Sol_140D0425Q0755.pdf
PDF 349 KB Posted
- Solicitation number
- 140D0425Q0755
About this file
This is a Request for Quote (RFQ) for concrete spalling repair work at the Stewart Lee Udall Building, Department of the Interior headquarters in Washington, DC. The solicitation is a total small business set-aside under NAICS code 238110 with a $19 million size standard, seeking a contractor to perform concrete repair and restoration in the building's garage areas. The project involves repairing concrete spalling in multiple parking spaces and ramp areas, including excavating damaged concrete, applying patching material, and repainting parking lines.
Key details include a solicitation number of 140D0425Q0755, issued on 08/24/2025, with quotes due by 09/04/2025 at 10:00 AM EST. The contract will be a firm fixed price (FFP) with a performance period of six months after award (approximately 09/12/2025 to 03/11/2026). The magnitude of construction is between $25,000 and $100,000. The government intends to evaluate quotes on a lowest price technically acceptable (LPTA) basis, with technical proposals limited to five pages and requiring a tentative project schedule. A site visit is scheduled for 08/27/2025 at 10:00 AM ET, with access requiring a Real ID.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140D0425Q0755_Amd_0005.pdf | ||
| Concrete_Spalling_Repair_Questions_0005.pdf | ||
| Sol_140D0425Q0755_Amd_0004.pdf | ||
| Sol_140D0425Q0755_Amd_0003.pdf | ||
| Sol_140D0425Q0755_Amd_0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Interior Business Center, AQD
Division 2 /Branch 3
381 Elden St Suite 2000A
D23
Herndon VA 20170
Xanthe Otterstedt 7039143719
108/24/2025
140D0425Q0755
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Contractor shall be responsible to provide all necessary construction alteration work located at the Stewart Lee Udall Building, HQ for the Department of the
Interior, 1849 C Street, NW, Washington DC 20240 in accordance with the Statement of
Work.
In accordance with FAR 36.204, the magnitude of construction is between $25,000 and
$100,000.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 181 calendar days and complete it within ________________ ________________ calendar days after receiving
09/04/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Xanthe Otterstedt
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140D0425Q0755
Period of Performance: 09/12/2025 to 03/11/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No.
140D0425Q0755
Document Title Stewart Lee Udall Building Concrete Spalling Page 4 of 36
REF: Solicitation 140D0425Q0755
(i) This is a Request for Quote (RFQ) for construction alteration work located at the Stewart Lee Udall Building, HQ for the Department of the Interior, 1849 C Street, NW, Washington DC 20240.
(ii) This requirement is a total small business set-aside under North American Industry Classification System (NAICS) Code 238110 Poured Concrete Foundation and Structure Contractors with a business size standard of $19 Million. Federal Supply Code (FSC): Z2AA, Repair or Alteration of Office Buildings. This solicitation is issued under Federal Acquisition Regulation (FAR) Part 13, Simplified Acquisition Procedures.
(iii) In accordance with FAR 36.204, the magnitude of construction is between $25,000 and $100,000.
(iv) This is a combined synopsis/solicitation. This announcement constitutes the only solicitation;
quotes are being requested and a separate written solicitation will not be issued. The Government will award a firm fixed price contract from this solicitation to the responsible vendor whose quote, conforming to the solicitation that will be most advantageous to the Government, price and other factors considered.
The Government intends to evaluate all timely quotes received from eligible vendors on a lowest price technically acceptable (LPTA) basis. The Government intends to evaluate quotations and award a contract without discussions with quoters. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Document Title Stewart Lee Udall Building Concrete Spalling Page 5 of 36
Section B - Supplies or Services and Prices/Costs
The following is the associated Contract Line Item Number (CLIN):
CLIN Description TYPE Quantity Amount
CLIN
00010 Concrete Spalling
FFP
(Firm Fixed
Price) 1 x job $
Total $
Sub description: The contractor shall furnish all required elements, including design, labor, materials, equipment, tools, supervision, and any other items necessary to complete the construction work Stewart Lee Udall Building, HQ for the Department of the Interior, 1849 C Street, NW. The construction alteration work is located in Washington DC 20240. Work shall be in strict compliance with the Statement of Work, all specifications, drawings/diagrams, terms, conditions, clauses, and all other provisions contained herein.
The contract price includes all applicable Federal, State, and local taxes and duties. It is the Contractor's responsibility to include in its price quote any other costs that may be required by the State of Indiana if the contractor intends to recover such costs under the contract. The Government will not modify the contract after award to compensate the contractor for any other specific Indiana costs that may not have been included in the award price.
Document Title Stewart Lee Udall Building Concrete Spalling Page 6 of 36
Section C – Description / Specifications / Statement of Work
Statement of Work (SOW) For
Garage Floor Concrete Spalling Repairs
Project Title: Garage Floor Concrete Spalling Repairs
Project Location: Stewart Lee Udall Building, HQ for the Department of the Interior, 1849 C Street, NW, Washington DC 20240
Project Overview The objective of this project is to rectify and restore the concrete spalling detected in the garage floor, specifically within the designated parking lot areas as described in the attachment.
This SOW outlines the specific tasks, materials, and expectations for the concrete flooring repair services.
Scope of Work
The scope of work includes the following tasks:
Site Assessment:
• Conducted a comprehensive inspection of the impacted areas (see attachment for spalling locations and estimated dimensions of the impacted area).
• Determined the extent of concrete spalling, including locations where rebar is exposed or exhibiting signs of corrosion.
• Submit an inspection report within 21 days of contract award.
Concrete Repair:
• Place safety barriers around the work area
• Excavate loose, spalling concrete and cut into existing concrete to establish an area to be patched.
• Apply a concrete patching material that meets or exceeds the required compressive strength of
4,000-5000 psi.
• Use repair mortar or repair concrete mix that is compatible with the existing concrete and can withstand similar environmental conditions.
• Ensure the repair material is properly applied to match the original surface profile and texture.
• Repaint parking lines, where necessary, to match existing.
Materials and Specifications
• Concrete Strength: The repair concrete must have a compressive strength of at least 4,000-5000 psi at 28 days.
• Corrosion Inhibitor: Any corrosion inhibitors used for rebar protection should meet industry standards for corrosion resistance, such as those outlined by ASTM A775/A775M for epoxy coatings or equivalent.
• Surface Preparation Equipment: Abrasive blast cleaning, wire brushing, or other approved methods shall be used to prepare the rebar and surrounding surfaces.
Project Deliverables
Document Title Stewart Lee Udall Building Concrete Spalling Page 7 of 36
• A detailed inspection report documenting the extent of the spalling damage and the planned repairs.
• A final inspection report, signed by both the contractor and the project manager, confirming completion of repairs to satisfaction.
• Identification of future/potential spalling locations that may require patching. Include drawings, photos, or spreadsheets that clearly identify the areas with an estimate of the square footage.
Schedule
• Following the initial inspection, the contractor shall provide a detailed schedule for repairing the identified areas. The schedule shall provide the location of the spalling to be repaired, the parking space(s) impacted during repairs, and an estimate for duration of the repairs for that location.
• All work shall be completed within the specified time frame, subject to delays due to unforeseen circumstances such as weather, material availability, or other conditions beyond the control of the contractor.
Performance Requirements
• All repairs must meet the applicable standards set forth by the American Concrete Institute (ACI), ASTM International, and local building codes.
• The contractor must employ experienced personnel who are familiar with concrete repair techniques and materials.
• The contractor will be required to provide a warranty for the repairs performed, with a minimum warranty period of 1 year for non-structural repairs covering defects in material and workmanship.
Safety Requirements
• The contractor shall comply with all federal, state, and local safety regulations, including
Occupational Safety and Health Administration (OSHA) standards.
• Proper signage, barricades, and safety equipment must be used to protect workers and building occupants from potential hazards during the repair process.
• A Safety Plan should be submitted for approval prior to the start of work.
Reporting and Communication
• The contractor shall provide weekly progress reports to the project manager, detailing completed work, issues encountered, and adjustments to the schedule or scope of work.
• A final report summarizing all repairs, including before-and-after photos, shall be submitted upon project completion.
Payment Terms
• A payment schedule and invoicing procedure will be provided by the project manager at the time of contract award.
Conclusion The contractor shall complete the concrete spalling repairs as outlined in this Statement of Work to restore the structural integrity and aesthetic appearance of the building. All repairs shall be completed according to the specifications and within the approved schedule.
Document Title Stewart Lee Udall Building Concrete Spalling Page 8 of 36
Attachment – Spalling Locations and Dimensions
Section D - Packaging and Marking
Amt. of Parking Spaces
Location Dimensions (in feet)
Notes
1 L.1.10 6 x 5 1 L.1.28 5 x 4 1 L.1.33 3 x 5 1 L.2.12 2.5 x 2 1 L.2.3 2 x 2 1 L.2.31 2.2 Lineal 1 L.3.40 3.3 Lineal 1 L.3.6 2.2 Lineal 1 L.4.4 5 x 3 1 L.5.1 9 x 1 1 L.5.2.3 1.4 Lineal 1 L.5.21 6 x 2 1 L.5.5 6.3 Lineal 1 L.53 6 x 4 1 L.7.2.1 2 x 3 1 L.8.23 1 x 4
1 M. 2.6B & M. 2.6A 6.5 x 4 1 M.2.9B & M. 2.9A 3.5 x 2.5 1 M.2.10A 3.5 x 2.5 1 M.2.9B 3.5 x 2.5 1 M.3.9 5.4 1 M.4.23 3 x 5 1 M.49 5.4 1 M.5.19 3.5 x 2.5
Ramps Ramp B - cobble area at the bottom of Ramp B 5 x 23 Reinforced concrete pavement to replace cobblestones Remp B - side of the compactor 20 x 2 Ramp B - side of compactor 10 x 3 Ramp B - between the colums - side of the compactor 10 x 3
Ramp B- front of ramp /side of compactor 15 x 3
Ramp B - small area at the botton of ramp 2 x 6
G Ramp (replace water retention) 1 x 19
2 S. 1.7 3.5 x 2.5
Total without Profit and Overhead
Profit Overhead
Total
26 Line Stripping: 26 parking spaces; approximately 45 linear ft. per parking space
Document Title Stewart Lee Udall Building Concrete Spalling Page 9 of 36
All required submittals shall be delivered to the Primary Contracting Officer’s Representative (COR) listed in Section G herein. All required submittals shall contain the following markings, if applicable:
1. Name and address of the contractor
2. Contract number
3. Description of item submitted
Document Title Stewart Lee Udall Building Concrete Spalling Page 10 of 36
Section E - Inspection and Acceptance
CLIN 00010
INSPECT AT: Destination
INSPECT BY: Government
ACCEPT AT: Destination
ACCEPT BY: Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)
CLAUSES INCORPORATED BY FULL TEXT
Pursuant to FAR 52.246-12, Inspection of Construction (AUG 1996), all work described in Section C of this solicitation, and its attachments, to be delivered under this contract are subject to final inspection and acceptance by an authorized representative of the government. The authorized representative of the government is the Primary COR listed in Section G of this contract.
Document Title Stewart Lee Udall Building Concrete Spalling Page 11 of 36
Section F - Deliveries or Performance
Place of Delivery: The construction repair will be completed at the location specified in the Statement of Work located in Washington DC 20240.
Customer Point of Contact(s) for construction:
Primary COR: TBD
Delivery Date: All construction work, including cleanup, shall be completed six months after contract award.
CLAUSES INCORPORATED BY REFERENCE
52.211-13 Time Extensions (SEPT 2000) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract immediately after contract award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than six months days after contract award.
(End of Clause)
Document Title Stewart Lee Udall Building Concrete Spalling Page 12 of 36
Section G - Contract Administration Data
Contract Administration Data. The Contracting Officer is responsible for the administration of this contract and, alone, is authorized to take actions on behalf of the Government that result in changes in the terms of the contract.
Contracting Officer: Xanthe Otterstedt Email: xanthe_otterstedt@ibc.doi.gov Phone: 703-914-3719
Other Relevant Points of Contract:
Primary COR: TBD
CLAUSES INCORPORATED BY FULL TEXT
DIAR 1432.903 RESPONSIBILITIES
The CO may modify the timing of payment specified in paragraph (a)(1)(i) and (ii) of the clause FAR 52.232-26, Prompt Payment for Fixed-Price Architect-Engineer Contracts, and/or paragraph (a)(1)(i) and
(ii) of the clause at FAR 52.232-27, Prompt Payment for Construction Contracts, as appropriate, to provide for a period shorter than 30 days (but not less than 7 days) for making contract financing payments based on geographical site location, workload, contractor ability to submit a proper request for payment, or other factors. When considering a modification to these FAR standard(s), the CO should alert the finance and program officials involved in the payment process to ensure that such shorter contract payment terms to be specified in the solicitation and resulting contract will be met. A CO determination justifying a shorter payment period must be documented in writing and incorporated into the solicitation/contract file.
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Invoices must include, as a minimum, the following information:
1. Contractor Name, Address, Contact Information
2. Invoice Date and Invoice Number
3. Contract Number
4. CLIN/Item number of deliverable
5. Description of Deliverable, Work, or Services Performed mailto:xanthe_otterstedt@ibc.doi.gov https://www.ipp.gov/
Document Title Stewart Lee Udall Building Concrete Spalling Page 13 of 36
6. Quantity and Firm Fixed Price of Deliverable
7. Date Deliverable was Provided to the Government for Inspection and Accepted
8. Period of Performance/Milestones Dates Applicable
The contractor is responsible for ensuring invoices submitted are accurate and complete.
Additional supporting documentation MAY BE REQUESTED at the discretion of the COR or CO.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
A Release of Claims is required IAW 1452.204-70 Release of Claims, after completion of work and prior to final payment.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause) mailto:IPPCustomerSupport@fiscal.treasury.gov
Document Title Stewart Lee Udall Building Concrete Spalling Page 14 of 36
Section H – Special Contract Requirements
Compliance with OSHA-Govt owned Facilities/Equipment
"Compliance with Occupational Safety and Health Act -- Government-Owned
Performance of work hereunder shall comply with the provisions of the Occupational Health and Safety Act of 1970, as amended (OSHA). If, at any time during the performance of this contract, the Government- furnished facilities and/or equipment do not conform to OSHA standards, the contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.
Accident Reporting
Accident Reporting - If an accident occurs on Government-controlled facilities, a report must be provided to the Contracting Officer's Representative and the Contracting Officer within 48 hours. An accident is defined as an event which causes injury, illness, or loss or damage to Government-owned or private property. The contractor will cooperate with any ensuing Government accident investigation.
List of subcontractors (Construction)
For purposes of monitoring compliance with the insurance and payroll reporting requirements of this contract, the contractor shall furnish a listing of all subcontractors to the Contracting Officer within 5 business days after contract award.
DOI CLAUSE – NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE
ASSESSMENT REPORTING SYSTEM (DEC 2015)
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the CPARS for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).
Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
Document Title Stewart Lee Udall Building Concrete Spalling Page 15 of 36
b. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in CPARS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Notice)
Document Title Stewart Lee Udall Building Concrete Spalling Page 16 of 36
Section I - Contract Clauses
The contractor must comply with the following FAR, DIAR, and local clauses that apply to this acquisition. This solicitation document and incorporated clauses are those in effect through FAC 2025-04, Effective 05/12/2025.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisiton.gov/
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management (NOV 2024) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-8 Order of Precedence--Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-14 Limitations on Subcontracting (OCT 2022) 52.219-28 Postaward Small Business Program Rerepresentation (JAN 2025) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination-Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.225-9 Buy American-Construction Materials (OCT 2022) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.229-3 Federal, State and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-16 Progress Payments (NOV 2021) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) https://www.acquisiton.gov/
Document Title Stewart Lee Udall Building Concrete Spalling Page 17 of 36
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.246-21 Warranty of Construction (MAR 1994) – Alternate I (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
DIAR CLAUSES INCORPORATED BY REFRENCE
1452.201-70 Authorities and Delegations (SEP 2011) 1452.203-70 Restrictions and Endorsements (JUL 1996) 1452.204-70 Release of Claims (JUL 1996)
CLAUSES INCORPORATED BY FULL TEXT
52.213-4 TERMS AND CONDITIONS – SIMPLIFIED ACQUISITIONS (OTHER THAN
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (JAN 2025)
(a)The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1)The clauses listed below implement provisions of law or Executive order:
(i)52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii)52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(iii)52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv)52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.
(v)52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (DEC 2023) (Pub. L. 115–390, title II).
(vi)52.222-3, Convict Labor (JUN 2003) (E.O.11755).
(ix)52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(x)52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR
2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(xi) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).
(xii)52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) ( Pub. L. 108-77 and
108-78 ( 19 U.S.C. 3805 note)).
(2)Listed below are additional clauses that apply:
https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3553&num=0&edition=prelim https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.govinfo.gov/link/plaw/108/public/77 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim
Document Title Stewart Lee Udall Building Concrete Spalling Page 18 of 36
(i)52.232-1, Payments (APR 1984).
(ii)52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii)52.232-11, Extras (APR 1984).
(iv)52.232-25, Prompt Payment (JAN 2017).
(v)52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi)52.233-1, Disputes (MAY 2014).
(vii)52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2025).
(viii) 52.253-1, Computer Generated Forms (JAN 1991).
(b)The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1)The clauses listed below implement provisions of law or Executive order:
(i)52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
(ii)52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(iii)52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2025) ( E.O.
13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).
(iv)52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) ( 41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(v)52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vi)52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vii)52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(viii)52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(ix) (A)52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and
E.O. 13627) (Applies to all solicitations and contracts).
(B)Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(x)52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, https://www.acquisition.gov/far/52.232-1#FAR_52_232_1 https://www.acquisition.gov/far/52.232-8#FAR_52_232_8 https://www.acquisition.gov/far/52.232-11#FAR_52_232_11 https://www.acquisition.gov/far/52.232-25#FAR_52_232_25 https://www.acquisition.gov/far/52.232-39#FAR_52_232_39 https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.244-6#FAR_52_244_6 https://www.acquisition.gov/far/52.253-1#FAR_52_253_1 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/4.1403#FAR_4_1403 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.222-20#FAR_52_222_20 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-chapter65&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/22.1408#FAR_22_1408 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-chapter67-front&num=0&edition=prelim https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41
Document Title Stewart Lee Udall Building Concrete Spalling Page 19 of 36
American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act ( 43 U.S.C. 1331, et seq.))).
(xi)52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xii)52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2024) ( 42 U.S.C.
11001-11050 and 13101-13109) (Applies to services performed on Federal facilities).
(xiii)52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products as prescribed at FAR 23.109(d)(1)).
(xiv)52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xv)52.223-20, Aerosols (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi)52.223-21, Foams (MAY 2024) ( 42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii)52.223-23, Sustainable Products and Services (MAY 2024) ( E.O. 14057, 7 U.S.C.
8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l) (Applies to contracts when the agency identifies in the statement of work, or elsewhere in the contract, the sustainable products and services that apply to the acquisition).
(xviii) (A)52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition-
(1)Is set aside for small business concerns; or (2)Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).
(B)Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end product in paragraph (a) of 52.225-1: (A) The cost of its components mined, produced, or manufactured in the United States exceeds ____ percent of the cost of all its components. [ Contracting officer to insert the percentage per instructions at 13.302-5(d)(4). ])
(xix)52.226-6, Promoting Excess Food Donation to Nonprofit Organizations., Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).
(xx)52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xxi)52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).
http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1331&num=0&edition=prelim https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.223-5#FAR_52_223_5 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11001&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section11001&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section13101&num=0&edition=prelim https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/23.109#FAR_23_109 https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/19.502-2#FAR_19_502_2 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/13.302-5#FAR_13_302_5 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6 https://www.acquisition.gov/far/26.404#FAR_26_404 https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34
Document Title Stewart Lee Udall Building Concrete Spalling Page 20 of 36
(xxii)52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118- 31, 41 U.S.C. 3901 note prec.).
(xxiii)52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305)(Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).
(xxiv)52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (JAN 2025) ( 49 U.S.C. 40118(g)). (Applies to contracts with a U.S.-flag carrier for the transportation by air of passengers; does not apply to contracts awarded by the Department of Defense or contracts for commercial products).
(2)Listed below are additional clauses that may apply:
(i)52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV
2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)
(ii)52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (JAN 2025) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).
(iii)52.211-17, Delivery of Excess Quantities (SEPT 1989) (Applies to fixed-price supplies).
(iv)52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).
(v)52.247-34, F.o.b. Destination (JAN 1991) (Applies to supplies if delivery is f.o.b.
destination).
(c)FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisiton.gov/
(d)Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights-
(1)Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2)Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e)Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f)Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .