Industry Day Notification The purpose of this Industry Day Notice Amendment is to provide the following items:
1) Update the solicitation number for this requirement from “140R4022R0026” to “140R4023R0016”. This RFI is being posted under both numbers on SAM.gov. All future postings will only be posted under 140R4023R0016.
2) Based on requests from industry after Industry Day was held in November 2022, a tour of the Cutter Lateral Water Treatment Plant (CLWTP) is being offered to vendors.
Location:
Cutter Lateral Water Treatment Plant Address: 323 County Road 7575 Bloomfield, NM 87413 Time: 9am MT
RSVP to Fred Lamone: 505-324-5014, flamone@usbr.gov
Instructions:
Please drive to the east entrance of the plant. If parking is full, Reclamation staff or operators will direct you to overflow parking. See the attached map. Operators will direct you to the breakroom to go over safety, sign-in, and an introduction of the tour.
The CLWTP is a conventional treatment facility that was commissioned and began water deliveries in October 2020. The plant utilizes a conventional treatment process consisting of coagulation, sedimentation, and sand and granular activated carbon filtration media. The tour will consist of a walkthrough of the flocculation/sedimentation facility, the process facility, the domestic pump building, the treated water pump building, drying beds, chemical building, backwash ponds, and site layout. Operators and Reclamation staff will guide you through the treatment process and will be available during the tour to answer questions related to the CLWTP Operations and Maintenance (O&M) and design. After the tour, we will meet back at the breakroom to answer any additional questions.
Personal Protection Equipment (PPE) is required: Hart Hat, steel/composite toe safety boots, safety glasses, high visibility safety vest. Contractors should bring their own PPE.
The Cutter Lateral Water Treatment Plant (CLWTP) is located here:
https://goo.gl/maps/RTPr2P1QftaKiSAg6
Address: 323 County Road 7575 Bloomfield, NM 87413
Directions:
From Farmington https://www.google.com/maps/dir/36.4089722,-107.7936111/36.7184575,-108.1569736/@36.5686989,-107.6339599,90277m/data=!3m1!1e3!4m9!4m8!1m5!3m4!1m2!1d-108.019731!2d36.706485!3s0x873c78f2257ea73b:0x5e8fd7e11ff54bc5!1m0!3e0 Google Maps Find local businesses, view maps and get driving directions in Google Maps.
www.google.com
From ABQ:
https://www.google.com/maps/dir/36.4089722,-107.7936111/35.0495825,-106.6246269/@35.9279675,-106.5548625,257444m/data=!3m1!1e3!4m2!4m1!3e0 Google Maps Find local businesses, view maps and get driving directions in Google Maps.
www.google.com
Driving directions from the south (Albuquerque – 2 ½ hrs):
· Proceed north on Hwy 550
· Proceed north past Cuba, Counselor, and Nageezi
· Just over 14 miles north of Nageezi, and immediately after Dzilth-Na-O-Dith-Hle (located on the right), turn right (east) onto Rd. 7575
· Proceed 3.3 miles on Rd. 7575 (gravel road) to the CLWTP on the left (north)
Driving direction from the north (Farmington – 1 hr/Durango – 1 ½ hrs):
· Proceed south on Hwy 550
· Proceed south from/past Bloomfield
· Just under 30 miles south of Bloomfield, immediately after the Dzil Na’oodilii Bible Church (located on the right), turn left (east) onto Rd. 7575
· Proceed 3.3 miles on Rd. 7575 (gravel road) to the CLWTP on the left (north)