This document is a Scope of Work (SOW) for a fiber build project between the Maryland State Highway Administration (SHA) and the MDBC manhole. The contractor shall install approximately 1,300 feet of 1" HDPE conduit from the MDBC manhole to the SHA shop building, including core drilling and sealing the connection. They shall install 3 new manholes along the approximate 1,450 feet of 24 count single mode outdoor rated fiber with trace wire from the MDBC manhole to the computer room in the SHA building. The contractor shall terminate all 24 fibers in the SHA computer room and the MDBC shelter, using SC connectors. The contractor will be responsible for obtaining any required permits and will have access to the SHA shop building per coordination with the SHA point of contact.

The contract opportunity requires the contractor to provide these fiber connection services to the SHA. There is no mention of pricing terms, set asides, incumbents, funding requirements, or other salient financial information in the provided documents.

View the file

Other files

File Type Posted
Snow Hill Fiber Build - PORFP J01P2600052 (003).pdf PDF
Amendment snow hill date.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHA – Snow Hill Shop Fiber Build J01B2600030

1. Contractor shall install approximately 1300 feet of 1 ¼” HDPE conduit from the MDBC manhole to the SHA shop building. Contractor shall core drill into MDBC manhole and seal connection.

Yellow path below is approximate path.

2. Contractor shall install 3 new manholes. One at the end of the island, one at the SHA fence, and a last one outside the building.

SHA – Snow Hill Shop Fiber Build J01B2600030

3. Contractor shall install approximately 1450 feet of 24 count single mode outdoor rated fiber with trace wire entire path from MDBC manhole to the computer room in SHA.

4. Contractor shall terminate all 24 fibers in the SHA computer room.

5. Contractor shall supply and install approximately 100 feet of plenum rated inner duct inside the SHA from the computer room to the end of the SHA building.

6. penetration. All wall penetrations will have to be repaired and fireproofed.

7. Contractor shall connect inner duct from inside of building to 1.5” ridge conduit to be mounted to the outside along the wall.

8. Rigid pipe shall connect to underground build to connect to the SHA.

9. Contractor shall terminate all 24 fibers in the MDBC shelter.

10. All fiber panels shall be SC connectors.

11. Fiber panels shall be preloaded with pig tails and fusion spliced to new cable.

12. Contractor shall test all 24 fibers going from MDBC manhole to SHA.

13. Contractor will be responsible for obtaining any required permits.

14. Contractor will have access to the SHA Shop building per coordination with the agency point of contact Kenny Bishop. Email: