Sol_140A1126R0012.pdf

PDF 578 KB Posted

Attached to
STOPLOG LIFTING BEAM MODIFICATION PROJECT - Colora
Solicitation number
140A1126R0012
Issued by

About this file

This is a Request for Proposal (RFP) for construction services issued by the Bureau of Indian Affairs for the Stoplog Lifting Beam Modification Project at Headgate Rock Dam in Parker, Arizona. The solicitation number is 140A1126R0012, issued on August 10, 2026, with proposals due by 5:00 PM local time on September 9, 2026. This is a competitive small business set-aside acquisition with a 22-page solicitation package. The contract is a firm fixed-price construction purchase order with a mandatory 365-day period of performance after issuance of the Notice to Proceed, which will be issued within 30 days of award. Questions must be submitted by 12:00 PM Pacific Time on August 31, 2026, to Contract Specialist Melanie Schiaveto at melanie.schiaveto@bia.gov.

The scope of work requires modification of a steel stoplog lifting beam and includes two primary line items: Item 101 (Lifting Beam End Guide Modifications and Transport) and Item 102 (Facilitate Final Test), each priced as lump sum (LS) deliverables. Offerors must include TERO fees at 3.5% and bonding costs in their pricing. The contractor must furnish all necessary personnel, supervision, materials, equipment, and services to complete the modifications in compliance with specifications listed in Attachment 1. Performance and payment bonds are required at 100% of the original contract price; a bid bond (SF24) at 20% is also mandatory. Offerors must be registered in the System for Award Management (SAM), submit representations and certifications per FAR 52.204-8, and comply with tribal employment rights ordinances and applicable federal, state, and local taxes. Proposals will be evaluated using a Lowest Price Technically Acceptable process, with award made to the lowest-priced proposal meeting minimum technical standards addressing technical approach, key personnel qualifications, project schedule, and quality control plans.

View the file

Other files

File Type Posted
A3_LiftingBeamMods_DemoDrawings_FINAL.pdf PDF
SF-24_Bid_Bond_Form.pdf PDF
SF-25A_Payment_Bond_Form.pdf PDF
DOL_-_AZ20260052_5_18_26.pdf PDF
B09__Questions_and_Answers_Log.xlsx XLSX spreadsheet
LiftingBeamMods_Specs_Final.pdf PDF
SF-25_Performance_Bond_Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140A1126R0012

BIA WRO 00011

2600 N CENTRAL AVENUE

Contracting Office

SUITE 400 MAILROOM

Phoenix AZ 85004

Bureau of Indian Affairs 2600 N Central Avenue Phoenix, AZ 85004

A11

Melanie Schiaveto 4807444870

08/10/2026

09/09/2026

10 365

This information is provided for the following project: STOPLOG LIFTING BEAM MODIFICATION PROJECT -

Colorado River Agency

1. This is a competitive small business set-aside acquisition. All responsible small businesses may submit a proposal for consideration in accordance with these and other terms and conditions of the solicitation. Offerors are required to submit a completed Section K - Representations, Certifications, and Other Statements of Offerors or Respondents.

2. Questions and Answers: Any questions relating to this solicitation shall be submitted to the Contract

Specialist (melanie.schiaveto@bia.gov) no later than 12:00pm PD on Monday, August 31st, 2026.

3. Notice to Proceed (NTP): The NTP will be issued within 30 calendar days of contract award. Pending the acceptance of all required bonding and insurance.

4. Period of Performance: Three hundred sixty-five (365) calendar days after issuance of NTP.

Continued...

1 22

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

BIA WRO 00011

2600 N CENTRAL AVENUE

Contracting Office

SUITE 400 MAILROOM

Phoenix AZ 85004

A11

Renee Holly

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140A1126R0012

5. Special attention is called to FAR Clause

52.236-7, Permits and Responsibilities and FAR

Clause 52.229-3, Federal, State, and Local

Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal.

Contractor is responsible for contacting the appropriate TERO office for coordination and approvals.

6. Point of Contact: Melanie Schiaveto at melanie.schiaveto@bia.gov (Contract

Specialist).

7. On-site Access: Site Visits shall be scheduled at the Government's discretion. A list of personnel, with all pertinent information shall be submitted to the CS and

CO.

00010 Modify Steel Stoplog Lifting Beam

Product/Service Code: K095

Product/Service Description: MODIFICATION OF

EQUIPMENT- METAL BARS, SHEETS, AND SHAPES

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 4 of 22

SECTION B – CONTRACT SCHEDULE

B.1 SCHEDULE OF ITEMS:

Propose your best prices projects in accordance with the attached Statement of Work (SOW). Price proposals should be submitted following the price schedule/format below.

In accordance with FAR 52.212-4(k) Taxes, the contract price includes all applicable Federal, State, and local taxes and duties.

Provide a price for all unit items in the pricing schedule. The total bid price will be the basis for comparing bids and determining the low bidder.

Bidders are responsible for determining applicable TERO fees and for complying with the CRIT TERO Ordinance. The successful Bidder is responsible for prompt payment of all applicable TERO fees.

Item No.[5] Description Est.

Quantity Unit Unit Price Bid Amount

101 Lifting Beam End Guide Modifications and Transport 1 LS $

102 Facilitate Final Test 1 LS $

TERO fees associated with this pricing schedule 3.5% $

Bonding $

TOTAL BID PRICE $

[1] Refer to specification Section 01 29 00 – Payment Procedures for complete descriptions of each bid item.

B.2 PAYMENT FOR BOND PREMIUMS:

Payment for bond premiums, in accordance with FAR Clause 52.232-5, Payments Under Fixed- Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under separate line item.

SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT:

The contractor shall furnish all necessary personnel, supervision, materials, equipment, services and facilities (except as otherwise specified) to perform the Stoplog Lifting Beam Modifications at Headgate Rock Dam in Parker, AZ in the accordance with the Statement of Work or Specifications (attachments to the Statement of Work/ Specifications are listed in Section J and are hereby made part of this solicitation and any resultant contract).

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 5 of 22

C.2 PROJECT LOCATION: Headgate Rock Dam - Headgate Rock Dam is accessed by turning north off of Riverside Drive (Highway 95) in Parker, AZ, onto West 4th Street. West 4th Street is located on the east end of Parker, AZ. At the end of West 4th Street. Access to the Dam and project site can be granted by the BIA Colorado River Agency Branch of Electrical Services

C.4 TECHNICAL SPECIFICATIONS:

All Project Specifications and Requirements are listed in Attachment 1

SECTION D: PACKAGING AND MARKING

a. All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Bureau of Indian Education. Preservation, packaging and packing shall be in accordance with standard practice for commercial packaging.

b. Materials provided by the Contractor shall be new and, where appropriate, shall arrive on-site in original containers sealed by the manufacturer. The Government reserves the right to refuse any materials not deemed adequate.

c. Materials damaged by equipment, water, or dirt are not acceptable.

d. Materials shall be stored in a manner acceptable to the manufacturer. Storage requirements include protection from rain, etc. The Contractor shall provide adequate storage; the Government may provide storage if interference with Government operations do not occur. This will be coordinated with the Government prior to mobilization. Manufacturer's requirements shall be strictly adhered to.

SECTION E: INSPECTION AND ACCEPTANCE

52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far

Clause Title Date 52.246-12 Inspection of Construction AUG 1996

SECTION F: DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far

Clause Title Date 52.211-13 Time Extensions SEP 2000 https://www.acquisition.gov/far

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 6 of 22

52.211-18 Variation in Estimated Quantity APR 1984 52.242-14 Suspension of Work APR 1984

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK APR 1984

The Contractor shall be required to (a) commence work under this contract within ten 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days after NTP. The time stated for completion shall include final cleanup of the premises.

SECTION G: CONTRACT ADMINISTRATION DATA

G.1 POST AWARD CONFERENCE:

A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held virtually via Microsoft Teams and further information will be provided after award.

G.2 CONTRACT ADMINISTRATION- GOVERNMENT:

All administrative questions shall be directed to: Melanie Schiaveto, Contract Specialist at Melanie.Schiaveto@bia.gov ; copy to Renee Holly, Contracting Officer – Email:

Renee.Holly@bia.gov

G.3 CONTRACT ADMINISTRATION- CONTRACTOR:

Designate a person whom the Government may contact during the period of the contract for prompt action on matters pertaining to the administration of the contract. Authorized Administrator is:

Company Name POC Name POC Email Company Address POC Phone #

G.4 CONTRACTING OFFICER:

The Contracting Officer means a person who is the principal individual and responsible representative of the Government with the authority to enter into, administer and/or terminate contracts and make related determinations and findings pertaining to the contract. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to the contract.

G.5 CONTRACTING OFFICER'S REPRESENTATIVE:

a. The Contracting Officer shall designate a Contracting Officer's Representative (COR) who will represent the Contracting Officer in the technical phase of the work. The COR's duties, mailto:Melanie.Schiaveto@bia.gov mailto:Renee.Holly@bia.gov

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 7 of 22 responsibilities, and limitations of authority will be set forth in a written COR designation letter.

A copy of the COR designation letter will be made available to the Contractor.

b. The COR is not authorized to make any changes to the terms and conditions of this contract.

Only the Contracting Officer is authorized to make any changes to the contract by a properly written signed modification to the contract.

c. The Contracting Officer is the only official who can legally commit or obligate the Government for expenditure of public funds.

G.6 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011

a. The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

b. The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

c. The COR is not authorized to perform, formally or informally, any of the following actions:

a. Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

b. Waive or agree to modification of the delivery schedule;

c. Make any final decision on any contract matter subject to the Disputes Clause;

d. Terminate, for any reason, the Contractor's right to proceed;

e. Obligate in any way, the payment of money by the Government.

d. The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

e. The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

f. The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

g. Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.7 INVOICE AND PAYMENT:

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 8 of 22

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: Refer to FAR 52.232-5 Payments under FP Construction Contracts, FAR 52.232-16 Progress Payments, and FAR 52-232-27 Prompt Payment for Construction Contracts. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer when submitting their quote.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 TRIBAL TAXES AND/OR TERO FEE REQUIREMENTS:

a. Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tribe, or tribal organization involved, regarding any requirements pertaining to tribal taxes and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's bid.

b. Offerors are also responsible for contacting the tribe’s Tribal Employment Rights Ordinance/Office (TERO) to obtain information on applicable TERO requirements or fees.

FAQ’s about TERO can be found at councilfortribalemploymentrights.org/tero-faq.

H.2 CONTRACTOR SAFETY PROGRAM REQUIREMENTS:

In accordance with FAR 52.236-13, Accident Prevention - Alternate I, a. Safety Program Submittal: Prior to commencement of work, submit the written plan for implementing this clause to: Melanie.Schiaveto@bia.gov, The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards.

b. Pre-Construction Safety Meeting: Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 9 of 22

H.3 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT:

In accordance with FAR 52.236-21, Specifications and Drawings for Construction, all designs, drawings, specifications, or other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.

H.4 CONTRACTOR SECURITY REQUIREMENTS:

At the Pre-construction Conference (and prior to beginning work on the contract), the Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer (note: after award, an SF1413 is required to be completed and returned to the Contracting Officer for each subcontract entered into). The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to a facility. Contractor personnel will be restricted to designated working areas and any personnel violating this policy may lose access to the facility. Contractor personnel shall have photo identification at all times while working on BIA facilities. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, etc...) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. Otherwise, access to a facility may be denied.

H.5 EXISTING UTILITIES:

Utility locations when shown are approximate. The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

H.6 BONDING REQUIREMENTS:

a. Bid Bond (use SF24) – Bid bond shall be 20% of the original contract price.

b. Performance Bond (use SF25) – Performance bond shall be 100% of the original contract price.

c. Payment Bond (use SF25A) – Payment bond shall be 100% of the original contract price.

d. Individual Surety – The bidders shall comply with FAR Clause 52.228-11, Pledge of Assets.

e. Third Party Indemnification Agreements. Furnish a copy of any indemnification agreements that was entered into in order to secure the bonds required by this solicitation by the time set the RFQ closes. If an indemnification agreement was not requirement to obtain the required bonds, an affidavit to that effect shall be provided by the surety along with the bid bond. Failure to furnish a copy of the required indemnification agreement or the surety’s affidavit may cause the quote to be rejected.

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 10 of 22

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

https://www.acquisition.gov/far and https://www.acquisition.gov/diar

52.203-7 Anti-Kickback Procedures JUN 2020 52.203-17 Contractor Employee Whistleblower Rights NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements and

Statements

JAN 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities

DEC 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial

Products and Commercial Services)

NOV 2024

52.215-8 Order Precedence – Uniform Contract Format OCT 1997 52.219-14 Limitations on Subcontracting OCT 2022 52.222-1 Notice to the Government of Labor Disputes FEB 1997 52.222-3 Convict Labor JUNE 2003 52.222-4 Contract Work Hours and Safety Standards-Overtime Compensation MAY 2018 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related

Regulations

MAY 2014

52-222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) AUG 2018 52.222-34 Notice of Requirement for Project Labor Agreement, Alternate I (JAN 2024) JAN 2024 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 11 of 22

52.222-40 Notification of Employee Rights Under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.222-55 Minimum Wages Under Executive Order 14026 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts MAY 2024 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.223-11 Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons

MAY 2024

52.232-33 Payment by Electronic Funds Transfer–System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes and Alternate I (DEC1991) MAY 2014 52.233-3 Protest after Award AUG 1996 52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements

APR 1984

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

MAY 2024

52.223-20 Aerosols MAY 2024 52.223-21 Foams JUN 2016 52.225-9 Buy American – Construction Materials, Alternate I (MAY 2014) OCT 2022 52.225-13 Restriction on Certain Foreign Purchases FEB 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises JUNE 2000 52.226-7 Drug-Free Workplace MAY 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

MAY 2024

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-1 Bid Guarantee SEP 1996 52.228-2 Additional Bond Security OCT 1997 52.228-11 Individual Surety – Pledges of Assets FEB 2021 52.228-12 Prospective Subcontractor Request for Bonds DEC 2022 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds-Construction JUN 2020 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payment NOV 2021 52.232-17 Interest MAY 2014 52.232-23 Assignment of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer–System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.236-10 Operations and Storage Areas APR 1984

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 12 of 22

52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction and Alt I applies FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-17 Government Delay of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services NOV 2024 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements AUG 1996 52.246-21 Warranty of Construction and Alternate I MAR 1994 52.246-26 Reporting of Nonconforming Items AUG 2024 52.249-1 Termination for Convenience of the Government (Fixed Price) (Short Form) and

Alternate I

APR 1984

52.249-10 Default (Fixed-Price Construction) and Alternate I applies APR 1984 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 1452.203-70 Restriction on Endorsements JUL 1996 1452.236-70 Prohibition Against Use of Lead-based Paint JUL 1996

I.2 FAR AND DIAR CLAUSES INCORPORATED BY FULL TEXT

FAR 52.204-1 APPROVAL OF CONTRACT DEC 1989

This contract is subject to the written approval of the Contracting Officer and shall not be binding until so approved.

DIAR 1452.204-7 RELEASE OF CLAIMS JUL 1996

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

SECTION J – LIST OF ATTACHMENTS

1. Statement of Work 29 Pages

2. Drawings 4 Pages

3. IA Form 3000v2 Material Approval Submittal 2 Pages

4. DOL Wage Determination AZ20260052 5 Pages

5. Standard Form 24 Bid Bond 2 Pages

6. Standard Form 25 Performance Bond Form 2 Pages

7. Standard Form 25A Payment Bond Form 2 Pages

8. Questions & Answers Log 1 Pages

SECTION K: REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 13 of 22

K.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE FEB 1998

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment

NOV 2021

52.211-6 Brand Name or Equal AUG 1999 52.236-28 Preparation of Proposals-Construction OCT 1997

K.2 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS JAN 2025

(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 238120. (2) The small business size standard is $19.0m. (3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519 if the acquisition— (i) Is set aside for small business and has a value above the simplified acquisition threshold; (ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or (iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies. (2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

(i) □ Paragraph (d) applies.

(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless– (A) The acquisition is to be made under the simplified acquisition procedures in part 13; (B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or (C) The solicitation is for utility services for which rates https://www.acquisition.gov/diar

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 14 of 22 are set by law or regulation. (ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000. (iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements- Representation. This provision applies to all solicitations. (iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management. (v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that- (A) Are not set aside for small business concerns; (B) Exceed the simplified acquisition threshold; and (C) Are for contracts that will be performed in the United States or its outlying areas. (vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations. (vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation. (viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold. (ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations. (x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government. (xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government. (xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii). (A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard. (B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard. (C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned. (xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii). (xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity. (xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity. (xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services. (xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA– designated items. (xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the provision at 52.204-7. (xx) 52.225-2, Buy American Certificate.

This provision applies to solicitations containing the clause at 52.225-1. (xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.)

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 15 of 22

This provision applies to solicitations containing the clause at 52.225-3. (A) If the acquisition value is less than $50,000, the basic provision applies. (B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies. (C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5. (xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan-Certification. This provision applies to all solicitations. (xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications. This provision applies to all solicitations. (xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions. (2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.] __ (i) 52.204-17, Ownership or Control of Offeror.

__ (ii) 52.204-20, Predecessor of Offeror.

__ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

__ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Certification.

__ (v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services- Certification.

__ (vi) 52.227-6, Royalty Information.

__ (A) Basic.

__ (B) Alternate I.

__ (vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically in SAM website accessed through https://www.sam.gov. After reviewing the SAM information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 16 of 22

(End of provision)

FAR 52.204-29 Federal Acquisition Supply Chain Security Act Orders— Representation and Disclosures DEC 2023

(a) Definitions. As used in this provision, Covered article, FASCSA order, Intelligence community, National security system, Reasonable inquiry, Sensitive compartmented information, Sensitive compartmented information system, and Source have the meaning provided in the clause 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition.

(b) Prohibition. Contractors are prohibited from providing or using as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the prohibition is set out in an applicable Federal Acquisition Supply Chain Security Act (FASCSA) order, as described in paragraph (b)(1) of FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition.

(c) Procedures. (1) The Offeror shall search for the phrase “FASCSA order” in the System for Award Management (SAM)(https://www.sam.gov) for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (b)(1) of FAR 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (2) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM, but are effective and do apply to the solicitation and resultant contract (see FAR 4.2303(c)(2)). (3) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.

(d) Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph (e).

(e) Disclosures. The purpose for this disclosure is so the Government may decide whether to issue a waiver. For any covered article, or any products or services produced or provided by a source, if the covered article or the source is subject to an applicable FASCSA order, and the Offeror is unable to represent compliance, then the Offeror shall provide the following information as part of the offer:

(1) Name of the product or service provided to the Government;

(2) Name of the covered article or source subject to a FASCSA order;

(3) If applicable, name of the vendor, including the Commercial and Government Entity code and unique entity identifier (if known), that supplied the covered article or the product or service to the Offeror;

(4) Brand;

(5) Model number (original equipment manufacturer number, manufacturer part number, or wholesaler number);

(6) Item description;

(7) Reason why the applicable covered article or the product or service is being provided or used;

(f) Executive agency review of disclosures. The contracting officer will review disclosures provided in paragraph (e) to determine if

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 17 of 22 any waiver may be sought. A contracting officer may choose not to pursue a waiver for covered articles or sources otherwise subject to a FASCSA order and may instead make an award to an offeror that does not require a waiver.

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L.1 INSTRUCTION TO OFFERORS:

a. The Offeror is advised that an award may be made without discussion, exchanges, or any contact concerning the offer received. Therefore, offerors should present their best and final price at time of proposal submission. The Offeror should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their price proposal after submission.

Work is all inclusive for complete and useable systems and price proposals must contain all associated costs.

b. The offeror must take into consideration any amendments, addendums to the plans and specifications, and acknowledge in block 19 on the Standard Form 1442 - Solicitation, Offer, and Award.

c. The solicitation requires a proposal of ALL line items; failure to do so may result in the proposal being rejected without further consideration. If a proposal on an item won’t be provided, offerors should insert the words "no proposal" in the space provided for any item on which no price is submitted.

d. See Section K & Attachment A: Per DIAR 1452.280-2(c) and (d), provide- (1) description of the required percentage of the work/costs to be provided by the offeror over the contract term (2) key personnel qualifications and (3) required assurance (that offeror is and will remain in compliance). Failure to provide the information required may cause the offer to be considered non-responsive & rejected (note: a written response is required; you may use Attachment A or return in your own format)

e. See Section K & Attachment B: Complete & return DIAR 1452.280-4

L.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

FEB 1998

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

52.204-7 System for Award Management Maintenance Oct 2018 52.204-16 Commercial and Government Entity Code Maintenance Aug 2020 52.204-22 Alternative Line Item Proposal Jan 2017 52.215-1 Instructions to Offerors – Competitive Acquisition Nov 2021 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work MAY 2014 https://www.acquisition.gov/diar

Sol No: 140A1126R0012 STOPLOG LIFTING BEAM MODIFICATION PROJECT Page 18 of 22

52.222-23

Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction

FEB 1999

52.222-33 Notice of Requirement for Project Labor Agreement, Alternate III JAN 2024 52.225-10 Notice of Buy American Act Requirement – Construction Materials MAY 2014 52.228-1

Bid Guarantee SEP 1996

52.228-17 Individual Surety—Pledge of Assets (Bid Guarantee) FEB 2021

L.3 FAR 52.216-1 TYPE OF CONTRACT APR 1984

The Government contemplates awarding a SINGLE firm fixed-price construction purchase order resulting from this solicitation.

L.4 FAR 52.236-27 SITE VISIT (CONSTRUCTION) FEB 1995

a. The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

b. An organized site visit has been schedule for- April 29, 2025, at 11am MDT/10am MST.

c. Participants will meet at the Administration Building.

L.5 ADDENDA TO 52.215-1, PARAGRAPH C – SUBMISSION OF PROPOSALS

a. Contact the Contracting Officer by phone/email if you do not understand any part of the instructions.

b. Submit proposal via email to: Melanie.Schiaveto@bia.gov

c. Offeror must be actively registered at https://www.sam.gov in order for an offer to be considered.

d. An offeror’s proposal must consist of two separate volumes:

Volume Section/Title Copies Size Limit I

Price Proposal 1 Copy- Emailed N/A

II Technical Proposal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .