Sol_140FHR24R0012.pdf
PDF 3 MB Posted
- Solicitation number
- 140FHR24R0012
About this file
This document is a Solicitation for construction services to replace two damaged restroom buildings at the Vieques National Wildlife Refuge in Puerto Rico. The Statement of Work requires the contractor to demolish and remove the existing wooden compost restrooms, and install two new pre-cast concrete comfort stations. The contractor will be responsible for all labor, materials, equipment, and supervision required to complete the work. The period of performance is 90 days after the Notice to Proceed is issued. This is a firm-fixed price contract, and proposals will be evaluated on price. The solicitation is set aside for small businesses, and includes prevailing wage requirements under the Davis-Bacon Act. Proposals are due by 09/24/2024, and the work must be completed by 01/31/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FHR24R0012_Amd_0003.pdf | ||
| Sol_140FHR24R0012_Amd_0002.pdf | ||
| Sol_140FHR24R0012_Amd_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040669790
FWS, Hurricane & Recovery
FWS, Hurricane & Recovery
5275 Leesburg Pike Falls Church VA 22041
FHR
Tina Baker
1x 08/22/2024
140FHR24R0012
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Statement of Work
Wage Determination
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 90 calendar days and complete it within ________________ ________________ calendar days after receiving
09/24/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
FWS, Hurricane & Recovery FWS, Hurricane & Recovery
5275 Leesburg Pike Falls Church VA 22041
FHR
Tina Baker
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 60
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140FHR24R0012
Delivery: 01/31/2025
Delivery Location Code: 0008349674
FWS VIEQUES NWR
POST OFFICE BOX 1527
VIEQUES PR 00765-3139 US
Period of Performance: 11/01/2024 to 01/31/2025
00010 Restrooms Rehab:
Task 1: Demolish and Remove Existing Wooden
Compost Restrooms
Task 2: Install Two (2) New Pre-Cast Concrete
Comfort Stations
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Vieques NWR La Chiva Restrooms Replacement Project Page 1 of 9
STATEMENT OF WORK
FOR
CONSTRUCTION REPLACEMENT SERVICES PROJECT
ON
PLAYA CARACAS COMPOST RESTROOM BUILDINGS
AT
VIEQUES NATIONAL WILDLIFE REFUGE
BACKGROUND:
The Vieques National Wildlife Refuge (NWR) require removal and replacement of the damaged Playa Caracas Restroom Buildings due to Hurricane Fiona of 2022. This Statement of Work (SOW) defines all the required tasks to repair the damages. The material and performance specifications for the Construction Services tasks are incorporated in the project description below. Consult any changes or recommendations with the Contracting Office Representative (COR) and the Contracting Officer
(CO).
Any dimensions provided below are approximate in nature. The Contractor shall verify all dimensions and note such dimensions on the submitted proposal. Product data submittals shall be required for all construction materials proposed herein.
DESCRIPTION OF WORK:
General Requirements (Task 1): Construction Services Task – Demolish and Remove Existing Wooden Compost Restrooms
1. Task shall consist of all mobilization costs, contract administration, and project management for the demolition and removal of the two (2) pre-existing wooden compost restrooms.
2. Each compost restroom building is a 10’ x 10’ enclosed structure with a self-contained waste holding tank over the surface. Both the super-structure as well as the waste vault system (and the contents within) are required to be removed and disposed of in accordance with all applicable waste disposal requirements by Federal or State laws and regulations.
General Requirements (Task 2): Construction Services Task – Install Two (2) New Pre-Cast Concrete Comfort Stations
1. Task shall consist of installing two (2) new pre-cast concrete comfort stations in the vicinity of the pre-existing compost restrooms. Each comfort station shall have a superstructure footprint of no less than 75 sq ft (7.5’ x 10’) but be no larger than 10’ x 10’.
2. Each structure shall be able to withstand hurricane force winds based on most recent building codes. Submit computations that evidence the structure complies with wind and earthquake loads for Puerto Rico.
Vieques NWR La Chiva Restrooms Replacement Project Page 2 of 9
3. Each new comfort station shall have a riser that is composting, similar to the comfort stations manufactured by Clivus Multrum Inc. (Or Equal). Each vault shall be installed in accordance with all applicable codes, federal and state.
4. The new restroom installed shall comply with the latest-to-date ADA codes for accessibility.
GENERAL NOTES:
A. The Contractor shall coordinate with the Refuge on appropriate stockpile locations for demolished and/or excess materials.
B. Security levels vary at the site. The Contractor shall provide secured areas deemed necessary for the protection of their materials.
C. All buildings and structures on the Refuge may be occupied during construction. Care should be taken to coordinate all construction activities with the Contracting Officer Representative (COR). This is an area open to public; tourists frequently visit this beach.
D. PERIOD OF PERFORMANCE: 90 days after Notice to Proceed (NTP).
E. DEFINITIONS
1. Commissioning is the act of statically and dynamically testing the operation of equipment and building systems to ensure they operate as designed and can satisfactorily meet the needs of the building throughout the entire range of operating conditions.
2. Construction is defined as, but not limited to, constructing (giving form by combining the parts), altering, repairing, adding to, subtracting from, improving, restoring, moving, wrecking or demolishing any building, highway, road, excavation or other structure, project, or improvement attached to real estate.
3. Contracting Officer (CO) is defined as a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the United States of America. The term includes certain authorized representatives of the Contracting Officer such as the Construction Specialist (CS), Contracting Officer's Representative (COR), Construction Representative (CR) and Site Representative (SR) acting within the limits of their authority as delegated by the Contracting Officer.
4. Day or Days shall mean calendar days unless otherwise specifically noted.
5. “Service” or “FWS” means United States Department of Interior, Fish and Wildlife Service, Region 4 (Southeast Region).
6. Government may also be referred to as the Owner, Contracting Officer, Contracting
Officer's Representative, the Service, or Fish and Wildlife Service (FWS).
7. Incident Rate (IR) is the number of recordable incidents resulting in days away from work for each 100 full-time employees per year, based on 2,000 hours worked per employee per year.
8. Local Authority Having Jurisdiction: Duly adopted local code authority, agency, or serving utility governing or serving the location of the project.
9. Management Plan: Contractor's project approach for planning, design, and construction and includes, at a minimum, but is not limited to the following:
a. Schedule
b. Project Staffing Plan
c. Safety Plan
Vieques NWR La Chiva Restrooms Replacement Project Page 3 of 9
d. Subcontracting Plan
e. Organization Chart with Roles and Responsibilities
f. QA/QC Plan
g. Commissioning Plan
10. DOI “Sustainable Building Assessment and Compliance Tool Construction Checklist for New Construction and Major Renovation Projects” and supporting documents. (This checklist will be furnished to the Contractor firm by the USFWS)
11. Notice to Proceed (NTP): There will be one (1) NTP for this project issued by the Contracting Officer (CO) to initiate the construction phase. The NTP will identify any qualifications, limitations, or exceptions to the work.
12. Open Book Accounting is the right of the government to have free and open access to financial and accounting documents that the Contractor has associated with the project being completed.
13. Performance Specifications are specifications that state what the required results will be with measurable or observable criteria for verifying compliance.
14. Public Works is construction performed under a contract with a Federal, State, County, City, or other government entity.
15. Schedule is a chronological layout of the work to be performed prepared using commercially available scheduling software.
16. Subcontractor is any person or entity retained by the Contractor as an independent contractor to perform a portion of the Work and shall include material, labor and suppliers.
17. Sub-Subcontractor is any person or entity retained by a Subcontractor as an independent contractor to perform any portion of a Subcontractor's Work and shall include material, labor and suppliers.
18. Work is comprised of all permitting, construction and other services required by the Contract Documents, including procuring and furnishing all materials, equipment, services and labor reasonably inferable from the Contract Documents.
CONSTRUCTION SERVICES
A. GENERAL
1. Following the Issuance of the Construction NTP, the Contractor shall provide the following items to the COR at the Preconstruction Meeting for approval.
a. A project schedule reflective of the critical path and other phases of the work.
b. A schedule of the planned site visits. The prime Contractor shall periodically, and at appropriate times, visit the site to inspect the construction. The Contractor shall prepare a site visit report for each visit and shall submit the reports to the COR within five (5) calendar days after the visit. The reports shall include comments about overall quality and accuracy of the construction. The reports shall also note all deficiencies observed.
2. Possess and maintain, for the duration of this project, a state license as a General Contractor in the State the project is located, if required by the state.
Vieques NWR La Chiva Restrooms Replacement Project Page 4 of 9
3. Provide supervision, labor, materials, tools, construction equipment and machinery, inspection, testing, start-up, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, if temporary or permanent; and whether incorporated, not incorporated, or to be incorporated in the Work.
4. Have at least one (1) qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours.
5. Perform all construction activities efficiently and with the requisite expertise, skill, and competence to satisfy the requirements of the Contract Documents. At all times, exercise complete and exclusive control over the means, methods, sequences, and techniques of construction.
6. Utilize Subcontractors who are duly licensed and qualified to perform the Work consistent with the Contract Documents. Government may reasonably object to Contractor's selection of any Subcontractor.
7. The Contractor is responsible for quality control of its own work and work performed by its subcontractors and their sub-subcontractors. Provide and pay for the services of an independent construction materials testing laboratory accredited by an acceptable laboratory accreditation authority. Laboratory shall sample and test materials and perform required special inspections. Laboratory shall be authorized to perform work in the state where project is located. Government may reasonably object to the Contractor’s selection of laboratory.
8. Assume responsibility for the proper performance of the Work of Subcontractors and all acts and omissions in connection with such performance. Nothing in the Contract Documents is intended or deemed to create any legal or contractual relationship between Government and any Subcontractor or Sub Subcontractor.
9. Coordinate the activities of all Subcontractors. If Government performs other work on the Project or at the Site with separate contractors under Government's control, Contractor agrees to reasonably cooperate and coordinate its activities with those of such separate contractors so that the Project can be completed in an orderly and coordinated manner without unreasonable disruption.
10. Minimize creation of construction, deconstruction, and demolition waste. Minimize factors that contribute to waste such as over-packaging, improper storage, ordering error, poor planning, breakage, mishandling, and contamination. Develop a Waste Management Plan to ensure that existing site and building materials are reused, salvaged, or recycled.
Unless modified by the CO, divert 50%, minimum, of total project waste from landfills.
Dispose of all materials not salvaged, reused, or recycled legally, off-site, in licensed disposal facilities.
11. Normal working hours are Monday to Friday from 7:00 am to 5:00 pm except for federal holidays, alternate work hours shall be approved by the COR.
12. During normal working hours throughout the duration of the contract, promptly furnish information and provide reasonable facilities and access for obtaining information respecting: the character of the materials, condition of the work-in-progress, number of workers employed, their pay rate, time worked, inspection reports and test results from sampling and testing laboratories, and similar information.
Vieques NWR La Chiva Restrooms Replacement Project Page 5 of 9
13. Government buildings and other facilities are not available for storage of Contractor's materials, equipment, and tools except for designated staging areas. Government Furnished Equipment (GFE) is not available for Contractor's use to accomplish any Work.
14. Housing for workers and campsites is not available.
15. Contractor to furnish all temporary facilities and utilities needed including heat, light, power, water, telephone, sanitary facilities, job offices, material handling equipment, temporary construction aids, and storage enclosures. The Contractor is responsible for all temporary connections and disconnections.
16. Permits. It is the responsibility of the Contractor to obtain all permits and pay all permitting fees required for this project. The Contractor is responsible for providing permitting drawings, engineering data and other technical information required by the permitting authority.
B. COMMUNICATION
1. The FWS Project Manager must be in the information loop for Quality Assurance purposes.
a. RFI Process: The Contractor shall utilize the following protocol:
(i) Utilize a RFI Form: All supplemental information and answers to questions shall be documented on Request for Information (RFI) forms. The Contractor may use any format they choose for the Request for Information form, but all shall be identified with the words “Request for Information” at the top of the form along with the Government Contract Number, Project Location (Vieques NWR) Project Title and the Contractor’s Name.
(ii) Numbering: RFI’s shall be sequentially numbered, logged and filed and shall be part of the Closeout Documents submitted to the Government.
(iii) FWS Concurrence: As RFI’s are generated and answered, submit copies to the COR for review within two (2) business days for concurrence via email .pdf format.
A non-response from the COR within four (4) days of receipt of the RFI will signify concurrence with the RFI answer. If the RFI is sent on a Friday, then Saturday and Sunday do not count as business days.
(iv) RFI Files Onsite: The Site Superintendent shall maintain a file of RFI changes.
This RFI file shall be subject to inspection by the FWS without advance notice.
b. Submittals: The Contractor shall utilize the following protocol.
(i) Utilize a Submittal Register: Develop a submittal register and update this register as submittals and logged and processed.
(ii) Numbering: Submittals shall be sequentially numbered. A completed submittal register shall be submitted with the Project Closeout Documents.
(iii) FWS Concurrence: Provide the FWS Project Manager with one (1) copy of the approved submittal and provide the FWS Construction Representative with one (1) copy of the approved submittal within two (2) business days of the approval date.
Vieques NWR La Chiva Restrooms Replacement Project Page 6 of 9
(iv) Site Responsibility: The Contractor’s Site Superintendent shall maintain a file of approved submittals for reference purposes. This Submittal file shall be subject to inspection by the FWS without advance notice.
c. Note: Coordinate with Contracting Officer and Contracting Officer Representative any delays resulting from FWS questions/stoppages due to a lack of, or inordinately lengthy or unnecessary delays. in, the flow of information from the Contractor to the Service for a time period in excess of twenty-one (21) days, will not give rise to claims for monetary consideration under the contract, including but not limited to requests for equitable adjustments, constructive changes, and other claims for compensation.
C. PAYMENT PROCEDURES
1. Measurement: No measurement of the work will be made unless unit prices are included in the project.
2. Payment: Payment will be made monthly for approved work performed in accordance with the contract requirements under the items listed in the Schedule of Items and based on the approved Schedule of Values.
a. Note: Undocumented changes which did not follow the RFI process outlined above may be subject to delayed or non-payment.
3. Schedule of Values: Prepare a Schedule of Values in the format of the American Institute of Architects (AIA) form number G702/703 Application and Certificate for Payment (or approved equivalent format). Submit a detailed Schedule of Values no less than seven (7) calendar days prior to the start of on-site construction work.
a. Payment Request Data: In addition to data required by the Contracting Officer: (1) Format the Schedule of Values to match the Schedule of Items and show sufficient additional detail to allow accurate calculation of monthly progress payments; and (2) Submit updated construction schedule identifying actual work complete.
D. PROJECT SAFETY
1. The Contractor shall be responsible for safety on the project site at all times, from issuance of the Notice to Proceed until final completion and acceptance of the project by the Contracting Officer. Ensure that all onsite activities, equipment, and facilities constructed by the Contractor, subcontractor, or supplier conform fully to the standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1926 and 1910; and DOI and FWS policies. In addition, the Contractor shall adhere to all current Federal, State, and local safety requirements. In the event where any safety standard referenced herein conflicts with another, the more stringent shall govern.
2. The Contractor shall initiate and maintain, throughout the performance of this contract, an effective safety and health program that provides adequate policies, procedures, and practices to protect employees from, and allow them to recognize, job-related safety and health hazards. The program shall include provisions for the identification, evaluation, prevention and control of general work site hazards, specific job hazards, and potential hazards that may arise from foreseeable construction methods and conditions, as well as providing a competent person to conduct frequent and regular inspections. Each employee (Contractor and subcontractors) must be instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment.
Vieques NWR La Chiva Restrooms Replacement Project Page 7 of 9
3. The Contractor shall provide barricades and warning devices as necessary to safeguard the public, workers, and government personnel. Where project work affects public roads, provide signage in accordance with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) as published by the US Department of Transportation, Federal Highway Administration.
4. Rollover protection and seat belts required by 29CFR 1926 (OSHA) shall be provided by the Contractor and extended to include equipment regardless of the year of manufacture.
E. Protections:
1. Comply with all applicable federal, state, and local environmental laws and regulations.
This condition applies to, but is not limited to, laws and regulations governing noise levels, air and water quality standards, erosion control, surface runoff, and cultural resources.
2. Provide erosion control methods (such as watering dry soils) and appurtenances (such as silt fence) as necessary to prevent wind-borne dust and water-borne silt from leaving the immediate work area.
3. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, immediately stop the work and notify the Construction Representative, COR, or Contracting Officer. The Contracting Officer will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resource Discovered During Construction) and other relevant laws are followed. Work will cease in the immediate vicinity until permitted to resume by written order from the Contracting Officer. Work in other areas may proceed as approved by the Contracting Officer.
4. Protect adjacent vegetation, property, structures, and improvements from damage.
5. Heavy equipment operated on FWS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise. Prior to operations, the Contractor and Contracting Officer will document condition of roads and parking. The Contractor is responsible for repairs of damage to roads and parking caused by their own actions.
6. Clearing limits and working limits will be as determined by Refuge Manager and COR and approved in the field. Do not remove any trees without prior COR field review and approval.
If no clearing limits are indicated, contact the COR for clarification. Coordinate with the local FWS staff to select a construction staging area. Construction equipment and operations shall be contained within the work limits and staging areas.
F. Closeout Procedures
1. Final Inspection: Submit a request in writing to the CO requesting the Final Inspection.
Notify the COR at least ten (10) calendar days prior to the anticipated date of completion of all Work. The COR will proceed with Final Inspection as promptly as practicable. The time required for such Final Inspection and for making any corrections as a result thereof shall be included in the contract performance time. The Contractor representative responsible for the work shall be present at the Final Inspection and shall submit a preliminary list of unfinished work prior to Final Inspection.
Vieques NWR La Chiva Restrooms Replacement Project Page 8 of 9
ATTACHMENTS
Vieques NWR La Chiva Restrooms Replacement Project Page 9 of 9
END OF STATEMENT OF WORK
PUERTO RICO – RESTROOM REHAB SOLICITATION NO. 140FHR24R0012
FWS
Section Title
Part I—The Schedule
A Solicitation/contract form
B Supplies or services and prices
C Description/specifications
D Packaging and marking
E Inspection and acceptance
F Deliveries or performance
G Contract administration data
H Special contract requirements
Part II—Contract Clauses
I Contract clauses
Part III—List of Documents, Exhibits, and Other Attachments
J List of documents, exhitibs, and other attachments
Part IV—Representations and Instructions
K Representations, certifications, and other statements of bidders
L Instructions, conditions, and notices to bidders
M Evaluation factors for award
SECTION B – SUPPLIES OR SERVICES AND PRICES
Name of Firm: _______________________________________________________________________
Address: ____________________________________________________________________________
City: __________________________________ State: ___________ Zip Code: __________________
UEI Number: ___________________________ CAGE Code: ___________________________
Name and Title of Firm’s Point of Contact: _________________________________________________
Phone Number: _________________________ Email Address: _________________________
This requirement is for one (1) Firm Fixed Price Construction contract for the removal and replacement of 2 damaged restroom buildings in Vieques, Puerto Rico.
Item no. Item Description Quantity Unit of
Measure Unit Price Total 0001 Demolish and Remove
Existing Wooden Compost Restrooms
1 Lump Sum
0002 Install 2 New PreCast Concrete Comfort Stations
1 Lump Sum
GRAND TOTAL $
NOTE:
Provide pricing and cost element break downs for each of the items listed above, down to the sub item level in the Scope of Work, in enough detail to allow adequate price analysis.
This could include, but is not limited to, labor, materials, equipment, competitive subcontractor quotes, overhead, bonding and profit.
(End of Section B)
SECTION C – DESCRIPTION/SPECIFICATIONS
The Contractor shall furnish all labor, materials, equipment, and supervision required for the location described in the statement of work or as shown in the contract drawings and specifications. See Attachment(s).
(End of Section C)
SECTION D – PACKAGING AND MARKING
D.1.0 PAYMENT OF POSTAGE AND FEES
All postage and fees related to submitting information, forms, reports, etc., to the CO or the COR shall be paid by the contractor.
D.2.0 MARKINGS
All information submitted to the Contracting Officer or the Contracting Officer’s Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.
(End of Section D)
SECTION E – INSPECTION AND ACCEPTANCE
The following clauses are incorporated by reference:
52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
52.246-13 INSPECTION – DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS
AUG 1996
(End of Section E)
SECTION F – DELIVERIES OR PERFORMANCE
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984
52.242-14 SUSPENSION OF WORK APR 1984
F.1.0 PERIOD OF PERFORMANCE
52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 90 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
F.2.0 PROGRESS PLAN
At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
(End of Section F)
SECTION G – CONTRACT ADMINISTRATION DATA
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
https://www.ipp.gov/
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice billed according to contract line items and rates.
2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.
3. If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
4. If final payment is billed, the last invoice shall state “FINAL”.
5. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause) (End of Section G) mailto:IPPCustomerSupport@fiscal.treasury.gov
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 WORK HOURS
Unless otherwise specified in Section C, Specifications, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be done on Saturday, Sunday, or Federal holidays unless authorized by the
COR.
H.2.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration.
H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, are discovered to be present in or adjacent to the project area.
H.3.0 DRAWINGS
H.3.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the COR.
H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5.0 SUBSTITUTION – PROCESSION OF WORK
Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the RFQ response. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.
H.6.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by his subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C.
1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.7.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.8.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:
• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
• USDA Biobased product listings published at www.biopreferred.gov.
• Energy Star® product listings published at www.energystar.gov/products.
• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements of the following clauses when applicable (See Clause section):
• 52.223-1 Biobased Product Certification
• 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts
• 52.223-4 Recovered Material Certification
• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
H.9.0 UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.10.0 DAVIS-BACON WAGE RATES APPLICABLE TO TRUCK DRIVERS
29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.
H.11.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
(End of clause) http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories
(End of Section H)
SECTION I – CONTRACT CLAUSES
52.252-2 – CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52)
Clause Title Date
52.202-1 DEFINITIONS JUN 2020
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT JUN 2020
52.203-7 ANTI-KICKBACK PROCEDURES JUN 2020
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY
MAY 2014
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS
JUN 2020
52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST JUN 2020
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS NOV 2023
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS
JAN 2017
52.204-1 APPROVAL OF CONTRACT DEC 1989
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS
JUN 2020
52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE OCT 2016
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-
DELIVERY CONTRACTS
OCT 2016
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG 2020
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS
DEC 2014
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS
NOV 2021
https://www.acquisition.gov/browse/index/far
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KAPERSKY LAB COVERED
ENTITIES
DEC 2023
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT
NOV 2021
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION JUN 2023
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,
OR PROPOSED FOR DEBARMENT
NOV 2021
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS
NOV 2015
52.215-2 AUDIT AND RECORDS—NEGOTIATION JUN 2020
52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT OCT 1997
52.216-7 ALLOWABLE COST AND PAYMENT--ALTERNATE I FEB 1997
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV 2020
52.219-7 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE NOV 2020
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS FEB 2024
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION FEB 2024
52.222-3 CONVICT LABOR JUN 2003
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS – OVERTIME
COMPENSATION
MAY 2018
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS AUG 2018
52.222-7 WITHHOLDING OF FUNDS MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS JUL 2021
52.222-9 APPRENTICES AND TRAINEES JUL 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS
AND RELATED REGULATIONS
MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015
52.222-26 EQUAL OPPORTUNITY SEP 2016
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION
APR 2015
52.222-35 EQUAL OPPORTUNITY FOR VETERANS JUN 2020
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES JUN 2020
52.222-37 EMPLOYMENT REPORTS ON VETERANS JUN 2020
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT
DEC 2010
52.222-50 COMBATING TRAFFICKING IN PERSONS NOV 2021
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION MAY 2022
52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE
ORDER 14026
JAN 2022
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 JAN 2022
52.223-5 POLLUTION PREVENTION & RIGHT-TO-KNOW INFORMATION MAY 2024
52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS
OCT 2022
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021
52.227-1 AUTHORIZATION AND CONSENT JUN 2020
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT
JUN 2020
52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-5 INSURANGE-WORK ON A GOVERNMENT INSTALLATION JAN 1997
52.228-11 INDIVIDUAL SURETY—PLEDGES OF ASSETS FEB 2021
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS DEC 2022
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION JUN 2020
52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB 2013
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-17 INTEREST MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD
MANAGEMENT
OCT 2018
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.232-40 PROVIDING ACCELERATED PAYMENT TO SMALL BUSNIESS
SUBCONTRACTORS
MAR 2023
52.233-1 DISPUTES MAY 2014
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984
52.236-2 DIFFERING SITE CONDITIONS APR 1984
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984
52.236-5 MATERIAL AND WORKMANSHIP APR 1984
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984
52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
52.236-8 OTHER CONTRACTS APR 1984
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
APR 1984
52.236-10 OPERATIONS AND STORAGE AREAS APR 1984
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984
52.236-12 CLEANING UP APR 1984
52.236-13 ACCIDENT PREVENTION NOV 1991
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES APR 1984
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997
52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995
52.242-13 BANKRUPTCY JUL 1995
52.243-4 CHANGES JUN 2007
52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES
FEB 2024
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.248-3 VALUE ENGINEERING—CONSTRUCTION OCT 2020
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE)--ALTERNATE I
SEP 1996
52.249-3 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS)
APR 2012
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION)--ALTERNATE I APR 1984
52.253-1 COMPUTER GENERATED FORMS JAN 1991
The following clauses are provided in full text:
52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec 2023). As prescribed in 4.2306(c).
(a) Definitions. As used in this clause—
Covered article, as defined in 41 U.S.C. 4713(k), means—
(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;
(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);
(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or
(4) Hardware, systems, devices, software, or services that include embedded or incidental information technology.
FASCSA order means any of the following orders issued under the Federal Acquisition Supply Chain Security Act (FASCSA) requiring the removal of covered articles from executive agency information systems or the exclusion of one or more named sources or named covered articles from executive agency procurement actions, as described in 41 CFR 201–1.303(d) and (e):
https://www.govinfo.gov/link/uscode/41/4713 https://www.govinfo.gov/link/uscode/40/11101 https://www.govinfo.gov/link/uscode/47/153 https://www.ecfr.gov/current/title-32/part-2002 https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(d) https://www.ecfr.gov/current/title-41/section-201-1.303#p-201-1.303(e)
(1) The Secretary of Homeland Security may issue FASCSA orders applicable to civilian agencies, to the extent not covered by paragraph (2) or (3) of this definition. This type of FASCSA order may be referred to as a Department of Homeland Security (DHS) FASCSA order.
(2) The Secretary of Defense may issue FASCSA orders applicable to the Department of Defense (DoD) and national security systems other than sensitive compartmented information systems. This type of FASCSA order may be referred to as a DoD FASCSA order.
(3) The Director of National Intelligence (DNI) may issue FASCSA orders applicable to the intelligence community and sensitive compartmented information systems, to the extent not covered by paragraph (2) of this definition.