Sol_140L4326Q0084.pdf
PDF 357 KB Posted
- Solicitation number
- 140L4326Q0084
About this file
This is a Request for Quotation (RFQ) for seedling production services for the Bureau of Land Management (BLM) Oregon/Washington State Office.
The solicitation seeks firm fixed-price commercial items supply contracts for tree seedling production to be delivered between September 15, 2026, and May 15, 2029. The BLM will issue multiple awards. Twenty items are specified, including containerized seedlings (Styro and other container types) in various species and sizes (Douglas-fir, Ponderosa pine, minor conifers, and specialty types), along with shipping (per loaded mile) and cold storage services (per box/bag per month). All seed will be government-furnished at no cost to the contractor. Quotations must be submitted electronically by August 3, 2026, at 2:00 PM Pacific Time to tiffany_eslinger@ios.doi.gov and blm_or_so_952_mail@blm.gov. The contract includes government-furnished seed with specified characteristics, and contractors must maintain detailed records, provide monthly inventory updates on specified dates, and comply with strict seedling specifications regarding height, stem diameter, root quality, and health. Delivery must be via refrigerated trailer maintaining temperatures of 33–35 degrees Fahrenheit. Payment is structured in phases based on inventory milestones (April 15, June 3, and October 1 for one-year-old seedlings, and similar dates for two-year-old seedlings), with final payment upon delivery of acceptable seedlings. The solicitation is set aside for Women-Owned Small Businesses (WOSB), with a North American Industry Classification Standard (NAICS) code of 113210 and a size standard of $20.5 million. Evaluation will consider technical approach, past performance, and price as factors for award determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L4326Q0084_Amd_0001.pdf | ||
| 140L4326Q0084_Amendment_0001_0001.pdf | ||
| A06_B09_Attachment_2_Updated_Schedule_of_Items_0001.xlsx | XLSX spreadsheet | |
| A06_B08_Attachment_1_Technical_Capability_Questionnaire.pdf | ||
| A06_B08_Attachment_2_Schedule_of_Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140L4326Q0084
See Schedule See Schedule
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204
08/03/2026 1400 PD
0044050846
Tiffany Eslinger 5032312008
LHA
LHA
Tiffany Eslinger
113210
$20.5
07/17/2026
0011276627
ADMINISTERED BY:
BLM OR-ST OFC PROC MGMT BR(OR952)
1220 SW 3rd Avenue, 12th Floor
PORTLAND OR 97204 US
DELIVER TO:
BLM-OR OREGON STATE OFFICE*
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
1220 SW Third Ave
PORTLAND OR 97204 US
OR/WA BLM SEEDLING PRODUCTION 2026;
Oregon/Washington BLM
Delivery: 05/15/2029
Period of Performance: 09/15/2026 to
05/15/2029
00010 Seedling Production for BLM OR/WA
Product/Service Code: 8730
Product/Service Description: SEEDS AND NURSERY
STOCK
OR/WA BLM Seedling Production 2026 SOLICITATION NO. 140L4326Q0084 BLM Oregon/Washington Page 3 of 31
SECTION B – SERVICES AND PRICES
This requirement is for one or more firm fixed price, commercial items supply contracts for seedling production for the Bureau of Land Management, Oregon Washington State Office. Multiple awards may be made. An Excel spreadsheet of this Schedule of Items is attached as Attachment 2, vendors are requested to utilize the spreadsheet to submit their quotes.
Item Item Description Estimated Quantity Needed
Unit of Measure
Vendor Quantity Available
Price Total
001 Styro 15 (515A) Douglas-fir 290 M $ $
002 Styro 15 (515A) Ponderosa pine 3 M $ $
Styro 15 (515A) Minor conifer species (cedars, spruce, Hemlock, true firs, sugar pine, white pine)
33 M $ $
004 Styro 10 (415D) Douglas-fir 279 M $ $
005 Styro 10 (415D) Ponderosa pine 110 M $ $
Styro 10 (415D) Minor conifer species (cedars, spruce, Hemlock, true firs, white pine)
371 M $ $
007 Styro 10 (415D) Sugar pine 47 M $ $
Styro 8 or 8L (415A or 415C) Douglas-fir 137 M $ $
Styro 8 or 8L (415A or 415C) Ponderosa pine 145 M $ $
Styro 8 or 8L (415A or 415C) Minor conifer species (cedars, spruce, Hemlock, sugar pine, white pine)
169 M $ $
Styro 8 or 8L (415A or 415C) Sugar pine 74 M $ $
012 411B Douglas-fir or Ponderosa pine 0 M $ $
411B Minor conifer species (cedars, spruce, Hemlock, true firs, white pine) 0 M $ $
014 211A Douglas-fir or Ponderosa pine 0 M $ $
211A Minor conifer species (cedars, spruce, Hemlock, true firs, white pine) 0 M $ $
016 Douglas-fir 1+1 (Code H) 101 M $ $
017 Douglas-fir P+1 (Code E) 23 M $ $
018 Minor Species P+1 (Code E) 131 M $ $
019 Shipping Costs – Per Loaded Mile 5000 PLM $ $
Cold Storage – Per Box (or Bag) /Month 2500 PBM $ $
Grand Total
M=Thousand; PLM = Per Loaded Mile; PBM = Per box/bag per month
(End of Section B)
BLM Oregon/Washington Page 4 of 31
SECTION C – STATEMENT OF WORK
1.0 GENERAL - The Contractor shall produce one-year-old (1+0), and/or two-year-old (2+0) greenhouse-grown containerized seedlings, and/or one-year-old (1+0) bareroot seedlings, and/or two-year-old (1+1 or P+1 or 2+0) bareroot tree seedlings as listed in Section B (Schedule of Items) in compliance with the terms, specifications, conditions, and clauses contained herein.
2.0 DEFINITIONS
Additional Seedlings - Seedlings produced in excess of quantities requested in Tree Seedling Schedule.
Breeding Unit - A basic physiographic unit within which environmental factors (elevation, climate, soils, topography, and vegetation) are considered uniform to the extent that seed movement for a given species can occur with little risk of mal-adaptation.
DF - Douglas-fir
GF – Grand fir
IC – Incense cedar
Minor Species – Species such as cedars, spruce, Hemlock, true firs, sugar pine, and white pine.
NF – Noble fir
Overruns – Seedlings produced by the Contractor which are in excess of the amounts requested by the Government on the Tree Seedling Schedule at time of contract award.
PP - Ponderosa pine
POC – Port Orford cedar
S.B. – Subclass B, Seed from a parent tree which has been tested for growth and/or disease resistance characteristics. Test may apply to one parent only.
S.I.A. - Source Identify Subclass A, personally supervised collection.
Seed Pelletization - Seed pelleting is the process of adding inert materials to seeds increasing their weight, size and shape. This improves plantability allowing for precise metering, spacing and depth of seed in the field.
SP – Sugar pine
SS – Sitka spruce
Surplus Seedlings - Seedlings in excess of quantities ordered for delivery. Pricing will be in accordance with clause “BLM - Variation in Quantity (May 1987), 52.211-70.”
T. – Tested Material.
BLM Oregon/Washington Page 5 of 31
Tree Seedling Schedule – BLM Form OSO 5713-2, used to request the number of seedlings to be grown and provide seed test information.
WH – Western Hemlock
WRC – Western Red Cedar
WWP – Western white pine
3.0 CONTRACTOR-FURNISHED PROPERTY AND SERVICES
3.1 The Contractor shall provide all necessary records, tools, equipment, labor, materials, laboratory tests, and perform accepted horticultural practices currently in use in the seedling nursery industry necessary to produce high-quality seedlings, including watering, protective fencing, weeding and fertilizing the seedlings, and the application of herbicides, fungicides, and insecticides, to control and prevent weeds, pathogens, rodents and insects.
3.2 Seedling Conditioning (Container Items) -
Final shipping dates are subject to change. To meet specific delivery dates, and desired caliper size and stem lignification for seedlings requested for fall planting, seedlings shall be induced to set bud early for seedlings scheduled for fall plant. This may be achieved thru industry standard practices such as the use of “black-out” cloth to shorten photoperiod, or the use of moderate moisture stress, fertilizer changes and/or exposure ambient air temperatures.
3.3 Fertilizer Incorporation (Container Items) – If slow-release fertilizer incorporation is utilized, rooting medium shall be constantly monitored for salinity. Immediate corrective action to prevent root damage must be taken if salinity thresholds are exceeded.
3.4 Delivery –Multiple deliveries may be made during the period of performance. Delivery location(s) is subject to change. Vendors shall use the delivery rate established at Section B (Schedule of Items) from the nursery to the specified BLM Office for delivery. All seedlings shall be delivered via enclosed, refrigerated trailers capable of maintaining temperatures of 40 degrees Fahrenheit (F) for fall planted seedlings, and 33 - 35 degrees F for seedlings ordered for winter delivery and spring planting.
4.0 GOVERNMENT FURNISHED SEED
4.1 The Government will provide seed for all Items included in a Purchase Order at no cost to the Contractor. Upon award of the Purchase Order, the Government will issue seed to the Contractor in quantities adequate to meet the requirements of the Purchase Order.
4.2 Stratified Seed –If delays in performance are encountered, the Government may elect to start the stratification of sufficient seed to meet the numbers of seedlings required for the order period. Seed amounts will be determined using the formulae contained in 14.3. Stratification may be conducted by personnel at the U.S. Forest Service’s JH Stone Nursery in accordance with accepted industry-wide procedures.
4.3 Non-Stratified Seed - The Government will provide non-stratified seed to the Contractor. Each order placed will list the seed lot characteristics (germination %, purity value, and seeds per pound) for seed
BLM Oregon/Washington Page 6 of 31 available from the Government. Contractor will determine the amount of seed needed based on the information provided. The Government’s maximum amount of seed to be furnished is determined by the process listed in 14.0.
4.4 Seed Pelletization – Pelletization of WRC seed may be requested. Cost of pelletization will be incurred by the Contractor.
5.0 SEEDLING LOT IDENTIFICATION AND RECORDATION
5.1 Seed Lot Identification - Seed lot identity must be maintained through the stratification treatment, sowing, all stages of seedling growth, lifting and shipping stages. The standard Bureau of Land Management (BLM) or Forest Service (FS) seed lot codes and district name shown on the individual Purchase Order shall be included in the identification.
5.2 Inventories and Records - Provide the Government with inventories of stock on hand in accordance with the following specifications and schedule:
5.2.1 The inventory sample size shall be large enough to provide for a +10 percent standard error with a 95% confidence level.
5.2.2 Inventories shall include the following information:
a) Contract number and order number
b) BLM or FS seed lot identification
c) Nursery seed lot identification
d) Number ordered (M seedlings) by lot
e) Number of containers sown by lot
f) Gross and net seedlings per lot
g) Mean height (inches) *
h) Mean caliper (MM) *
* Items to be included with the final inventory due on October 15.
5.2.3 1+0 Containerized Seedling Inventory Schedule:
a) Current inventory by June of each year when sowing occurs, of live healthy seedlings (gross inventory) and those projected to meet contract specifications (projected net inventory).
b) Current and complete inventory by October of each year sowing occurs, of projected shippable seedlings meeting contract specifications.
5.2.4 Bareroot Seedling Inventory Schedule
1) For seedlings to be fall transplanted, current 1+0 inventory by August 1 of each year of live, healthy trees (gross amount) and the number expected to meet transplant standards (net transplantable amount).
2) For seedlings to be spring transplanted, current 1+0 inventory by November 15 of each year of
BLM Oregon/Washington Page 7 of 31 live, healthy trees (gross amount) and the number expected to meet transplant standards (net transplantable amount).
3) Actual number of live healthy trees transplanted within 45 days of completion of the transplanting operation.
4) Current inventory by October of each year, of total live trees (gross count) and trees projected to meet contract specifications (net count).
5.3 Records - The Contractor shall maintain and provide to the Government, upon request, a current record by dates, listing cultural work undertaken for this contract. Such records shall include date of seed stratification, sowing amounts, and dates of fertilization, fungicide treatments, herbicide treatments, root culturing, watering schedule, moisture stress measurements, electrical conductivity (EC) tests, and lifting dates.
5.4 Sowing Table/Bed Identification - Contractor shall identify each table/bed or portion of a table/bed of seedlings with a bed marker using the correct BLM or FS seed source code from labels on seed lots delivered by the Government, or a nursery identification number referenced to the BLM or FS seed lot code.
6.0 SEEDLING SPECIFICATIONS
6.1 Container Seedling Specifications
6.1.1 Roots - The roots should form a cohesive plug when extracted. The root mass and soil media shall remain intact when pulled out of the cavity and remain intact during normal handling associated with sorting and packaging operations. The seedling must be capable of being withdrawn from the container without being damaged.
6.1.2 Stem and Lateral Branches - Seedlings shall be of good quality as evidenced by dark green color, firm-dark brown buds, absences of root, stem or top deformity, mechanical damage, disease, mold, insect or animal damage, and absences of chlorotic or short abnormal “bottlebrush” needles. All gradable (seedlings meeting specifications) and shippable seedlings shall have the top capable of maximum photosynthesis. All defects lessening the vigor and predictability of a tree to survive and grow shall be classed as a cull.
6.1.3 Seedling Specifications – Special Containerized Seedling Specifications
Species Type of Seedling Container Top Height
Minimum Stem
Diameter Hardwood/Shrub Styro 40 (723A) 10 to 18 in. 3.5 mm Doug-fir 815C 11 to 23 in. 5.5 mm Doug-fir Styro 20 (620A) 10 to 16 in. 3.8 mm Ponderosa pine Styro 20 (620A) 6 to 14 in. 4.0 mm Hardwood/Shrub Styro 20 (620A) 8 to 14 in. 3.0 mm Doug-fir Styro 15 (515A) 8 to 14 in. 3.5 mm
BLM Oregon/Washington Page 8 of 31
Species Type of Seedling Container Top Height
Minimum Stem
Diameter Ponderosa pine Styro 15 (515A) 5 to 12 in. 3.8 mm Minor species Styro 15 (515A) 5 to 10 in. 3.0 mm Hardwood species Styro 15 (515A) 8 to 14 in. 3.0 mm Doug-fir Styro 10 415D 5 to 10 in. 3.0 mm Ponderosa pine Styro 10 415D 4 to 10 in. 3.2 mm Minor species Styro 10 415D 4 to 10 in. 2.8 mm White pine Styro 10 415D 3.5 to 10 in. 2.8 mm Hardwood species Styro 10 415D 6 to 12 in. 3.0 mm Doug-fir Styro 10D (RL 10) 6 to 12 in. 2.8 mm Ponderosa pine Styro 10D (RL 10) 4 to 10 in. 3.0 mm Minor species Styro 10D (RL 10) 5 to 10 in. 2.5 mm White pine Styro 10D (RL 10) 3.5 to 8 in. 2.5 mm
Doug-fir Styro 8or 8L (415A or C) 5 to 10 in. 2.5 mm
Ponderosa pine Styro 8or 8L (415A or C) 4 to 10 in. 2.8 mm
Minor species Styro 8or 8L (415A or C) 4 to 10 in. 2.5mm
Doug-fir 411B 4 to 10 in. 2.3 mm Ponderosa pine 411B 3 to 10 in. 2.5 mm Minor species 411B 3 to 10 in. 2.3 mm Doug-fir Styro 5 (315A) 5 to 10 in. 2.3 mm Ponderosa pine Styro 5 (315A) 4 to 10 in. 2.5 mm Minor species Styro 5 (315A) 4 to 10 in. 2.3 mm Doug-fir Styro 5.5 (315B) 5 to 10 in. 2.3 mm Ponderosa pine Styro 5.5 (315B) 4 to 10 in. 2.5 mm Minor species Styro 5.5 (315B) 4 to 10 in. 2.3 mm Doug-fir Styro 4S (310B) 4 to 10 in. 2.3 mm Ponderosa pine Styro 4S (310B) 3 to 10 in. 2.5 mm Minor species Styro 4S (310B) 3 to 10 in. 2.3 mm Doug-fir 211A 4 to 10 in. 1.5 mm Ponderosa pine 211A 3 to 10 in. 1.8 mm Minor species 211A 3 to 10 in. 1.5 mm
6.2 Bareroot Seedling Specifications
6.2.1 General - Seedlings shall be of good quality as evidenced by dark green color, firm-dark brown buds, absences of root, stem or top deformity, mechanical damages, disease, mold, insect or animal damage, and the absence of chlorotic or short abnormal "bottle brush" needles. Seedlings which are taller or shorter than maximum/minimum height specifications, but which otherwise meet grading criteria may be purchased by the Government.
BLM Oregon/Washington Page 9 of 31
6.2.2 Roots
6.2.2.1 Planting stock root systems shall have at least 3/4 of the smaller feeder roots intact or unbroken. When the tap root is split or severed at any point above the specified root pruning length, the seedling is considered a cull. Any seedling having the tap root and more than 25 percent of the remaining roots growing more than 30 degrees (approximately 5 to 7 o'clock) out of the stem axis is unacceptable.
6.2.2.2 Seedlings with roots broken or torn from the tap root, or with root endings torn or stripped more than 2 millimeters during pruning are unacceptable.
6.2.2.3 Stiff lateral roots are permitted, if when held in a natural position they will fit in a six inch diameter hole.
6.2.2.4 "J" shaped roots are unacceptable.
6.2.2.5 "L" shaped roots are allowed if the root mass will fit in a six inch diameter planting hole and 3/4 or more of the remaining roots have continued to grow in a vertical direction.
6.2.2.6 Minimum acceptable root length is nine inches for 1+1 seedlings.
6.2.2.7 Muddy Roots - The weight ratio of soil to trees shall not exceed 45 percent when packed.
6.2.3 Stem and Lateral Branches
6.2.3.1 When visible mechanical damage that breaks the outer bark and exposes or extends into the cambium tissue is present on the stem, the seedling shall be culled. All trees exhibiting brown or dead branches or needles, mottling, needle cast, cankers, lesions, mold, disease, insect damage, spindliness, or any other defect lessening the vigor and predictability of a tree to survive and grow are unacceptable.
6.2.3.2 Stem and top injuries must be healed and calloused.
6.2.3.3 Seedlings with a crook located within two inches (above or below) of the root collar and/or is greater than 45 degrees (approximately 3 to 9 o'clock) out of the stem axis are unacceptable.
6.2.3.4 Seedlings without a bud capable of becoming dominant near the top of the main leader (disease, frost, mechanical or animal damage) are unacceptable.
6.2.3.5 Top pruning shall not be done after July 10, for 1+1 seedlings.
6.2.3.6 Trees with more than two tops (i.e., - multiple tops), regardless of where the forks originate, are unacceptable.
BLM Oregon/Washington Page 10 of 31
6.2.4 Seedling Specifications – Bareroot Special
Bare-Root Seedling Specifications
Code Species Minimum Caliper 1/ Target Height 2/ Minimum and Maximum Height 3/
A. 1+0 PP, IC 4.0 MM 6 inches 3 – 12 inches
B. 2+0 PP, IC 4.0 MM 10 inches 4 – 16 inches
C. 2+0 DF 5.0 MM 12 inches 8 – 18 inches
D. P+1 WRC, WH, GF, SS,
WWP, SP, PP, DF
5.0 MM 12 inches 8 – 16 inches
E. P+1 WRC, WH, GF, SS,
WWP, SP, PP, DF
5.5 MM 14 inches 10 – 20 inches
F. 1+1 DF, PP, NF 5.5 MM 12 inches 8 - 16 inches
If needed, this group may be top pruned once prior to July 10
G. 1+1 DF 6.0 MM 14 inches 10 - 18 inches
May be top pruned once prior to July 10
H. 1+1 DF 7.0 MM 20 inches 14 - 28 inches
No top pruning unless authorized by COR
1/ Minimum Caliper -- Minimum caliper for acceptance and payment 2/ Target Height -70 percent of seedlings shall be within 2 inches of the target height specified.
3/ Minimum and Maximum Height Range -- Minimum and Maximum height for acceptance and payment.
6.3 Seedling Measurement Standards
6.3.1 Height will be measured from the cotyledon scar to the tip of the terminal bud to the nearest inch.
6.3.2 Stem caliper will be measured at a point 2.0 mm below the cotyledon scar. Stem will be measured where the stem is round. No measurement will be taken at an interval swelling.
6.3.3 Point of reference for measuring root length commences at the cotyledon scar for 1+1 seedlings.
7.0 LIFTING, PACKAGING AND MARKING
7.1 Container Seedlings
7.1.1 The Government will notify the Contractor at least seven days prior to the planned date of pickup or delivery. This request will be made by telephone or in writing. The seven-day delivery date
BLM Oregon/Washington Page 11 of 31 requirement will begin at the time of the request. The request will specify, by lot, seedling quantities, and the date seedlings are to be delivered or picked up.
7.1.2 Seedlings shall not be packed until conditioned for storage based on accumulation of chilling hours and hardiness testing.
7.1.3 Seedlings shall be fully watered and treated with a fungicide to prevent storage molding. This should occur a maximum of five days before packaging.
7.1.4 Seedlings pulled from containers for packaging shall be wrapped with plastic or placed into plastic bags in bundles of 4 to 10 seedlings each.
7.1.5 All seedlings shall be packaged in boxes meeting the specifications shown below:
Specifications - Fiberboard Boxes
Style: Full overlap top and bottom, without hand holes. If hand holes are present, boxes must be lined with plastic bags or other suitable material to prevent moisture loss or drying while in cold or freezer storage.
Joint: Stitched, glued, or stapled joints are acceptable.
Size: Maximum of 16" in height so that boxes are storable on existing BLM/Forest Service racks.
7.1.6 All containers shall be labeled on one or more sides or ends. The label shall contain the number of seedlings per container, seed lot number, species, date packed, and nursery name. Containers shall be closed in a secure manner by banding, taping or stapling. Self-locking and/or folding tops are permissible.
7.2 Bareroot Seedlings
7.2.1 The Government will notify the Contractor of tree lifting / packing requests at least seven days prior to the planned date of pickup at the nursery. This order may be made by telephone or in writing.
Telephone orders will be followed by written orders. The seven day delivery date requirement will begin at the time of the telephone order. The delivery order will specify, by lot, seedling quantities, root pruning length, packing material, and the date trees are to be ready for pick up/delivery.
7.2.2 The Contractor shall notify the District requesting seedlings of the approximate date and time of lifting and grading so that scheduling of inspection can be arranged.
7.2.3 For all seedling lots which are 3,500 feet or less in elevation, lifting will be required during the months of December, January and February. For seedling lots 3,500 feet or more in elevation, fall (late Nov. -early Dec.) lifting and freezer storage may be required by the Contractor.
7.2.4 The Contractor shall have the capability to lift, pack, and have ready for shipping 150,000 tree seedlings within seven calendar days after receipt of a lifting request. Exceptions (see clause 7.2.7 below) will be allowed for prolonged winter rainstorms, freezing conditions, plant moisture stress, or other environmental conditions which prevent lifting.
BLM Oregon/Washington Page 12 of 31
7.2.5 Tree lifting shall be done in such a manner as not to break or damage the root system, stem or foliage.
The Contractor shall prune roots to the maximum acceptable length described in each seedling order request. Pruning shall be done in a manner that prevents stripping or tearing of roots.
7.2.6 During the period of December 1 to February 1 of each year, 1+1 seedlings shall not be lifted until requested by the Government's representative. The Contractor shall lift only the amount requested for each order. For the period of February 2 to March 1 of each year the Contractor shall lift and pack all remaining ordered trees as conditions allow, and place in cold storage.
7.2.7 If weather or soil conditions do not permit lifting and delivery as requested, the Contractor shall promptly (within eight hours) notify the District requesting lifting.
7.2.8 The Contractor shall not lift when plant moisture stress (PMS) prior to drawing lifting bar through seedling beds exceeds 20 bars PMS as measured by a pressure bomb.
7.2.9 Seedlings measuring 15 to 20 bars PMS (prior to drawing lifting bar through seedling beds) shall be watered in the field prior to or immediately after lifting to reduce the PMS to 5 to10 bars.
7.2.10 Seedlings measuring 10 to 15 bars (prior to drawing lifting bar through seedling beds) shall be monitored in lifting containers and/or storage cooler. If PMS does not decrease to the 3 to 7 bar range in two hours or less, trees will be watered in the lifting containers and/or storage cooler. Seedlings with PMS levels above 8 bars will not be sorted until measured readings fall below this level.
Weather Conditions
7.2.11 Lifting shall not be done under field conditions of frozen or water saturated soils.
7.2.12 Under ideal weather conditions, seedlings shall not be undercut more than 700 feet ahead of the nearest person pulling seedlings. Ideal weather conditions are described as overcast or foggy, temperature less than 45 degrees Fahrenheit (F), relative humidity 80 percent or higher, and wind speed less than two miles per hour.
7.2.13 Under favorable weather conditions, seedlings shall not be undercut more than 200 feet ahead of nearest person pulling seedlings. Favorable weather conditions are described as high overcast, less than 50 percent sunny, temperature 45- 60 degrees F, relative humidity 60 percent or higher and wind speed less than four miles per hour.
7.2.14 Under unfavorable weather conditions, seedlings shall not be undercut more than 75 feet ahead of the nearest person pulling seedlings. Unfavorable weather conditions are described as more than 50 percent sunny, temperatures greater than 60 degrees Fahrenheit, relative humidity less than 60 percent, or wind speed five miles per hour or greater. If one or more of the above weather conditions exist at the time of lifting, the 75 foot limit shall apply. All seedlings undercut under the above conditions shall be lifted and properly stored prior to breaks exceeding 15 minutes.
Bareroot Seedling Lifting
7.2.15 Seedlings lifted and placed into tubs or boxes shall be covered with moist burlap within 30 seconds of lifting, and remain covered with moist burlap or other suitable moisture retention material unless trees are in a grading or packing process.
BLM Oregon/Washington Page 13 of 31
7.2.16 Seedlings lifted and placed into bins shall be pulled and placed into bins within 30 seconds. Bins shall be covered with moist burlap or other suitable moisture retention material when lifting is stopped or during transportation to packing area and remain covered unless trees are in a grading or packing process. If trees show signs of drying prior to the bin being filled, seedlings shall be watered.
7.2.17 If seedling roots exhibit signs of drying (indicated by a color change in the soil covering the roots), the Contractor shall immediately water the roots and cover with wet burlap or other suitable wet material.
The cause of drying roots shall be assessed and a method implemented to prevent drying. If drying continues, no further lifting shall take place until conditions causing drying change.
7.2.18 Seedling Storage - Seedlings shall be removed from the lifting area within 30 minutes after lifting and placed in a storage area conforming to one of the following standards prior to grading and packing:
a. Seedlings shall be stored in a weather-tight building under conditions of 33 to 45 degrees F. All grading and packaging shall be completed within 24 hours of lifting.
b. Seedlings shall be placed in cold storage under conditions of 80 percent or greater relative humidity and 33 to 35 degrees F. All grading and packaging of seedlings shall be completed within three days of lifting.
Bareroot Seedling Packing
7.2.19 The Contractor shall maintain seedling moisture stress levels below five bars PMS during grading, pruning, packing, and storage operations. The Contractor shall perform moisture stress tests as necessary to maintain required moisture stress levels.
7.2.20 Seedlings shall be packaged in boxes or bags as specified and identified on Exhibit A.
7.2.21 Seedlings shall be packed in individual bundles of 20 to 50 trees each. After the number of seedlings that can be adequately packed in a given box or bag without damage to the seedlings has been determined, the Contractor shall keep the number of seedlings per container constant for that lift and seedling lot. Packed containers shall not exceed 50 pounds. The weight ratio of soil to trees in the containers shall not exceed 45 percent.
7.2.22 Seedlings shall be packaged in containers meeting specification listed below:
Specifications - Fiberboard Boxes
Style: Full overlap top and bottom, without hand holes
Board: 250 lb. (min.) to 275 lb. (max.) test rigid when wet, poly wax curtain coat both inside and outside of box.
Joint: Stitched, glued, or stapled joints are acceptable.
Size: 40"L x 12"W x 16"H outside measurement (maximum size)
BLM Oregon/Washington Page 14 of 31
Specifications - Paper Bags
Style: Sewn bottom, open mouth
Type: Triple-ply, poly-lined, heavy duty paper
Size: As needed to insure that seedling tops and roots are not bent, folded or damaged when placed in the bags.
7.2.23 All containers shall be labeled on one end with a minimum of one quarter inch high numerals. The label shall contain the number of seedlings, seed lot number, species, date packed, nursery name and BLM District. Containers shall be closed in a secure manner by banding, taping or sewing.
7.3 Storage of Container Seedlings
7.3.1 Packed seedlings must be placed promptly into cold storage facilities and inside box /bag temperature maintained at 33-35 degrees F. Trees shall be kept at a temperature of 33-35 degrees F and 80 percent or higher relative humidity throughout the storage period.
7.3.2 Boxes shall be arranged in such a manner as to prevent crushing, smothering, heating, or other physical damage.
7.3.3 Provide cold/freezer storage for a maximum of seven days after packaging containerized trees.
7.3.4 Extended cold storage at the nursery beyond the maximum timeframe listed in 7.3.3 may be charged according to the price listed in Section B (Schedule of Items) and clause “BLM - Variation in Quantity (May 1987), 52.211-70.
7.3.5 Cold storage facility shall have access and turning space capable of handling a 70 foot tractor-trailer.
8.0 ACCEPTANCE
8.1 Acceptance by the Contracting Officer’s Representative (COR) of workmanship and individual seedlings shall be final.
8.2 Acceptance of work will be determined by the Contractor's compliance with terms, specifications, and workmanship required by this contract as observed by COR and determined by an inspection or test made at the nursery site, except as herein provided below.
8.3 Upon receipt of written notice from the COR that seedlings delivered do not meet contract standards and specifications, the Contractor shall within five days regrade any seedling lots found to be defective. The Contractor shall pay all costs involved, including labor and shipping.
8.4 If the Contractor fails or refuses to correct defective seedlings within five days or a longer period as the COR may designate the Government will reject the seedlings or accept them in accordance with FAR clause 52.212-4(a) at and equitably reduced price.
BLM Oregon/Washington Page 15 of 31
9.0 MEASUREMENT AND PAYMENT
9.1 Measurement for payment will be made on the number of thousand acceptable seedlings in accordance with Section 6.0. Payments will be made for the actual quantity requested or delivered.
9.2 Payment of 1 Year Old Seedlings
9.2.1 After seed is stratified, sown, and germinated, and the seedlings have reached one inch in height, the Contractor shall submit an inventory form. The spring inventory must be completed and submitted by April 15 of the planting year. Upon COR certification, the Contractor may invoice up to 25% of the unit price.
9.2.2 Upon receipt and acceptance of the June 3rd annual inventory (after thinning, if necessary) the Contractor may invoice up to 50% of the unit price times the actual number of live healthy seedlings in the inventory, up to the quantity listed in the contract, less payment 1.
9.2.3 Upon receipt and acceptance of the October 1 annual inventory of shippable seedlings meeting contract specifications, the Contractor may invoice up to 75% of the unit price times the actual number of live, healthy seedlings in the inventory, up to the quantity listed in the Purchase Order, less the amount of payments 1 and 2.
9.2.4 When all seedlings have been picked up by the Government and/or delivered by the Contractor, final payment will be made for actual number of seedlings accepted up to the quantity listed in the Purchase Order, less any earlier payments. Contractor shall include all costs, to include shipping and cold storage costs, in this final invoice.
9.2.5 If the final payment for total acceptable live seedlings is less than the combined total of partial payments 1, 2, and 3, the Contractor will reimburse the Government for any overpayment.
9.3 Payment of 2-Year-Old Seedlings
9.3.1 Upon completion of sowing and subsequent satisfactory germination and seedling height growth of one inch, the Contractor may invoice in the amount of ten percent of the bid price times the number of thousand trees up to the quantity listed in the Tree Seedling Schedule.
9.3.2 Upon receipt and acceptance of the August 1 inventory for seedlings to be fall transplanted and/or the November 15 inventory for seedlings to be spring transplanted, the Contractor may invoice up to the amount of twenty percent of the bid price times the actual number of thousand live healthy trees in the inventory up to the quantity listed in the Tree Seedling Schedule, less payment 1.
9.3.3 Upon the completion of transplanting and subsequent receipt and acceptance of an inventory of satisfactory planted trees, the Contractor may invoice up to fifty percent of the bid price times the actual number of thousand trees transplanted up to the quantity listed in the Tree Seedling Schedule, less payments 1 and 2.
9.3.4 Upon receipt and acceptance of the October 15 inventory of shippable live trees, the Contractor may invoice up to sixty-five percent of the bid price times the actual number of thousand shippable live trees in the inventory up to the quantity listed in the Tree Seedling Schedule, less payments 1, 2, and 3.
BLM Oregon/Washington Page 16 of 31
9.3.5 When all trees have been picked up by the Government, the Contractor may invoice in the amount of one hundred percent of the bid rate per thousand trees up to the quantity listed in the Tree Seedling Schedule, less payments 1, 2, 3, and 4. See section 11 for surplus purchases.
9.3.6 If the payment for the total acceptable live trees is less than the combined payments, then the Contractor shall reimburse the Government for the overpayment.
10.0 OPTION TO PURCHASE ADDITIONAL SEEDLINGS –
The Government will have the first opportunity to purchase all additional seedlings at the contract price. The Government will request the additional seedlings by December 12th of each year, or make them available for sale by the Contractor. If not requested by this date, the Contractor may retain or sell additional seedlings, without compensation to the Government.
11.0 SURPLUS SEEDLINGS
11.1 Surplus seedlings will be addressed in accordance with clause “BLM - Variation in Quantity (May 1987), 52.211-70.
11.2 Disposal costs, if any, will be agreed to and approved by the CO prior to any disposal actions.
Seedlings produced in excess of the quantities requested by the Government in the Purchase Order, (i.e., overruns in requested production) which are not sold will be disposed of at the Contractor’s expense. Overruns not purchased by the Government may be sold by the Contractor without further compensation to the Government.
12.0 DELIVERY
12.1 All seedlings may be required for delivery to destination F.O.B by the Contractor to destination point.
Multiple deliveries may be made during the period of performance. Delivery location(s) is subject to change. Vendors shall use the delivery rate established at Section B (Schedule of Items) from the nursery to the specified BLM Office for delivery. Deliveries shall be made between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday, excluding official federal holidays.
12.2 The Government may elect to pick up seedlings at the Contractor’s storage facility. If the Government elects to pick up seedlings at the Contractor’s storage facility, the Contractor will furnish a forklift and personnel to load the Government trailer.
12.3 Contractor deliveries shall be made by refrigerated truck or trailer. Temperatures within the seedling boxes inside the shipping container shall be maintained between 33° and 35° F.
12.4 Boxes shall be arranged in such a manner as to prevent crushing, smothering, heating or other physical damage.
12.5 Contractor shall prepare and provide to the driver of the Government truck, or BLM receiving clerks, a nursery shipping ticket when seedlings are loaded or delivered. The shipping ticket shall contain the contract number, seed lot number(s), number of boxes, number of seedlings per box, and total number of seedlings per seed lot.
12.6 The Contractor shall be responsible for all seedlings produced for the Government, until the seedlings are delivered to or picked up by the Government.
BLM Oregon/Washington Page 17 of 31
13.0 PERFORMANCE TIME
13.1 Container One Year Old Seedlings
The period of the contract will be from issuance of a Purchase Order to completion of delivery.
The following dates are deadlines set out in the other parts of this contract:
a. June 3 of each year - Provide COR with Seedling Inventories, 5.2.3(a)
b. October 15th of each year- Provide COR with Seedling Inventories, 5.2.3(b)
13.2 Bareroot One & Two Year Old Seedlings and Govt. Furnished P+1 Transplants
The period of the contract will be from issuance of a Purchase Order to completion of delivery.
The following dates are deadlines set out in other parts of this contract:
February 5 Seed Requirements from Contractor, Section 4.1
June 15 Provide COR with a nursery map or drawing showing the location of all seed lots included in this contract Section 5.4
August 15 Current 1+0 inventories for fall transplants completed Section 5.2.2 (d)(1)
Nov. 15 Current 1+0 inventories for spring transplants completed Section 5.2.2 (d)(2)
October 15 2nd year inventories complete Section 5.2.2 (d)(4)
14.0 GOVERNMENT-FURNISHED TREE SEED
14.1 The Government will provide the following information on all seed lots included : germination percent, number of seeds per pound, purity percent, species, seed zone and elevation, year of collection, year tested, certification class, and testing lab.
14.2 The Government will provide and deliver seed identified by lot number to the Contractor's nursery site not later than one week following the issuance of the Purchase Order.
14.3 The Contractor shall determine the quantity of seed needed to produce the required number of seedlings in each Item awarded, based on information to be provided in each order. The maximum pounds of seed to be provided by the Government for individual seed lots can be estimated as follows:
BLM Oregon/Washington Page 18 of 31
Containerized Seedlings
Standard Sowing - Items shown for standard sowing in Attachment 3, Sample Tree Seedling Sowing Schedule.
Seedling Data Sheet will be computed as follows:
Seed Required in lbs. = T x O x W x G S x P
T = total order (number of seedlings) Germ. Rate Seed/Cell O = oversow for falldown 1.15 (15%) 55 - 64% 4.0-3.6 W = seed waste factor 1.1 (10%) 65 - 74% 3.5-3.1 S = seeds per pound 75 - 84% 3.0-2.6 G - seed per cell (depending on germ. rate) 85 - 94% 2.5-2.1 P = purity factor (1.0) 95 -100% 2.0-1.6
Bareroot Seedlings
Seed Required lbs = Quantity Seedlings Requested Germ. % x Purity % x Seeds/lb. x 40% Survival Factor
The quantity of seed determined to be needed by the Contractor shall be subject to approval by the COR for both Standard and Improved Seed Sowing. Deadline for this information being given to the COR is ten days after Contractor receipt of the order with Tree Seedling Schedule with seed attributes filled in.
(End of Statement of Work)
(End of Section C)
BLM Oregon/Washington Page 19 of 31
SECTION F – DELIVERIES OR PERFORMANCE
F.1.0 PERIOD OF PERFORMANCE
The contract shall commence from 09/15/2026 to 05/15/2029.
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
F.3.0 STOP WORK ORDER
The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage.
Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either-
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in contract clause 52.212-4.
If a stop-work order is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work.
The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if-
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of Section F)
BLM Oregon/Washington Page 20 of 31
SECTION G – CONTRACT ADMINISTRATION DATA
The following local clauses are provided in full text:
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR42.15.
(b) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available for Government use in evaluating past performance as part of a source selection action.
(c) We request that you furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found at this site.
(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, blocks 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating ''No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.
(f) The following guidelines apply concerning your use of the past performance evaluation:
(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
https://www.cpars.gov/ http://www.cpars.csd.disa.milj/ https://www.cpars.gov/ http://www.cpars.csd.disa.mil/
BLM Oregon/Washington Page 21 of 31
(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.
(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30- day review period.
(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of clause)
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP)
(FEB 2021)
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform System (IPP).
“Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Products or Commercial Services included in commercial products or commercial services contracts.
The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice
1. Invoice billed according to contract line items and rates.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contract (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .