Sol_140P2126Q0103_Amd_0002.pdf
PDF 470 KB Posted
- Attached to
- HAFE FY26 HAZARD TREE MITIGATION Federal contract opportunity
- Solicitation number
- 140P2126Q0103
About this file
This document is Amendment 0002 to Solicitation 140P2126Q0103 issued by the National Park Service (NPS), Washington Support Office (WASO), Western Contracting Program (WCP). The amendment, effective June 2, 2026, corrects typographical errors in the original solicitation pages 9-10 and 21. Specifically, the changes renumber section D.6.3 to D.6.2, section D.6.4 to D.6.3, section D.6.5 to D.6.4, and correct a duplicate Contract Line Item Number (CLIN) 0030 to CLIN 0040. The amendment is not extended, and all other terms and conditions remain unchanged.
The solicitation requires tree risk mitigation and assessment services at Harpers Ferry National Historical Park with a period of performance from September 14, 2026 to March 26, 2027. The contract is structured with a base requirement (CLIN 00010) to perform trail tree risk mitigation along Maryland Heights (~93 trees: 4 prune and 89 fell/buck) and 80 hours of Level 2 tree risk assessments, plus three optional bid items: Option 1 (CLIN 00020) for Bolivar Heights trail (~27 trees), Option 2 (CLIN 00030) for Potoma Wayside trail (~16 trees), and Option 3 (CLIN 00040) for Appalachian Trail (~22 trees). The Government intends to award all options at time of award, though options are not guaranteed until exercised. Offerors must propose prices separately for each CLIN and submit deliverables including tree risk assessment reports, shapefiles compatible with ArcMap Pro, and all data in PDF and MS Office Suite formats.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2126Q0103_Amd_0001.pdf | ||
| Attachment_3__SCA_WD_2015-4285_(3-30-2026).pdf | ||
| Sol_140P2126Q0103.pdf | ||
| Attachment_1_2026_Tree_Data_Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment_2_Maps_(Site_Specific).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Brian Thornton
See continuation page
NPS, WASO - WCP Contracting P.O.Box 25287 MS WCP Denver CO 80225
PWA
140P2126Q0103
06/02/2026
05/05/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P2126Q0103/0002
The purpose of this amendment is to correct typos on pages 9-10 and 21.
A. Replace pages 9-10, and 21 of 57 with the attached revised pages 9-10 and 21 of 57.
Changes are annotated by a line located in the left margin. Changes are on page 9: D.6.3 is changed to D.6.2, On page 10: D.6.4 is changed to D.6.3; D.6.5 is changed to D.6.4. On page
21: Duplicate numbered CLIN 0030 is changed to
CLIN 0040.
B. All other terms and conditions remain unchanged.
Period of Performance: 09/14/2026 to
03/26/2027
Solicitation 140P2126Q0103
IV. Description of tree parts V. Overall risk rating
VI. Mitigation recommendations
e. A digital copy of the report and risk assessment tabulated data shall convey to the government in
PDF and MS Office Suite formats.
f. A digital copy of exported shapefiles and supporting files that can be used in ArcMap Pro.
D.6.1 – BASE: Perform trail tree risk mitigation along Maryland Hts. (~93 trees: 4 Prune & 89 Fell/Buck) and perform 80 hrs. of Level 2 tree risk assessments at sites included in attachment 2 and provide tree risk report. (See info above for specifics)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade unless taller poles (minimum of 10 feet) may be left for wildlife habitat such that the risk to visitors or property is mitigated.
• Assess trees in areas along the boundary following Tree Risk Assessment (a-k) guidance discussed above.
D.6.2 - OPTION 1: Perform trail tree risk mitigation along the Bolivar Hts. trail in accordance with the tree risk assessment data. (~27 trees: 10 Prune & 17 Fell/Buck)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors. Fell trees onto park property.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible in order to facilitate decay and improve aesthetics (maximum of 12” from ground).
All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail.
The contractor shall make every attempt to place debris in a manner that does not face bthornton Line large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade, unless taller poles (minimum of 10 feet) may be left for wildlife habitat such that the risk to visitors or property is mitigated.
D.6.3 - OPTION 2: Perform tree risk mitigation along Potoma Wayside trail in accordance with the tree risk assessment data. (~16 trees: 10 Fell/Buck & 6 Prune)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All debris shall be positioned so that no hazards are presented to park visitors utilizing the trail. The contractor shall make every attempt to place debris in a manner that does not face large chainsaw cuts (white eyes / round eyes) toward the viewing public from the trail. Debris shall be evenly distributed across the landscape.
• Remediate any ground damage to the trail incurred during the performance of operations under the guidance of the cultural resource specialist (e.g., ruts, holes, etc.). Notify COR immediately.
• Cut all stumps remaining in the environment flush 3-4 inches above grade unless taller poles (minimum of 10 feet) may be left for wildlife habitat such that the risk to visitors or property is mitigated.
D.6.4 - OPTION 3: Perform tree risk mitigation along Appalachian Trail in accordance with the tree risk assessment data. (~22 trees: 2 Prune & 20 Fell/Buck)
• All trees shall be felled, when possible, at an angle of 45 degrees or greater from the line of trail so that the brushy / leafy canopy faces away from visitors.
• All trails shall be left free and clear of all debris. All woody debris within ten (10) feet of a trail edge shall be laid in a manner that facilitates visitors in identifying the contour of the trail.
• Woody debris may be left in the general location of felling when such action would not create a hazard (such as on a slope), threaten to convey into a watershed (river or stream), or create an artificial and unaesthetic appearance. Debris shall be felled and staged to convey a natural appearance. Relief cuts shall be applied to create as much contact with the ground as possible to facilitate decay and improve aesthetics (maximum of 12” from ground). All bthornton Line
CLIN STRUCTURE
Offerors to propose price on each CLIN separately. The Government intends to award all options at time of award; however, all options are not guaranteed until awarded/exercised.
CLIN Description Price
CLIN 00010 Base (section 6.1) $
CLIN 00020 Bid Option 1 (section 6.2) $
CLIN 00030 Bid Option 2 (section 6.3) $
CLIN 00040 Bid Option 3 (section 6.4) $
Total Contract Price with all Options $____________
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
| Solicitation/Contract/Order for commercial products and commercial services |
| Requisition number |
| Contract number |
| Award/Effective date |
| Order number |
| Solicitation number |
| Solicitation issue date |
| For solicitation information call: |
| Name |
| Telephone number |
| Offer due date/local time |
| Issued by |
| Code |
| This acquisition is |
| NAICS |
| Size standard |
| Delivery for free on board (FOB) destination unless block is marked |
| Discount terms |
| This contract is a rated order under the defense priorities and allocations system - DPAS |
| Rating |
| Method of solicitation |
| Deliver to |
| Code |
| Administered by |
| Code |
| Contractor/Offeror |
| Code |
| Facility code |
| Telephone number |
| Check if remittance is different and put such address in offer |
| Payment will be made by |
| Code |
| Submit invoices to address shown in block 18a unless block below is checked |
| Accounting and appropriation data |
| Total award amount |
| Solicitation incorporates by reference |
| Addenda |
| Contract/purchase order incorporates by reference |
| Addenda |
| Contractor is required to sign this doc. and return: |
| Award of contract: reference |
| Signature of offeror/contractor |
| Name and title of signer |
| Signer date signed |
| Signature of contracting officer |
| Name of contracting officer |
| Contracting officer date signed |
| Authorized for local reproduction. Previous edition is not usable |
| Standard Form 1449 (Rev. 11/2021) |
| Quantity in column 21 has been |
| Signature of authorized government representative |
| Date |
| Printed name and title of authorized government representative |
| Mailing address authorized government representative |
| Telephone number of authorized government representative |
| Email number of authorized government representative |
| Ship number |
| Voucher number |
| Amount verified correct for |
| Payment |
| Check number |
| Stock record (S/R) |
| S/R account number |
| S/R voucher number |
| Paid by |
| I certify this account is correct and proper for payment |
| Signature and title of certifying officer |
| Date |
| Received by |
| Received at |
| Date received |
| Total containers |
| Standard Form 1449 (rev. 11/2021) Back |
File details come from the government source that posted it. Updated .