Sol_140P1425Q0058.pdf
PDF 1 MB Posted
- Attached to
- GRTE, BAT MITIGATION UNIT 1037
- Solicitation number
- 140P1425Q0058
About this file
This document is a Request for Quote (RFQ) for bat mitigation services at Unit 1037 in Grand Teton National Park. The National Park Service seeks a contractor to perform critical remediation and restoration work on a historic Highlands cabin with significant bat infestation, involving deconstructing and sealing bathroom ceiling, walls, and closet areas, removing bat guano, and rebuilding interior spaces. The project is a 100% small business set-aside with a NAICS code of 236220 (Commercial & Institutional Building Construction) and a small business size standard of $45.0 Million, with an estimated contract value between $25,000 and $100,000.
The solicitation requires contractors to conduct a comprehensive site inspection, identify and seal bat entrance points, remove guano using proper safety protocols, repair structural damage while preserving the cabin's historical integrity, and dispose of contaminated materials. The performance period is from 10/15/2025 to 11/30/2025, with a site visit scheduled for 6/26/2025 at 10:00 am Mountain Time at 308 Highlands Ranch Rd. in Moran, Wyoming. Quotes are due by 7/15/2025 at 2:00 pm Mountain Time, and the contract will be awarded based on technical capability and price, with a preference for domestic construction materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0044010711
NPS, IMR - Northern Rockies MABO
PO Box 168
Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
PIR
Sally Leitch, Contracting Officer
Sally_Leitch@nps.gov
140P1425R0021 - GRTE Qtrs 1037 - Bat Mitigat.
Sally Leitch 7204505172
1x 06/16/2025
140P1425Q0058
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Grand Teton National Park requires a contractor to provide bat mitigation services for Quarters 1037 in accordance with the Scope of Work.
The Government contemplates an award of a firm-fixed-price contract resulting from this solicitation.
This is a 100% small business set-aside posted in the open market governmentwide point of entry.
NAICS code is 236220 - Commercial & Institutional Building Construction with a small business size standard of $45.0 Million.
See Section L "Instructions, Conditions, and Notices to Offerors" for quote submission specifics.
Phone Calls related to this solicitation shall not be accepted.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
1 46 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
07/15/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, IMR - Northern Rockies MABO PO Box 168
Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190
PIR
Sally Leitch
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 45
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P1425Q0058
Delivery: 10/19/2026
Delivery Location Code: 0011283244
NPS, Grand Teton NP
Headquarters Warehouse
103 Headquarters Loop Road
Moose WY 83012-0170 US
Period of Performance: 10/15/2025 to 11/30/2025
00010 Bat Mitigation Services in accordance with the terms and conditions and Scope of Work for unit
1037.
Product/Service Code: Y1FZ
Product/Service Description: CONSTRUCTION OF
OTHER RESIDENTIAL BUILDINGS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation #140P1425Q0058
Point of Contact: Sally Leitch, Contracting Officer, sally_leitch@nps.gov
CONTINUATION OF SOLICITATION/CONTRACT FORM 1442
This is a Request for Quote (RFQ), that is prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Part 13 and Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation issued as RFQ 140P1425Q0058. This solicitation incorporates all terms and conditions as established in this document and clauses and provisions that are in effect through Federal Acquisition Circular (FAC) 2025-04 which are located at FAR | Acquisition.GOV and CAAC Letter 2025-02, Supplement 1 which is located at CAAC Letters | Acquisition.GOV.
Special Notice for Contractors Submitting Quotes:
Signing of the SF 1442 shall be deemed to be a representation by the quoter that contractor owns, operates, or maintains a place of business, regularly engaged in construction projects that include having staff with experience required to perform the work described in this solicitation. Proposed pricing shall include all materials, labor, work, and taxes to complete the work outlined in the Scope of Work (SOW).
This contract does not contain Options.
PURPOSE:
The National Park Service (NPS) anticipates issuing a Firm-Fixed Price (FFP) single award contract for the construction services noted below. The NPS has elected to compete this project on SAM.gov through Contracting Opportunities as a 100% small business set-aside.
GENERAL:
(a) The NPS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13.
(b) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Respondents are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award.
(c) Respondents are cautioned to submit adequate information to enable the Government to fully ascertain each respondent’s capability to perform the requirements in accordance with the requirements of the RFQ.
(d) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale prior to the closing of this
RFQ.
(e) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Quoter will not be participating in a mailto:sally_leitch@nps.gov https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/caac-letters sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government.
(f) Quotation shall be valid for a minimum of 180 days.
(g) All interested parties shall be registered in the System for Award Management or SAM at time a quotation is submitted. Firms that show not registered or registered but registration that is expired will not be considered further for award.
(h) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate.
(i) Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer.
(j) All questions should be emailed directly to the Contracting Officer. Only written questions that are applicable to the solicitation will be considered and responded to by the Government. NPS responses to applicable questions will be posted as an amendment to the solicitation.
LOCATIONS:
Park Location:
Grand Teton National Park 103 Headquarters Loop Moose, Wyoming, 83012
The work to be completed is located at:
Grand Teton National Park Highlands Employee Housing Area Unit 1037 308 Highlands Ranch Rd.
Moran, WY 83013
PRICE SCHEDULE / LINE-ITEMS / PERIOD OF PERFORMANCE:
Magnitude:
Between $25,000.00 and $100,000.00
The governments payment for the items listed in the Contract Price Schedule will constitute full compensation to the Contractor for – (1) Furnishing all management, supervision, labor, equipment, services, appliances, and materials; and (2) performing all operations required to complete the work in conformity with the SOW. The contractor shall include in the prices for the items listed in the price schedule, all costs for work in the SOW, whether or to specifically listed in the price schedule. This includes all taxes as applicable under FAR 52.229-3, Federal, State, and Local Taxes, including New Mexico Gross Receipts Tax and Tribal Employment Rights Ordinance (TERO) Taxes where applicable.
Period of Performance: 10/15/2025 – 11/30/2025 Line- Item
Description Unit of Measure
FFP Cost mailto:sally_leitch@nps.gov
10 Bat Mitigation Services in accordance with the terms and conditions and Scope of Work for unit 1037.
By Dollars $
Period of performance (Reference 52.211-10) may begin once a Notice to Proceed has been provided. A Notice to Proceed will only be issued upon receipt of acceptable bonding and insurance.
POINTS OF CONTACT:
Department of the Interior National Park Service / Contracting Operations (ConOps) Central Northern Rockies Major Acquisition Buying Office (NR MABO)
Contracting Officer: Sally Leitch Email: Sally_leitch@nps.gov Phone: To be Provided at Award
Grand Teton National Park (GRTE) Contracting Officer Representative: To be Provided at Award
Email: To be Provided at Award Phone: To be Provided at Award
Company / Point of Contact (POC) Information / SAM ID / Cage Code / Business Size Company Name: Will be determined at time of award.
Address: Will be determined at time of award.
City/State/Zip: Will be determined at time of award.
POC Name: Will be determined at time of award.
Email: Will be determined at time of award.
Phone: Will be determined at time of award.
SAM ID: Will be determined at time of award.
Cage Code: Will be determined at time of award.
Business Size: Will be determined at time of award.
ADDITIONAL REQUIREMENTS & CONTRACT TERMS AND CONDITIONS:
The NPS contemplates award of an open market, FFP construction contract as a result of this solicitation.
Scope of Work Contract / Project Title: Bat Mitigation in Housing Unit 1037 Park: Grand Teton National Park Contract# / Contract #: TBD
Project Description / Summary:
The purpose of this project is to undertake critical remediation and restoration work at a historic Highlands cabin in Grand Teton National Park that has become a site of significant bat mailto:Sally_leitch@nps.gov activity. Unit 1037, recognized for its architectural and historical significance, requires immediate intervention to mitigate health risks and safeguard its integrity as a viable seasonal housing unit. The primary scope of this project involves deconstructing parts of the bathroom ceiling, walls and closet to help mitigate bat entrance points into the housing unit, seal off the areas to prevent further bat incursions, removing bat guano from affected attic, wall and interior spaces, and rebuilding damage to the unit’s interior. The area impacted in the cabin is less than 200 square feet, with the bathroom measuring approximately 3 feet by 6 feet by 7 feet, the closet at 3 feet by 3 feet by 7 feet, and the ceiling peak reaching about 12 feet. The project will also include the disposal of any contaminated materials associated with the bat activity.
Objectives:
The project encompasses several key objectives aimed at addressing the pressing issues related to bat incursions:
Mitigation of Bat Entrance Points:
• Conduct a comprehensive inspection of the cabin on the first day of work with the
COR present to identify all potential and active entry points used by bats. This includes examining the roof, eaves, vents, and any cracks or gaps in the exterior walls.
Additional inspections will be required once access to the interior attic and wall space is achieved.
• Utilize eco-friendly and historically sensitive materials to seal these entry points, ensuring that the methods employed do not compromise the structural integrity or aesthetic value of the cabin. The exterior of the cabin is historic and must remain unchanged, while the bathroom, added at a later date, lacks the same historical significance; however, any construction within the cabin should be replaced in kind, using matching finishes and textures to preserve the overall integrity of the structure.
Sealing Off Areas:
• Following the identification of entrances, further steps will be taken to seal off the affected areas comprehensively. This will involve:
• Installing exclusion devices that allow any existing bats to exit without re-entering.
• Sealing off any other vulnerable points to create a bat-proof environment within the cabin.
Guano Removal:
• The project will involve the safe and thorough removal of bat guano, which poses serious health risks due to the potential for histoplasmosis and other zoonotic diseases.
The removal process will be conducted by trained professionals using proper PPE.
• Protective measures will be employed to prevent contamination of the cabin and surrounding environment during the removal process such as drop clothes and plastic coverings.
Damage Repair:
• Assessing and addressing structural damage caused by bat activity is imperative to maintaining the cabin's historical integrity. This includes:
o Repairing and restoring the bathroom ceiling and walls, which have suffered from moisture and damage due to guano accumulation.
o Employing historically appropriate materials and techniques to ensure that renovations align with preservation standards, thus maintaining the cabin’s historical character and authenticity.
o Any wood salvaged from the project, including tongue and groove wall and ceiling boards, must be treated for mold and mildew prior to reinstallation.
Disposal of Contaminated Materials:
• All material removed from the premises, including bat guano and any contaminated construction materials, will be disposed of in compliance with local health and safety regulations. This may involve specialized disposal methods to ensure that health risks to workers and the environment are minimized. The local transfer station will accept bat guano provided it is securely bagged and free of any rips or tears in the packaging.
Timeline and Implementation:
• This project is time-sensitive, with all mitigation and repair efforts mandated to be completed while bats are not roosting in unit 1037.
• A detailed schedule will be developed outlining each phase of the project, from initial inspection and assessment through to the final disposal of contaminated materials.
Regular updates will be provided to the COR in the project to ensure transparency and maintain alignment with historical preservation goals.
Significance:
• The successful completion of this project will have several significant outcomes:
o Health and Safety Enhancement: By addressing the bat issue comprehensively, the project will protect the health of current and future tenants, eliminating potential exposure to harmful pathogens.
o Preservation of Historical Heritage: The careful restoration and maintenance of this historic cabin will ensure that it continues to serve as an essential housing unit for seasonal employees, supporting operational needs while respecting its historical value.
o Community Impact: Ensuring that the cabin remains habitable not only preserves a piece of history but also supports the community by providing housing essential for seasonal workforce continuity.
Background:
The historic 235 square foot cabin in question has been a vital resource for seasonal employees, providing shelter and comfort in a unique setting. However, in recent years, this housing unit has become increasingly plagued by significant bat activity, prompting serious concerns regarding tenant safety and the structural integrity of the cabin.
Increased Bat Activity:
Over the past two years, numerous reports of bats entering the unit have led to multiple emergency situations requiring the eviction of tenants for their safety. The tenant in 2024 had to receive post-exposure treatments, which is extremely costly and a traumatic experience. The presence of bats poses not only immediate hazards—such as potential bites or scratches—but also long-term health risks associated with bat guano, which can carry pathogens like histoplasmosis. Such risks make the cabin unsuitable for habitation, directly impacting the welfare of seasonal employees who rely on this housing.
Assessments and Findings:
In response to the escalating situation, Pest Management assessments were conducted, identifying a bat colony of Little Brown Bats residing in the attic and within the walls of the bathroom. These assessments revealed that the bats not only represented a nuisance but were also damaging the structure itself. The accumulation of bat guano has led to moisture-related issues, raising concerns about mold and structural decay.
Mitigation measures were initiated in the Fall of 2023 with the intent to eliminate the bat presence. Unfortunately, these actions were ineffective; by 2024, bats returned in greater numbers, indicating that the initial measures did not adequately address the root of the problem. The inability to successfully manage this bat infestation necessitated further evaluations by Historic Preservationist staff.
Expert Recommendations:
Upon review, the Historic Preservationist staff recognized that the most effective method of mitigation would involve removing the bathroom ceiling and south facing bathroom wall to gain access to the contaminated areas housing the bats. This approach is critical not only for a thorough clean-up but also for inspecting underlying structural elements that may need repair or reinforcement.
The need for this invasive method stems from the understanding that without direct intervention, the historic cabin risks becoming a permanent habitat for bats. Such a scenario would not only eliminate its ability to house seasonal employees but would also have broader implications for the surrounding community. Other housing units nearby would face similar risks, as bat colonies can expand and new colonies may establish in adjacent structures, creating a larger public health and safety issue.
Community and Historical Implications:
The historical significance of the cabin underscores the urgency of this project. Constructed in a period that reflects unique architectural styles and craftsmanship, the cabin has served as a tangible link to the past staff. Failing to act would not only jeopardize the structure's integrity but also diminish its role as an essential resource for seasonal employees.
Moreover, community members depend on the operational integrity of this housing unit, as it directly supports the seasonal workforce essential for maintaining the area's economic and residential stability. If the mitigation is not executed promptly and effectively, the lasting ramifications could threaten not only the preservation of this historic asset but also the broader community dynamics reliant on temporary housing.
This project, therefore, stands at the intersection of public health, historical preservation, and community support. Immediate action is essential to ensure the cabin can continue to fulfill its role as a housing unit while preserving its historical value for future generations.
Specific Work / Tasks:
• Remove Affected Ceiling and Walls
• Carefully take down the bathroom ceiling, any damaged wall sections to access underlying contaminated areas and any bathroom fixtures that are in the way.
• Assess Structural Integrity: Inspect for mold, moisture damage, or any signs of structural compromise and note any repairs needed.
• Site Inspection and Assessment:
o Comprehensive Inspection: Conduct a detailed visual assessment of the cabin, specifically the attic, bathroom, and exterior components, to identify bat entry points and assess the extent of damage.
Mitigation Implementation:
• Identify and Seal Entrance Points:
o Mark all previously identified entry points used by bats.
o Use appropriate exclusion techniques and eco-friendly sealants to close access points.
o Install Exclusion Devices: Implement bat exclusion devices that prevent re-entry while allowing bats to exit.
• Guano Removal o Prepare Work Area: Set up containment zones to prevent contamination of non-affected areas.
o Remove Bat Guano: Employ trained professionals to safely collect and remove bat guano from the attic and bathroom walls.
o Decontaminate Work Area: Treat and sanitize all surfaces affected by guano and moisture to eliminate health risks.
• Structural Repairs
• Conduct Repairs:
o Replace damaged ceiling materials with historically appropriate substitutes.
o Re-install all bathroom fixtures.
o Repair, caulk, seal and re-varnish bathroom walls to restore the space to original finish
• Disposal of Contaminated Materials o Identify Disposal Protocols: Work with local waste management to ensure proper disposal of contaminated materials in compliance with health regulations.
o Execute Safe Disposal: Safely transport and dispose of all contaminated materials, including bat guano and damaged construction elements.
• Final Inspection and Clean-up o Conduct Post-Mitigation Inspection: Perform a thorough review of all completed work to ensure compliance with project specifications and effectiveness of mitigation efforts.
o Final Clean-up: Remove all construction debris, dispose of protective gear, and ensure the cabin is left in a clean, sanitary, presentable condition.
• Documentation and Reporting:
o Document Work Performed: Keep accurate records of the work completed, including photos, materials used, and entry points sealed.
o Prepare Final Report: Compile a report summarizing the project’s outcomes, including before-and-after photos, and provide recommendations for future monitoring.
• Optional Work / Tasks: None
• Government Furnished Equipment / Materials / Other: None
• Special Conditions / Requirements:
o Contractor shall ensure compliance with federal, state, and local regulations regarding wildlife. Bats are often protected species, and certain practices may require adherence to specific provisions, especially if they are found to be endangered or threatened.
o Planning must consider local bat breeding seasons, as mitigation efforts should ideally occur outside these times to avoid disrupting roosting and breeding activities. Local bat populations usually migrate out in mid-September.
o These are seasonal cabins and as such there may be no facilities available such as power, water or bathrooms.
o Plan interventions to avoid extreme weather conditions (e.g., heavy rain, snow), which could impact construction and safety protocols. Fall is often affected with early in the year snowfall and limited road access.
o Monitor air quality during and after remediation work, especially during guano removal. Utilize air filtration systems if there is a risk of airborne spores or particles.
o Ensure that all repair work adheres to local historic preservation guidelines and standards. Use historically accurate materials and techniques to maintain the building's integrity and historical value.
Location & Maps:
Highlands Employee Housing Area 308 Highlands Ranch Rd, Moran, WY 83013 Grand Teton National Park
Highlands 1037: 308 Highlands Ranch Rd - Google Maps
Performance Period / Schedule Requirements:
10/15/2025 to 11/30/2025, due to snow on roads may not/are not usually accessible later November.
It is estimated that an anticipated award will be made once the Department of the Interiors annual blackout period has ended around 10/15/2025.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
https://www.google.com/maps/place/308+Highlands+Ranch+Rd,+Moran,+WY+83013/@43.7089285,-110.7298066,17z/data=!3m1!4b1!4m6!3m5!1s0x5352553a768b9425:0x778ac77719025680!8m2!3d43.7089285!4d-110.7298066!16s/g/11cpjtqwhb?entry=ttu&g_ep=EgoyMDI1MDUxNS4xIKXMDSoASAFQAw%3D%3D
Images:
LIST OF ATTACHMENTS:
Description Number of Pages B08 Solicitation Attachment 1 - DBA WD WY20250003 dated 1-3-2025 for Teton County, WY – Residential
B08 Solicitation Attachment 2 – SF 1413 List of Subcontractors 1 B08 Solicitation Attachment 3 – CM_16 Transmittal Form 2
BONDING:
Bonds are due no later than 10 calendar days after award.
• Bid Bond is not required.
• Payment Bond - 100% - Any amount awarded over $35,000.00 requires submission of a Payment Bond within 10 calendar days of award.
• Performance Bond – is not required.
DEPARTMENT OF LABOR (DOL) CONSTRUCTION WAGE RATES:
Construction Wage Rate Requirement (formerly Davis Bacon wage rates) are applicable under General Decision Numbers. The Construction Wage Rate are:
• DBA WD WY20250003 dated 1-3-2025 for Teton County, WY - Residential
Current prevailing wage determination(s) at time of issuance of solicitation are included in this Section.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the Quoter’s responsibility to insure the most recent determination is used in preparing the Quote. An amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all Quoters submitting a Quote. If applicable, these Quoters/contractors will be given an opportunity to provide revised Quotes solely to amend Quotes due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.
Applicable wage rates can be found at https://sam.gov/
KEY PERSONNEL:
The contractor identifies the following as key-personnel:
Position Title Prime / Subcontractor
Name Email Phone
Project Manager:
Job-site Superintendent:
Quality Control Manager:
During the first 60 days of performance of the contract performance the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the CO within 15 calendar days after the occurrence of any of these events and provide the information required by the paragraph below. After the initial 60-day period, the Contractor shall submit the information required by the paragraph below to the CO at last 15 days prior to making any permanent substitutions.
The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the CO. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The CO will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. This clause will be modified to reflect any approved changes of key personnel.
PRE-CONSTRUCTION CONFERENCE:
A Pre-Construction Conference will be held after award at a mutually agreed upon date and time between. This conference shall take place before or within one week of the NTP being award.
PROJECT SAFETY:
https://sam.gov/
The contractor shall submit a CM-16 form for each contract describing the project Safety Plan via Form CM-16 to be reviewed by the CO/COR. The contractor shall implement the approved Safety Plan that provides adequate policies, procedures and practices to protect employees from health-work hazards and the general public from injury or harm.
SITE VISIT INSTRUCTIONS:
Attendance at the Site Visit is very strongly recommended (See Provision 52.236-27, Site Visit (Construction) – Alternate I for date and time). Any issues that arise post-award that the contractor should have known from attendance at the site visit will be subject to FAR 52.236- 3, Site Investigation and Conditions Affecting the Work. Note the last sentence of paragraph (a):
“Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.”
Attendees should submit their company name and name(s) of attendees to the Contracting Officer (CO) via email at sally_leitch@nps.gov by Noon (12:00 pm) Mountain Time on 06/23/2025.
• No questions shall be asked during the site visit, if you have any questions please write them down, then after the site visit is concluded the quoter shall compile and submit all questions they have and submit them to the contracting officer by the time & date listed below under questions.
• All questions shall be answered via amendment to the TO RFQ the following week.
• Failure to attend a walk-through may not be used as an excuse for omission or miscalculation in quotes.
• The awarded Contractor shall not be reimbursed for Quote preparation, attendance during negotiation, site visits, walk-through, or other pre-contract costs.
• The site visit is normally scheduled within one to two weeks after the solicitation is posted; however, the site visit can be scheduled as soon as two days after issuance of the solicitation when an urgent need or end of fiscal year requirements.
SITE VISIT & OTHER QUESTIONS:
All questions shall be submitted via email by the stated date and time listed below. Late questions may not be accepted.
Time: Noon (12:00 pm) Mountain Time Date: 7/2/2025 Email: sally_leitch@nps.gov
AWARD SELECTION PROCESS:
Award will be made in accordance with FAR Part 13.106-1(a)(2) to quoter that presents the overall best value to the Government when price and other factors are considered. Evaluations will be completed using comparative evaluations which is a side-by-side comparison of all quotes. This solicitation is not stating nor required to state the relative importance assigned to each evaluation factor and/or sub factor.
mailto:sally_leitch@nps.gov
1. Price.
2. Technical:
Documentation designating the Project Superintendent including information that clearly demonstrates three (3)-years of relevant experience in bat mitigation services.
Construction schedule that meets the period of performance and requirements specified in the
SOW.
Provide at minimum 3 past experiences in Bat Mitigation Services of the same size and scope to this project that includes: Company Name, POC, Email, description of work, and associated cost.
List of any required construction permits (if applicable).
Organizational Chart that lists at minimum:
o Key personnel – Contractor shall not substitute key personnel or key subcontractors after award without the CO approval.
o Subcontractors
Warranty Information
INSTRUCTIONS TO QUOTERS:
All quotes shall be emailed to the email address by the stated closing date and time listed below:
Time: 1400 (2:00 pm) Mountain Time Date: 7/15/2025 Email: sally_leitch@nps.gov
Please note the time listed is the time by which all quotes shall be received by, not sent by.
Emails will have a received date and time that will show when the quote received into the contracting officers email box. Quotes submitted after the closing date and time may not be accepted.
SAM Registration Requirements:
To be considered for award a firm shall obtain a Unique Entity Identifier (UEI), shall have an active registration, and shall have completed the representations and certifications section in the System for Award Management (SAM) via https://www.sam.gov at the closing date and time of the solicitation; as well as, at the time of award and throughout performance of this requirement.
If a firm has questions regarding the SAM registration process, please call 866-606-8220. If assistance is needed with SAM registration or updating SAM, please contact the Procurement Technical Assistance Center nearest you at http://www.aptac-us.org/new/Govt_Contracting/find.php
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
mailto:sally_leitch@nps.gov mailto:sally_leitch@nps.gov https://www.sam.gov/ http://www.aptac-us.org/new/Govt_Contracting/find.php http://www.aptac-us.org/new/Govt_Contracting/find.php
Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
Whenever possible, award will be made without discussions. Quoters should not anticipate or expect discussions and ensure they have provided their best and final pricing. Award will be made to the quoter whose quote is determined to be the overall best value to the Government when price and other factors are considered.
A quote that merely reiterates or promises to accomplish the requirements of the RFQ will be considered incomplete and not considered further for award. A Quote that is orderly, provides all required items in the submission checklist, and sufficiently documented will enable the Government to perform meaningful and fair evaluations. Quotes that fail to address any of the items listed in the submission checklist shall be deemed incomplete, and the Quote will not be further considered for award.
If an Quoter believes that requirements in these instructions contain an error, omission, or are otherwise unsound, the Quoter shall immediately notify the Contracting Office in writing (email is the preferred method) with supporting rationale. All concerns shall be submitted to the Contracting Officer, Sally Leitch at Sally_Leitch@nps.gov.
By submission of its Quote, the Quoter accepts all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Quoters with any “Incomplete” and/or “Unacceptable” technical ratings will not be considered for award.
Quoters shall clearly identify any exception to the solicitation and conditions and provide complete accompanying rationale.
Quotes shall be valid for a minimum of 180 days.
Format for Quotes:
1. Quotes shall be 8 ½” x 11” .pdf format
2. A page is defined as one face of a sheet of paper containing information
3. Typing shall not be less than 11 pitches (Times New Roman/Ariel/etc., narrow border, no artistic script for readability
4. Elaborate formats, bindings, or color presentations are not desired or required
5. Email(s) cannot exceed 10mbs
Overview of Acceptability Submission Requirements (in the order listed below):
● Submission Checklist
● SF 1442, completed and signed
● Amendments, if applicable, completed and signed.
● Completed Provision 52.204-24
● Completed Quote Contact Data
● Completed Key Personnel
● Contract Price Schedule
SUBMISSION CHECKLIST:
mailto:Sally_Leitch@nps.gov
Submission Checklist Quote Submission Requirements
Completed and signed SF 1442 Sections:
14 – 20C - page 2 of this document
Completed Provision: (Entire Provision)
52.204-24 pages 41 - 43 with highlighted portions on page 42 filled out.
Complete and Return:
Quoter Contact Data Quoters Name:
Address:
City/State/Zip:
Quoters POC:
Quoters email:
Quoters Phone:
Quoters SAM ID:
Quoters Cage Code:
Quoters Business Size:
Complete and Return:
Key Personnel Data
Position Title Prime / Subcontractor
Name Email Phone
Project Manager:
Job-site Superintendent:
Quality Control Manager:
Safety Manager:
CHECKLIST IS CONTINUED ON THE NEXT PAGE
Contract Price Schedule Complete and Return:
Pricing shall not be referenced anywhere else in the quoter’s Quote submission.
Solicitation Number: 140P1425Q0058 Grand Teton National Park - PMIS: 345616
QUOTER
NAME:
Notice: Quoters are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items.
Failure to do so may render the Quote unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts governs. Round totals and extended prices to whole dollars.
Quoter acknowledges by presenting the proposed pricing herein that all pricing shall be held firm for 180 days from the date and time the Quotes are due.
Line- Item Number
Contract Line-Item Title Quantity Unit of Measure
Line-Item Price
10 Bat mitigation services in accordance with the Scope of work
1 By Dollars
Total Firm Fixed Price $
Technical Acceptability Requirements Documentation designating the Project Superintendent including information that clearly demonstrates three (3)-years of relevant experience in bat mitigation services.
Construction schedule that meets the period of performance and requirements specified in the SOW.
Provide at minimum 3 past experiences in Bat Mitigation Services of the same size and scope to this project that includes: Company Name, POC, Email, description of work, and associated cost.
List of any required construction permits (if applicable). ☐
Organizational Chart that lists at minimum:
o Key personnel – Contractor shall not substitute key personnel or key subcontractors after award without the CO approval.
Subcontractors
Warranty Information ☐
*It is the responsibility of the quoter to thoroughly read and submit sufficient information and documentation in their Quote.
*Quoters shall not copy the Scope of Work and state the firm can meet the requirement. Nor shall the Quoter copy the Scope of Work and add comments to specific areas.
QUOTE RECAP DATES AND TIMES:
RSVPs to Site Visit due NLT Noon (12:00pm) Mountain Time on 06/23/2025
Site Visit 06/26/2025 @ 10:00 am, Mountain Time All Site Visit & Other Questions Due NLT Noon (12:00pm) Mountain Time on
07/2/2025 Quotes Due NLT 1400 (2pm) on 7/15/2025 Bonds Within 10 days of Award
EVALUATION PROCESS:
All eligible Quotes shall be evaluated in accordance with the factors described herein. The evaluation factors used in this RFQ are technical and price. Award will be made to the quoter who is determined to be the overall best value to the Government by using comparative evaluation. A comparative evaluation is where each quote will be compared side-by-side with other quotes to determine the overall best value to the Government.
Quoters are reminded to include their best technical and price terms in their initial quote and not to automatically assume they will have an opportunity to participate in discussions or be asked to submit a revised quote.
The contracting officer will review all quotes submitted to ensure all aspects of the submission requirements have been submitted. If any documentation is missing, cannot be located or simply copies the SOW provided the quote shall be considered incomplete and not considered for award.
The contracting officer shall conduct the price evaluation, and the technical evaluators will evaluate the technical portion of the quotes and make a recommendation of award to the contracting officer. If all quotes are determined to be technically equal, the award will be made to the lowest priced quote. Additional details on the evaluation process are detailed below.
Information recorded in SAM will be used to determine a contractor’s responsibility.
The following factors shall be used to evaluate quotes for technical acceptability:
Factor 1: Technical Capability
Technical Capability will be initially rated by the technical evaluator(s) as either “Acceptable” or “Unacceptable.” An “Unacceptable” rating shall deem the quoter ineligible for award.
Acceptable Information provided demonstrates the quoter has the technical capability of all contractual requirements of the solicitation, portrays a clear and technical understanding of the project requirements, and has provided all the submission requirements.
Unacceptable Information provided does not demonstrate that the quoter has the technical capability of all contractual requirements of the solicitation, does not portray a clear and technical understanding of the project, and did not provide all the required submission requirements.
The technical evaluators will take the remaining technically acceptable quotes and compare them to one another to determine what quote is the overall best value to the government and make their technical recommendation for award based on this side-by-side evaluation based on the established requirement and information provided in the quoters quote. If all remaining quotes are determined to be technically equal, the award will be made to the quoter with the lowest priced quote upon the contractors fair and reasonable price determination.
Quoter shall provide the following:
Technical Criteria Documentation designating the Project Superintendent including information that clearly demonstrates three (3)-years of relevant experience in bat mitigation services.
Construction schedule that meets the period of performance and requirements specified in the SOW.
Provide at minimum 3 past experiences in Bat Mitigation Services of the same size and scope to this project that includes: Company Name, POC, Email, description of work, and associated cost.
List of any required construction permits (if applicable).
Organizational Chart that lists at minimum:
o Key personnel – Contractor shall not substitute key personnel or key subcontractors after award without the CO approval.
o Subcontractors
Warranty Information
Factor 2: Price
For all line items Pricing must be a firm fixed-price, valid for a minimum of 180 days, and with every item listed, priced, including labor, materials, other direct costs, and total cost of all work.
Quoters shall submit their proposed pricing using the Price Schedule found in the checklist above and attach a detailed breakdown for all line-items. Failure to submit pricing and a breakdown for all items will deem the quoter ineligible for award.
The Contracting Office will review the pricing for fair and reasonableness. For price to be reasonable, it shall represent a price to the Government that a prudent person would pay in the conduct of competitive business.
SOLICITATION & CONTRACT CLAUSES:
52.252-2 Clauses Incorporated by Reference Feb 1998 This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov
52.204-13 System for Award Management Maintenance Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications Dec 2014 52.209-6 Protecting the Government’s Interest when Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment Jan 2025 https://www.acquisition.gov/
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations Nov 2015 52.219-28 Post-Award Small Business Program Representation Jan 2025 52.222-6 Construction Wage Requirements Aug 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records Jul 2021 52.222-9 Apprentices and Trainees Jul 2005 52.222-10 Compliance with Copeland Act Requirements Feb 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related
Act Regulations May 2014
52.222-14 Disputes Concerning Labor Standards Feb 1988 52.222-15 Certification of Eligibility May 2014 52.222-27 Affirmative Action Compliance Requirements for Construction Apr 2015 52.223-3 Hazardous Material Identification and Material Safety Data Feb 2021 52.226-7 Drug Free Workplace May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving May 2024 52.227-4 Patent Indemnity – Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-14 Irrevocable Letter of Credit NOV 2014 52.232-5 Payments under Fixed-P rice Construction Contracts May 2014 52.232-23 Assignment Of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts Jan 2017 52.236-2 Differing Site Conditions Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work Apr 1984 52.236-5 Material and Workmanship Apr 1984 52.236-6 Superintendence by the Contractor Apr 1984 52.236-7 Permits and Responsibilities Nov 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements.
Apr 1984
52.236-10 Operations and Storage Areas Apr 1984 52.236-12 Cleaning up Apr 1984 52.236-13 Accident Prevention Nov 1991 52.236-14 Availability and Use of Utility Services Apr 1984 52.236-17 Layout of Work Apr 1984 52.236-26 Preconstruction Conference Feb 1995 52.240-1 Prohibition on Unmanned Aircraft Systems Manufacturer or Assembled by American Security Drone Act-Covered Foreign Entities Nov 2024
52.242-14 Suspension of Work Apr 1984 52.243-5 Changes and Changed Conditions Apr 1984 52.246-21 Warranty of Construction Mar 1994
CLAUSES INCORPORATED FULL TEXT:
52.204-30 Federal Acquisition Supply Chain Security Act Orders – Prohibition Dec 2023 (a)Definitions. As used in this clause— Covered article, as defined in 41 U.S.C. 4713(k), means— https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4713&num=0&edition=prelim
(1)Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;
(2)Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);
(3)The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or
(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.
FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201–1.303(d) and (e):
(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.
(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.
(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and…