SJLWTP_UFNF_Pilot_Official_Update_2023-0123_3.pdf
PDF 137 KB Posted
- Solicitation number
- 140R4023R0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign_in_Sheet_CLWTP_1_24_23_5.pdf | ||
| SJLWTP_RFI_Amendment-Industry_Day_Notice_1-31-2023_5.docx | DOCX document | |
| Site_tour_Minutes_CLWTP_1_24_23_5.pdf | ||
| SJLWTP_RFI_Amendment-Industry_Day_Notice_1-24-2023_(_2)_4.docx | DOCX document | |
| Pilot_Data_-_Supplemental_2_4.pdf | ||
| SJLWTP_UFNF_Pilot_-_USBR_Data_2023-0123_3.pdf | ||
| SJLWTP_UFNF_Pilot_-_Data_2023-0123_3.pdf | ||
| SJLWTP_UFNF_Pilot_-_Data_-_Supplemental_2023-0123_3.pdf | ||
| SJLWTP_RFI_Amendment-Industry_Day_Notice_1-24-2023_3.docx | DOCX document | |
| SJLWTP_RFI_Amendment-Industry_Day_Notice_1-6-2023_2.docx | DOCX document | |
| CLWTP_Parking_Map_2.pdf | ||
| Cutter_Map_2.jpg | JPG image | |
| Cutter_Map_1.jpg | JPG image | |
| CLWTP_Parking_Map_1.pdf | ||
| SJLWTP_RFI_Amendment-Industry_Day_Notice_1-6-2023_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Bureau of Reclamation Technical Service Center
SJLWTP UF/NF Pilot Update
Purpose The purpose of this document is to provide an update regarding the current SJLWTP ultrafiltration/nanofiltration (UF/NF) pilot status and data.
Pilot Status
Pilot operations ceased on December 17th, 2022 due to equipment failure. The earliest possible pilot re-start is estimated to be mid-March 2023.
Pilot Data
• Data collected during pilot operations between 11/1/2022 and 12/16/2022 is attached.
• Data is provided in PDF format, but MS Excel formatting available upon request to Amy Loveless
(aloveless@usbr.gov).
San Juan Generating Station Reservoir Data
• Data collected from the San Juan Generating Station Reservoir between March 2006 and December 2022 is attached.
• Data is provided in PDF format, but MS Excel formatting available upon request to Amy Loveless
(aloveless@usbr.gov).
Forthcoming Information
• Whole Effluent Toxicity (WET) testing results are expected in early February 2023.
• The UF/NF pilot Interim Report is expected in early February 2023.
• The SJLWTP Water Quality (WQ) Basis of Design (BOD) in March 2023.
mailto:aloveless@usbr.gov mailto:aloveless@usbr.gov
| Pilot Status |
| Pilot Data |
| San Juan Generating Station Reservoir Data |
| Forthcoming Information |
File details come from the government source that posted it. Updated .