This is a Request for Quote (RFQ) for the 2025 Huerfano County Fuels and Vegetation Management project issued by the Bureau of Land Management (BLM) National Interagency Fire Center. The solicitation is for mastication services on 201 acres located approximately 5 miles south of Gardner, Colorado. The project aims to thin high-density piñon and juniper trees to increase forest resilience, improve wildlife habitat, and enhance overall forest health by creating a combination of openings and reserve tree islands.
Key details include a solicitation number of 140L3725Q0110, with quotes due by 10:00 AM Mountain Daylight Time on 08/27/2025. An optional site visit is scheduled for 08/19/2025 at 10:00 AM. The contract period of performance is from 09/15/2025 to 03/01/2026, with no work allowed during the migratory bird nesting season (March 1 through July 15). The project is set aside as 100% for small business, with a NAICS code of 115310. Contractors must follow specific requirements for tree removal, including reserving ponderosa pine trees, trees with cavities, and select larger piñon and juniper trees, while chipping or mulching cut vegetation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quoters Copy
Issuing Office:
BLM NIFC
This solicitation can be downloaded at https://www.sam.gov.
Quotes Are Solicited For:
Huerfano Mastication
Solicitation: 140L3725Q0110
IMPORTANT – NOTICE TO ALL PROSPECTIVE QUOTERS
Quotes shall be emailed to the Contracting Specialist, at Daniel Rosales drosales@blm.gov by 1000 hours, Mountain Daylight Time, 08/27/2025.
As part of its quote, the quoter shall complete/submit the following:
(a) SF 1449, Blocks 17a, 30a-30c;
(b) Fill in the appropriate information requested in Section B.1, Schedule of Items;
(c) Provide your responses to Sections E.3 Instructions to Offerors, Technical Evaluation Factors; and,
(d) Contact information for an individual with the authority to bind.
(e) Questions can be submitted via email until 08/21/2025 @ 1000 Mountain Daylight Time. Answers to questions will be submitted to SAM.gov as an amendment.
(f) Optional Site visit 08/19/2025 @1000 MDT. Additionally, interested vendors may reach out to the COR Glenda Torres g1torres@blm.gov and Nick Grooms ngrooms@blm.gov if you would like to formally visit the site with the Government representative. Respond with site visit interest by 08/18/2025 1000 Hours MDT.
Quotes that arrive after the prescribed time for receipt of quotes will be considered late and treated in accordance with FAR 52.212-1, Instructions to Offerors-Commercial Items.
It is the Quoter’s responsibility to monitor the following website for any changes to the RFQ: https://www.sam.gov.
Quotes submitted in response to the solicitation shall honor the offer for 60 days.
This solicitation neither commits the Government to pay any cost incurred in the submission of the quote or in making necessary studies or designs for preparing the offer, nor to contract for services or supplies. Any cost incurred in anticipation of a contract shall be at the Quoter’s own risk.
Quoters may contact the Contracting Officer, Daniel Rosales at drosales@blm.gov.
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LFA
BOISE ID 83705
3833 S. DEVELOPMENT AVE.
BLM FA NTL INTRAGCY FIRE (FA250)
0011276309 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLFA
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
08/27/2025 1000 MD
08/13/2025
Daniel Rosales (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140L3725Q0110
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 60 0044027484OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
CANON CITY CO 81212
3028 E MAIN STREET
BLM-CO ROYAL GORGE FIELD OFFICE*
15. DELIVER TO
BOISE ID 83705
3833 S. DEVELOPMENT AVE.
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$34
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Delivery: 03/01/2026 Period of Performance: 09/15/2025 to 03/01/2026
00010 2025 HUERFANO CTY FUELS AND VEG. MGMT
Product/Service Code: F014 Product/Service Description: NATURAL
RESOURCES/CONSERVATION- TREE THINNING
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
Daniel Rosales
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
60 2 of
SECTION B – SCHEDULE OF ITEMS/DESCRIPTION/SPECIFICATIONS
B.1 SCHEDULE OF ITEMS/PRICE SCHEDULE
2025 HUERFANO COUNTY FUELS AND VEGETATION MANAGEMENT
SECTION C - DESCRIPTION -Performance Work Statement
C.1 – GENERAL REQUIREMENTS
C.1.1 – PROJECT OBJECTIVES
This project is designed to thin high-density piñon, juniper trees. The goals of this project are to increase stand resilience to fire by altering the arrangement fuels, to improve and enhance wildlife habitat and forage, and to increase the vigor of the reserve trees. The thinning efforts will concentrate on removing smaller diameter trees, in an effort to promote overall forest health. The desired end result will be a combination of openings and reserve islands. The more open stand will allow for the development of a grass and forb understory, while creating breaks in the continuous canopy. It is HIGHLY recommended that the contractor attend the site visit to determine actual difficulty of work needed to complete this contract. The stipulations listed in “Description of the Work” will be required within the 201 acres of the project area (see Project Map, Attachment J.1).
These stands are variable in structure (tree height, tree diameter, species composition, and number of trees per acre) due to natural disturbances and topography. Acceptable leave tree spacing will be variable and based on tree species, size, and quality. As a result, types of work situations encountered will differ.
C.1.2 - LOCATION OF PROJECT
The project area is approximately 5 miles south of Gardner, CO off of Huerfano County Road 540. The legal description is 6th Principal Meridian, Huerfano County, Colorado T. 26 S., R.69 W., sec. 32, and T. 27 S., R.69 W., sec. 05&06. (See Huerfano County Overview Map, Attachment J.2).
C.1.3 – SCOPE OF CONTRACT
The contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to complete the work required. The Treatment Plan and Schedule will be agreed upon by both parties and incorporated into the contract. All changes to the Treatment Plan will be agreed to prior to the changes taking effect.
C.1.4 - DESCRIPTION OF THE WORK:
C.1.4.1 Reserve Trees
1. Reserve all ponderosa pine trees.
2. Reserve all trees that have cavities or evidence of cavity nesting.
3. Piñon pine and Juniper trees greater than or equal to 10 inches DRC will be favored as reserve trees; however, trees this size and larger may be removed in order to achieve the target density specified (See C.1.4.2).
Description Acres Unit Price Subtotals
Huerfano Mastication
Total $
Solicitation No. 140L3725Q0110 Page 3 of 60
4. In areas of high concentrations of standing dead, one piñon/juniper snag10 inches DRC or greater per will be reserved.
5. Ponderosa pine snags will be reserved
C.1.4.2 Project Specifications
1. The desired end result will be a combination of openings that range in size from ½ to 2 acres and leave islands (clumps) consisting of 5-10 trees of variable size.
2. Leave islands and openings can be dictated by terrain.
3. Clear all trees within 30 feet of Ponderosa trees (if present).
4. Clumps can consist of a combination of small diameter trees and reserve trees.
5. If reserve size/species trees are not present, create clumps with smaller diameter trees.
6. All cut trees (including branches and boles) will be chipped or mulched.
7. Standing dead trees will be mulched unless they fit in a category of a reserve tree (See C.1.4.1).
8. Chip/mulch piles cannot exceed 12 inches in depth.
9. Mulch/chip slash into pieces no larger than 3” diameter and no longer than 4’ in length.
10. Stump heights cannot exceed 6 inches in height and all live branches will be severed from the stump.
If the masticator cannot accomplish this specification, a chainsaw or other hand powered equipment will be used to achieve desired result.
11. Existing dead and down trees will be mulched.
12. No trees shall be felled toward or across any improvement such as, but not limited to roads, trails, fences, gates, signs and spring developments.
13. Section corner monuments, survey markers, and private land boundaries will be protected. These markers have been heavily flagged with pink flagging, and boundary marking placards.
14. The contractor is responsible for the removal of all created slash and debris from roadways and trails.
15. Mastication activity will only be allowed within the boundaries identified on the maps. Cutting outside of the boundary is prohibited, and if it occurs, must be reported to the COR immediately.
16. Keep any fence cutting to a minimum. If fences need to be cut, seek approval from COR prior to cutting fence, and report location of cut to the COR.
C.1.5 - CONTRACT PERIOD
This project will begin as soon as possible, and shall be completed within 90 weekdays, Monday through Friday. This project must be completed before March 1, 2026. No work will be allowed from March 1 through July 15 for migratory bird nesting season. Holidays do not count as weekdays. Consideration will be given to delays caused by bad weather, wet road conditions, or fire restrictions.
C.1.6 DEFINITIONS
DEFINITIONS
Bearing Tree - A tree which is used as a reference monument to locate a property corner.
Biomass- Biomass – Any tree, or portion of, less than 6 inches DBH and top, limbs, or slash of a merchantable tree.
Bole – The central stem of a tree, with no limbs, once it has grown to substantial thickness
Brush - Vegetation consisting of shrub species with single or multi-stems originating at or near ground level not normally reaching twenty feet in height. Examples include but are not limited to oakbrush, mountain mahogany, and sagebrush.
Solicitation No. 140L3725Q0110 Page 4 of 60
Conifer – A tree that is a gymnosperm, usually an evergreen with cones and needle-shaped or scale like leaves, i.e. Douglas-fir, ponderosa pine, white fir, juniper or piñon pine.
CO – Contracting Officer
COR – Contracting Officers’ Representative
COR/PI - either the COR or the PI
Cut Leave Tree - A tree noted during inspection as a tree that should not have been cut.
DBH – Diameter at Breast height. The diameter of a tree measured at 4.5 feet from the ground on the uphill side.
DRC-Diameter at Root Collar or at the ground level.
Damaged Leave Tree - A tree damaged through the mastication of other trees.
Forest Products – “Other vegetative resources” and “Timber” as defined in 43CFR5400.0.0
Fuelwood – Smaller diameter forest products that are generally used for heating, see POL.
Landing – A flat location cleared of trees within or near the treatment area with room to deck forest products for subsequent transportation.
Lodged Trees and Brush - Cut trees and brush leaning into, supported by, or covering a leave tree.
Muddy – Soil moisture conditions high enough for equipment to leave ruts over 1.5 inches in depth from the natural ground level.
PI – Project Inspector
Reserve Trees - Trees not to be cut. Trees that are the largest, dominant, and healthiest while maintaining a representation of all size classes within the stand.
Sever – To completely separate from the whole.
Slash - Any material which has been cut by the Contractor during mulching operations
Unsevered – not completely separated from the whole, pieces still attached.
**When a disagreement over definitions not listed arises, the Society of American Foresters, THE DICTIONARY of FORESTRY, will be used to determine accepted definitions.
SECTION C.2 –EQUIPMENT REQUIREMENTS
1. Due to the terrain and potential ground conditions (snow, ice, and wet weather, rocks), masticator(s) must have at minimum one set of chains during operation to allow for optimal traction.
2. The masticator(s) must be rubber tired. Tracked machines will not be considered due to the soil conditions at the project site.
Solicitation No. 140L3725Q0110 Page 5 of 60
C.2.1 - BLM WILL FURNISH OR PROVIDE THE FOLLOWING
1. Designate the boundary of the areas to be treated with roads, pink, plastic surveyors flagging, or previously treated areas.
2. Provide maps and descriptions of the area, and go with the operator around the boundary of the area.
3. The use of Avenza, GAIA, Garmin, or other mapping applications is highly recommended to ensure that work is only completed within the designated boundary area. The BLM COR can provide a multitude of file types to support the use of the applications.
4. Provide a site visit inspection tour for all potential offerors:
DATE: August 19, 2025 TIME: 10:00am LOCATION: Intersection of HWY 69 and Huerfano County Road 550 POC: Nick Grooms ngrooms@blm.gov, 970-549-7366 and Glenda Torres gltorres@blm.gov, 719- 429-1707
It is HIGHLY RECOMMENDED that the contractor participate in the site visit inspection tour to get an idea of tree density, terrain, and access conditions prior to submitting a technical plan and price quote.
A pre-work conference with the contractor awarded the job.
4. Conduct on-site inspections by the PI/COR.
5. The COR/PI are available to approve/disapprove a proposed cutting method not herein listed prior to acceptance of a quote.
6. Measurement of the area treated by Global Positioning System (GPS) as each unit is completed.
Note: All GPS measurements are taken on the horizontal plane not “slope” acreage.
C.2.2 - CONTRACTOR WILL FURNISH
1. The contractor will furnish cutting equipment and any and all necessary parts or equipment to maintain the tools in a safe operating condition.
2. Transportation for equipment and operators to and from the site.
3. Repair and maintenance of equipment.
4. An “English speaking Contractors Authorized Representative” on site at all times when working.
C.2.3 - ACCESS
1. Access is provided to the project location through County Roads and BLM roads throughout the treatment areas unless wet road conditions are encountered as specified in C.2.6.1
2. Access to the treatment unit will be by existing BLM and or County roads.
3. Under no circumstance will new roads/routes/access points be created in the project area. All travel will occur on current and existing BLM and or County Roads, or through travel points within the flagged boundaries. If a need for alternative travel route/road/access point arises, it must be mapped and approved by the COR in writing prior to its creation.
4. All gates within the project area shall be left as found or as directed by the COR.
5. No littering is allowed and the contractor shall be responsible for hauling all trash accumulated out of the area. All trails designated on the project map shall be kept free of slash.
6. The area will not be closed to the public during the contract period. Contractor must be aware of the presence of people in the work area and adjust activities to account for their presence. The contractor is responsible for securing his equipment and supplies from possible theft and vandalism.
Solicitation No. 140L3725Q0110 Page 6 of 60
C.2.4 – OPERATIONS PLAN
Prior to the commencement of operations, the Contractor shall obtain from the COR written approval of a written treatment plan commensurate with the terms and conditions of the contract which shall include measures needed to assure protection of the environment and watershed. All thinning and clearing shall be done in accordance with the plan.
C.2.4.1 - Work must be done in a systematic manner, beginning at one end of the project area and working through it in a logical manner prescribed in the operations plan.
C.2.4 CAMPING AND WORKSITE CONDITIONS
C.2.4.1 The contractor or his employees, upon documented permission from the CO/COR, may establish temporary work camps on public lands administered by the Bureau of Land Management. Camps shall be kept tidy and free of refuse. These camps may consist of mobile trailers, pickup campers, tent trailers, or tents. The contractor will be required to rehabilitate the camping area to the satisfaction of the CO/COR.
Camps are subject to all fire restrictions placed by state, county or federal authorities.
C.2.4.2 MIGRANT SEASONAL AGRICULTURAL WORKERS PROTECTION ACT
REGISTRATION
As set forth in Title 29, Part 500 of the Code of Federal Regulations, Migrant and Seasonal Agricultural Worker Protection, the Contractor shall maintain all necessary U.S. Department of Labor registrations during the performance period of this contract. Failure to maintain a valid registration is grounds for termination of this contract.
In compliance with the Migrant and Seasonal Agricultural Worker Protection Act, the Contractor shall provide the following to meet minimum safety and health standards for housing employees when camping on Federal lands:
a. A shelter to provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect the workers from the cold.
b. Sanitary facilities for storing food. Ice chests or coolers, with ice supply made from potable water replenished as necessary, to meet the requirement for storage of perishable food items.
c. An adequate and convenient potable water supply, approved by the appropriate health authority, in each camp for drinking and cooking purposes. As an alternative, commercial bottled water may be used.
d. Toilet and hand washing facilities adequate for the capacity of the camp, at not less than a 1:15 ratio, supplied with adequate toilet paper. Such facilities shall be maintained in a sanitary condition and shall be on site and serviceable prior to any camping.
e. Fly-tight, rodent-tight, impervious, cleanable or single service containers to be used for the storage of garbage. Such containers shall be kept clean and emptied when full.
f. Basic first aid supplies under the charge of a person trained to administer first aid.
g. A laundry tray or tub for every 30 workers, or transportation, at least weekly, to a commercial Laundromat for all workers.
C.2.4.3 Biomass Removal:
Pursuant to 48CFR1437 (as amended in the Federal Register / Vol. 69, No. 166 / Friday, August 27, 2004) biomass resulting from this contract may be purchased from the BLM.
Solicitation No. 140L3725Q0110 Page 7 of 60
1. The contractor may remove and utilize woody biomass if:
(a) Project work is progressing as scheduled; and
(b) Removal is completed before contract expiration
2. To execute this option, the contractor must submit a written request to the Government.
3. Following receipt of the written request, and if appropriate, the Government and the contractor will negotiate and execute a separate timber/vegetative sales contract. Payment under this sales contract must be at a price equal to or greater than the appraised value before the removal of any woody biomass. The contractor must make any appropriate payment specified in this timber/vegetative sales contract.
4. The contractor must treat any woody biomass not removed in accordance with the specifications in the service contract.
5. The sales contract and service contract are severable; default or termination under either does not remove the contractor from payment or performance obligations under the other contract.
C.2.5 - COR/PI
COR/PI – Nick Grooms Fire Management Specialist-Fuels Cell - 970-549-7366
PI – Glenda Torres Wildfire Mitigation and Education Coordinator Office - (719) 269-8582 Cell - (719) 429-1707
C.2.6 - ENVIRONMENTAL CONSIDERATIONS
C.2.6.1 - Surface Conditions - Crew carriers (vehicles) shall not be operated when the road is muddy or if on site moisture (rain/snow/hail/etc.) events exceed 0.25 inch in 1 hour or .75" in 24 hours, the COR may require a halt to traffic until the roads dry enough (or freeze) so that damage by vehicles does not occur. When/If such conditions are encountered, the Contractor shall stop work and immediately notify the COR/PI.
C.2.6.2 - Any damage to roads caused by the contractor will be repaired by the contractor to the satisfaction of the COR.
C.2.6.3 - Contractor shall clean-up all generated liter and dispose of it at an approved sanitary landfill or other location and in a manner approved by the CO/COR.
C.2.6.4 - To avoid the taking of a nest and disruption of the nesting season, no cutting will be allowed from March 1 to July 15.
C.2.6.5 Project start date may be adjusted to avoid work during Ips beetle flight and activity times.
C.2.7 FEDERAL HOLIDAYS
To avoid user conflicts on the Federal Holiday of Labor Day, Memorial Day, and July 4 th there will be no work from noon on the Friday before Labor/Memorial Day through midnight of Labor/Memorial Day and from noon on July 3rd through midnight of the following Sunday.
C.2.8 - FIRE STIPULATIONS
C.2.8.1. Fire Period and Closed Season
Solicitation No. 140L3725Q0110 Page 8 of 60
Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 19, which is the defined fire season start and stop dates for the area, of each year. The Bureau of Land Management may change the dates of said period by advance written notice if justified by unusual weather or other conditions.
Required tools and equipment shall be kept in serviceable condition and immediately available for initial attack on fires.
C.2.8.2. Substitute Measures
The Contracting Officer Representative may by written notice authorize substitute measures or equipment or may waive specific requirements during periods of low fire danger.
C.2.8.3. Emergency Measures
The Bureau of Land Management may require emergency measures, including the necessary shutting down of equipment or portions of operations in the project area during periods of fire emergency created by hazardous climatic conditions or when the implementation of Fire Restrictions require.
C.2.8.4. Fire Control
The Contractor shall, independently and in cooperation with the BLM, take all reasonable action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area.
For the purpose of fighting wildland fires on or in the vicinity of the project, which are not caused by the Contractor's operations, the Contractor shall place employees and equipment temporarily at the disposal of the BLM. Any individual hired by the BLM will be employed in accordance with the Interagency Pay Plan for Emergency Firefighters. The BLM will compensate the Contractor for equipment rented, at firefighting equipment rates common in the area.
C.2.8.5. Compliance with State Forest Laws
Listing of specific fire precautionary measures herein is not intended to relieve the Contractor in any way from compliance with the State Fire Laws covering fire prevention and suppression equipment, applicable to operations under this contract, permit or license.
C.2.8.6. Fire Precautions
Specific fire precautionary measures are as follows:
a. Smoking and Open Fires
The Contractor shall not allow open fires on the project area without advance permission in writing from the Contracting Officer Representative.
Unless restricted by State Law or Federal Regulations, smoking shall be permitted only in such portions of the project area that are free of flammable material. Smokers shall smoke in such a position that any burning material will fall within a cleared area and shall extinguish and press out in mineral soil all burning material before leaving the cleared area.
b. Fire Extinguishers and Equipment, on Trucks, Tractors, etc.
Solicitation No. 140L3725Q0110 Page 9 of 60
All power-driven equipment operated by the Contractor on public land, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 B, C and one "D" handled or long handled round point shove.
In addition, each motor patrol, truck and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3-1/2 pounds or larger.
Equipment shall be kept in a serviceable condition and shall be readily available.
c. Power Saws
Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long handled round point shovel, size "O" or larger. The extinguisher shall be kept in possession of the saw operator at all times. The shovel shall be accessible to the operator within 1 minute.
d. Extinguishers
One refill for each type or one extra extinguisher sufficient to replace each size extinguisher required on equipment shall be safely stored in the fire tool box or other agreed upon place on the project area that is protected and readily available.
e. Spark Arresters and Mufflers
Each internal combustion engine shall be equipped with a spark arrester meeting either (1) USDA Standard 5100-1a, or (2) appropriate Society of Automotive Engineers (SAE) recommended practice J335(b) and J350(a) as now or hereafter amended unless it is:
(1) Equipped with a turbine-driven supercharger such as the turbocharger. There shall be no exhaust bypass.
(2) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler complete with baffles and an exhaust system in good working condition.
(3) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.
C.2.8.7. Additional Fire Precautions
If determined that fire danger indices as displayed in the National Fire Danger Rating System for a given area are exceeding the .90 percentile for Energy Release Component and Burning Index the Contractor will be required to:
a. Partial Hoot owl - The following may operate only between the hours of ½ HOUR BEFORE SUNRISE and 2 P.M. local time:
Solicitation No. 140L3725Q0110 Page 10 of 60
(1) power saws, except at loading sites
(2) welding or cutting of metal
(3) tractor or other mechanized roller crushing, hydro-axing, dozer piling operations
(4) mechanized loading and hauling
(5) any other spark-emitting operation not specifically mentioned
b. Additional Fire Precautionary Measure 1 - Tank Truck
The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing, roller crushing, hydro-axing, and mechanical treatment of slash. Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed season.
The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4 inch nozzle tip, through a 50 foot length of rubber lined hose. In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.
If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch/Fire Security service.
c. Fire Security
The Contractor shall designate a person who shall perform fire security services listed below on the project area and vicinity. The designated person shall be capable of operating the Contractor's communications and firefighting equipment specified in the contract, excluding helicopters, and of directing the activities of the Contractor's personnel on forest fires. In lieu of having the designated person perform the required supervisory duties, the Contractor may provide another person meeting the qualifications stated above to direct the activities of the Contractor's personnel and equipment during all firefighting activities.
Services described shall be for at least 2 HOURS from the time the Contractor's Operations are shut down.
For the purposes of this provision, personnel servicing equipment and their vehicles or who are engaged in cutting or welding metal are not considered on fire security.
Fire security services shall consist of moving throughout the operation area or areas constantly looking, reporting and taking suppression action on any fires detected. Where possible, the designated person shall observe inaccessible portions of remote operating areas from vantage points within or adjacent to project work.
d. Communications
Solicitation No. 140L3725Q0110 Page 11 of 60
The Contractor shall provide adequate two-way communication facilities to report a fire to Bureau of Land Management within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB's are not considered adequate two-way communications.)
Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required.
8. General Shutdown-all Operations Suspended
If fire danger is severe, the Contractor will be asked to suspend work.
C.2.9 - HAZARDOUS MATERIALS
C.2.9.1 Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Material Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
C.2.9.2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized.
On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.
C.2.9.3. Incidental (de minimus) leaks from fittings, gaskets or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses.
Continual leaks will be noted on inspection reports and correction through maintenance required.
C.2.9.4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on site only if the fluids are captured, containerized, and removed from public lands for proper disposal.
C.2.10 - PROTECTION
The contractor is required to protect cadastral survey markers (brass caps), bench marks, project markers, and other markers and stakes from damage or removal. In case of destruction or removal by the contractor, they will be replaced by the government and the actual cost of replacement deducted from payments due the contractor.
C.2.11 - REMEASUREMENT
Re-measurement of the acreage under a task order will be made upon written request by the Contractor. The written request must be made within 10 calendar days after completion of the work. If measurement indicates a difference of not more than 5 percent from the original measurement, the contractor shall pay the actual cost of the Re-measurement. Payments will be based on the second measurement where the difference between measurements is more than 5 percent. Where the difference is less than 5 percent the results of the first measurement will be used.
C.2.12 - ROAD MAINTENAINCE
There is no intent in this contract to require road maintenance except to repair any damage that occurs by the contractor on non-county roads or by those in his employ. Should damage occur, sections C.2.11.1 & C2.11.2 will apply.
C.2.12.1 The contractor shall maintain the cross section of dirt or graveled roads as existed prior to this contract by blading and shaping the road surface and shoulders. Banks shall not be undercut. Established berms shall be maintained and additional berms shall be placed where needed to protect fills as directed by the COR/PI.
Solicitation No. 140L3725Q0110 Page 12 of 60
C.2.12.2 The contractor shall perform all road cleanup including removal of bank slough, slides, and fallen timber, which can practicably be accomplished by a motor patrol grader equipped with a front end blade, rubber-tired front end bucket loader, or comparable equipment, and by the use of hand tools. When working conditions dictate end haul of material, the distance and the quantity of material required to be moved shall be limited to what is reasonable and practicable without the use of additional equipment.
C.2.12.3 There shall be no snow plowing without prior approval of the CO/COR
C.2.13 - SAFETY
C.2.13.1 Safety Plan Required The contractor shall prepare a Safety Plan that addresses the specific hazards of the work site and shall include working in areas of dead trees and falling debris. The Contractor shall identify the specific conditions that she/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will employ to increase safety on the worksite. Additionally, a plan of action for an emergency event shall be included in the Safety Plan.
C.2.14 - INJURIES AND DAMAGE
The Contractor, in his operations under this contract, shall not do or omit to do anything by which act or omission any person or property may be injured or damaged and shall indemnify and save the United States harmless from any claim, demand, action, or damages on account of any personal injury or property damage arising by reason of anything done or omitted to be done by the Contractor, his contractors, subcontractors, or the employees of any of them.
C.2.15 - SIMULTANEOUS USE OF AREA
If the CO or Field Office Manager determines that other uses of the contact area will not seriously interfere with the operations of the contractor, he may issue permits, leases, or contracts for the simultaneous use of the contract area by others.
C.2.16 - SPARK ARRESTERS
It is prohibited to operate or use any internal or external combustion engine, on any timber, brush, or grass covered land, including trails traversing such land, without a spark arrester maintained in effective working order and meeting guidelines set forth in National Wildfire Coordinating Group Publication NFES 1363 and 2363.
C.2.17 - STATUS REPORT
Provided an onsite visit has not occurred during the period, the contractor is required to report status of work when any special situations or problems are encountered or once a week (whichever is less). These reports may be made by telephone to the PI/COR.
In the event of extreme weather the Contracting Officer will determine the best course of action based on comments from both the Contractor and PI/COR.
C.2.18 - ARCHAEOLOGICAL OR CULTURAL DISCOVERIES
If in connection with operations under this contract the Contractor, his subcontractors, or the employees of any of them, discovers, encounters, or becomes aware of any objects or sites of cultural value on the contract area such as historical or prehistorical ruins, human remains, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR of the findings. Operations may resume at the discovery site upon receipt of written instructions and authorization by the COR.
Solicitation No. 140L3725Q0110 Page 13 of 60
C.3 - CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall propose and adopt a quality control inspection system to ensure that the work is progressing in compliance with specifications. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during the contract performance.
The following is an example that may be used or the contractor may propose their own:
Inspections will be made on a series of 1/20th acre (26’4” feet radius) plots located at predetermined intervals across each work unit. Sufficient plots will be taken to obtain at least one percent sample of the work unit. The plots are to determine if the requirements of section C.1.4 were met.
Each inspection plot will be subdivided into four (4) quadrants based on cardinal directions. Each quadrant will be evaluated for compliance with the intent of the contract specifications as stated in Section C that pertains to this individual treatment. If two (2) or more quadrants fail to comply, the plot will fail.
Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory plots divided by the number of plots inspected determines the quality rate. This rate multiplied by 100 provides the work quality percentage.
Example: Number of plots inspected 25 Number of satisfactory plots 23 23 divided by 25 92 Work Quality Percentage 92%
C.4 - GOVERNMENT INSPECTIONS
C.4.1 The Government will make periodic inspections as a basis for payments and recommendations for adjustments in work quality while work is in progress.
C.4.2 When a succinct area (unit) is complete and ready for inspection, the contractor shall request a final inspection.
Inspection requests shall be in writing and pursuant to FAR 52.246-4 shall include results of Contractor’s quality inspections. Inspection of completed units will not occur until such notification is received. Inspections will be completed within ten (10) calendar days after the notice is received for each item. If a formal request for an item inspection is within the ten (10) working days since the previous request, the time will not start until the time for the previous inspection expires.
C.4.3 Inspections will be made on a series of linear plots (100ft x 20ft) located at predetermined locations across the work unit. Sufficient plots will be done to obtain at least a one percent (1%) sample of the treated area.
Inspection plots will not be done in the reserve areas.
C.4.4 Each inspection plot will be evaluated for compliance with all contract specifications. Plots meeting all contract specifications will receive 10 points. Plots found to have one contract violation will receive 5 points. Plots found to have two or more contract violations will receive no points. Any plot having a cut or damaged conifer leave tree will receive no points.
C.4.5 The COR/PI will also check for cut or damaged leave trees between plots.
Solicitation No. 140L3725Q0110 Page 14 of 60
C.4.6 The following information will be recorded for each plot inspected:
a. Number of leave trees on the plot, was thinning met as outlined in C.1.4
b. Number of cut or damaged leave trees or other trees specifically designated not to be cut or damaged in each quadrant.
c. Plots where stumps exceed maximum height.
d. Plots where slash is not within the specifications outlined in C.1.4.5.
C.4.7 - Work Quality Percentage
C.4.7.1 - The work quality percentage is derived from data developed from inspection plots.
C.4.7.2 - Work quality is determined by dividing the total number of points earned by the total number of points possible. This rate multiplied by 100 equals the work quality percentage.
EXAMPLE:
Number of plots inspected - 5
Total points possible (10 x 5) - 50
Total points earned - 45
WQP - (267/300) x 100 - 90%
C.5 -ACCEPTANCE
C.5.1 Work will be accepted or rejected on a unit basis.
C.5.2 Acceptable Quality Level (AQL) - A minimum AQL of 85 percent WQP is required.
C.5.3 - Unsatisfactory Work Quality
C.5.3.1 - Based on inspection results, if units fall below the AQL of 85 percent or if the cut/damaged tree percent exceeds five, the CO will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of the work. If the quality of the work is not raised to the AQL of 85 percent or the cut/damaged tree percent reduced to five or less after written notification, the CO may issue a suspend work order to resolve the problem, during which time contract performance time will continue to run
C.5.3.2 - If lodged trees, high stumps, or untreated surplus vegetation are the primary reason for unsatisfactory work, the area may be reworked to obtain satisfactory work quality.
C.6 - REINSPECTION
When units fall below the AQL of 85 percent, rework may be required. When instructed by the COR, the Contractor shall rework the unit for re-inspection by the Government. If the unit again fails to meet the AQL of 85 percent, the CO has the option of accepting the unit at the work quality percent calculated from inspection plots or of ordering the Contractor to rework the unit again. If the CO elects to accept the unit at the work quality percent calculated after rework, the Contractor will be paid based on the results of the re--inspection.
The Contractor shall be charged for all the Government's re-inspection costs.
C.7 - PAYMENT
Solicitation No. 140L3725Q0110 Page 15 of 60
Payment will be based on the Government's inspection results. The Contractor's inspection results are to be used as a guide for the Contractor's use in complying with contract specifications and not as a basis for payment. Payment will be made for completed units, for the actual number of acres completed, inspected and accepted by the Government, less the adjustment in payment based on the work quality level percentage, if any.
If the work quality level equals or exceeds 95 percent before rework, full payment (100%) will be made for the number of acres inspected and accepted by the Government on the completed units. Units achieving a work quality level of 85-94 percent will be paid at that percentage rate. If units are accepted which do not meet the AQL of 85 percent, payment will be made at a rate determined by multiplying the actual inspection percentage by the quote price.
Unit Number Total Acres Unit 1 201 Acres Total
PART I - THE SCHEDULE
C.8 - KEY PERSONNEL
C.8.1 The Contractor shall assign to this contract key personnel that list may include the following:
CONTRACTOR REPRESENTATIVE
FOREMAN
INSPECTOR
C.8.2 The Contractor shall make no substitutions of key personnel without notifying the Contracting Officer within a reasonable timeframe and in advance, and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. Proposed substitutes should have comparable qualifications to those of the persons being replaced.
C.8.3 The Contractor shall make no diversion of key personnel without the written consent of the Contracting Officer.
C.8.4 The contract will be modified to reflect any approved changes of key personnel.
C.8.5 The Contractor's contractor representative shall be fully conversant in the English language.
C.9 - PREWORK CONFERENCE
Prior to commencement of work, the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also at this meeting such items as work progress schedule, quality control, camping/worksite plan, and fire prevention plans shall be finalized in writing.
C. 10. SAFETY PLAN
The Contractor shall prepare a Safety Plan that addresses the specific hazards of the work site and shall include working in areas of falling debris. The Contractor shall identify the specific conditions that she/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will employ to increase safety on the worksite. Additionally, a plan of action for an emergency event shall be included in the Safety Plan. (See also C.2.13.1)
Solicitation No. 140L3725Q0110 Page 16 of 60
LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SEE SECTION D of RFQ
Solicitation No. 140L3725Q0110 Page 17 of 60
SECTION C - CONTRACT CLAUSES
C.1 CONTRACT TERMS AND CONDITIONS – COMMERCIAL PRODUCTS
AND COMMERCIALS SERVICES. FAR 52.212-4 (NOV 2023)
Addendum to 52.212-4:
C.2 ADDENDUM TO FAR. FAR 52.212-4
DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph
(e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this
Solicitation No. 140L3725Q0110 Page 18 of 60 contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
--- End of Addendum to 52.212-4---
C.3 CONTRACT CLAUSES INCORPORATED BY REFERENCES. FAR 52.252-2 (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52).
Department of the Interior Acquisition Regulation (DIAR) Clauses:
https://www.acquisition.gov/diar.
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)
C.4 Contract Terms and Conditions Required to Implement Statutes or Executive
Orders– Commercial Products and Commercial Services. FAR 52.212-5 (JAN
2025) (DEVIATION FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .