actions to ensure the safety of all personnel, especially the visiting public, during the execution of operations. The contractor shall follow all federal, state, municipal, and local requirements for permitting and operating along/in roadways.
D.7 DELIVERY SCHEDULE
The contractor shall provide the following deliverables. Additional deliverables may be required in the scope section of the PWS, but not listed below. This does not relieve the contractor of fulfilling the requirement.
End Result/Deliverable(s) Schedule/Milestone(s) Delivery Location Safety Plan Before Work Begins Via email to COR and CO Update Report (status) Weekly once work begins Via email to COR & CO Completion and certification of credentialed personnel checklist.
Before Work Begins Via email to COR and CO
D.8 BIOBASED AND SUSTAINABLE PRODUCTS
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.
8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for bio preferred products that are required for performance of this service contract.
• 2-Cycle Engine Oils – 34% Minimum Biobased Content
• Diesel Fuel Additives – 90% Minimum biobased Content
• Erosion Control Materials – 77% Minimum biobased Content
• Fuel Conditioners – 64% Minimum biobased Content
• Gasoline Fuel Additives – 92% Minimum biobased Content
• Greases – Truck – 71% Minimum biobased Content
• Mobile Equipment Hydraulic Fluids – 44% Minimum biobased Content
• Multipurpose Lubricants – 88% Minimum biobased Content
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.
D.9 DEFINITIONS (Not included in Federal Acquisition Regulations) Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
2-Cycle Engine Oils - Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear.
Calendar Days - Every day shown on the calendar, Saturdays, Sundays, and holidays included.
Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
Clearing Limits - The limits of clearing as designated on the ground, shown on the drawing, or designated in the Special Project Specifications.
Contract Pay Item - A pay item designated on the bid schedule and described by a specification.
Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the Contracting Officer’s Representatives are defined below in this Section or in a letter of designation issued by the Contracting Officer.
Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Diesel Fuel Additives - (1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use. (2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20).
Erosion Control Materials - Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth.
Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.
http://www.biopreferred.gov./
Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Fuel Conditioners - Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system.
Gasoline Fuel Additives - Chemical agents added to gasoline to increase octane levels, improve lubricity, and provide engine cleaning properties to gasoline-fired engines.
Greases – Truck - Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots.
Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.
Materials - Any substances for use in the construction of the project and its appurtenances.
Mobile Equipment Hydraulic Fluids - Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes.
Multipurpose Lubricants - Products designed to provide lubrication under a variety of conditions and in a variety of industrial settings to prevent friction or rust. Greases, which are lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners, are not included in this item. In addition, task-specific lubricants, such as chain and cable lubricants and gear lubricants, are not included in this item.
Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.
Remove - Remove from site and dispose of properly.
Right of Way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.
Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.
Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.
Specifications - A general term applied to all written directions and requirements pertaining to performance of work.
Utility Services - Are services such as electricity, gas, steam, water, and sewage.
D.10 PLACE OF PERFORMANCE AND HOURS OF OPERATION
National Capital Area (NCA)
HARPERS FERRY NATIONAL HISTORICAL PARK (HAFE)
The contractor is responsible for conducting services between the hours of 0700 – 1730 ET Monday thru Friday, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the government facility is closed for the above reasons unless emergency services are requested. Any work performance outside of this schedule requires written approval from the COR.
Requests for variations shall be submitted at least three (3) business days before the desired work date.
No work shall occur on the following Federal Holidays:
New Year’s Day – January 1st Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day – Second Monday in October Veteran’s Day – November 11th Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.
D.11 SERVICE SCHEDULE
The contractor is responsible for conducting routine services, between the hours of 0700 – 1730 hours ET Monday thru Friday, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor will not be reimbursed when the government facility is closed for the above reasons unless emergency services are requested. The work Schedule will be negotiated at the time of contract award but shall remain the same throughout the contract period unless otherwise authorized by the COR in writing. Additional days or a change in work schedule must be agreed upon by the contractor and the COR in advance.
D.12 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT
ADMINISTRATION
A. Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO, is authorized to amend, modify, or deviate from the contract.
B. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO/PA in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;
(1) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;
(2) Requesting removal of unsuitable contractor employees;
(3) Ensuring adequacy of schedule and Quality Control Plan, including changes;
(4) Ordering re-performance of unacceptable work or performance by other mean, etc.
C. Point-of-Contact (POC): The POC will be used if an official COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO/COR in the day-to-day on-site administration of the contract requirements.
D.13 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR)
A. The Contracting Officer will designate a certified FAC-COR as the Contracting Officer's
Representative (COR) at time of award of a BPA Call. The COR will receive a designated COR Appointment Letter.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual document executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as…