Snow Hill Fiber Build - PORFP J01P2600052 (003).pdf
PDF 139 KB Posted
- Attached to
- SHA Snow Hill Shop Fiber Build
- Solicitation number
- BPM028603
- Issued by
- Maryland
About this file
This document is a Purchase Order Request for Proposals (PORFP) for the Cable and Wiring Materials and Services Master Contract 060B6400046 issued by the Maryland Department of Transportation (MDOT) Office of Procurement. The PORFP seeks proposals from Master Contractors to provide cable and wiring materials and installation, relocation, preventive and routine maintenance services for a fiber optic and communications cable build project at the SHA Snow Hill Shop. The required materials and services are detailed in Attachment #1 - Scope of Work. Proposals are due by March 30, 2022 at 2:00 pm EST and must be submitted electronically. The work start and end dates are to be determined. Award will be made to the Master Contractor whose proposal is deemed most advantageous to the State, considering both price and the technical evaluation factors outlined in the PORFP.
The PORFP is not designated as a Small Business Reserve. Pricing proposals must be password protected. The contract will be a fixed-price arrangement. No other salient information about pricing, funding, or incumbents is provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Snow Hill-SOW -final.pdf | ||
| Amendment snow hill date.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Order Request for Proposals (PORFP) Cable and Wiring Materials and Services Master Contract
Section 1 – General Information
PORFP Number:
(ADPICS PO Number)
PORFP # J01P2600052 - C&W Master Contract 060B6400046
SHA Snow Hill Shop
PORFP Type:
Fixed Price
Functional Area (FA) for this PORFP:
FA I (Structured Cable Wiring )
FA II (Installation, Relocation, Preventive and Routine
Maintenance of Outside Plant Fiber Optic and Communication
Cables)
Designated Small
Business Reserve?(SBR):
(Select “Yes” or “No” from drop down list)
No
PORFP Issue Date:
(mm/dd/yyyy)
03/15/2022 PROPOSAL DUE
DATE and TIME:
03/30/2022@2:
00pm (EST)
Special Instructions:
Proposals must be submitted electronically via email to :
srobinson5@mdot.state.md.us
1. Master Contractors electing not to propose to this PORFP must submit an Attachment #1 - Master Contractor Feedback Form.
2. Master Contractors proposing in response to this PORFP must submit a Technical Proposal separate from the Price Proposal
3. Price Proposal: The Price Proposal shall be contained in a separate file, titled: Price Proposal. The Price Proposal shall be password protected (encrypted). The Procurement Officer will contact the firms for the password following technical review.
Invoicing Instructions:
OTTSFinance@mdot.state.md.us
Section 2 – Agency Point of Contact (POC) Information
Agency / Division Name: MDOT Office of Procurement
Agency POC Name: sheryl Robinson Agency POC
Phone Number:
410-865-1389
Agency POC Email
Address:
srobinson5@mdot.maryland
.gov
Agency POC
Fax:
Agency POC Mailing
Address:
7201 Corporate Center Drive, Hanover, MD 21076
Section 3 – Delivery Address POC Information (if different from above)
Agency On-site Contact
Name:
Kenneth Bishop Agency On-site
Phone Number:
Agency On-site Email
Address:
Agency On-site
Fax:
Agency On-site Address: 1 Orchard Rd, Glen Burnie MD 21060
Section 4 – Scope of Work
FA I – Structured Cable and Wiring
Purchase Order Request for Proposals (PORFP) Cable and Wiring Materials and Services Master Contract
(Provide itemized list of required information and model number/s. If type of equipment is unknown, describe required functionality):
List Required Cable and Wiring Materials, Equipment and Model Number/s
Quantity
1. See Attachment #1- Scope of Work 1.
Due Date for Delivery:
(mm/dd/yyyy)
FA II – Installation, Relocation, Preventive and Routine Maintenance of Outside Plant Fiber Optic and Communications Cables (Provide itemized list of required installation services. If type of equipment is unknown, describe required functionality):
List Required Cable and Wiring Installation Quantity
1. See Attachment #1- Scope of Work
2.
3.
1.
2.
3.
Work Start Date:
(mm/dd/yyyy)
TBD
Work End Date:
(mm/dd/yyyy)
TBD
Section 5 – Evaluation Criteria – Technical Proposal
(Provide a list of evaluation criteria in descending order of importance)
1. Proposal detailing conformance to Scope of Work (Attachment #1)
2. Price Proposal (password protected)
3. Required Forms: Feedback Form (this form is required is you are not submitting a response to this solicitation)
Basis for Award Recommendation
Evaluation criteria for award will be established at the PORFP level. The agency POC will recommend award to the Master Contractor whose proposal is determined to be the most advantageous to the State, considering price and the evaluation factors set forth in the PORFP.
The agency POC will initiate and deliver a PO to the selected Master Contractor.
File details come from the government source that posted it. Updated .