SMR- Bldg 110 Porch Repairs.pdf
PDF 143 KB Posted
- Attached to
- SMR Bldg. #110 Porch Repairs
- Solicitation number
- 62058
- Issued by
- Virginia Beach City, Virginia
About this file
The provided document is a Quick Quote Order for a project to repair the existing porch on Building 110 at the State Military Reservation (SMR) in Camp Pendleton, Virginia Beach, VA. The scope of work includes jacking up the existing porch support beams, removing the screen porch framing and tongue-and-groove flooring, reframing the porch substructure using treated lumber, installing new tongue-and-groove flooring, and reframing and rescreening the porch above the floor. The project also includes minor siding and trim repairs, and removal and replacement of a small deck and stairs adjacent to the porch. The project is expected to be completed within 45 days.
The document specifies the required paint materials, including primer, trim paint, and deck/floor enamel. A mandatory site visit is scheduled for March 28, 2024, at 10:00 AM, and the prospective bidder must have a scannable ID or license and vehicle registration to enter the site. The State and Local Contract Opportunity related to this project is for the demolition of the existing porch and construction of a new screened-in porch on Building 110 at the State Military Reservation in Virginia Beach, VA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMR Bldg 110 BID FORM.pdf | ||
| REQUIRED GENERAL TERMS AND CONDITIONS.pdf | ||
| Standard eVA Terms & Condition.pdf | ||
| Quick Quote SMR Bldg 110 porch repair.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
What: Quick Quote Order
Project: 24-84569, SMR Camp Pendleton Bldg 110 Porch Repairs
Loca�on: State Military Reserva�on -Camp Pendleton in Virginia Beach, Va.
Date for Site Visit: March 28, 2024 @ 10:00am
Site Visit Loca�on: SMR Camp Pendleton Building #110
POC for Site Visit: Scot Temple (757) 618-5343
Note: Site Visit is required to be able to quote pricing for this project.
*GPS loca�on will be 1096 South Birdneck Road, Virginia Beach Va. This will get you to the VB Armory.
Go past this drive and con�nue about 500 yards and look for white canopy on le� side. This will be SMR entrance at guard shack. Please have scannable ID or license, and vehicle registra�on. *
Scope of work is as follows:
Provide labor and material to replace exis�ng porch subframing and decking on the rear of the house at building #110 located at the State Military Reserva�on Camp Pendleton in Virginia, Beach, Va. This scope of work is needed due to the subdeck deficiencies and inadequate exis�ng support. In addi�on to that, there is also termite and insect damage which has further affected the porch integrity. Scope of work is to include the following at a minimum:
* Jacking the exis�ng porch support beams from underneath and installing temporary support.
* Removing the exis�ng screen porch framing above the floor.
* Remove all exis�ng tongue and groove flooring on the porch.
* Remove all necessary porch subframing components.
* Reframe porch subframing using treated dimensional lumber. All framing will be on a layout of 16" on center.
* Install new tongue and groove porch flooring. Material will be of the same size and profile but it will be #1 Kiln Dried Treated and it will be back primed and one coat of finish paint applied before install.
* Reframe and rescreen porch above the porch floor. The layout will match the exis�ng configura�on and style of what is currently there.
* Repair minor damaged siding and trim metal that is related to this project.
* At the conclusion of this work, all areas will be properly prepared (all joints caulked and holes pu�ed) and painted to match exis�ng colors prior to install la�ce.
* This work also includes the removal and replacement of small salt treated deck and stairs adjacent to exis�ng screen porch to allow access for required work.
Recommended Paint Material:
Duration of project shall be 45 days.
* Primer: Sherwin Williams Prep Rite Problock (For all raw wood)
* Trim: Sherwin Williams A100 Gloss
* Decking: Sherwin Williams Latex Porch & Floor Enamel
All trash and demoli�on material will be transported off site for disposal.
File details come from the government source that posted it. Updated .