This solicitation is for a small business set-aside contract to rehabilitate concrete at the Eisenhower and Snell Locks. Prospective contractors must register in SAM and submit bids by September 15th for award by September 30th. The contractor will furnish all labor, equipment, and materials to place dry mix shotcrete from January 18th to March 5th in the Snell downstream valve recesses, Snell north intake manifold, and Eisenhower VLG pit wall. The Department of Transportation Saint Lawrence Seaway Development Corporation will provide dewatering and preparation work. Pricing will be based on actual cubic yards of shotcrete applied. The applicable NAICS code is 238110 and size standard is $16.5M.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VLG pit Wall 4.JPG | JPG image | |
| VLG Pit view from above standing on north side of lock.JPG | JPG image | |
| VLG pit Wall 1.JPEG | JPEG file | |
| Inside taer drop 2.JPG | JPG image | |
| view entering tear drop from culvert recess.JPG | JPG image | |
| VLG Pit Wall 2.JPG | JPG image | |
| Wage_Determination.pdf | ||
| culvert and tear drop interface.JPG | JPG image | |
| Inside tear drop.JPG | JPG image | |
| SK-1 - Site plan.pdf | ||
| Intake_view from above looking at trash racks.JPG | JPG image | |
| View from culvert recess toward tear drop.JPG | JPG image | |
| 327-C-20_27.pdf | ||
| VLG Pit View wall on left standing under gate during clean out of 2017.JPG | JPG image | |
| inside tear drop 3.JPG | JPG image | |
| culvert and tear drop interface inboard side.JPG | JPG image | |
| SLS-326-206.pdf | ||
| VLG Pit view from above looking upstream.JPG | JPG image | |
| VLG Pit Wall 3.JPEG | JPEG file | |
| 327-C-20-36.pdf | ||
| Inside tear drop looking up at trash rack.JPG | JPG image |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
6923G520B1021
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
08/14/2020
PAGE OF PAGES
IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
U.S. Department of Transportation
Saint Lawrence Seaway Development Corporation
Attn: Contracting Office
180 Andrews Street
Massena, New York 13662
U.S. Department of Transportation
Saint Lawrence Seaway Development Corporation
Contracting Office
180 Andrews Street
Massena, New York 13662
9. FOR INFORMATION
CALL: ►
A. NAME
Katie Maloney Contract Specialist
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 315-764-3230 e-mail – katie.maloney@dot.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Furnish all plant, labor, equipment, and materials, and perform all work to rehabilitate portions of damaged concrete in the Snell downstream valve recesses, the Snell north intake manifold (tear drop) locations at Snell Lock and the Eisenhower Vertical Lift Gate (VLG) pit wall utilizing dry mix shotcrete application methods.
NOTE: PROSPECTIVE CONTRACTORS ARE REQUIRED TO REGISTER IN THE SYSTEM FOR
AWARD MANAGEMENT (SAM) DATABASE AT www.sam.gov PRIOR TO AWARD OF A
CONTRACT. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE PROCUREMENT, THE
APPLICABLE NAICS CODE IS 238110 AND THE SIZE STANDARD IS $16,500,000.00.
This 11. The Contractor shall begin performance within 10 calendar days after receiving the notice to proceed and complete by March 5, 2020 performance period is mandatory, negotiable. (See Section F, Page 14 of 35.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
10 days
13. ADDITIONAL SOLICITATION REQUIREMENTS::
A. Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 2:00 PM local time September 15, 2020. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442
mailto:Patricia.White@sls.dot.gov http://www.sam.gov/
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in
Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS ►
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation – give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Department of Transportation
Saint Lawrence Seaway Development Corporation
Finance Office
PO Box 520
Massena, New York 13662
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO
SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30c. DATE 31B. UNITED STATES OF AMERICA
BY
31C. DATE
STANDARD FORM 1442 BACK
6923G520B1021
PART I
SECTION A
TABLE OF CONTENTS
SECTION DESCRIPTION PAGES
PART I – THE SCHEDULE
A SOLICITATION/CONTRACT FORM – TABLE OF CONTENTS 1 – 3
B SUPPLIES OR SERVICES AND PRICES/COSTS 4 – 5
C DESCRIPTION/SPECS/WORK STATEMENT 6 – 12
D PACKAGING AND MARKING 13
E INSPECTION AND ACCEPTANCE 14
F DELIVERIES OR PERFORMANCE 15
G CONTRACT ADMINISTRATION DATA
H SPECIAL CONTRACT REQUIREMENTS
PART II – CONTRACT CLAUSES
I CONTRACT CLAUSES 20 – 26
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
J LIST OF ATTACHMENTS 27
PART IV – REPRESENTATIONS AND INSTRUCTIONS
K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS 28 – 32
L INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS 33 – 35
M EVALUATION OFFERS FOR AWARD 36
END OF SECTION A
16-18
PART I
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Furnish all plant, labor, equipment and materials and perform all work as described in the contract documents for:
Basic
Bid Item
No.
Schedule of Supplies/Services Estimated
Quantity Unit Unit Price Amount
For the Job LS. $____________ $____________
10 C.Y. $____________ $____________
1. Mobilization and Demobilization of all labor, equipment and materials.
2. Place repair concrete as described in the Statement of Work and as directed by the Corporation in downstream valve recess's (North & South Side.)
3. Place repair concrete as described in the Statement of Work and as directed by the Corporation as needed Snell and/or Eisenhower Lock Locations (Overrun)
10 C.Y. $____________ $____________
OPTIONAL LINE ITEMS:
Option
Bid Item
No. Schedule of Supplies/Services
Estimated
Quantity Unit Unit Price Amount
10 C.Y. $____________ $____________
C.Y. $____________ $____________
4. Place repair concrete as described in the Statement of Work and as directed by the Corporation in Snell Intake (Tear Drop).
5. Place repair concrete as described in the Statement of Work and as directed by the Corporation on Eisenhower VLG pit wall.
TOTAL $____________
6923G520B01021
INSTRUCTIONS TO OFFERORS
1. Offerors must include bid prices for all of the Basic and Optional Requirements to be considered responsive.
2. The Mobilization and Demobilization shall not exceed 15% of the total Basic Bid Items.
3. The Corporation intends to award the Basic Requirement by September 30, 2020. The optional Bid
Items may be awarded during project construction on a need only basis if funding is available.
4. Cubic yard volumes are estimated quantities. Payment will only be for actual cubic yards of material installed.
5. Offerors are required to keep their respective bids valid for 180 days after the bid opening.
6. The Corporation reserves the right to make award for only the Basic Requirement or for the
Basic Requirement and any combination of the Optional Requirements, dependent upon the availability of funds.
Bidder Signature ____________________________________
END OF SECTION B
PART I
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1. Background:
Each winter the Saint Lawrence Seaway Development Corporation (SLSDC or Corporation) performs inspections and winter maintenance on the Eisenhower and Snell Locks. Inspections during previous winter maintenance periods have indicated the need for concrete rehabilitation in the Snell downstream valve recesses, Snell north culvert inlet manifold (tear drop), and the Eisenhower Vertical Lift Gate (VLG) pit wall.
The intent of this project is to perform concrete rehabilitation in these damaged areas.
C.2. Location:
The Eisenhower and Snell Locks are located in Massena, New York. A site visit of the lock is strongly recommended for any Contractor interested in providing a bid.
Each vertical culvert valve recess is rectangular in shape and approximately 14’ X 20’ at the top. However, there are obstructions and sloped walls which diminish overall dimensions as you descend them. These features are shown on the reference drawings.The downstream culvert valve recesses (both north and south) are approximately 100’ deep from top of wall. At the base of the culvert valve recesses are intersecting concrete culverts approximately 12-14’ wide and 14’ high.
The north culvert recess is approximately 12-14’ wide and 14’ high by 860’ long and is approximately 100’ below the top of the lock wall on the upstream end and 120’ below the top of wall on the downstream end.
This access may be utilized to access the tear drop area. A reference drawing of the intake is included for a general guide to the existing structure. Access can be made from the top of the intake inlet grating (trash racks), however the contractor shall ensure heat and control water with or without using this access point.
The Eisenhower VLG pit wall is approximately 80’ wide and 45-50’ in height, and located approximately 40’ below the working surface (underwater during summer months). Photos and a reference drawing has been included for a general guide to the existing structure.
C.3. Utilities
Process water, potable water, heat, air, and any other utilities needed for this scope of work shall be the responsibility of the Contractor. All temporary facilities, including restroom facilities, shall be provided by the
Contractor. The Corporation will provide a maximum of two electric load centers concurrently. The load centers are rated for 60 amps and is available in three phase or single phase. Any additional electrical power shall be provided by the Contractor at his/her own expense. Additionally, the SLSDC will not provide housing/ break rooms and the contractor will be responsible for any and all utilities/facilities outside of the load centers indicated above.
C.4. Access
The Corporation will dewater the locks and attempt to limit the infiltration of water past the stoplog dam structures used to dewater the lock. It is expected that work areas will experience water infiltration, therefor the Contractor will be required to erect and maintain cofferdams (or equivalent) and maintain a pump(s) to actively dewater work areas. The Contractor shall expect water depths above culvert floor elevation of up to 24” in the downstream culvert recess locations, including at the two downstream valve recess locations.
Additionally, the contractor shall anticipate placing a cofferdam with a cover to contain heating efforts at the north intake/tear drop location (above trash racks) to eliminate water infiltration into the tear drop area.
The dimensions of clearance to mobilize equipment and materials through the culvert valve recesses are limited.
SLSDC intends to remove the Snell downstream culvert valves and upstream culvert valve strut arms prior to performing concrete work in the valve recess locations. The VLG pit will contain a minimal amount of water (18” max) across the floor. However, there is a drain that if debris is removed around it will diminish the water depth.
Personnel access to the culvert is permissible through the valve recesses. The Contractor is responsible for providing any cranes to perform the work. The Contractor shall furnish and install work platforms, such as scissor lifts, man baskets, scaffolding or other means required to complete the work within the valve recesses and tear drop. Refer to the reference drawings which show a layout of the locks with approximate locations and details on the dimensions of the valve recesses and culvert. The drawings provided are for reference only and should not be scaled or used to represent actual conditions. Personnel access to the VLG pit wall is possible via crane, refer to the reference drawings which show the layout of Eisenhower Lock with approximate locations and dimensions.
C.5. Scope of Work
The Contractor shall provide all labor, equipment and materials required to complete this scope of work. All work shall be performed in accordance with American Concrete Institute (ACI) Specification for Shotcrete
506.2 and to industry standards.
The Corporation estimated the amount of repairs in each area based on cubic yards of shotcrete to be placed.
The Contractor will only be paid for actual volumes of completed concrete rehabilitation at each location. Note that volumes of concrete waste, such as rebound or over spray, will not be paid for. Concrete rehabilitation work will occur in locations throughout each area. Patches will vary in depth of new concrete throughout. The Corporation and/or another contractor will complete the required preparation work for concrete rehabilitation in each location. The Contractor will be authorized to commence work on or about January 18, 2021 for the downstream valve recesses and will have approximately twelve (12) calendar days to complete the work. The Contractor will be authorized to commence work on or about January 29, 2021 in the tear drop (Optional Bid Item, if awarded) and will have approximately seventeen (17) calendar days to complete operations in the tear drop location. The Contractor will be authorized to commence work on or about February 16, 2021 in the Eisenhower VLG Pit wall (Optional Bid Item, if awarded) and will have approximately seventeen (17) calendar days to complete operations on the VLG pit wall. All work shall be completed by no later than March 5, 2021.
Under no circumstances shall the Contractor be authorized to access or have materials, tools or equipment within the work areas and/or lock wall working zones after March 5, 2021. The Corporation will keep the Contractor notified of progress of dewatering the locks as updates are available prior to his/her start date.
The Contractor shall provide means for heating work areas as necessary. Partitions and/or vapor barriers shall be erected and maintained by the Contractor to isolate the heating areas. The Contractor shall be responsible for a safe work environment and provide means to ensure work areas are accessible for work and inspection at all times. The Contractor shall submit a project safety plan for approval prior to mobilization for work. The Corporation intends to rehabilitate concrete in all locations this work period, but due to unforeseen conditions, may not be able to do so at all locations. As each area(s) becomes available to the Contractor, the Contractor will be given the opportunity to mobilize and access that area.
6923G56923G52020BB10211021
C.6. Requirements for Shotcrete Application
This Scope of Work is for the application of concrete, also referred to as shotcrete, which is pneumatically projected at high velocity in accordance with the “dry” placement method where all ingredients are pneumatically conveyed dry to the nozzle for final mixing with water before projection onto the work surface.
Shotcrete shall be KING Shotcrete RS-D1 or approved equal. The shotcrete dry mix may be supplied as a prepackaged single component dry product ready for field application. Mixing and application shall be performed in accordance with American Concrete Institute (ACI) Specification for Shotcrete 506.2. Portions of this specification with other special requirements are presented in this section.
i. Submittals: Submit the manufacturer’s product data and installation instructions for each material and ingredient used. Submit the mix design with proportions of all ingredients. Include the manufacturer’s Safety Data Sheets as appropriate.
ii. Quality Assurance: The manufacturer of single-component dry mix product shall be a company with at least 15-years of experience in the manufacturer and marketing of pre-packaged cementitious repair materials. The Contractor shall be experienced and qualified to perform the work and each nozzlemen shall be certified in accordance with requirements of ACI CP-60 Craftsman Work Book and the ACI 660 Shotcrete Nozzlemen Certification Committee. The Contractor shall ensure two (2) qualified nozzlemen are used to perform shotcrete application, due to the limited schedule available to complete work. A test panel of at least 2-feet square by 8-inches deep shall be prepared by the Contractor at the site for each day of shotcrete placement (at the Contractor’s expense). The test panels shall be cored by an approved laboratory (at the Contractor’s expense) for visual examination for bond and consolidation and compressive strength determination. Pursuant to the test panel findings, the completed work may also be cored by the Corporation for evaluation of the in-place bond, consolidation and compressive strength.
iii. Delivery, Storage and Handling: Deliver prepackaged shotcrete materials and cements in original packaging, labeled with product identification, manufacturer, batch number and shelf life. Store all ingredients in a dry area. Keep ingredients dry and protected from the weather, direct sunlight and freezing. Handle packaged materials in accordance with manufacturer’s printed recommendations.
iv. Materials: The shotcrete is a microsilica-fortified, air-entrained cement-based mixture of Portland cement, microsilica, air entrainment, pozzolans and graded aggregates. Coarse aggregates shall be no larger than 3/8-inch (0.375”) in size. The shotcrete shall comply with ASTM C 1480 Type FA. Grades GU, SR, LP.
Water-cement ratio of the completed mix shall be no greater than 0.40. The 28-day compressive strength shall be at least 5,000 pounds per square inch (psi) as tested by an approved laboratory. The Contractor shall be responsible for obtaining testing and for associated costs to do so. Air content shall be 6 to 9 %.
To reduce dust, pre-dampen pre-packaged shotcrete materials before they are conveyed to the nozzle.
Instructions provided by the manufacturer regarding mixing and handling shall be followed. Use only potable water in shotcrete.
v. Surface Preparation: The repair areas shall be dewatered as necessary to allow unobstructed dry access to all surfaces. Additionally, repair areas shall be dust/debris free and dampened prior to shotcrete placement.
Weeps and/or 1-inch pvc pipes shall be placed prior to application to drain water in repair areas as directed by the COTR. The Corporation and/or its contractor will perform all other preparation to include squaring off repair areas, saw-cutting to sound concrete and installation of reinforcing mesh and bars. Do not use bonding agents.
vii. Application: Place shotcrete first into corners, recesses and other areas where rebound or overspray cannot escape easily. Hold the nozzle perpendicular to the receiving surface and move it in circles to
vi. Grade and Alignment: The proper surface grade and alignment of the completed shotcrete shall be maintained by use of taut “ground” wires that are set to the original profile of the concrete base. The shotcrete can then be carried to the ground wires. A sufficient number of wires shall be used to ensure a square and even conformity to the original dimensions of the concrete base. Ground wires shall also be set at corners to ensure that the reconstructed corner conforms to the original geometry and dimensions.
vii. Application: Place shotcrete first into corners, recesses and other areas where rebound or overspray cannot escape easily. Hold the nozzle perpendicular to the receiving surface and move it in circles to improve consolidation and reduce rebound (separated aggregate that bounces or ricochets out of the placement). In corners, direct the nozzle at a 45-degree angle, or bisect the corner angle if different than 90 degrees. Rebound shall not be incorporated in the completed work. Apply the shotcrete in such a manner as to prevent sags and sloughing.
Apply around reinforcing materials to completely encase it and have a free flow of material completely around the reinforcement so there are no voids. The front face of reinforcement shall remain clean during the encasement.
Shotcrete shall not be deposited into standing or running water.
viii. Weather Conditions: Shotcrete application shall not be done in windy conditions that cause separation of the mix. The prevailing ambient temperature shall be maintained at least 50 degrees Fahrenheit. Surfaces against which shotcrete is applied shall not be below 40 degrees Fahrenheit, and shall be free of frost. In the event the lower ambient and/or surface temperatures/conditions cannot be achieved, the Contractor shall provide means for suitable heat application. Shotcrete materials shall be no less than 50 degrees Fahrenheit or more than 100 degrees Fahrenheit, and surfaces against which shotcrete is applied shall be no greater than 100 degrees Fahrenheit.
ix. Finishing and Curing: Finish immediately after shotcrete application with a steel trowel to a smooth surface where necessary, with care to prevent loosening of the bond. Shotcrete application areas shall be cured at least three (3) days in accordance with Cast-in-Place concrete industry standards and, at a minimum, be maintained at an ambient temperature of 50 degrees Fahrenheit or greater. A gun finish is acceptable. However, the Corporation will utilize a straight edge to ensure no peaks/valleys and/or rolling surfaces. The straight edge (approximately 8’ in length) will be placed against the finished product in random positions and there shall be no more than ½” variance across the finished product.
x. Disposal: Contractor shall dispose of all materials, debris, rebound, packaging and any other items used in performance of this Contract per governing agencies having jurisdiction of the property. All items shall be hauled offsite for disposal and/or recycling. However, rebound and excess aggregate can be disposed of at Eisenhower lock as directed by the COR. All waste shall be quantified by weight and submitted to the project Contracting Officer Representative (COR) prior to final payment.
C.7. Schedule
The following schedule applies:
August 20 and 26, 2020 at 10 AM Eastern Bids Due: Tuesday, September 15, 2020 at 2:00 PM Eastern
Commence Work: On or about January 18, 2021 Complete Work No Later Than March 5, 2021
It is recommended that the offeror visit the site before quoting the work. A proper understanding of the physical conditions pertaining to the work may only be gained through an on-site visit. Failure to visit the site before quoting the work will not relieve the Contractor from the responsibility of proper fulfillment of the contract. All expenses associated with the site visit will be the responsibility of the offeror.
Site Visit:
C.8. Responsibilities
The Corporation will be responsible for the following:
• Dewatering the lock chamber (as described in this Contract)
• Concrete preparation (excluding dust/debris that settles after preparation and water blasting.
The Contractor shall be responsible for the following:
• Personnel, materials, and equipment to complete the work.
• Any utilities required to complete the work. Utilities include, but are not necessarily limited to, water, heat, electricity, restroom facility and lighting.
• Contractor shall provide any crane and support equipment/labor.
C.9. Contract Drawing and Specifications
These special provisions provide a basic description of the various tasks comprising the project and together with the technical specifications, contract drawings, reference drawings, approved submittals and referenced publications, codes and standards form the contract requirements for the project. The specifications and drawings are being furnished to the Contractor per Part III, Section J, List of Attachments, in an electronic format. Hard copies will not be furnished.
Arrangements must be made with the SLSDC Office of Engineering, Phone (315) 764-3256 (no collect calls) at least three business days in advance so that any requirements to enter SLSDC property can be conveyed and adhered to by the bidder. Any expenses incurred in the site visit will be borne by the bidder. All expenses associated with the site visit will be the responsibility of the offeror.
C.10. Environment Protection:
i. General. For the purpose of this specification, environment protection is defined as the retention of the environment in its natural state to the greatest possible extent during project construction and the enhancement of the natural appearance in its final condition. Environment protection requires consideration of air, water and land resources and involves noise, solid waste management and management of liquid and gaseous pollutants, radiant energy and radioactive materials as well as other pollutants. In order to prevent and provide for abatement and control of any environmental pollution arising from the construction activities in the performance of this contract, the Contractor and his/her subcontractors shall investigate and comply with all Federal, State and local laws and regulations concerning environmental pollution control and abatement. Any non-compliance shall be immediately corrected and the SLSDC notified.
ii. Notification. The COR will notify the Contractor whenever the SLSDC detects any noncompliance with the aforementioned Federal, State and/or local laws and regulations. Such notice, when delivered to the Contractor or his/her authorized representative at the site of the work, shall be deemed sufficient for the purpose. The Contractor shall, after receipt of such notice, immediately inform the COR of the proposed corrective action and take such action as may be approved. If the Contractor fails or refuses to comply promptly, the COR may issue an order stopping all or a part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of a claim for extension of time or for excess costs or damages incurred by the Contractor.
iii. Protection of Land Resources. The land resources within the project boundaries and outside the limits of permanent work performed under this contract shall be preserved in their present condition or be restored to a condition after completion of construction that will appear to be natural and not detract from the appearance of the project. The Contractor shall confine his/her activities to areas defined by the contract plans and specifications.
iv. Protection of Water Resources. The Contractor shall not pollute the ground or surface waters with fuels, oils, bitumens, calcium chloride, acids, insecticides, herbicides or other harmful materials. The Contractor shall investigate and comply with all applicable Federal, State and local laws and regulations concerning pollution.
v. Permits and Insurance. The Contractor shall be responsible for researching and obtaining all permits that may be required for the work. The Contractor shall also have insurance as appropriate for the class of work.
C.11. Site Visit It is recommended that the offeror visit the site before quoting the work. A proper understanding of the physical conditions pertaining to the work may only be gained through an on-site visit. Failure to visit the site before quoting the work will not relieve the Contractor from the responsibility of proper fulfillment of the contract.
Arrangements must be made with the SLSDC Office of Engineering, Phone (315) 764-3256 (no collect calls) or brian.tulip@dot.gov at least three business days in advance so that any requirements to enter SLSDC property can be conveyed and adhered to by the bidder. Any expenses incurred in the site visit will be borne by the bidder. All expenses associated with the site visit will be the responsibility of the offeror.
C.12. Plant
The Contractor shall furnish all plant required for the performance of the contract. The plant shall be in satisfactory operating condition and capable of safely and efficiently performing the work. The plant shall be subject to the inspection of the COR at all times.
C.13. Use of Explosives
Blasting will not be permitted.
C.14. Safety
The Williams-Steiger Occupational Safety and Health Act of 1970 (as amended) as set forth in 29 CFR 1926/1910, where applicable, shall govern this contract. The Contractor shall be responsible for a safe work environment at all times. The Contractor shall submit a safety plan for approval prior to commencing work.
C.15. Wage Rates:
In accordance with the requirements of Clause (a), Construction Wage Rate Requirements, (see Clause 52.222-6 of this contract), the minimum wages to be paid to laborers and mechanics on this project, as most recently determined by the Secretary of Labor to be prevailing for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the pertinent locality, are as set forth in Attachment I. The complete determination is incorporated in the contract specifications regardless of whether the Contractor will employ all of the classes of laborers and mechanics listed.
Any class of laborers and mechanics not listed in Attachment I, which will be employed on this contract shall be classified or reclassified to conform to Attachment I, by mutual agreement between the Contractor and the class of labor concerned, subject to the prior approval of the Contracting Officer. In the event the interested parties cannot agree on the proper classification or reclassification of a particular class of laborers and mechanics to be used, the question, accompanied by the recommendation of the Contracting Officer, shall be referred to the Secretary of Labor for final determination.
C.16. Other Work:
Maintenance work by SLSDC personnel and other work by contractors may be in progress concurrently with the work under this contract. Only the Contractor's authorized personnel, subcontractors and suppliers shall be allowed to enter the work area. The Contractor shall fully cooperate with the SLSDC in all phases of the work and any disputes which may arise will immediately be brought to the attention of the Contracting Officer through the COR.
C.17. Acceptance of Work.
After completion of all work contracted for, the COR or their designee will examine the work for final acceptance and approval by the Contracting Officer.
END OF SECTION C
PART I
SECTION D
PACKING AND MARKING
D.1. PRESERVATION, PACKAGING, AND MARKING.
The Contractor may have supplies/materials shipped to the S L S D C Receiving Warehouse located at
251 Fregoe Road, Massena, NY 13662. Packaging must be labeled to include the Contractor’s name and contract number. The Contractor shall be responsible for any damaged or missing packages. Upon receipt, the Contractor shall examine all packages and make appropriate written exception for any goods not in apparent good order. The Contractor is responsible for contacting the shipping company for any damages or losses. The SLSDC shall make every effort to contact the Contractor when packages arrive.
The Contractor shall have large and/or heavy items (exceeding 80 lbs) delivered directly to the work site.
Warehouse hours are 7:00am to 3:00pm on weekdays (except Federal holidays).
The SLSDC reserves the right to refuse any packages that are damaged, improperly labeled, or appear suspicious.
END OF SECTION D
PART I
SECTION E
INSPECTION AND ACCEPTANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.acquisition.gov
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
Inspection of services provided hereunder shall be made by the Contracting Officer’s Representative (COR) or any inspectors designated by the Contracting Officer. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
END OF SECTION E
www.acquisition.gov
PART I
SECTION F
DELIVERIES OR PERFORMANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.acquisition.gov
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 SUSPENSION OF WORK (APR 1984)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to: (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed; (b) prosecute the work diligently; and (c) complete the entire work ready for use not later than March 5, 2021. The time stated for completion shall include final cleanup of the premises.
F.1. SCHEDULES FOR CONSTRUCTION CONTRACTS.
The Contractor shall prepare and submit to the Contracting Officer after award and prior to a preconstruction meeting, for approval, a copy of a practicable schedule showing the order in which the Contractor proposes to perform the work and the dates on which the Contractor contemplates starting and completing the salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule as required, the Contracting
Officer may withhold approval of progress payments until the Contractor submits the required schedule.
END OF SECTION F
http://www.arnet.gov/far/
PART I
SECTION G
CONTRACT ADMINISTRATION DATA
G.1. CONTRACT ADMINISTRATOR
Nancy Scott, Contracting Officer, Saint Lawrence Seaway Development Corporation, 180 Andrews Street, Massena, New York, 13662-0520, telephone number (315) 764-3275, facsimile number (315) 764-3268, and e-mail address nancy.scott@dot.gov will administer the contract.
No oral or written statement by anyone other than the Contracting Officer shall modify or otherwise affect any contract clause. Only Contracting Officers acting within their scope of authority can execute contract modifications on behalf of the Government (Corporation). No claim by the Contractor for any increase in the contract price or adjustment in the performance schedule shall be valid except as may be covered by a duly executed contract modification.
G.2. REQUIRED INSURANCE
a. The Contractor shall procure and maintain during the entire period of his/her performance under this contract the following minimum insurance coverage:
(1) Workmen's Compensation Coverage: As required by applicable New York Statutes in effect as of contract award date.
(2) Comprehensive General Liability Insurance:
Bodily Injury Liability: $500,000 each person; $1,000,000 each accident
(3) Comprehensive Automotive Liability Insurance:
Bodily Injury Liability: $500,000 each person; $1,000,000 each accident
Property Damage: $50,000 each accident
b. Prior to commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Corporation in such insurance shall not be effective until ten (10) days after written notice thereof to the Contracting Officer.
c. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in paragraph (a). The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
G.3. CONTRACTING OFFICER DELEGATION OF AUTHORITY
The Contracting officer may delegate all or part of her authority to administer this contract. Such a delegation will be in writing and will describe the extent of the authority delegated. The Contracting Officer will provide a copy of such delegation to the Contractor.
mailto:Patricia.White@sls.dot.gov
G.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR)
The Contracting Officer may designate Government personnel or other Contractors to act as the Contracting
Officer’s Representative (COR) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting
Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the contractor the notice to proceed. The designation letter will set for the authorities and limitations of the COR under the contract. The COR will ensure that the SLSDC's project objectives are met, along with providing necessary information, direction, coordination, etc., within the contractual work description. The COR is not authorized to change any of the terms or conditions of this contract nor sign documents such as contracts or contract modifications.
When in the opinion of the Contractor, the COR requests work outside the existing scope of the contract, the
Contractor shall promptly notify the Contracting Officer in writing. The Contractor shall take no action until the
Contracting Officer has issued a contractual change or otherwise resolved the issue. A copy of all written correspondence to the COR by the Contractor shall also be mailed or otherwise furnished to the Contracting
Officer at the address set forth in Clause G.1.
G.5. ADDITIONAL WORK
a. The Contractor shall not perform any additional work without the Contracting Officer's authorization.
b. The Contractor, in connection with any proposal he/she makes for a contract modification, shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer. Unless otherwise directed, the breakdown shall be in sufficient detail to permit an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.
c. The Contracting Officer reserves the right to accomplish additional work on the basis of a negotiated fixed price when it is in the best interest of the Corporation.
G.6. REQUESTS FOR PROGRESS PAYMENTS
The Contractor shall furnish a breakdown of the total contract price, showing the amount included therein for each principal category of work, which shall substantiate the payment amount requested, in order to provide a basis for determining progress payments, in such detail as requested by the Contracting Officer.
The Government shall make progress payments monthly as the work proceeds on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor’s request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration
(3) Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that---
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of chapter 39 of Title 31, United States Codes; and
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name) (Title) (Date)
G.7. RELEASE OF CLAIMS
Upon completion of the work and prior to final payment, the Contractor shall furnish to the Contracting Officer a
"Release of Claims," as specified in paragraph (h) of Contract Clause 52.232-5, "Payments Under Fixed-Price
Construction Contracts," Part II, Section I, Contract Clauses.
G.8. INCORPORATION OF SECTION K BY REFERENCE
In accordance with FAR 14.201-1(c), Part IV of the Uniform Contract Format shall not be physically included in the resulting contract, but shall be retained in the contract file. Section K, Representations, Certifications, and Other
Statements of Offerors (as completed by the Contractor) shall be incorporated by reference in the contract.
G.9. EXECUTIVE ORDER (EO) 13101: GREENING THE GOVERNMENT THROUGH WASTE
PREVENTION, RECYCLING, AND FEDERAL ACQUISITION
The Corporation encourages the use of environmentally sound, energy-efficient products and services. This includes, but is not limited to, the use of energy-efficient office equipment, supplies that contain recovered materials, and products that are either degradable, ozone safe, recyclable, contain low volatile organic content compounds, or contribute to source reduction. The Contractor shall comply with the requirements of this order within the scope of its operations.
G.10. OTHER ADMINISTRATION DATA
The Contractor shall not in any way represent that he/she is part of the United States Government or that he/she has the authority to contract or procure supplies on the credit of the United States of America.
END OF SECTION G
PART I
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1. PERFORMANCE AND PAYMENT BONDS
a. If the contract price exceeds $150,000.00, the Contractor agrees to furnish a Performance Bond (Standard Form
25) and a Payment Bond (Standard Form 25-A), within 10 calendar days after award. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury
Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States.
The penal amount of the performance bond shall be one hundred (100) percent of the contract price. The performance bond secures performance and fulfillment of the contractor’s obligations under this contract.
The penal amount of the payment bond shall equal one hundred (100) percent of the original contract price. The payment bond assures payments as required by law to all persons supplying material or labor in connection with the performance of the work under this contract.
The Corporation may require additional performance and payment bond protection if the contract price is increased.
The increase in protection generally will equal 100 percent of the increase in contract price.
b. For contracts greater than $35,000, but not greater than $150,000, the Contractor shall submit one of the following payment protections:
• Payment bond
• Irrevocable letter of credit (ILC)
• Certificate of deposit
The amount of the payment protection shall be 100 percent of the contract price. The Contractor shall submit its alternative payment protection within 10 calendar days of contract award.
H.2. SECURITY REQUIREMENTS
The Contractor shall be responsible for providing the Contracting Office with the following information on all his/her employees and subcontractor employees assigned to work on site prior to commencing work.
• Employee(s) name
• Copy of employee(s) driver’s license
• Make and license plate numbers of vehicles to be used on site
The SLSDC shall issue an identification pass to each of the Contractor’s and subcontractor’s employees engaged on the contract. Contractors are responsible for requiring their employees to display their pass while on site. Passes are to be returned to the COR or SLSDC security personnel upon completion of the project or upon the release of any employee. Failure to return the passes will result in a non-refundable $50.00 fee which will be deducted from the
Contractor’s final payment. If the employee loses or damages his/her pass, a replacement fee of $50.00 will be assessed to the Contractor. The Contractor shall notify the COR of any personnel changes(s) prior to arriving on site.
The Contractor will be required to sign for his/her employee passes and any subcontractor employee passes.
END OF SECTION H
PART II
SECTION I
CONTRACT CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.acquisiton.gov
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER
52.203-10
ACTIVITY (MAY 2014)
PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO
52.203-19
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
52.204-4
AGREEMENTS OR STATEMENTS (JAN 2017)
PRINT OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER
52.204-9
(MAY 2011)
PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
52.204-13 52.204-14 52.204-18 52.204-19
AWARDS (JUN 2020)
SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
52.209-10
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)
PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
52.214-29
52.219-6
52.219-8 52.219-14
(NOV 2015)
ORDER OF PRECEDENCE—SEALED BIDDING (JAN 1986)
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)
UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
LIMITATIONS ON SUBCONTRACTING (MAR 2020)
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020)
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-3 CONVICT LABOR (JUNE 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME COMPENSATION
52.222-6
(MAY 2018)
CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
52.222-9 APPRENTICES AND TRAINEES (JULY 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222-12 CONTRACT…