PAY ITEM DESCRIPTION PAY UNIT EST. # OF

PAY UNITS Unit Price TOTAL PRICE

Toilet #1 Removal: Includes all materials, equipment, and labor to pump and remove the existing toilet structure and vault. Includes hauling of debris off site.

Lump Sum 1 $ - $ -

Toilet #3 Removal: Includes all materials, equipment, and labor to pump and remove the existing toilet structure and vault. Includes hauling of debris off site.

Lump Sum 1 $ - $ -

Toilet #1 Install – Includes all materials, equipment, and labor to construct a new double stick-built toilet in the same location as the removed toilet #1. Includes seeding disturbed areas.

Lump Sum 1 $ - $ -

Toilet #3 Install – Includes all materials, equipment, and labor to construct a new double stick-built toilet in the same location as the removed toilet #3. Includes seeding disturbed areas.

Lump Sum 1 $ - $ -

ADA Pathway - Includes all materials, equipment, and labor to prepare the site, supply, and install ADA accessible aggregate pathways for the three toilets.

Includes seeding disturbed areas.

LF 50 $ - $ -

Schedule of Items Willow Creek Campground Toilet Replacement

TOTAL CONTRACT AMOUNT:

TOTAL OPTIONAL PAY ITEMS AMOUNT:

TOTAL BASE PAY ITEMS AMOUNT:

OPTIONAL BID ITEMS

Engineer Estimate