SOI - SF Water System Upgrades.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Water System Upgrades Santa Fe National Forest
- Solicitation number
- 127EAX25R0021
- Issued by
-
Department of Agriculture Forest Service
About this file
This Schedule of Items (SOI) details water system upgrades for the USDA Forest Service's Santa Fe National Forest under the Great American Outdoors Act (GAOA), covering three distinct locations: Jacks Creek Campground, Panchuela Administrative Site, and Field Tract Campground. The comprehensive project includes demolition of existing infrastructure, trenching, water line installations using 2" and 1" HDPE piping, installation of yard hydrants, curb shutoff valves, pump house buildings, underground electrical lines, water system disinfection, and development of an operations and maintenance plan.
The project involves specific quantities across each site, such as 9,700 linear feet of 2" water lines and 2,130 linear feet of 1" water lines at Jacks Creek, 600 linear feet of 2" and 210 linear feet of 1" water lines at Panchuela, and minimal water line work at Field Tract. Each location requires a pump house building with a 1,700-gallon water tank, associated electrical and plumbing accessories, and complete mobilization. The solicitation (No. 127EAX25R0021) indicates a site visit on 10-15-2025 at the Pecos Las Vegas Ranger Station, with interested parties required to reserve participation by 10-13-2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX25R0021 0002.pdf | ||
| Important Notice to Contractors.docx | DOCX document | |
| 127EAX25R0021 0001.pdf | ||
| 127EAX25R0021 Santa Fe Water System Upgrades QA1.docx | DOCX document | |
| 127EAX25R0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| USDA Forest Service - Santa Fe National Forest |
| GAOA - Santa Fe Water System Upgrades |
| Schedule of Items |
| Jacks Creek Campground | ||||||
| Item No. | Description | Unit | Qty | Meathod of Measurement | Unit Price | Amount |
| 02419(01) | Demolition of Yard Hydrants & Concrete Bases | Each | 11 | DQ | ||
| 02419(03) | Removal of Contaminated soil under water line road crossings, storage in earthen swales lined with 4 mil HDPE liner, then backfilling into trench after water lines are placed. | Each | 11 | DQ | ||
| 10168(01) | Pump House Building (170 sq. ft.) and Related Items. Includes all electrical & plumbing accessories in the building such as 1,700 gallon water tank, piping, valves, spigots, drain line, pressure tank, booster pump, chlorination system, level controls, radio control, electrical panel and wiring, & misc. Also includes Service Road and bollards. | LS | 1 | DQ | ||
| 10168(02) | Trenching & Underground Electrical Lines | LF | 50 | DQ | ||
| 02500(01) | Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 9,700 | DQ | ||
| 02500(02) | Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 2,130 | DQ | ||
| 02500(03) | Curb Shutoff Valve: 1" | Each | 19 | DQ | ||
| 02500(04) | Curb Shutoff Valve: 2" | Each | 4 | DQ | ||
| 02500(05) | Combination Air Valve | Each | 4 | DQ | ||
| 02500(06) | Check Valve | Each | 1 | DQ | ||
| 02500(07) | Yard Hydrants on Concrete Pads | Each | 9 | DQ | ||
| 02500(08) | Water Systems Disinfection | Each | 1 | DQ | ||
| 02500(09) | Operation & Maintenance Plan | Each | 1 | DQ | ||
| 01601(01) | Mobilization | LS | 1 | DQ | ||
| JACKS CREEK SUBTOTAL | Subtotal |
| Panchuela Admin Site | ||||||
| Item No. | Description | Unit | Qty | Meathod of Measurement | Unit Price | Amount |
| 02419(01) | Demolition of Yard Hydrants & Concrete Bases | Each | 4 | DQ | ||
| 02500(01) | Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 600 | DQ | ||
| 02500(02) | Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 210 | DQ | ||
| 02500(03) | Curb Shutoff Valve: 1" | Each | 6 | DQ | ||
| 02500(04) | Curb Shutoff Valve: 2" | Each | 1 | DQ | ||
| 02500(07) | Yard Hydrants on Concrete Pads | Each | 2 | DQ | ||
| 02500(08) | Water Systems Disinfection | Each | 1 | DQ | ||
| 02500(09) | Operation & Maintenance Plan | Each | 1 | DQ | ||
| 01601(01) | Mobilization | LS | 1 | DQ | ||
| PANCHUELA SUBTOTAL | Subtotal |
| Field Tract Campground | ||||||
| Item No. | Description | Unit | Qty | Meathod of Measurement | Unit Price | Amount |
| 02419(01) | Demolition of Yard Hydrants & Concrete Bases | Each | 1 | DQ | ||
| 02419(02) | Demolition of Well House & Foundation (64 sq. ft.), Installation of Pitless Adapter, and Backfill of Pit | LS | 1 | DQ | ||
| 10168(01) | Pump House Building (170 sq. ft.) and Related Items. Includes all electrical & plumbing accessories in the building such as 1,700 gallon water tank, piping, valves, spigots, drain line, pressure tank, booster pump, chlorination system, level controls, radio control, electrical panel and wiring, & misc. Also includes Service Road and bollards. | LS | 1 | DQ | ||
| 10168(02) | Trenching & Underground Electrical Lines | LF | 200 | DQ | ||
| 02500(01) | Trenching & Water Lines, 2" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 20 | DQ | ||
| 02500(02) | Trenching & Water Lines, 1" HDPE. Includes fittings, thrust blocks, and other accessories. | LF | 20 | DQ | ||
| 02500(03) | Curb Shutoff Valve: 1" | Each | 2 | DQ | ||
| 02500(04) | Curb Shutoff Valve: 2" | Each | 1 | DQ | ||
| 02500(07) | Yard Hydrants on Concrete Pads | Each | 1 | DQ | ||
| 02500(08) | Water Systems Disinfection | Each | 1 | DQ | ||
| 02500(09) | Operation & Maintenance Plan | Each | 1 | DQ | ||
| 01601(01) | Mobilization | LS | 1 | DQ | ||
| FIELD TRACT SUBTOTAL | Subtotal |
PROJECT TOTAL