Attachment 2a_Phase II Drawings.pdf
PDF 14 MB Posted
- Attached to
- 8a File Transfer
- Solicitation number
- SJER8a442790
About this file
Phase II Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9702_S10_0574_SJER Construction.zip | ZIP file | |
| Attachment 1_Specifications.pdf | ||
| Attachment 2_Phase I Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
GENERAL MECHANICAL NOTES
ABBREVIATIONS HVAC SYMBOLS
FD
FSD
M
DUCT SECTION, SUPPLY AIR UP
DUCT SECTION, RETURN AIR UP
DUCT SECTION, EXHAUST AIR UP
DUCT SECTION, SUPPLY AIR DN
DUCT SECTION, RETURN AIR DN
DUCT SECTION, EXHAUST AIR DN
FLEXIBLE DUCT
FIRE AND SMOKE DAMPER
FIRE DAMPER
DIRECTION OF FLOW
MANUAL VOLUME DAMPER
WALL SUPPLY OUTLET, RETURN GRILLE
CEILING DIFFUSER
CEILING RETURN
CEILING EXHAUST
DUCT SMOKE DETECTOR
ELECTRIC THERMOSTAT
REMOTE SENSOR
MOTORIZED ACTUATOR
DD
T
S
FOS
CWS
SYMBOL DESCRIPTION
FUEL OIL (SUPPLY)
FUEL OIL (RETURN)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
REFRIGERANT LIQUID
REFRIGERANT SUCTION
AUTOMATIC AIR VENT
BLOW OFF STRAINER
FILTER AND STRAINER LINE
PRESSURE GAGE
PRESSURE GAGE AND COCK
PRESSURE REDUCING VALVE
RELIEF OR SAFETY VALVE
STRAINER
TEMPERATURE GAGE
PUMP (PLAN)
PUMP (SCHEMATIC)
EXPANSION LOOP
CAP
CONCENTRIC REDUCER
UNION
THREE-WAY MANUAL VALVE
BALL VALVE
BUTTERFLY VALVE
DIAPHRAGM VALVE
GATE VALVE
GLOBE VALVE
CHECK VALVE
POINT OF CONNECTION
FLEXIBLE CONNECTOR
THERMOMETER
PETE'S PLUG
AIR TERMINAL IDENTIFICATION
12x12 SD-1
AIR TERMINAL MARK
AIRFLOW, CFM
NOTE:
ARROWS INDICATE DIRECTION OF AIRFLOW
NO ARROWS INDICATE 4-WAY AIRFLOW
AIR TERMINAL NECK SIZE
(IF SHOWN)
1 KEYNOTE
DEMOLITION NOTE
ROOM NAME AND ROOM NUMBER
DETAIL INDICATOR SECTION INDICATOR
MECHANICAL EQUIPMENT
DESIGNATION
(SEE SCHEDULE)
DETAIL
NUMBER
SHEET NUMBER ON
WHICH DETAIL APPEARS
SECTION LETTER
SHEET NUMBER ON WHICH
SECTION APPEARS
WH
E5.1
A
E3.1
SHEET ANNOTATION
CARBON DIOXIDE SENSOR
PIPING SYMBOLS
SYMBOL DESCRIPTION
FOR
CWR
HHWS
HHWR
CS
CR
RL
RS
A AMPERES, AREA
ABS ACRYLONITRILE-BUTADIENE-STYRENE
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
APPROX APPROXIMATE(LY)
AS AIR SEPARATOR
AVG AVERAGE
BD BALANCE DAMPER
BDD BACK DRAFT DAMPER
BFP BACK FLOW PREVENTER
BG BELOW GRADE
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
� CENTERLINE
CCW COUNTER CLOCKWISE
CD CEILING DIFFUSER, CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CMPR COMPRESSOR
CONT CONTINUED
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CT COOLING TOWER
CU COPPER
CU FT CUBIC FEET
CU IN CUBIC INCHES
CW COLD WATER, CLOCKWISE
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN,
CWS CONDENSER WATER SUPPLY
CWV COMBINATION WASTE & VENT
D DEPTH
DB DECIBEL, DRY BULB
DEG DEGREE(S)
DIA DIAMETER
DN DOWN
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DS DOWN SPOUT
DWG DRAWING
(E) EXISTING
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EFF EFFICIENCY
EG EXHAUST GRILLE
ELEV ELEVATION
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
F FLOW
FACP FIRE ALARM CONTROL PANEL
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN, FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FM FLOW METER
FP FIRE PROTECTION
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FSP FIRE SPRINKLER
FT FOOT, FEET
G GAS
GA GAUGE
GALV GALVANIZED
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPS GALLONS PER SECOND
HD HEAD
HG MERCURY
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HP HORSEPOWER
HR HOSE REEL, HOUR
HT HEIGHT
HVAC HEATING, VENTILATION &CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HZ FREQUENCY
ID INSIDE DIAMETER
INVERT INVERT ELEVATION
IW INDIRECT WASTE
KW KILOWATTS
KWH KILOWATTS PER HOUR
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LF LINEAR FEET
LPG LIQUID PETROLEUM GAS
LTG LIGHTING
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1,000 BTUH
MCC MOTOR CONTROL CENTER
MD MOTORIZED DAMPER
MFR MANUFACTURER
MIN MINIMUM, MINUTE
MTD MOUNTED
MUA MAKE UP AIR
(N) NEW
NC NORMALLY CLOSED, NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
ORD OVERFLOW ROOF DRAIN
PB POLYBUTYLENE
PE POLYETHYLENE
PPM PARTS PER MILLION
POC POINT OF CONNECTION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH, ABSOLUTE
PSIG POUNDS PER SQUARE INCH, GAGE
PVC POLYVINYL CHLORIDE
RA RETURN AIR
RD ROOF DRAIN
REQ REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RPS REVOLUTIONS PER SECOND
SAD SEE ARCHITECTURAL DRAWINGS
STD STANDARD
SOV SHUT OFF VALVE
SD SUPPLY DIFFUSER, STORM DRAIN
SS SANITARY SEWER, STAINLESS STEEL
TD TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TOD TOP OF DUCT
TP TOTAL STATIC PRESSURE
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
V VENT, VOLT
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VP VELOCITY PRESSURE
VTR VENT THROUGH ROOF
W WIDTH
W/ WITH
WB WET BULB
WG WATER GAGE
W/O WITHOUT
WRG WALL RETURN GRILLE
WSR WALL SUPPLY REGISTER
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
XFMR TRANSFORMER
YR YEAR
Z ZONE
10306-10-003
CSH
SAS
CSH
7/23/10
AS NOTED
M0.1 26 40
CO2
1. THE ABBREVIATION G.C. WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS SHALL
REFER TO THE GENERAL CONTRACTOR.
2. THESE DRAWINGS ARE BASED UPON AVAILABLE DOCUMENTS, WHICH MAY NOT ACCURATELY
PORTRAY AS-BUILT CONDITIONS. EXISTING EQUIPMENT AND PIPING SIZES, LOCATIONS, AND
DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO DEMOLITION AND CONSTRUCTION.
NOTIFY THE COR IMMEDIATELY OF ALL DISCREPANCIES AFFECTING THE REMOVAL OF
EXISTING EQUIPMENT AND PIPING, AND THE INSTALLATION OF NEW EQUIPMENT AND PIPING.
3. INSTALL PIPING AND DUCTWORK TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE
INSTALLATION WORK OF OTHER TRADES. THESE DRAWINGS ARE DIAGRAMMATIC, DO NOT
SCALE TO DETERMINE EXACT LOCATION OF PIPING.
4. PROTECT ALL EXISTING EQUIPMENT THAT IS TO REMAIN. VERIFY WITH COR WHAT SYSTEMS
WILL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. NOTIFY THE COR PRIOR TO
SHUTTING DOWN ANCILLARY SYSTEMS OR EQUIPMENT.
5. REPAIR AND/OR REPLACE ALL EXISTING UTILITIES, STRUCTURAL ELEMENTS, EQUIPMENT,
PIPING, CONDUIT, DUCTWORK, ETC. THAT IS DAMAGED OR BECOMES INOPERABLE AS A
RESULT OF THIS WORK.
6. COORDINATE MODIFICATIONS TO EXISTING SYSTEMS WITH COR TO MINIMIZE SHUTDOWN TIME
OF BUILDING SYSTEMS.
7. FOR ALL MECHANICAL SYSTEMS CONTROLS, PROVIDE CONDUIT AND WIRING IN ACCORDANCE
WITH ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS.
8. ALL SANITARY AND SANITARY VENT PIPING SHALL SLOPE AT 14" PER 12" UNLESS OTHERWISE
NOTED.
9. THE BUILDINGS INCLUDED IN THE SCOPE OF WORK ARE ELIGIBLE FOR INCLUSION ON THE
NATIONAL REGISTER OF HISTORIC PLACES. ANY PIPES, DUCTS OR EQUIPMENT THAT ALTERS
THE EXTERIOR APPEARANCE MUST BE SUBMITTED TO AND APPROVED BY THE COR.
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
DEMOLITION NOTES
1. REMOVE EXISTING WINDOW MOUNTED AIR CONDITIONING UNIT AND
ASSOCIATED APPURTENANCES
2. REMOVE EXISTING SERVICE SINKS AND ASSOCIATED APPURTENANCES.
10306-10-003
CSH
SAS
7/23/10
1/4" = 1'-0"
M1.0 27 40
N
S
T
CU
FC
2304-1
M5.1
M5.12304-1
2304-15
M5.1
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
SHEET GENERAL NOTES
1. SEE SHEET M5.0 FOR MECHANICAL SCHEDULES.
2. SEE SHEET M5.1 FOR MECHANICAL DETAILS.
3. NO REFRIGERANT OR CONDENSATE PIPING SHALL BE ROUTED ON
THE EXTERIOR OF THE BUILDING. PENETRATE THE BUILDING WALL
AS CLOSE TO GRADE AS POSSIBLE. ROUTE VERTICAL RUNS INSIDE
STUD WALL IF AVAILABLE. PROVIDE SHEET METAL SHROUD PER
DETAIL #2, SHEET M5.1 IF STUD WALL IS NOT PROVIDED AND
ROUTING IS ON INTERIOR SURFACE OF ROOM WALL.
4. PROVIDE NEW SUPPLY STOPS TO FIXTURES.
5. REPAIR EXISTING PIPING AS REQUIRED TO PROVIDE A FUNCTIONAL
PLUMBING SYSTEM.
6. EXTEND PIPING AS REQUIRED TO CONNECT NEW OR RELOCATED
FIXTURES TO EXISTING PROPANE, CW, HW, SS, AND VENT PIPING
MAINS.
KEYNOTES
1. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" ABOVE
FINISHED FLOOR. ROUTE CONDENSATE LINE THROUGH TO EXTERIOR OF
WALL AND DOWN TO 6” ABOVE FINISHED GRADE. CONCEAL CONDENSATE
PIPING BENEATH SHEETMETAL COVER ALONG WITH REFRIGERANT LINES.
2. INSTALL NEW EXTERIOR MOUNTED CONDENSING UNIT ON CONCRETE PAD.
LIQUID AND VAPOR REFRIGERANT LINES TO BE RUN AT EXTERIOR OF
BUILDING BENEATH SHEETMETAL COVER BEFORE PENETRATING THE WALL
BEHIND THE INTERIOR AIR CONDITIONING UNIT.
3. INSTALL NEW SINK. RECONNECT DOMESTIC WATER AND SANITARY SEWER
PIPING TO NEW SINK AT NEW POINT OF CONNECTION 6" AFG.
4. MOUNT REMOTE THERMOSTAT 48" AFF.
5. ROUTE SINK VENT BELOW WINDOW IN FURRED WALL TO CORNER. ROUTE
2" VENT UP THROUGH ROOF.
10306-10-003
CSH
SAS
7/23/10
1/4" = 1'-0"
M1.1 28 40
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
10306-10-003
CSH
SAS
7/23/10
1/4" = 1'-0"
M3.0 29 40
DEMOLITION NOTES
1. REMOVE EXISTING EXTERIOR MOUNTED AIR CONDITIONING UNIT AND
ASSOCIATED APPURTENANCES.
2. REMOVE EXISTING WALL FURNACE, FLUE, PROPANE PIPING, THERMOSTAT
AND ASSOCIATED APPURTENANCES. CAP PROPANE PIPING BELOW FLOOR.
REPAIR WALL, ROOF AND/OR CEILING PENETRATIONS TO MATCH EXISTING
FINISH OF SURROUNDING AREA.
3. REMOVE EXISTING PROPANE FIRED WATER HEATER AND FLUE.
4. REMOVE EXISTING WASHING MACHINE.
5. REMOVE EXISTING KITCHEN SINK.
6. REMOVE EXISTING ELECTRIC KITCHEN STOVE.
7. REMOVE EXISTING TUB AND SHOWER FIXTURES, WATER CLOSET AND
LAVATORY.
CU
1007-2
M5.1
M5.1
FC
1007-1
CU
1007-1
CU
1007-3
FC
1007-2
M5.1
WC
LAV
SH
FC
1007-3
M5.1
EF
1007-1T
1007-3 T
1007-2
T
1007-1
M5.1
M5.1
WH
1007-1
M5.1
M5.1
M5.1
M5.1
M5.1
M5.1
M5.1
M5.1
M5.1
SHEET OF
SCALE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
10306-10-003
CSH
SAS
7/23/10
1/4" = 1'-0"
M3.1 30 40
SHEET GENERAL NOTES
KEYNOTES
1. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" ABOVE
FINISHED FLOOR. ROUTE CONDENSATE LINE THROUGH TO EXTERIOR OF
WALL AND DOWN TO 6” ABOVE FINISHED GRADE. CONCEAL CONDENSATE
PIPING BENEATH SHEETMETAL COVER ALONG WITH REFRIGERANT LINES.
2. KEYNOTE NOT USED.
3. KEYNOTE NOT USED.
4. KEYNOTE NOT USED.
5. INTERLOCK EXHAUST FAN WITH RESTROOM LIGHTING.
6. INSTALL NEW PROPANE FIRED WATER HEATER WITH BOTTOM OF UNIT 36"
AFF. ROUTE FLUE AND INTAKE THROUGH ROOF. CONTRACTOR TO FIELD
VERIFY LOCATIONS OF HW, CW, AND PROPANE PIPING IN BASEMENT AND
EXTEND IN BASEMENT TO BELOW CLOSET LOCATION OF WATER HEATER.
ROUTE PIPING UP THROUGH FLOOR INTO CLOSET TO WATER HEATER.
7. INSTALL NEW PROPANE FIRED STOVE/OVEN. SEE SPECIFICATION SECTION
113100 FOR APPLIANCE INFORMATION. CONTRACTOR TO FIELD VERIFY
EXACT LOCATION OF PROPANE PIPING POINT OF CONNECTION. EXTEND
PIPING TO NEW APPLIANCE. PROVIDE SHUT OFF VALVE AT APPLIANCE.
8. INSTALL NEW KITCHEN SINK, RECONNECT TO EXISTING HW, CW, AND SS
MAINS.
9. INSTALL NEW PROPANE FIRED CLOTHES DRYER. SEE SPECIFICATION
SECTION 113100 FOR APPLIANCE INFORMATION. CONNECT TO EXISTING
PROPANE PIPING POINTS OF CONNECTION. 4" VENT THROUGH WALL PER
MANUFACTURER VENTING DIAGRAM. CONTRACTOR TO FIELD VERIFY
POINT OF CONNECTION. CONNECT NEW PROPANE PIPING TO EXISTING
PIPING IN BASEMENT.
10. INSTALL NEW SHOWER/TUBONTRACTOR TO FIELD VERIFY EXACT
LOCATION OF HW, CW AND SS PIPING IN CRAWLSPACE AND EXTEND PIPING
FROM FIXTURE TO NEAREST MAIN.
11. INSTALL LAVATORY. RECONNECT TO EXISTING CW, HW AND SS MAINS..
12. INSTALL WATER CLOSET. RECONNECT TO EXISTING CW AND SS MAINS.
13. MOUNT RANGE HOOD TO UNDERSIDE OF CABINET CENTERED DIRECTLY
ABOVE STOVE AND RANGE. ROUTE DUCTWORK TO ROOFCAP.
14. MOUNT THERMOSTAT 48" AFF.
15. ROUTE 6" EXHAUST DUCTWORK TO ROOFCAP.
16. ROUTE KITCHEN SINK VENT IN NEW FURRED WALL AND UP THROUGH
ROOF.
17. INSTALL NEW CLOTHES WASHER. SEE SPECIFICATION SECTION 113100
FOR APPLIANCE INFORMATION. CONNECT TO EXISTING PLUMBING AND
VENT POINTS OF CONNECTION IN BASEMENT. CONTRACTOR TO FIELD
VERIFY POINTS OF CONNECTION FOR HW, CW AND SS.
18. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE KITCHEN SINK,
LAVATORY, WATER CLOSET, SHOWER AND CLOTHES WASHING MACHINE
ABOVE THE CEILING TO A SINGLE 4" VENT THROUGH ROOF.
N
1. SEE SHEET M5.0 FOR MECHANICAL SCHEDULES
2. SEE SHEET M5.1 FOR MECHANICAL DETAILS.
3. NO REFRIGERANT OR CONDENSATE PIPING SHALL BE ROUTED ON
THE EXTERIOR OF THE BUILDING. PENETRATE THE BUILDING
WALL AS CLOSE TO GRADE AS POSSIBLE. ROUTE HORIZONTAL
RUNS IN BASEMENT/CRAWLSPACE AND/OR ATTIC AS NOTED.
ROUTE VERTICAL RUNS INSIDE STUD WALL IF AVAILABLE.
PROVIDE SHEET METAL SHROUD PER DETAIL #2, SHEET M5.1 IF
STUD WALL IS NOT PROVIDED AND ROUTING IS ON INTERIOR
SURFACE OF ROOM WALL.
4. PROVIDE NEW SUPPLY STOPS TO FIXTURES.
5. REPAIR EXISTING PIPING AS REQUIRED TO PROVIDE A
FUNCTIONAL PLUMBING SYSTEM.
6. EXTEND PIPING AS REQUIRED TO CONNECT NEW OR RELOCATED
FIXTURES TO EXISTING PROPANE, CW, HW, SS, AND VENT PIPING
MAINS.
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
10306-10-003
CSH
SAS
CSH
7/23/10
AS NOTED
M5.0 31 40
EXHAUST FAN SCHEDULE
MARK MANUFACTURER MODEL AIRFLOW EXT. STATIC ELECTRICAL ACOUSTIC WEIGHT
(CFM) PRESS. (IN W.G.) WATTS AMPS VOLT PHASE (SONES) (LBS)
EF-1007-1 GREENHECK SP-A190 167 0.25 113 1.3 115 1 3.1 15
REMARKS:
1. PROVIDE AND INSTALL GREENHECK RJ - 6x9 ROOF CAP.
INDOOR SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE
AHRI CONDITIONS
ARI COOLING
CAPACITY (MBH)
ARI HEATING
CAPACITY (MBH)
DESIGN COOLING (MBH)
DESIGN HEATING
(MBH)
ELECTRICAL
COOLING OPERATING CONDENSATE
LINE, OUTSIDE
DIA. (IN.)
OUTDOOR
REMARKSMARK MANUFACTURER MODEL AIRFLOW EFFICIENCY WEIGHT UNIT
(CFM) INDOOR, DB (F?) OUTDOOR, DB (F?) TOTAL TOTAL SENSIBLE TOTAL OUTPUT VOLT PHASE MCA/MOCP (SEER) (LBS)
FC-2304-1 CARRIER 40QNQ024--3 645 80.0 95.0 22.2 22.0 17.9 18.7 13.4 208/230 1 0.48 / 15 13.0 31 3/4 CU-2304-1 1
FC-1007-1 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 9.7 10.3 5.2 35 VDC 1 9 / 15 13.0 33 3/4 CU-1007-1 2
FC-1007-2 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 7.7 8.3 5.3 35 VDC 1 12 / 20 13.0 25 3/4 CU-1007-2 2
FC-1007-3 CARRIER 40QNQ030--3 730 80.0 95.0 28.2 27.0 25.4 26.6 13.6 208/230 1 0.48 / 15 13.0 51 3/4 CU-1007-3 1
REMARKS:
1. INDOOR AND OUTDOOR UNITS HAVE DEDICATED POWER SUPPLIES.
2. INDOOR UNIT POWERED FROM OUTDOOR UNIT.
LOCAL CONNECTION SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL No. WASTE VENT CW HW REMARKS
WC-1 WATER CLOSET AMERICAN STANDARD 2832.128 3" 1 1/2" 1" - 1, 6
LAV-2
LAVATORY KOHLER K-1997-4
1 3/4" 1 1/2" 1/2" 1/2" 1, 2, 7
FAUCET AMERICAN STANDARD 7385.000
SH-3 ADA TUB/SHOWER
POWERS E426-A-G-1-S-1-Y
1 1/2" 1 1/2" 1/2" 1/2" 3
AMERICAN STANDARD 0255.202
S-1
SINK ELKAY ELUHAD3216 2" 1 1/2" 1/2" 1/2"
4, 5
FAUCET AMERICAN STANDARD 6274.000
REMARKS:
1. INCLUDE ANGLE STOP & SUPPLY.
2. PROVIDE AND INSTALL 0.5 GPM SPRAY HEAD
3. NO HAND SHOWER. MOUNT DIVERTER 48" AFF. MOUNT SHOWERHEAD 78" AFF.
4. PROVIDE AND INSTALL DRAIN LK35L.
5. 5" DEPTH. PROVIDE AND INSTALL WITH AMERICAN STANDARD 172H HANDLES.
6. OLSONITE 10CT SEAT.
7. PROVIDE AND INSTALL TRUBRO LAVGAURD.
OUTDOOR SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE
ENTERING AIR REFRIGERANT LINES,
OUTSIDE DIAMETER, (IN.)
OPERATING INDOOR
REMARKSMARK MANUFACTURER MODEL SUMMER/WINTER ELECTRICAL WEIGHT UNIT
(DEGREES F) LIQUID VAPOR VOLT PHASE MCA/MOCP (LBS)
CU-2304-1 CARRIER 38QRF024--3 102.1 / 30.0 3/8 5/8 208/230 1 16.8 / 25 176 FC-2304-1 1
CU-1007-1 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1007-1 2
CU-1007-2 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-1007-2 2
CU-1007-3 CARRIER 38QRF030--3 102.1 / 30.0 3/8 3/4 208/230 1 18.4 / 30 187 FC-1007-3 1
REMARKS:
1. INDOOR AND OUTDOOR UNITS HAVE DEDICATED POWER SUPPLIES.
2. INDOOR UNIT POWERED FROM OUTDOOR UNIT.
RANGE HOOD SCHEDULE
MARK MANUFACTURER MODEL AIRFLOW ELECTRICAL SONES DUCT SIZE REMARKS
(CFM) AMP VOLT PHASE RPM (IN)
RH-1007-1 BROAN 403001 160 2.0 120 1 2795 6.5 3.25 X 10 1,2
REMARKS:
1) WHITE FINISH
2) PROVIDE AND INSTALL BROAN ROOF CAP #634
WATER HEATER SCHEDULE
MARK MANUFACTURER MODEL LPG INPUT LPG OUTPUT HOT/COLD WATER GAS PIPE CONNECTION INTAKE CONNECTION FLUE CONNECTION ELECTRICAL WEIGHT REMARKS
(BTH/HR) (BTH/HR) CONNECTION (IN) (IN) (IN) (IN) VOLTS PHASE AMPS (LBS)
WH-1007-1 TAKAGI USA T-K3 11,000 199,000 3/4 3/4 3 4 120 1 0.77 40 1, 2, 3, 4, 5, 6
REMARKS:
1. FACTORY SET LIQUID PROPANE GAS
2. PROVIDE AND INSTALL NIBCO T-585-70-UL GAS SHUT-OFF VALVE BEFORE CONNECTION INTO WATER HEATER
3. PROVIDE AND INSTALL TAKAGI USA TK-IV-01-AB ISOLATION VALVES AND PRESSURE RELIEF VALVE ON HOT WATER PIPING. ROUTE HOT WATER PRESSURE RELIEF DISCHARGE PIPING TO 6" ABOVE THE FLOOR INTO DRAIN PAN.
4. PROVIDE AND INSTALL SMITTY DRAIN PAN WITH HOSE BIBB CONNECTION.
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O J E C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
1 FLUE THRU ROOF NOT TO SCALE 3 ROOF EXHAUST CAP NOT TO SCALE 4 CONDENSING UNIT MOUNTING PAD NOT TO SCALE
CEILING
EXHAUST GRILLE
STUD
6" EXHAUST DUCT
UP TO ROOF
EXHAUST CAP
EXHAUST FAN
1-1/4" WOOD
SCREWS, TYP.
OF 2.
EXHAUST DUCT
CONNECTION WITH
BACKDRAFT DAMPER
5 CEILING EXHAUST FAN MOUNTING NOT TO SCALE
FIRE STOP COLLAR
2" BLOCKING
1" MINIMUM
CLEARANCE
ROOFING BY
CONTRACTOR
8"Ø ANCHOR BOLT
W/ NUT & WASHER AT
EACH CONDENSING
UNIT FOOT. MIN. 3"
EMBEDMENT.
6" THICK CONCRETE
PAD W/ #3 AT 12"
O.C. EA. WAY.
CONCRETE
PAD DIMENSIONS:
FOR UNIT MODELS 38MVQ009 - 44" WIDE BY 24" LONG
FOR UNIT MODELS 38MVQ012 - 48" WIDE BY 24" LONG
FOR UNIT MODELS 38QRF018 - 54" WIDE BY 24" LONG
FOR UNIT MODELS 38QRF024 - 54" WIDE BY 24" LONG
FOR UNIT MODELS 38QRF030 - 70" WIDE BY 24" LONG
CENTER CONDENSING
UNIT ON PAD
2x6 BLOCKING
ALL AROUND
1" CLEAR MIN
ALL AROUND
4" CATEGORY III STAINLESS
M
IN
RAIN CAP
TAKAGI USA TK-KPRT4
COUNTERFLASHING RING
RUN ROOFING UP UNDER
COUNTERFLASHING RING
TALL CONE FITTING WITH
STEEL VENT TO WATER HEATER
TO CEILING
EXHAUST FAN OR
RANGE HOOD
7 REFRIGERANT PIPING IN PVC NOT TO SCALE
6 CONDENSATE DRAIN NOT TO SCALE
2 REFRIGERANT/CONDENSATE PIPING SHROUD NOT TO SCALE
7"
4" SHEET METAL
SCREW WITH
COLOR MATCHED
HEADS EVERY 24"
3"
CONDENSATE
PIPING TO
EXTERIOR (BELOW
FLOOR IN
BASEMENT OR
THROUGH WALL TO
EXTERIOR)
REFRIGERANT
LINES TO
OUTDOOR UNIT
(BELOW FLOOR IN
BASEMENT,
ABOVE CEILING
IN ATTIC OR
THROUGH WALL
TO EXTERIOR)
1/8" FORMED
ALUMINUM, SHOP
PAINTED TO MATCH
INTERIOR FINISH
1" AIR GAP
FILL WITH GRAVEL
8"X8"
18"
TRACER WIRE SHALL BE INSTALLED WITH
ALL NON-METALLIC PIPING BELOW GRADE.
B A C K F
IL
L
SCH 40 PVC
NOTES:
P
IP
E
O .D
MIN. 4"
MAX 4" + 25% PIPE O.D.
UNPAVED AREAS
REFRIGERANT PIPING
SUCTION W/
INSULATION AND LIQUID
WITHOUT INSULATION.
PE-X FOAM
3/4" CONDENSATE
DRAIN FROM FAN
COIL ABOVE
FLOOR
3/4" PVC SCH. 40 SLOPE
1/8" PER FOOT
CHRISTY LID G3C, WITH
BOLT DOWN BOLTS
CHRISTY G3 TRAFFIC
VALVE BOX
FILL WITH GRAVEL
12" DEEP
EXTERIOR WALL
VENT
P-TRAP
SLOPE 1/8"
PER 1'-0"
3/4" CONDENSATE
DRAIN, TERMINATE
OVER GRAVEL PIPE CLAMP,
SECURE TO WALL
WITH 3/8"Ø X 3"
LAG SCREW
8 CONDENSATE DRAIN DRY WELL NOT TO SCALE
6" MIN.
72" MIN.
INTERIOR ROOM
WIDTH
CONTRACTOR
ROOFING BY
GREENHECK OR
BROAN ROOF CAP
PROVIDE ROOF
THIMBLE AS
REQUIRED
10306-10-003
CSH
SAS
CSH
7/23/10
AS NOTED
M5.1 32 40
4" TAPCON
MASONRY
ANCHOR, MIN
3" DEPTH,
SPACED
EVERY 24".
1/8" X 1" X 1"
ALUMINUM
ANGLE
DRAWING
CHECKED BY
DATE
CHECKED BY
A/E
DRAWN BY
DESIGNED BY
PROJECT NUMBER
N A M E
P R O
JE
C T
F O R E S T
D R A W
IN
G
N A M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
10306-10-003
CSH
SAS
CSH
7/23/10
AS NOTED
M7.1 33 40
The Principal Mechanical Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in the applicable parts of Sections 100, 101, 102, 110 through 115, 120 through 125, 142, 144 and 145.
The operation & maintenance information meets the requirements of Part 1 (10-103c).
GENERAL INFORMATION
STATEMENT OF COMPLIANCE
BUILDING TYPE
PHASE OF CONSTRUCTION
CERTIFICATE OF COMPLIANCE MECH-1-C(Part 1 of 3)
PROJECT NAME
PROJECT ADDRESS
PRINCIPAL DESIGNER-MECHANICAL
DOCUMENTATION AUTHOR
TELEPHONE
TELEPHONE
DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE
NONRESIDENTIAL
NEW CONSTRUCTION
HIGH RISE RESIDENTIAL
ADDITION ALTERATION
HOTEL/MOTEL GUEST
ROOM
DATE
Building Permit #
Checked by/Date
Enforcement Agency Use
This Certificate of Compliance lists the building features and performance specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR SIGNATURE DATE
2005 Nonresidential Compliance Forms January 2006
The plans & specifications meet the requirements of Part 1 (Sections 10-103a).
The installation certificates meet the requirments of Part 1 (10-103a 3).
Please check one: ( These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.)
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or mechanical engineer, or I am a licensed architect.
I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work.
I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1.
PRINCIPAL MECHANICAL DESIGNER-NAME SIGNATURE DATE LIC. #
INSTRUCTIONS TO APPLICANT MECHANICAL COMPLIANCE & WORKSHEETS (check box if worksheet is included)
MECH-1-C
MECH-2-C
MECH-3-C
MECH-4-C
Certificate of Compliance. Part 1 of 3, 2 of 3, 3 of 3 are required on plans for all submittals
Air/Water/Service/Water Pools Requirements. Part 1 of 3, 2 of 3, 3 of 3 are required for all submittals, but may be on plans.
Mechanical Ventilation and Reheat is required for all submittals with mechanical ventialtion, but may be on plans.
HVAC Misc. Prescriptive Requirements is required for all prescriptive submittals, but may be on plans.
UNCONDITIONED
(file affidavit)
CERTIFICATE OF COMPLIANCE MECH-1-C(Part 2 of 3)
PROJECT NAME DATE
2005 Nonresidential Compliance Forms January 2006
Test Performed By:Test Description
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all the equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is oeprated for normal use, all control devices serving the buidling or space shall be certified as meeting the Acceptance
Requirements for Code Compliance.
In addition a Certificate of Acceptance, MECH-1-A, Form shall be submitted to the building department that certifies plans, specifications, installtion certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title 24 Part 6.
� MECH-2-A: Ventilation System Acceptance Document
- Variable Air Volume Systems Outdoor Air Acceptance
- Constant Air Volume Systems Outdoor Air Acceptance
Test required on all New systems both New Construction and Retrofit.
Equipment requiring acceptance testing
MECH-3-A: Packaged HVAC Systems Acceptance Document
Test required on all New packaged systems both New Construction and Retrofit.
Equipment requiring acceptance testing
MECH-4-A: Air-Side Economizer Acceptance Document est required on all New packaged
Test required on all new air-side economizers for both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the Commission do not require equipment testing but do require construction inspection.
Equipment requiring acceptance testing
CERTIFICATE OF COMPLIANCE MECH-1-C(Part 3 of 3)
PROJECT NAME DATE
2005 Nonresidential Compliance Forms January 2006
Test Performed By:Test Description
� MECH-5-A: Air Distribution Acceptance Document This test is required if the unit serves 5,000 ft of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit.
Equipment requiring acceptance testing
MECH-6-A: Demand Control Ventilation Acceptance Document
All new DCV controls installed on new or existing packaged systems must be tested.
Equipment requiring acceptance testing
MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
All new VAV fan volume controls installed on new or existing systems must be tested.
Equipment requiring acceptance testing
� MECH-8-A: Hydronic System Control Acceptance Document Variable Flow Controls, Applies to chilled and hot water systems .
Automatic Isolation Controls, Applies to new boilers and chillers and the primary pumps are connected to a common header .
Supply Water Temperature Reset Controls, Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000
Btu/hr .
Water-loop Heat Pump Controls, Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp .
Variable Frequency Control, Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5hp .
Equipment requiring acceptance testing
AIR SYSTEM REQUIREMENTS MECH-2-C(Part 1 of 3)
2005 Nonresidential Compliance Forms January 2006
PROJECT NAME: DATE:
112(a)
112(a)
112(b)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
121(c), 122(e)
122(e)
122(f)
122(g)
Reference on Plans or Specification
AIR SYSTEMS, Central or Single Zone
144(a & b)
144(a & b)
144(a & b)
144(a & b)
144(c)
144(c)
144(c)
144(d)
144(e)
144(f)
144(k)
ITEM or SYSTEM TAG(S)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat Furnace Controls
Natural Ventilation
Minimum Ventialtion
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity
Proposed Heating Capacity
Calculated Cooling Capacity Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simulataneous Heat/Cool Economizer
Heat and Cool Air Supply Reset Duct Sealing
1: For each central and single zone air systems (or group of similar units) fill in the the reference to sheet number and/or specification section and paragraph number where the required features are documetned. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating or cooling. Either enter value here or put in reference to plans and specifications per footnote 1.
T-24
Section
1. THE AIR CONDITIONING UNITS MAY BE INSTALLED ONLY IF THE MANUFACTURER HAS CERTIFIED THAT THE
EQUIPMENT MEETS OR EXCEEDS ALL APPLICABLE EFFICIENCY REQUIREMENTS LISTED IN 112 OF THE ENERGY
EFFICIENCY STANDARDS.
2. PIPING, EXCEPT THOSE CONVEYING FLUIDS AT TEMPERATURES BETWEEN 60 DEG F AND 105 DEG F, OR WITHIN
HVAC EQUIPMENT SHALL BE INSULATED IN ACCORDANCE WITH STANDARDS PAR. 123.
3. AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED, SEALED AND INSULATED AS PROVIDED IN
CHAPTER 10 OF THE CMC.
4. EACH SPACE CONDITIONING SYSTEM SERVING BUILDING TYPES SUCH AS OFFICES AND MANUFACTURING FACILITIES
(AND ALL OTHERS NOT EXPLICITY EXEMPT FROM THE REQUIREMENTS OF SECTION 122(e)OF THE 2001 ENERGY
EFFICIENCY STANDARDS FOR NONRESIDENTIAL BUILDINGS (TITLE 24) SHALL BE INSTALLED WITH AN AUTOMATIC
TIME SWITCH WITH AN ACCESSIBLE MANUAL OVERRIDE THAT ALLOWS OPERATION OF THE SYSTEM DURING
OFF-HOURS FOR UP TO FOUR HOURS. THE TIME SWITCH SHALL BE CAPABLE OF PROGRAMMING DIFFERENT
SCHEDULES FOR WEEKDAYS AND WEEKENDS; INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE THAT
TURNS OFF ALL LOADS FOR AT LEAST 24 HOURS, THEN RESUMES THE NORMALLY SCHEDULED OPERATION, AND
HAS PROGRAM BACKUP CAPABILITIES THAT PREVENT THE LOSS OF THE DEVICE'S PROGRAM AND TIME SETTING
FOR AT LEAST 10 HOURS IF POWER IS INTERRUPTED.
5. EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT TEMPORARILY OPERATE THE
SYSTEM AS REQUIRED TO MAINTAIN A SETBACK HEATING THERMOSTAT SETPOINT.
6. EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL THERMOSTAT CONTROL THAT
RESPONDSTO TEMPERATURE WITHIN THE ZONE. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE
CONTROL SHALL BE CAPABLE OF PROVIDING A DEAD BAND OF AT LEAST 5 DEG F WITHIN WHICH THE SUPPLY OF
HEATING AND COOLING IS SHUT OFF OR REDUCED TO A MINIMUM.
7. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN DEG F.
8. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL.
9. CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OR DEVICES TO BE OPERATED AT THE
VENTILATION RATES AS SPECIFIED IN THE PLANS.
10. GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED ON THE
OUTSIDE AIR INTAKES AND DISCHARGES OF ALL SPACE CONDITIONING AND EXHAUST SYSTEMS.
11. ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN
THESE PLANS, IN ACCORDANCE WITH THE NEBB PROCEDURAL STANDARDS OR AABC NATIONAL STANDARDS.
12. THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL AIR CONDITIONING UNIT
SCHEDULES AND SHALL BE MEASURED AND CERTIFIED BY THE INSTALLING LICENSED C-20 MECHANICAL
CONTRACTOR.
SJER BARRACKS SEISMIC UPGRADE
24075 HWY 41 COARSEGOLD, CA 93614
CHRISTOPHER S. HANZEL
CHRISTOPHER S. HANZEL
415-283-4970
415-283-4970
July 23, 2010
CHRISTOPHER S. HANZEL
None
None
None
July 23, 2010
SJER BARRACKS SEISMIC UPGRADE July 23, 2010 SJER BARRACKS SEISMIC UPGRADE July 23, 2010
CU/FC - 2011-1 to 8
CU/FC - 1004-1 to 8 & CU/FC - 2304 - 1 & CU/FC - 1007 - 1 to 3
CONTRACTOR
None
None
None
FC-2011 - 1 to 8 FC-1004 - 1 to 8 FC-2304 - 1 FC-1007 - 1 to 3
M6.0 M6.0 M5.0 M5.0
M6.0 M6.0 M5.0 M5.0
M2.1 M4.1 M1.1 M3.1
N/A N/A N/A N/A
A2.1 & A6.2 A4.2 & A6.2 A1.1 & A6.2 A3.2 & A6.2
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
M6.0 M6.0 M5.0 M5.0
M6.0 M6.0 M5.0 M5.0
M6.0 M6.0 M5.0 M5.0
M6.0 M6.0 M5.0 M5.0
M2.1 & M6.0 M6.0 & M4.1 M1.1 & M5.0 M3.1 & M5.0
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
SJER BARRACKS SEISMIC UPGRADE July 23, 2010
| SJER Structural Drawings - Phase 2.pdf |
| ANCHOR DETAILS PHASE 2 S61 |
| S01 Structural Notes Phase 2 |
| S11 |
| S31 |
| S32 |
| S33 |
| S51 |
| S62 |
| S64 |
| SJER 100% W&K drawings - Phase 2.pdf |
| 1030610003 M0.1 - PH2 |
| 1030610003 M0.1 - PH2.dwg |
| Layout1 |
| 1030610003 M1.0 |
| 1030610003 M1.0.dwg |
| Layout1 |
| 1030610003 M1.1 |
| 1030610003 M1.1.dwg |
| Layout1 |
| 1030610003 M3.0 |
| 1030610003 M3.0.dwg |
| Layout1 |
| 1030610003 M3.1 |
| 1030610003 M3.1.dwg |
| Layout1 |
| 1030610003 M5.0 |
| 1030610003 M5.0.dwg |
| Layout1 |
| 1030610003 M5.1 |
| 1030610003 M5.1.dwg |
| Layout1 |
| 1030610003 M7.1 - PH2 |
| 1030610003 M7.1 - PH2.dwg |
| Layout1 |
File details come from the government source that posted it. Updated .