SK-1 - Site plan.pdf

PDF 268 KB Posted

Attached to
Eisenhower & Snell Lock Concrete Rehabilitation
Solicitation number
6923G520B1021
Issued by

About this file

This document contains details for a federal contract solicitation to rehabilitate concrete at two locks. The solicitation seeks offers to furnish all plant, labor, equipment, and materials to rehabilitate portions of damaged concrete in valve recesses and intake manifolds at Snell Lock and a vertical lift gate pit wall at Eisenhower Lock utilizing dry mix shotcrete application methods. Offerors must register in the System for Award Management database prior to award. This is a total small business set-aside procurement with a North American Industry Classification System code of 238110 and size standard of $16,500,000. The solicitation was issued by the Department of Transportation Saint Lawrence Seaway Development Corporation.

View the file

Other files

File Type Posted
VLG pit Wall 4.JPG JPG image
VLG Pit view from above standing on north side of lock.JPG JPG image
VLG pit Wall 1.JPEG JPEG file
Inside taer drop 2.JPG JPG image
view entering tear drop from culvert recess.JPG JPG image
VLG Pit Wall 2.JPG JPG image
Snell and Eisenhower Lock Concrete Rehabilitation_IFB(final).pdf PDF
Wage_Determination.pdf PDF
culvert and tear drop interface.JPG JPG image
Inside tear drop.JPG JPG image
Intake_view from above looking at trash racks.JPG JPG image
View from culvert recess toward tear drop.JPG JPG image
327-C-20_27.pdf PDF
VLG Pit View wall on left standing under gate during clean out of 2017.JPG JPG image
inside tear drop 3.JPG JPG image
culvert and tear drop interface inboard side.JPG JPG image
SLS-326-206.pdf PDF
VLG Pit view from above looking upstream.JPG JPG image
VLG Pit Wall 3.JPEG JPEG file
327-C-20-36.pdf PDF
Inside tear drop looking up at trash rack.JPG JPG image
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Downstream South Valve RecessApproximate

Trash Rack/ Intake Location

Upstream North Valve Recess

Approximate Location Downstream Stairway

Downstream North Valve Recess

FOR REFERENCE ONLY

brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Rectangle brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line brian.tulip Line

File details come from the government source that posted it. Updated .