This is a Request for Quotes (RFQ) for mastication services issued by the Bureau of Land Management (BLM) Grand Junction Field Office in Colorado. The solicitation number is 140L3726Q0065, with a solicitation issue date of 05/22/2026 and quote due date of 06/10/2026 at 9:00 a.m. Mountain Daylight Time. This is a small business set-aside acquisition under NAICS code 115310 (Forest Fire Suppression) with a $34.0 million size standard. The acquisition involves vegetation treatment through mastication of two units totaling 611 acres in Mesa County, Colorado: the Farmers Unit (468 acres) and the Corcoran Peak Unit (143 acres). Work is expected to begin approximately July 15, 2026, and must be completed by November 15, 2026, within 113 calendar days of the Notice to Proceed. The contract is firm-fixed-price with payment based on actual acres completed, inspected, and accepted by the Contracting Officer's Representative (COR), with an Acceptable Quality Level (AQL) of 85 percent required.
Contractor-furnished items include equipment (skidders, tractors, or excavators with mounted masticators/mulchers), transportation, fuel, lubricants, and all repairs. The BLM will provide georeferenced maps, GPS measurements of treated areas, and government representatives for supervision. Specific mastication requirements include reducing vegetation to mulch with minimum 80 percent of woody material less than 1 inch in diameter and 6 inches long, with stumps not exceeding 6 inches in height. Special considerations include no operations between May 15 and July 15 to protect migratory birds, protection of Ponderosa Pine of any size, noxious weed mitigation through equipment cleaning prior to transport, hazardous materials compliance, and fire prevention protocols. Quotes must be submitted electronically to daniel_rosales@ios.doi.gov with contractors providing their Unique Entity ID (UEI) and CAGE code. The contract incorporates FAR clauses 52.212-1, 52.212-4, and 52.212-5, and includes federal wage determinations under Wage Determination 1976-1351.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_2_Corcoran_Map.pdf | ||
| B08_Attachment_3_Farmers_Unit_Map.pdf | ||
| B08_Attachment_6_CorcoranMasticationFY26.zip | ZIP file | |
| B08_Attachment_7_FarmersMasticationFY26.zip | ZIP file | |
| B03_Attachment_5_Wage_Determination_1976-1351_Rev_79_05132026.pdf | ||
| B08_Attachment_1_GJFO_FY26_mastication_SOW.pdf | ||
| B08_Attachment_8_Clauses_and_Provisions.pdf | ||
| B08_Attachment_4_Western_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
140L3726Q0065
See Schedule See Schedule
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
3833 S. DEVELOPMENT AVE.
BOISE ID 83705
06/10/2026 0900 MD
0044046922
Daniel Rosales
LFA 100.00
LFA
Daniel Rosales
115310
$34
05/22/2026
0011276304
ADMINISTERED BY:
BLM FA NTL INTRAGCY FIRE (FA250)
3833 S. DEVELOPMENT AVE.
BOISE ID 83705 US
DELIVER TO:
BLM-CO GRAND JUNCTION FIELD OFFICE
Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
2815 H ROAD
GRAND JUNCTION CO 81506 US
Delivery: 11/15/2026
Period of Performance: 07/15/2026 to
11/15/2026
00010 GJFO Mx
Product/Service Code: F003
Product/Service Description: NATURAL
RESOURCES/CONSERVATION- FOREST-RANGE FIRE
SUPPRESSION/PRESUPPRESSION
MASTICATION, BUREAU OF LAND MANAGEMENT, GRAND JUNCTION FIELD
OFFICE, COLORADO
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement and attachments constitute the only solicitation; quotes are being requested, and a written solicitation will not be issued. Consider this solicitation (140L3726Q0065) as a Request for Quotes (RFQ). This solicitation documents incorporate provisions and clauses in effect through Federal acquisition Circular 2026-01. This solicitation is set-aside for small business.
NAICS 115310– Forest Fire Suppression. The small business size standard is $34.0 million.
Product Service Code F003 – Forest Range Fire Suppressions Presuppression Services. The resulting purchase order will be a firm-fixed price type purchase order. (SEE ATTACHMENT
140L3726Q0065 – RFQ PACKAGE FOR COMPLETE SOW, MAPS, WAGE
DETERMINATIONS, AND CLAUSES / PROVISIONS.)
Department of Interior, Bureau of Land Management, GJFO has a requirement to perform mastication.
Description Quantity/Acre Unit of
Issue Unit Price Total
CLIN 0010 GJFO
MASTICATION
Acre $ $
SITE VISIT: No scheduled site visit. However, Contact COR Jacob Pollert @, jpollert@blm.gov if you should have questions pertaining to site visit. Vendors may visit the site at their convenience prior to due date submittal of quote (Technical questions solicitation questions, submit through email to the Contracting Officer).
In accordance with the procedures in FAR Part 12, RFQ 140L3726Q0065 is available for viewing through electronic commerce via website at https://sam.gov.
The Government will award a contract and/or purchase order resulting from this solicitation to the responsible vendor whose quote conforms to the solicitation and in accordance with the technical evaluation factors.
Questions are due Friday, May 29, 2026, 9:00 a.m. Mountain Daylight Time. Quotes are due Wednesday, June 10, 2026, 9:00 a.m. Mountain Daylight Time. Contractors submit quotes by email to daniel_rosales@ios.doi.gov.
Note: Any contractor to submit an acceptable quote or awarded a government contract must be registered and active in the System for Award Management (SAM). Contractors must register at www.sam.gov.
Solicitation No. 140L3726Q0065 Page 3 of 25
Contractors must submit their Unique Entity ID (UEI) and CAGE code with their quote.
Sign SF-1449 and any amendments that may be posted to www.sam.gov.
UEI ______________________
CAGE ____________________
For further information about this requirement, offerors should contact daniel_rosales@ios.doi.gov.
The provisions and clauses attached apply to this solicitation.
Attachments:
1. SOW, 05/21/2026, 8 Pages
2. Corcoran Map, 05/21/2026, 1 Page
3. Farmers Unit Map, 05/21/2026, 1 Page
4. Western Map, 05/21/2026, 1 Page
5. Wage Determination 1976-1351, Rev 78, 05/13/2026, 3 Pages
6. Corcoran Mastication ZIP files, 05/21/2026, 1 Page
7. Farmers Mastication ZIP files, 05/21/2026, 1 Page
8. Provisions and Clauses, 05/21/2026, 6 Pages
Solicitation No. 140L3726Q0065 Page 4 of 25
Statement of Work Bureau of Land Management (BLM) Grand Junction Field
Office, GJFO FY26 Mastication COR: Jake Pollert : (970) 210-8780
PI: Ken Miller (208)296-1758 05/21/2026
C.1.1 Description of Work: GJFO FY26 Mastication treatment unit is located in Western
Colorado. It consists of 2 units in the general vicinity of Grand Junction. The locations are Unit 1-Farmers: Township__15__ South(TS), Range_100__ West (RW) Sections 10, 11, 14, 15, 16 and Unit 2-Corcoran Peak: Township__8__ South(TS), Range_99__ West (RW) Sections 27, 28,29, 32 and 34 (see project area maps below).The proposed project is located in Mesa County at an average elevation of 7,200 feet. The vegetation is Pinon/Juniper and Mixed Mountain Shrub. To achieve the objectives the project work is vegetation treatment by mastication of 2 units for a total of _611___acres. In addition, pursuant to 48CFR1437 (as amended in the Federal Register / Vol. 69, No. 166 / Friday, August 27, 2004) biomass resulting from this contract may be purchased from the BLM as described under C.1.2 below.
The average slope is __<30%_Crown cover is less than __<45%__.
The Contractor will be responsible for removal of targeted pinyon, juniper and mixed mountain shrub totaling 611_ acres. The contractor will grind/mulch all targeted vegetation with contractor furnished equipment (e.g., Hydro-Ax, Fecon Bull Hog or similar).
C.1.1.2 Description of Work:
Unit 1-Farmers- Vegetation treatment consists of mastication of encroaching Pinyon, Juniper and mixed mountain shrub. Located 22 South miles of Grand Junction, Colorado; (project area map attached). The proposed project is in Mesa County, elevation of the project ranges from 7300’ to 7700’. The targeted vegetation consists of Pinyon, Juniper and mixed mountain shrub.
To achieve objectives the project work is vegetation treatment by mastication of one polygon.
Polygon shape is determined by slope, bedrock/bare soil, and identified changes in vegetation type. Any Ponderosa Pine in the unit will not be treated. Damage of Sagebrush in unit should be minimized as much as possible.
The average slope is less than 30%. Crown cover is less than 45%. The contractor will be responsible for mastication of 50% of mixed mountain shrub, and all juniper under 24” diameter at breast height (DBH) and smaller. The project area consists of one treatment polygon totaling 468 acres. Isolated areas which are too steep or rocky to operate may be left untreated and locations provided to the COR or PI.
Unit 2-Corcoran Peak- Vegetation treatment consists of mastication of mixed mountain shrub vegetation types and encroaching juniper. Located 18 miles north of Grand Junction, Colorado;
(project area map attached). The proposed project is in Mesa County, elevation of the project ranges from 7000’ to 7300’. The targeted vegetation consists of mixed mountain shrub (oak
Solicitation No. 140L3726Q0065 Page 5 of 25 brush, snowberry, serviceberry), and juniper. To achieve objectives the project work is vegetation treatment by mastication of multiple polygons. Polygon shape is determined by slope, bedrock/bare soil, and identified changes in vegetation type.
The average slope is less than 30%. Crown cover is less than 45%. The contractor will be responsible for mastication of 75% of mixed mountain shrub, and all juniper under 8” diameter at breast height (DBH) and smaller in a mosaic fashion, avoiding sagebrush where possible. The project area consists of four treatment polygons totaling 143 acres. It is understood that that isolated areas may be too steep or rocky to operate or may include pockets of pinion/juniper greater than 8” DBH that will be left untreated.
-Additional specific objectives will be communicated during the required pre-work meeting or during subsequent project inspections with the Contracting Officer’s Representative (COR) or Project Inspector (PI). Notice to Proceed is expected to be issued approximately July 15,2026 The end of the period of performance will be November 15, 2026. Work on this project is to begin within 10 days of contractor’s receipt of Notice to Proceed and shall be completed no later than 113 calendar days
SPECIAL CONSIDERATIONS TO OPERATION-Operations will cease during times where rutting or excessive soil disturbance is being observed-rutting greater than 3 inches.
C.1.2 Biomass Removal:
1. The contractor may remove and utilize woody biomass if:
(a) Project work is progressing as scheduled; and
(b) Removal is completed before contract expiration
2. To execute this option, the contractor must submit a written request to the Government.
3. Following receipt of the written request, and if appropriate, the Government and the contractor will negotiate and execute a separate timber/vegetative sales contract.
Payment under this sales contract must be at a price equal to or greater than the appraised value before the removal of any woody biomass. The contractor must make any appropriate payment specified in this timber/vegetative sales contract.
4. The contractor must treat any woody biomass not removed in accordance with the specifications in the service contract.
5. The sales contract and service contract are severable; default or termination under either does not remove the contractor from payment or performance obligations under the other contract.
C.1.3 Location: ---GROUND TRANSPORTATION ROUTE/S
C.1.4 Unit 1 Farmers- Access to the project site is via Highway141 to the Divide Road (26.10 rd). Follow the Divide Road southwest approximately 6 miles. Turn South onto the Dominguez Cutoff rd (24.40 rd) for approximately 3.2 miles. Turn East onto Cactus Park rd/Tabeguache trail approximately .25 miles.
Unit 2 Corcoran Peak- From Grand Junction, Travel on Interstate 70 Eastbound 35 miles to Debeque, Colorado (exit 62). Turn North onto Roan Creek Road, travel approximately
Solicitation No. 140L3726Q0065 Page 6 of 25
4 miles to CR 200(South Dry Fork Rd.). Turn left onto CR 200(South Dry Fork Rd.) Travel approximately 6 miles on CR 200(South Dry Fork Rd.). Turn left on to CR 222 (O 9/10 Rd.) travel approximately 7 miles to BLM Rd 277 to the treatment units.
C.1.5 Environmental Considerations: The majority of the targeted area is relatively flat to moderately sloping mesa top between some drainages/small canyons. Most rocky areas are associated with drainages.
C.1.6 Work Limits: Moving should be limited to dry conditions to reduce damage to any roads or operator will need to smooth roads with equipment at the end of the project returning it to prior condition. Work should not continue in wet conditions where more than 3-inch ruts will be produced by equipment operation.
C.1.7 A pre-bid inspection tour will not be held. Both units are currently accessible and may be inspected by contractors prior to bidding. Contact the COR- Jake Pollert (970)210- 8780 or PI- Ken Miller (208)296-1758 with any questions or requests for information.
C.2.0 SCHEDULING: This is a single schedule contract.
C.2.1 In the event of extreme weather or environmental conditions, the Contracting Officer will determine the best course of action based on comments from the Contractor and PI/COR.
C.3.0 CONTRACTOR-FURNISHED ITEMS:
C.3.1 The operator will provide equipment (skidder, tractor and/or excavator) with an operator.
The equipment will be equipped with a machine mounted, thinning and shredding machine [a masticator/mulcher]. Either a vertical-shaft or horizontal-shaft may be used in this contract area.
C.3.2. Transportation for equipment and operators to and from the site.
C.3.3. All fuels, lubricants, parts for repairs, and repairs to the machine.
C.4.0 GOVERNMENT-FURNISHED PROPERTY:
C.4.1 The BLM will provide a georeferenced map of the parcel/s to be treated. A shape file or
KML polygon is also available on request. Any area within the project area to be avoided by the contractor will be identified on a map, flagged in pink and discussed during the pre-work meeting. From this point it will be the contractor's responsibility to avoid these areas.
C.4.2 The BLM will provide maps and descriptions of the area and will go with the operator around the boundary of the area. The government will map the area treated by the Contractor using a Global Positioning System (GPS), based on horizontal plane measurement, not “slope” acreage.
C.4.3 The government will provide representatives from the BLM Grand Junction Field Office
Solicitation No. 140L3726Q0065 Page 7 of 25 and/or US Wildland Fire Service to act as liaison between the contractor and the BLM Contracting Officer to implement the project and to ensure that the resource objectives of the project are met.
COR:______Jake Pollert___970-210-8780 ___________ PI: ______Ken Miller____208-296-1758____________
C.4.4 The BLM provides treatment measurement: The determination of the acreage of completed work will be made by using the Global Positioning System (GPS). Area measurements required under this Contract will be measured on a horizontal plane.
Mechanical treatment of trees and brush will be measured and paid for by the number of acres treated to the nearest whole acre. Work performed according to the specifications and C.9.0 will be considered acceptable for payment purposes.
C.4.5 The BLM will provide re-measurement of the acreage under this Contract upon the written request of the Contractor. The request for re-measurement must be made in writing within 10 calendar days after completion of the work. If re-measurement indicates a difference of not more than 5 percent from the original measurement, the Contractor shall pay the actual cost of the re-measurement. Payments will be based on the second measurement where the difference between measurements is more than 5 percent. Where the difference is less than 5 percent the results of the first measurement will be used.
C.4.6 The PI and/or COR will conduct weekly on-site inspections. The Contractor is encouraged to observe inspections while they are being made and have a supervisor on site to confer with the PI and/or COR. If an onsite visit has not occurred during the period, the contractor is required to report status of work each week, or when any special situations or problems are encountered. These reports may be made by telephone to the PI or COR.
C.5.0 TRANSPORTATION OF EQUIPMENT, DELIVERY, STORAGE, AND HANDLING:
C.5.1 The contractor will provide transportation for all equipment; operators, fuel, and water to and from the site. The Contractor shall be responsible for providing the necessary material handling equipment to on-load and off-load all materials and the appropriate security when equipment or property is left on site.
C.6.0 LUBRICATING AND SERVICING OF EQUIPMENT:
C.6.1 The Contractor shall be responsible for all service to all equipment including support vehicles. The Contractor shall keep all the equipment in proper functioning condition to ensure objectives of the project are met.
C.7.0 REPAIRS TO EQUIPMENT:
C.7.1 The Contractor shall be responsible for repair of all equipment including the support vehicles. The Contractor shall keep all the equipment in proper functioning condition to ensure objectives of the project are met. The Contractor shall be equipped to make
Solicitation No. 140L3726Q0065 Page 8 of 25 necessary field repairs to equipment.
C.7.2 Use of welding equipment may be limited by fire restrictions. It is the Contractors responsibility to keep current on any restrictions.
C.8.0 SPECIFIC TASKS:
C.8.1 Surface Conditions: Treatment shall not be done when soil surface conditions are muddy.
When such conditions are encountered, the Contractor shall stop work and notify the Contracting Officer. The Contracting Officer will determine the best course of action based on comments from the contractor and the COR/PI.
C.8.2 Protection: The Contractor is required to protect section corners, benchmarks, and other markers and stakes from damage or removal. In case of destruction or removal by the Contractor, they will be replaced by the Government and the actual cost for replacement will be deducted from payments due the Contractor. The Contractor is also required to avoid all areas flagged and identified by the COR as areas to be protected due to resource concerns.
C.8.3 Noxious Weeds: Vehicles and heavy equipment are one of the primary agents for the spread of noxious weed seed to public lands. In efforts to mitigate the spread of weed seed to BLM lands the following actions are required for contractors prior to transport to a BLM project area. The Contractor will be responsible for power-washing or comparable cleaning, to ensure that noxious weed seeds are removed from any and all equipment and vehicles used on the project prior to entering the project area. BLM will require a pre-implementation inspection to ensure compliance which would be arranged to occur in Grand Junction when the contractor is planning transport to the project area. The Contractor is responsible for any additional transport or expenses associated with non-compliance.
Support vehicles (pickups, fuel/service vehicles, transports, dump trucks, etc.)
<Pressure wash radiator to flush seeds.
<Pressure wash undercarriage to remove accumulations of mud and soil that may contain seeds.
Heavy Equipment (dozers, road graders, excavators, backhoes, loaders, etc.)
< Pressure wash radiator(s) to flush seeds.
< Pressure wash tracks to remove accumulations of soil.
< Pressure washes all areas of soil/debris accumulations (i.e. steps) < Pressure wash blades and buckets where soil/mud is accumulated.
< Empty pre-cleaners (air intake) before transport.
C.8.4 Hazardous Materials: Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Material Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE). On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. The Contractor will be responsible to prevent
Solicitation No. 140L3726Q0065 Page 9 of 25 introduction of hazardous materials into the environment during the implementation of the proposed action. Any on-site disposal or release of two gallons or more in the form of spilled fuel, hydraulic fluid, or oil used by the machinery and the resulting contaminated soil will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil. Fueling and maintenance activities should not take place in or adjacent to any drainage (perennial or ephemeral.)
1. All product containers, cans, and debris should be removed from the site and disposed of properly.
2. Incidental leaks from fittings, gaskets, or ruptured hoses will not subject the contractor to remedial requirements (if less than 2 gallons).
3. Fueling equipment and maintenance/repair locations, and equipment will be inspected and approved prior to contract startup by the owner/operator and the Government’s PI/COR. Inspections will include checking for evidence of oil/fuel leaks at all piping, oil/fuel lines, hydraulic lines and seals, fuel tanks and other potential sources of leaks. All evidence of leaks will be investigated and immediately repaired prior to equipment operation on the job and continual leaks will be noted on inspection reports and corrected through required maintenance.
4. All non-manual fueling equipment will have an automatic shut-off switch installed to avoid fuel releases.
5. Fuel tanks greater than 200 gallons may only be used within a spill containment pit.
The spill containment pit shall be constructed at a site designated by the PI/COR, with an impermeable liner capable of containing a released volume of one and one-half times the tank volume. The Contractor will report all hazardous substance spills immediately to the BLM PI or COR
C.8.5 Fire Prevention and Fire Safety Provisions: The government may require the contractor to curtail or cease operations should wildland fire danger approach critical levels. The contractor will be given 24-hour notice in the form of a suspend/stop work order issued by the Contracting Officer.
Ignition of a wildland fire that threatens the project area may require the Contractor to proceed with an emergency evacuation of the project area.
A 10 lb. ABC fire extinguisher and shovel or equivalent tool will be available on the operating equipment for fire prevention and control.
If extreme fire and/or fuels conditions are experienced there may be a stop work order to reduce the opportunity for unintentional ignitions by mechanized operations.
C.9.0 MASTICATION OPERATIONS:
C.9.1 General: Mastication shall be performed within the project area as marked by the
Government and instructed by the COR or PI. Insufficient shredding/mulching may require some work areas to be treated more than once to meet objectives. Any additional
Solicitation No. 140L3726Q0065 Page 10 of 25 cost of rework is the responsibility of the Contractor.
Remaining stumps shall not exceed 6 inches in height.
Vegetation shall be reduced to a mulch material with a minimum of 80% of the woody material less than 1" in diameter and 6" long. The mulch shall be scattered evenly across the soil surface and not remain in piles greater than 8" deep.
Vegetation which is pushed over by equipment but not shredded shall be severed by the contractor by hand (chainsaw) and slash shall not exceed 18 inches in height.
No trees/shrubs shall be left to cross any improvement such as, but not limited to roads, fences, gates, ponds, power lines or cattle guards. Any damage to such improvements will be charged to or repaired by the contractor.
C.9.2 Additional Requirements:
-The following guidelines for Mastication are a required mitigation measure incorporated in the decision record authorizing this project and will be communicated to the owner/operator during the on-site pre-work meeting:
The contractor will post signs on the access road warning visitors of heavy equipment use in the area. These signs will be checked daily by the contractor to ensure they are in place.
The signage will be coordinated with and pre-approved by the BLM Project Inspector (PI) or the Contracting Officers Representative (COR).
The BLM PI or COR must be informed of any objects or sites of cultural, paleontological, or scientific value such as historic or prehistoric resources, graves or grave markers, human remains, ruins, cabins, rock art, fossils, or artifacts. The objects shall not be damaged, destroyed, removed, moved, or disturbed. Any person who knowingly violates this may be subject to fines and/or imprisonment (Public Law 16-95; 16 U.S.C. 470).
Work will not occur between May 15 and July 15 to protect migratory birds and their nests.
Ponderosa Pine of any size WILL NOT be cut.
-Any damage to private lands caused by the contractor crossing private lands to get to the project is the responsibility of the contractor.
-Pursuant to 43 CFR 10.4(g), the Contractor must notify the authorized officer, by telephone, with written confirmation, immediately upon the discovery of human remains, funerary items, sacred objects, or objects of cultural patrimony on federal land. Further, pursuant to 43 CFR 10.4 (c) 41 and (d), the Contractor must stop activities in the vicinity of the discovery that could adversely affect the discovery. The Contractor shall make a
Solicitation No. 140L3726Q0065 Page 11 of 25 reasonable effort to protect the human remains, funerary items, sacred objects, or objects of cultural patrimony for a period of thirty days after written notice is provided to the authorized officer, or until the authorized officer has issued a written notice to proceed, whichever occurs first.
C10.0 PAYMENT
10.1 Work Quality Acceptance
1. Work will be accepted or rejected on each treatment area.
2. Acceptable Quality Level (AQL) - A minimum AQL of 85 percent is required.
3. Unsatisfactory Work Quality
a. Based on inspection results, if the treatment falls below the AQL of 85 percent, the
CO will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of the work. If the quality of the work is not raised to the AQL of 85 percent after written notification, the CO may issue a suspend work order to resolve the problem, during which time contract performance time will continue to run.
b. If untreated surplus vegetation is the primary reason for unsatisfactory work, the area may be reworked to obtain satisfactory work quality.
4. Re-inspection – If the contracted work falls below the AQL of 85 percent, rework will be required. When instructed by the COR, the Contractor shall rework the treatment area for re-inspection by the COR/PI. If the treatment area again fails to meet the AQL of 85 percent, the CO has the option of ordering the Contractor to rework the treatment area again or seek other remedies.
The Contractor shall be charged for all the COR/PI re-inspection costs. The COR/PI re-inspection costs will include, but may not be limited to, personnel costs, transportation costs, and overhead administrative costs of 21%.
10.2 Payment
Payment will be based on the COR/PI inspection results by unit. The Contractor's inspection results are to be used as a guide for the Contractor's use in complying with contract specifications and not as a basis for payment. Payment will be made for the actual number of acres completed, inspected and accepted by the COR/PI.
Solicitation No. 140L3726Q0065 Page 12 of 25
0 9/1 Rd
6848 ft
7974 ft
7255 ft
Je rry
C reek
H A N C O C K
G U L C H
8017 ft
H A N C O C K
G U L C H
Corcoran Unit Mastication
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of this map or the data displayed for individual use or aggregate use with other data.
Delta
County
Mesa
County
Garfield County
Mesa County
ColoradoFY26 West Zone Mastication Bureau of Land Management
Grand Junction Field Office 2815 H Road
Grand Junction, CO 81506 970-244-3000
Map Created: 4/22/2026
Corcoran Unit Mastication - 143 Acres
Bureau of Land Management
Private
0 0.5 10.25 Miles¯
Corcoran Units
Solicitation No. 140L3726Q0065 Page 13 of 25
7581 ft
Big Do m inguez C reek
DOM INGUEZ CANYON
DOM INGUEZ CAN
YON
4/
Rd
A 627Z
A6 Y
B
8C
Big Dominguez Trail
026A
A
023X
627023S
24.4
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of this map or the data displayed for individual use or aggregate use with other data.
Delta
Count y
Mes a
Count y
Mesa County
Montrose County
ColoradoFY26 West Zone Mastication Bureau of Land Management
Grand Junction Field Office 2815 H Road
Grand Junction, CO 81506 970-244-3000
Map Created: 4/22/2026
Farmer's Unit Mastication - 468 Acres
Bureau of Land Management
US Forest Service
0 0.5 10.25 Miles¯
Farmer's Unit
Solicitation No. 140L3726Q0065 Page 14 of 25
Kannah Creek
THE
HUNT ING
GROUND
P IÑON MESA
GRAND
VALLEY
HORSETH IE F
CANYON
BLACK
R IDGE
MONUMENT
MESA
GLADE
PARK
SOUTH
SHALE
R IDGE
B O O K C
L IF
F S
UN
A W
E E P C A N Y O N
Me s a
Palisade Clifton
Fruita
Grand Junction
SNYDER
FLATS
DOM
IN
GU
EZ
CA
NY
ON
UNAWEEP CAN YON
Plateau Creek
Kanna h Creek
Farmer's Unit Mastication
Corcoran Unit Mastication
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of this map or the data displayed for individual use or aggregate use with other data.
Delta
County Mesa
County
Garfield County
Mesa County
ColoradoFY26 West Zone Mastication Bureau of Land Management
Grand Junction Field Office 2815 H Road
Grand Junction, CO 81506 970-244-3000
Map Created: 4/22/2026
Corcoran Unit Mastication - 143 Acres
Mastication Unit - 468 Acres
Bureau of Land Management
Bureau of Reclamation
National Park Service
Other Federal
Private
State
State, County, City: Recreation Areas
US Forest Service
0 7 143.5 Miles¯
Overview
Solicitation No. 140L3726Q0065 Page 15 of 25
ATTACHMENT 6 AND 7 ARE INCLUDED AS SEPARATE ZIP FILE ATTACHMENTS
Solicitation No. 140L3726Q0065 Page 16 of 25
| ���������� | ������������ �!"�!#� $������� %���!#��%&!������������������� | |
| �� | ��� | |
| ����� | ������������������������������������������������������������������� | �� |
� ��+�"% �!"��!�,�)-./0)12) %"��3������++4���������� �5�4�!"�!#�����������������5�4�!"��!�,�.- � ��+�"% �!"4��� % �� #��%4 ���5�4�!",�26)16'('/777777777777777777777777777777777777777�77777777777777777777777777777777777777777777�+83!����!"�4��5�����!" �%� 4�#!��#!��4 ��9�3%"��+%"%*�+�" 9� $���3�%"�"*�!#�8:&3���:4��%��%4�%"�� �+&����"5�" !���4��5���4��777777777777777777777777777777777777777777777777777777777777777777777777777777777777� % �,��!3!�%�!���%,��!3!�%�!��!:" ��4�!#���%+49��3%+!4%9���%8%$!�9����$:3� %9��%�%9���" 9��!:3���9���!!+#��3�9��$%##��9��$���""�9��3�%������;9��!"�<!49��!4 �33%9���!=3��9��:4 ��9� �3 %9� �"5��9� !3!��49� !:*3%49��%*3�9��3��%4!9��3&�� 9� ��+!" 9��%�#��3�9���38�"9���%"�9��:""�4!"9���"4�%3�9��:��#%"!9�>%�;4!"9�>�##��4!"9�?�!=%9�?� ��%�4!"9��%��3% %9��%;�9��%��+��9��%4��"�+%49���"�!3"9��!*%"9���4%9���"��%39��!##% 9��!" �@:+%9��!" �!4�9��!�*%"9� ��!9� :�%�9��%�;9��$�33�849��� ;�"9���!=��49��:�&3!9���!��3%"�!9���!���%"��9��!: 9��%*:%�$�9��%"�>:%"9��%"���*:�39����*=��;9��:++� 9���33��9��%4$�"* !"9���3��%"���:+%777777777777777777777777777777777777777777777777777777777777777777777777777777777777����������AA ��"*����"�#� 4���B:�����
!33!=� $�� ��:8% �!"%3���4 �"*AA������� ������� ���
��0������������������������������������������ �� ����������(C()(�0���:4$6����!++����%3��$�""��������������������������������������).�)D(C(D(�0��$!;����� ����������������������������������������������������)C�.)(C(.(�0� %33��6�:�;����������������������������������������������������')�D1(C)((�0� �����!!;!: ���������������������������������������������������).�)D(C)1(�0�
| !��4 ����B:�8+�" � | 8��% !�������������������������������������'D�C'(C)/(�0� |
| !��4 ��6�!**�"*���%5���B:�8+�" � | 8��% !�����������������������'/�1C(C)-(�0� |
!��4 ������$"���%"��������������������������������������������'/�1C(C'((�0� !��4 �����:�;� ��5��������������������������������������������'/�1C(C'2(�0���"��%3� !��4 ����%&!������������������������������������������)C�'-(C'C(�0��:�4�����8���%3�4 ���������������������������������������������'1�.-(C1)(�0��3%4$���3��6�:�"�����������������������������������������������).�)D(C1D(�0�������3�+&�����������������������������������������������������)-�(D(C1.(�0�������3%" �����������������������������������������������������)D�('(CD((�0�������3%" ��9����$%"��%3���������������������������������������)D�('�! �,��E��: �5�� �����F� G�)1.(/9��4 %&3�4$�"*��%������;���%5��#!�� ����%3��!" �%� !�49�%883��4� !�%33��!" �%� 4�4:&<�� � !� $�����5�����!" �%� ��� �#!��=$��$� $���!" �%� ��4�%=%�����F%"��%"��4!3��� % �!"�=%4��44:��G�!"�!��%# ���>%":%���)9�
HIJKIJLM�NOJP�QR SQRTUVW
XYYZ[OII[\]TUVWÎ\U_̀a_Y_b]cd\YcVdIKeNL̀KPHKINe KIPSolicitation No. 140L3726Q0065 Page 17 of 25
| �� | �� |
| ���� |
| �� | �� | |
| ������ | ��������������������� |
| $���� | ������������ | |
| �����%������� | ���� | |
| ���&� | ������� | �����������������'����������� |
| ����������������� | �� |
| $���� | ������������ | ||
| �����%������� | ���� | ||
| ���&��������������������� | ��%���������� | ������� | �����������������'����������� |
| ����������������� | �� |
| �����)���������� | ������ | �����%���*��� | ������������� | ������� |
| �� | �� | |||
| �����+������� | ���������������� | � | ||
| ����������� | ||||
| ������������������� | ���������%��,� |
| �� | �� | |
| ��-� | �.��)� | |
| � | ����������� "!/�%����������������� | �� |
| �� | �� | |
| �����#� | ||
| � | �� |
��0����
| ��1�� | �� | ||
| �* | |||
| � | |||
| � | ���������������������� | �����2�������������!�����2��������3������������ | |
| � | � | ||
| ������ | ������������������) | �������������� | ���2������� �������������� |
| �� | �� | ||
| �������#� | |||
| � | ���)� | ||
| � | ����������� "!/�� |
| �� | �� | |
| ������ | ��������� | |
| ���������������� | ����� | �4� �"!����� |
| �������%���� | ����� | ������ | |
| �����%���� | ������ | ��������� | ���� |
| ��*��� | ������������� | ������� | |
| �� | �� | ||
| �����+������� | ���������������� | � | |
| ������������)� | |||
| � | ����������� "!/��������������� | ���������%��,� |
| �� | �� |
| ��*55��1167*8��-0�5�08�9�*:�;��<�1��;��8=��>�55�?�-@�:�-�>�80.�=�*58=�A�?�5>*<�.�4!�!!����� | |
| �������� | ��B�� |
������������������4�������������������43"������������ �=�*58=�A�?�5>*<������ ��".�4!��3����� �������� ��B�� ������������������4�� �"���������������4//������������ C�C8 ��������01*$
| �� | �� |
| ������ | |
| �������������� ��"���� | ����� |
��%�7����0�
| ��5���������>�������1�� | �� | |
| ������*� | ||
| �� | �� | |
| ��������� | ��� |
| ���� | � | ������� | ��01*�����%� | �������������������� |
| ������������������������ | � | ������ ��"�;*1*8��-.���������������� | ||
| � | ������ | ������������������ |
| �� | �� |
| �������� |
������� ��������� ���!������������B��������� ����!���������5��%
| �������� | � |
| �� | �� |
| �������� |
| �� | �� |
| ������� |
| ��� | ����'<�%���3�1><�B��� (=�5�9*D0.�*������������������������ |
| ����������������.�-���D���E��9����F�� | ���5� |
���G��%�2��E��:��
| ��% | ��E��:�� |
| �����F��������9����2��� | ��� |
| �-� | ���������������� |
��9�������������� ��9����5�����9����1��������9����;� �����E�9����8 ����%����%�9��������1
| ��� | ����9����'*� | |||
| �� | �� | |||
| ����������� | � | � | ������������� |
| � | ��� | �� |
| ���������������������(��'0����3�1><�B���B(CC�6-�>�<F�*55�?*-1��CC�������������������+������ | ������������������� |
| �� | �� |
| �'�� |
| �� | �������� |
| ��@�������� | � |
| �� | �� |
| ����� |
| �������� | �������� | |
| � | ���+��������� | |
| ����%���� | ������ | �����8 |
| ��9���� | ��� | ����5����������� |
�.8
| �� | �� | |
| ��������� | ||
| �� | �� | |
| ��������+������ | �������� |
| �������+�� | ����������������������� | |
| �� | � | |
| �� | ���� | �������������������������� |
| ���� | |
| �� | ���� |
| �������������������� | ������ |
| �� | �� | |
| ����������� | ||
| �� | �� | |
| �������#� | ||
| � | �� | |
| �����%���� | ������ | ����� |
| ���� | |
| �� | (�������������������������������� |
| ������%��������� | ���� | |
| ��� | ����� | �����4 � !����������'���4�"�� |
| �� | ���������(���=����������� | |
| ������� | �� |
���������������HHHH���
���������HHHH��� ������������������ ���������
| ������������%����� | ������������ | ���+������������ | |
| ���� | ��� | ��� | ��� |
| ��� | ���������� | ���� |
| �� | �������� | |
| ��@�������� | � | |
| �� | �� | |
| ����� |
| �� | �� |
| ������������������ | |
| ���� | ������� |
| ������������+������� | � | |
| � | ����������������������������������������� | ���� |
| �� | ��CC�0�<;�1��1�-8<*18�*18�9�<�18�<D��>��1167*8��-0�CC8 | |||
| ���� | �����������������������#��� | � | ������� | ������� |
��HHHH0����
| ��1�� | �� |
| �* | |
| �9��� | |
| �������� |
| ��� | ����HHHH��>�� | ||
| ���� | ����'<���������(���� | ���0�� | ���������!���������� |
� ����CC�<�I6�08�>�<�*68=�<�J*8��-��>�*99�8��-*5�15*00�>�1*8��-�*-9�?*@��<*8�0 �������>�����BBB�'0>$�BBB(�CC1�������� ��7�� ���.8
| �� | �� |
| ��%����� |
| �� | �� | |
| �'������ | ||
| ������� | �������������������� | ������������������ |
| � | ������� | ������ |
| ����%���� | ������ | ���(����� |
| �� | �� | ||
| ��������� | ��������������������������� | ���� | |
| ���'��������������� | ����������������� | ||
| ���������(��� | ������� | ||
| ������ | ��� |
| � | �������� | ������ |
| ����%���� | ������ | �����0� |
������%�������� ����������� ��������'0����3�1><�B�"'�('�('�((��0�
| �� | �� | |
| ��������� | �� |
| �� | �� |
| ����������� | |
| ������ | ��� |
����'��(��������������'0����3�1><�B�"'�('�('��((��8 ��?�%������=����9���������
| ��������� | ��� | |
| ���� | �� |
| �� | �� | ||
| �'0����3�1><�B�"'�('�('��('1('��((��? | |||
| ������ | �������%���� | ������ | ����������� |
| �� | �� | |
| ���������� | ��0>$�BBB�� |
KLMNLMOP�QRMS�TU VTUWXYZ
[\\]̂RLL̂_̀ WXYZLa_Xbcdb\bèfg_\fYgLNhQOcNSKNLQh MLSSolicitation No. 140L3726Q0065 Page 18 of 25
| ���� | |
| � | � |
| ���� | |
| � | � |
| ��� | ����� |
| % | � |
| ���� | ���� | |
| � | � | |
| �� | � | ��� |
| ���� | "��� |
| ��! | �!��� |
| � |
| ��� | �� |
| �� | ��� |
| � | |
| ���� | "��� |
| ���� | ��� |
| ��� | �� |
| � |
| �� | �� |
| � | ������ |
| � | ���� | � |
| � |
| ���� | |
| � | � |
| + | �� |
| ,�!��� | �� |
| � | |
| /�� | �� |
| � | � |
�0 1 2 3�4������������3�
| + | �� |
| ,�!��� | � |
| ���� | !��� |
| � | ������� |
| � | |
| ������� | !�� |
| � | |
| � | ������ |
��������5�
| ���� | |
| � | ��4� |
| ���� | |
| � | � |
| ��� | ��� |
���� "����6�� ����� � 2������� �� . 7�333
| � | |
| � | �� |
8888.��!� 1 ����
| � | �" |
| � |
����� ��8888
| � | �"� |
| �� | ��� |
| ����� | |
| % | � |
| �������� | �� |
| � | � |
| ���� | ���� |
2��������
| ����������� | �� | |
| 1 | �� | ���� |
| ������ |
| � |
����������� ��8
@A<B
CD ECDFGHI
JKKLMA;;MNOFGHI;PNGQRSQKQTOUVNKUHV;=W@>R=B:=;@W B;BSolicitation No. 140L3726Q0065 Page 19 of 25
Contract Clauses (05/21/2026)
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: www.acquisition.gov/far/part-52
DOI Clauses: www.acquisition.gov/diar/part-1452-solicitation-provisions-and-contract-clauses
Revolutionary FAR Overhaul Clauses: www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
(End of clause)
Clauses Incorporated by Reference
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-13 System for Award Management Maintenance. (DEVIATION MAR 2026)
52.204-14 Service Contract Reporting Requirements (DEVIATION MAR 2026)
52.204-19 Incorporation by Reference of Representations and Certifications (DEVIATION MAR 2026)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for
Debarment (DEVIATION MAY 2026)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (DEVIATION MAY 2026)
52.212-4 Terms and Conditions—Commercial Products and Commercial Services. (DEVIATION MAR 2026)
52.219-6 Notice of Total Small Business Set-Aside (DEVIATION JAN 2026)
52.219-28 Post-Award Small Business Program Representation (DEVIATION JAN 2026)
52.222-3 Convict Labor (DEVIATION MAY 2026)
52.222-35 Equal Opportunity for Veterans (DEVIATION MAY 2026)
52.222-36 Equal Opportunity for Workers with Disabilities (DEVIATION MAY 2026)
52.222-37 Employment Reports on Veterans (DEVIATION MAY 2026)
52.222-41 Service Contract Labor Standards (DEVIATION MAY 2026)
52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014)
52.222-50 Combatting Trafficking in Persons (DEVIATION MAY 2026)
52.222-54 Employment Eligibility Verification (DEVIATION MAY 2026)
52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (DEVIATION MAY 2026)
52.222-62 Paid Sick Leave Under Executive Order 13706 (DEVIATION MAY 2026)
52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026)
52.223-23 Sustainable Products (DEVIATION MAY 2026)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024)
52.232-34 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
Solicitation No. 140L3726Q0065 Page 20 of 25
52.233-3 Protest After Award. (AUG 1996) - Alternate I (JUN 1985)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)
52.240-91 Security Prohibitions and Exclusions (DEVIATION MAR 2026)
52.242-13 Bankruptcy. (JUL 1995)
52.242-15 Stop-Work Order. (AUG 1989)
52.242-17 Government Delay of Work. (APR 1984)
52.244-6 Subcontracts for Commercial Products and Commercial Services (DEVIATION MAY 2026)
52.245-1 Government Property (SEP 2021)
52.245-9 Use and Charges (APR 2012)
Clauses Incorporated by Full Text
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Regulation (48 CFR 14) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.
(End of clause)
1452.201-70 Authorities and delegations. (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
Solicitation No. 140L3726Q0065 Page 21 of 25
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the
Contractor's risk.
(End of clause)
1452.204-70 Release of Claims (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)
(February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform
System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. A copy of the Contractor¿s invoice, to include the finalized OF-286 invoice from the incident.
2. The contract number.
3. The invoice number.
4. Dates of transactions.
5. A description of the line items being bille
6. The unit prices for each line item.
7. Quantities for each line item.
8. Total amount of each line item.
9. Overall invoice total.
10. All receipts for travel (meals, lodging, transportation).
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor
Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve
Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Solicitation No. 140L3726Q0065 Page 22 of 25
Solicitation Provisions
52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
FAR Provisions: www.acquisition.gov/far/part-52
DOI Provisions: www.acquisition.gov/diar/part-1452-solicitation-provisions-and-contract-clauses
Revolutionary FAR Overhaul Provisions: www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
(End of provision)
Provisions Incorporated by Reference
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (SEP 2024)
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—
Representation (JAN 2017)
52.204-7 System for Award Management (DEVIATION MAR 2026)
52.209-12 Certification Regarding Tax Matters. (OCT 2020)
52.240-90 Security Prohibitions and Exclusions Representations and Certifications (DEVIATION MAR 2026)
52.212-1 Instructions to Offerors—Commercial Products and Commercial Services. (DEVIATION MAR
2026)
(a) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, offers shall include—
(1) The solicitation number;
(2) The name, address, telephone number of the Offeror;
(3) The Offeror’s Unique Entity Identifier (UEI) and, if applicable, Electronic Funds Transfer (EFT) indicator;
(4) Information necessary to evaluate the factors contained in the provision at 52.212-2 or as described in the solicitation;
(5) Responses to provisions that require Offeror completion of information, representations, and certifications
(other than those collected via the System for Award Management (SAM)); and
(6) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and any solicitation amendments.
(b) Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 60…