Sol_140P1426R0025.pdf
PDF 605 KB Posted
- Attached to
- GLAC REPLACE GENERATOR COMPONENTS
- Solicitation number
- 140P1426R0025
About this file
This is a Request for Proposal (RFP) for a firm fixed price task order under a National Park Service MATOC IDIQ contract for generator component replacement and electrical work at Glacier National Park.
The project requires replacement of wiring, electrical components, gas piping, duct work, and sound attenuation components to bring two backup generators online at the St. Mary Wastewater Treatment Plant (WWTP) and the Rising Sun booster pumphouse. The St. Mary WWTP generator requires a new transfer switch, connecting components, gas piping to the regulator, and an exhaust pipe to the existing muffler. The Rising Sun generator requires a new transfer switch and connecting components but no muffler (outdoor installation), with gas piping connecting to a propane tank and two line reactors installed inside the pump house. The contract is set aside as 100% small business, with a NAICS code of 236220 and a small business size standard of $45 million. The contract magnitude is between $25,000 and $100,000. Performance of work must commence within 10 calendar days of receiving the Notice to Proceed and be completed within 60 calendar days. The anticipated period of performance is September 20, 2026 through November 19, 2026, with delivery required by November 19, 2026 at Glacier National Park in West Glacier, Montana.
Proposals are due by 10:00 a.m. Mountain Daylight Time on August 24, 2026, submitted via email to sally_leitch@ios.doi.gov. A mandatory site visit is scheduled for August 12, 2026. Questions must be submitted by 10:00 a.m. MDT on August 14, 2026. Award will be made to the low-price offeror whose proposal demonstrates price reasonableness as determined by comparison to competitive prices received and the independent Government cost estimate. The proposed price must include all materials, labor, work, and taxes to complete the scope of work, with an itemized breakdown of all line items. Offerors must submit a completed price schedule (Section B), signed SF 1442 form with acknowledgement of all RFP amendments, FAR Provision 52.204-26 (and 52.204-24 if applicable), and identification of key personnel. Performance and payment bonds are not required for this task order. Standard labor wage determinations apply for Glacier County, Montana. Contractor liability insurance must be maintained at $100,000 per person, $500,000 per occurrence, and $500,000 property damage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1426R0025_Amd_0002.pdf | ||
| Sol_140P1426R0025_Amd_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140P1426R0025
NPS, IMR - Northern Rockies MABO PO Box 168 Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
Sally Leitch, Contracting Officer sally_leitch@ios.doi.gov
0044041786 PMIS35067A
PIR
Sally Leitch 7204505172
07/28/2026
08/24/2026
10 60
FAR 52.211-10
This is a Request for Proposal
Project Name/Description: Glacier National Park (GLAC) has a requirement to replace generator components, to replace all wiring and electrical components required to bring these generators online.
The St Mary WWTP generator requires a new transfer switch and all new connecting components including gas piping to the regulator and the exhaust pipe to the existing muffler. The Rising Sun generator will also require a new transfer switch and connecting components but does not require a muffler since it is outdoors. The gas piping will need to connect to the propane tank and (2) line reactors will be installed inside the pump house.
Type of Contract: Firm Fixed Price (FFP) task order
Set-Aside: 100% total small business
Magnitude (FAR): Between $25,000.00 and $100,000.00
Continued...
1 22
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
NPS, IMR - Northern Rockies MABO PO Box 168 Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
PIR
Sally Leitch
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P1426R0025
NAICS: 236220 Small Business size standard of
$45 Million
Anticipated Period of Performance: 09/20/2026 -
11/19/2026
The National Park Service contemplates award of a firm fixed price task order as a result of this solicitation.
Questions shall be submitted in writing to sally_leitch@ios.doi.gov no later than 5 business days prior to the solicitation closing date. No phone calls will be accepted.
Delivery 60 days after the Notice to Proceed has been issued.
Delivery: 11/19/2026
Delivery Location Code: 0011286207
NPS. Glacier NP
61 Scoyen Circle
West Glacier MT 59936 US
Period of Performance: 09/20/2026 to
11/19/2026
00010 St Mary Generator Hookup
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00020 Rising Sun Generator Hookup
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
PART I – THE SCHEDULE
SECTION A – SOLICITATION / CONTRACT FORM
This is a Request for Proposals (RFP), in accordance with the Statement of Work and is issued on Standard Form (SF) SF1442 in the preceding pages.
Reference Department of Interior Acquisition Regulation (DIAR) Part 1436, 1436.270-1 Uniform Contract Format.
In accordance with FAR subpart 16.505. A price evaluation will be performed to determine the reasonableness of the proposed price. Reasonableness will be determined considering other competitive prices received and comparison to the Independent Government Cost Estimate.
Special Notice for Contractors Submitting Proposals:
Signing of the offer shall be deemed to be a representation by the offeror that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Proposed pricing shall include all materials/labor/work/taxes to complete work outlined in the Scope of Work.
--END OF SECTION A--
SECTION B – PRICE SCHEDULE
Pricing shall be provided in accordance with Section L and is incorporated herein. IAW FAR 36.204 – Disclosure of the Magnitude of Construction Projects, the Magnitude of Construction is Between $25,000 and $100,000. The contractor shall furnish an itemized breakdown of all line items.
Solicitation Number: 140P1426R0025
PARK - PMIS: 35067A
Project Title: Glacier National Park (GLAC) Generator Parts
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts governs. Round totals and extended prices to whole dollars. Refer to solicitation section “H” as applicable for additional information regarding contract options.
Contract Line Item Number (CLIN) Contract Line Item (CLI) Title Quantity Unit of
Measure Unit Price Total Price
1 Generator Parts 1 Lump Sum TOTAL BASE PRICE (Contract Line Item Number 1 through 1) -------
The proposed price/bid schedule reflects the following rates and do not exceed our contractual binding rates of the base contract. Rates included in the firm-fixed price shall not exceed contractual binding rates of the base contract. Hourly Rate or Percentage
Construction Superintendent/Foreman
Construction PM
Overhead G&A
Profit / ROM ROM under $150K
--END OF SCTION B--
SECTION C – SPECIFICATIONS / DRAWINGS
ALL BASE MATOC IDIQ CLAUSES APPLY TO THIS TASK ORDER
The primary purpose of this project replace wiring, electrical components, gas piping, duct work and sound attenuation components that are required to bring two backup generators online in the St Mary wastewater treatment plant (WWTP) and the Rising Sun booster pumphouse at Glacier National Park.
“Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J.”
--END OF SECTION C—
SECTION D – PACKAGING AND MARKING
Contractor initiated correspondence and submittals shall identify the task order number and the associated contract number. Task order requirements will be detailed at the task order level, but correspondence includes the Submittal Register and Construction Schedule/Reports. Submittals shall be submitted to the Contracting Officer's Representative (COR) and copied to the task order CO. If hard copies are required, specific task order documentation or meetings will detail submission addresses.
--END OF SECTION D--
SECTION E – INSPECTION AND ACCEPTANCE
ALL BASE MATOC IDIQ CLAUSES APPLY TO THIS TASK ORDER.
The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
--END OF SECTION E—
SECTION F – DELIVERIES OR PERFORMANCE
ALL BASE MATOC IDIQ CLAUSES APPLY TO THIS TASK ORDER.
ADDITIONAL AND REVISED CLAUSES:
Clauses by Full Text:
52.211-10 Commencement, Prosecution and Completion of the Work
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than approximately 60 days after NTP.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
--END OF SECTION E—
SECTION G – CONTRACT ADMINISTRATION DATA
1. CONTRACT REPRESENTATIVE
Contracting Officer (CO):
Sally Leitch, sally_leitch@ios.doi.gov
Contracting Officer’s Representative (COR):
Ryan Herken, ryan_herken@nps.gov
2. JOB SITE ADMINISTRATION
The Government’s designated COR will be available at the site to inspect the work as it progresses. The COR will prepare a Daily Log, beginning with the first day of the contract, detailing ground and weather conditions, work being performed, materials delivered, and notes of any problems or difficulties.
Government inspections do not relieve the Contractor of responsibility for providing adequate quality control measures. At the end of every day of work on this contract, The Contractor’s Superintendent, as defined below, shall contact the COR to review the daily log, and sign as the Contractor’s representative. Unless the Contractor’s Superintendent makes a contrary notation on the daily log, the log shall be presumed to be accurate for recording daily inspections and conditions, work accomplished, and notations of any issues as described above. In accordance with FAR 22.406.7(4) regular compliance checks may include comparison to daily inspector’s reports and daily logs of construction to ensure consistency in meeting compliance requirements.
3. CONSTRUCTION CONTRACT ADMINISTRATION
Federal Acquisition Regulation (FAR) 36.211(b) requires agencies to provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts.
This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
--END OF SECTION G--
SECTION H – SPECIAL CONTRACT REQUIREMENTS
ALL BASE MATOC IDIQ CLAUSES APPLY TO THIS TASK ORDER.
ADDITIONAL AND REVISED CLAUSES:
H.1 SYSTEM UPDATES
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
THE REST OF THIS PAGE IS INTENTIONALLY LEFT BLANK
mailto:sally_leitch@ios.doi.gov mailto:ryan_herken@nps.gov https://www.doi.gov/pam/acquisition/policy/constructioncontract
H.2 KEY PERSONNEL (Contractor shall complete section (a) listing Key Personnel listed in their base IDIQ MATOC Contract)
(a) The Contractor shall list the Key Personnel assigned to the base contract:
Project Manager:
Site Superintendent:
Quality Control Manager:
Safety Manager:
(b) During the first 60 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 60-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications for those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receiving receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.
--END OF SECTION H—
PART II – CONTRACT CLAUSES
SECTION I -- CONTRACT CLAUSES
ALL BASE MATOC IDIQ CLAUSES APPLY TO THIS TASK ORDER.
ADDITIONAL AND REVISED CLAUSES:
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov.
52.222-6 Construction Wage Rate Requirements (Aug 2018) (DEVIATION Feb 2025) 52.222-9 Apprentices and Trainees (Jul 2005) (DEVIATION Feb 2025) 52.222-11 Subcontracts (Labor Standards) (May 2014) (DEVIATION Feb 2025) 52.222-12 Contract Termination-Debarment (May 2014) (DEVIATION Feb 2025) 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024) -
DEVIATION (FEB 2025)
52.223-10 Waste Reduction Program (MAY 2024) - DEVIATION (FEB 2025) 52.223-23 Sustainable Products and Services (MAY 2024) - DEVIATION (FEB 2025) 52.236-2 Differing Site Conditions (Apr 1984) (DEVIATION Jan 2026) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) (DEVIATION Jan 2026) 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) http://www.acquisition.gov/
52.236-6 Superintendence by the Contractor (Apr 1984) (DEVIATION Jan 2026) 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) 52.236-8 Other Contracts (Apr 1984) (DEVIATION Jan 2026) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (DEVIATION Jan 2026) 52.236-10 Operations and Storage Areas (Apr 1984) (DEVIATION Jan 2026) 52.236-11 Use and Possession Prior to Completion (Apr 1984) (DEVIATION Jan 2026) 52.236-12 Cleaning Up (Apr 1984) (DEVIATION Jan 2026) 52.236-13 Accident Prevention (Nov 1991) (DEVIATION Jan 2026) 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026) 52.236-16 Quantity Surveys (Apr 1984) (DEVIATION Jan 2026) 52.236-17 Layout of Work (Apr 1984) (DEVIATION Jan 2026) 52.236-21 Specifications and Drawings for Construction (Feb 1997) (DEVIATION Jan 2026) 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone
Act-Covered Foreign Entities (NOV 2024) 52.243-4 Changes (Jun 2007) (DEVIATION Oct 2025)
Clauses Incorporated by Full Text:
52.204-30 Federal Acquisition Supply Chain Security Act Orders— Prohibition-Alternate II (DEC 2023)
(a) Definitions. As used in this clause— Covered article, as defined in 41 U.S.C. 4713(k), means—
(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;
(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);
(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or
(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.
FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201–1.303(d) and (e):
(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.
(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.
(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition. This type of FASCSA order may be referred to as a DNI FASCSA order.
Intelligence community, as defined by 50 U.S.C. 3003(4), means the following—
(1) The Office of the Director of National Intelligence;
(2) The Central Intelligence Agency;
(3) The National Security Agency;
(4) The Defense Intelligence Agency;
(5) The National Geospatial-Intelligence Agency;
(6) The National Reconnaissance Office;
(7) Other offices within the Department of Defense for the collection of specialized national intelligence through reconnaissance programs;
(8) The intelligence elements of the Army, the Navy, the Air Force, the Marine Corps, the Coast Guard, the Federal Bureau of Investigation, the Drug Enforcement Administration, and the Department of Energy;
(9) The Bureau of Intelligence and Research of the Department of State;
(10) The Office of Intelligence and Analysis of the Department of the Treasury;
(11) The Office of Intelligence and Analysis of the Department of Homeland Security; or
(12) Such other elements of any department or agency as may be designated by the President, or designated jointly by the Director of National Intelligence and the head of the department or agency concerned, as an element of the intelligence community. National security system, as defined in 44 U.S.C. 3552, means any information system (including any telecommunications system) used or operated by an agency or by a contractor of an agency, or other organization on behalf of an agency—
(1) The function, operation, or use of which involves intelligence activities; involves cryptologic activities related to national security; involves command and control of military forces; involves equipment that is an integral part of a weapon or weapons system; or is critical to the direct fulfillment of military or intelligence missions, but does not include a system that is to be used for routine administrative and business applications (including payroll, finance, logistics, and personnel management applications); or
(2) Is protected at all times by procedures established for information that have been specifically authorized under criteria established by an Executive order or an Act of Congress to be kept classified in the interest of national defense or foreign policy. Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of any covered articles, or any products or services produced or provided by a source. This applies when the covered article or the source is subject to an applicable FASCSA order. A reasonable inquiry excludes the need to include an internal or third-party audit. Sensitive compartmented information means classified information concerning or derived from intelligence sources, methods, or analytical processes, which is required to be handled within formal access control systems established by the Director of National Intelligence. Sensitive compartmented information system means a national security system authorized to process or store sensitive compartmented information. Source means a non-Federal supplier, or potential supplier, of products or services, at any tier.
(b) Prohibition. (1) Contractors are prohibited from providing or using as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by any applicable FASCSA orders identified by the checkbox(es) in this paragraph (b)(1).
Yes ☐ No ☒ DHS FASCSA order Yes ☐ No ☒ DoD FASCSA order Yes ☐ No ☒ DNI FASCSA order
(2) The Contractor shall search for the phrase “FASCSA order” in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders identified in paragraph (b)(1) of this clause.
(3) The Government may identify in the request for quotation (RFQ) or in the notice of intent to place an order additional FASCSA orders that are not in SAM, but are effective and apply to the order.
(4) A FASCSA order issued after the date of the RFQ or the notice of intent to place an order applies to this contract only if added by an amendment to the RFQ or in the notice of intent to place an order or added by modification to the order (see FAR 4.2304(c)). However, see paragraph (c) of this clause.
(5)(i) If the contractor wishes to ask for a waiver, the Contractor shall disclose the following:
(A) Name of the product or service provided to the Government;
(B) Name of the covered article or source subject to a FASCSA order;
(C) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied the covered article or the product or service to the Offeror;
(D) Brand;
(E) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(F) Item description;
(G) Reason why the applicable covered article or the product or service is being provided or used;
(ii) Executive agency review of disclosures. The contracting officer will review disclosures provided in paragraph (b)(5)(i) of this clause to determine if any waiver may be sought. A contracting officer may choose not to pursue a waiver for covered articles or sources otherwise covered by a FASCSA order and may instead make award to an offeror that does not require a waiver.
(c) Notice and reporting requirement.
(1) During contract performance, the Contractor shall review SAM.gov at least once every three months, or as advised by the Contracting Officer, to check for covered articles subject to FASCSA order(s), or for products or services produced by a source subject to FASCSA order(s) not currently identified under paragraph (b) of this clause.
(2) If the Contractor identifies a new FASCSA order(s) that could impact their supply chain, then the Contractor shall conduct a reasonable inquiry to identify whether a covered article or product or service produced or provided by a source subject to the FASCSA order(s) was provided to the Government or used during contract performance.
(3)
(i) The Contractor shall submit a report to the contracting office as identified in paragraph (c)(3)(ii) of this clause, if the Contractor identifies, including through any notification by a subcontractor at any tier, that a covered article or product or service produced or provided by a source was provided to the Government or used during contract performance and is subject to a FASCSA order(s) identified in paragraph (b) of this clause, or a new FASCSA order identified in paragraph (c)(2) of this clause. For indefinite delivery contracts, the Contractor shall report to both the contracting office for the indefinite delivery contract and the contracting office for any affected order.
(ii) If a report is required to be submitted to a contracting office under (c)(3)(i) of this clause, the Contractor shall submit the report as follows:
(A) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil.
(B) For all other contracting offices, the Contractor shall report to the Contracting Officer.
(4) The Contractor shall report the following information for each covered article or each product or service produced or provided by a source, where the covered article or source is subject to a FASCSA order, pursuant to paragraph (c)(3)(i) of this clause:
(i) Within 3 business days from the date of such identification or notification:
(A) Contract number;
(B) Order number(s), if applicable;
(C) Name of the product or service provided to the Government or used during performance of the contract;
(D) Name of the covered article or source subject to a FASCSA order;
(E) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied the covered article or the product or service to the Contractor;
(F) Brand;
(G) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);
(H) Item description; and
(I) Any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (c)(4)(i) of this clause:
(A) Any further available information about mitigation actions undertaken or recommended.
(B) In addition, the Contractor shall describe the efforts it undertook to prevent submission or use of the covered article or the product or service produced or provided by a source subject to an applicable FASCSA order, and any additional efforts that will be incorporated to prevent future submission or use of the covered article or the product or service produced or provided by a source that is subject to an applicable FASCSA order.
(d) Removal. For Federal Supply Schedules, Governmentwide acquisition contracts, multi-agency contracts or any other procurement instrument intended for use by multiple agencies, upon notification from the Contracting Officer, during the performance of the contract, the Contractor shall promptly make any necessary changes or modifications to remove any product or service produced or provided by a source that is subject to an applicable FASCSA order.
(e) Subcontracts.
(1) The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (c)(1) of this clause, in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products and commercial services.
(2) The Government may identify in the solicitation additional FASCSA orders that are not in SAM, which are effective and apply to the contract and any subcontracts and other contractual instruments under the contract.
The Contractor or higher-tier subcontractor shall notify their subcontractors, and suppliers under other contractual instruments, that the FASCSA orders in the solicitation that are not in SAM apply to the contract and all subcontracts.
(End of clause)
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008)
(a) Definitions. As used in this clause-
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b)The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to sally_leitch@ios.doi.gov.
(End of clause)
52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)
(a) The Contractor shall submit one of the following payment protections: (to be determined within each individual task order over $35,000.)
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of Clause)
52.228-15 Performance and Payment Bonds-Construction (JUN 2020) (DEVIATION May 2023)
(a)Definitions. As used in this clause- Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102–1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25[, except that a seal is not required]). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
mailto:sally_leitch@ios.doi.gov
(2) Payment bonds (Standard Form 25-A[, except that a seal is not required]). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c)Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d)Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of the Treasury, Financial Management, Service Surety Bond Branch, 3700 East West Highway, Room 6 F01, Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(e)Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
52.252-6 Authorized Deviations in Clauses (NOV 2020)
As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert "(DEVIATION)" after the date of the clause.
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of Clause)
1452.228-70 Liability Insurance—Department of the Interior (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
http://www.fms.treas.gov/c570/
$100,000 Per person $500,000 Per occurrence $500,000 Property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
(End of clause)
--END OF SECTION I--
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
List of Documents, Exhibits and other Attachments:
1. Section B – Price Schedule
2. GLAC 1.1 Scope of Services
3. GLAC 1.2 Site Photos
4. Wage Determination – Glacier County MT – MT20260034 05/18/2026
--END OF SECTION J—
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
ALL BASE MATOC IDIQ PROVISIONS APPLY TO THIS TASK ORDER.
ADDITIONAL AND REVISED PROVISIONS:
52.252-1 Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): http://www.acquisition.gov
52.204-29, Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023) 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025) Provisions Incorporated by Full Text:
52.201-1 Acquisition 360: Voluntary Survey (Sep 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the pre-award and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https://www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the pre-award and debriefing processes, as applicable, used for a specific acquisition.
(End of provision)
52.204-8 Annual Representations and Certifications (JAN 2025) (DEVIATION FEB 2025)
(a)(1)The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2)The small business size standard is $45M.
(3)The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519 if the acquisition—
(i)Is set aside for small business and has a value above the simplified acquisition threshold;
(ii)Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii)Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1)If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2)If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i)□ Paragraph (d) applies.
(ii)□ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1)The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i)52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A)The acquisition is to be made under the simplified acquisition procedures in part 13;
(B)The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C)The solicitation is for utility services for which rates are set by law or regulation.
(ii)52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii)52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv)52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v)52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A)Are not set aside for small business concerns;
(B)Exceed the simplified acquisition threshold; and
(C)Are for contracts that will be performed in the United States or its outlying areas.
(vi)52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.
(vii)52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.
(viii)52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix)52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x)52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi)52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii)52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(A)The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B)The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C)The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii)52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(xiv)52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv)52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi)52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.
(xvii)52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.
(xviii)52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xix)52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the provision at 52.204-7.
(xx)52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225- 1.
(xxi)52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A)If the acquisition value is less than $50,000, the basic provision applies.
(B)If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.
(C)If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.
(xxii)52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii)52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations.
(xxiv)52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations.
(xxv)52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2)The following representations or certifications are applicable as indicated by the Contracting Officer:
☒ (i)52.204-17, Ownership or Control of Offeror.
☒ (ii)52.204-20, Predecessor of Offeror.
☐ (iii)52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
☐ (iv)52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification.
☐ (v)52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification.
☐ (vi)52.227-6, Royalty Information.
☐ (A)Basic.
☐ (B)Alternate I.
☐ (vii)52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d)The offeror has completed the annual representations and certifications electronically in SAM website accessed through https://www.sam.gov. After reviewing the SAM information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause # Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in…
This is the start of the file's text. The full file is on GovTribe.