Attachment 2_Phase I Drawings.pdf

PDF 22 MB Posted

Attached to
8a File Transfer
Solicitation number
SJER8a442790
Issued by

About this file

Phase I Drawings

View the file

Other files

File Type Posted
9702_S10_0574_SJER Construction.zip ZIP file
Attachment 1_Specifications.pdf PDF
Attachment 2a_Phase II Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

SCALE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

GENERAL MECHANICAL NOTES

1. THE ABBREVIATION G.C. WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS SHALL

REFER TO THE GENERAL CONTRACTOR.

2. THESE DRAWINGS ARE BASED UPON AVAILABLE DOCUMENTS, WHICH MAY NOT ACCURATELY

PORTRAY AS-BUILT CONDITIONS. EXISTING EQUIPMENT AND PIPING SIZES, LOCATIONS, AND

DIMENSIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO DEMOLITION AND CONSTRUCTION.

NOTIFY THE COR IMMEDIATELY OF ALL DISCREPANCIES AFFECTING THE REMOVAL OF

EXISTING EQUIPMENT AND PIPING, AND THE INSTALLATION OF NEW EQUIPMENT AND PIPING.

3. INSTALL PIPING AND DUCTWORK TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE

INSTALLATION WORK OF OTHER TRADES. THESE DRAWINGS ARE DIAGRAMMATIC, DO NOT

SCALE TO DETERMINE EXACT LOCATION OF PIPING.

4. PROTECT ALL EXISTING EQUIPMENT THAT IS TO REMAIN. VERIFY WITH COR WHAT SYSTEMS

WILL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. NOTIFY THE COR PRIOR TO

SHUTTING DOWN ANCILLARY SYSTEMS OR EQUIPMENT.

5. REPAIR AND/OR REPLACE ALL EXISTING UTILITIES, STRUCTURAL ELEMENTS, EQUIPMENT,

PIPING, CONDUIT, DUCTWORK, ETC. THAT IS DAMAGED OR BECOMES INOPERABLE AS A

RESULT OF THIS WORK.

6. COORDINATE MODIFICATIONS TO EXISTING SYSTEMS WITH COR TO MINIMIZE SHUTDOWN TIME

OF BUILDING SYSTEMS.

7. FOR ALL MECHANICAL SYSTEMS CONTROLS, PROVIDE CONDUIT AND WIRING IN ACCORDANCE

WITH ELECTRICAL SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS.

8. ALL SANITARY AND SANITARY VENT PIPING SHALL SLOPE AT 14" PER 12" UNLESS OTHERWISE

NOTED.

9. THE BUILDINGS INCLUDED IN THE SCOPE OF WORK ARE ELIGIBLE FOR INCLUSION ON THE

NATIONAL REGISTER OF HISTORIC PLACES. ANY PIPES, DUCTS OR EQUIPMENT THAT ALTERS

THE EXTERIOR APPEARANCE MUST BE SUBMITTED TO AND APPROVED BY THE COR.

ABBREVIATIONS HVAC SYMBOLS

FD

FSD

M

DUCT SECTION, SUPPLY AIR UP

DUCT SECTION, RETURN AIR UP

DUCT SECTION, EXHAUST AIR UP

DUCT SECTION, SUPPLY AIR DN

DUCT SECTION, RETURN AIR DN

DUCT SECTION, EXHAUST AIR DN

FLEXIBLE DUCT

FIRE AND SMOKE DAMPER

FIRE DAMPER

DIRECTION OF FLOW

MANUAL VOLUME DAMPER

WALL SUPPLY OUTLET, RETURN GRILLE

CEILING DIFFUSER

CEILING RETURN

CEILING EXHAUST

DUCT SMOKE DETECTOR

ELECTRIC THERMOSTAT

REMOTE SENSOR

MOTORIZED ACTUATOR

DD

T

S

FOS

CWS

SYMBOL DESCRIPTION

FUEL OIL (SUPPLY)

FUEL OIL (RETURN)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

REFRIGERANT LIQUID

REFRIGERANT SUCTION

AUTOMATIC AIR VENT

BLOW OFF STRAINER

FILTER AND STRAINER LINE

PRESSURE GAGE

PRESSURE GAGE AND COCK

PRESSURE REDUCING VALVE

RELIEF OR SAFETY VALVE

STRAINER

TEMPERATURE GAGE

PUMP (PLAN)

PUMP (SCHEMATIC)

EXPANSION LOOP

CAP

CONCENTRIC REDUCER

UNION

THREE-WAY MANUAL VALVE

BALL VALVE

BUTTERFLY VALVE

DIAPHRAGM VALVE

GATE VALVE

GLOBE VALVE

CHECK VALVE

POINT OF CONNECTION

FLEXIBLE CONNECTOR

THERMOMETER

PETE'S PLUG

AIR TERMINAL IDENTIFICATION

12x12 SD-1

AIR TERMINAL MARK

AIRFLOW, CFM

NOTE:

ARROWS INDICATE DIRECTION OF AIRFLOW

NO ARROWS INDICATE 4-WAY AIRFLOW

AIR TERMINAL NECK SIZE

(IF SHOWN)

1 KEYNOTE

DEMOLITION NOTE

ROOM NAME AND ROOM NUMBER

DETAIL INDICATOR SECTION INDICATOR

MECHANICAL EQUIPMENT

DESIGNATION

(SEE SCHEDULE)

DETAIL

NUMBER

SHEET NUMBER ON

WHICH DETAIL APPEARS

SECTION LETTER

SHEET NUMBER ON WHICH

SECTION APPEARS

WH

E5.1

A

E3.1

SHEET ANNOTATION

CARBON DIOXIDE SENSOR

PIPING SYMBOLS

SYMBOL DESCRIPTION

FOR

CWR

HHWS

HHWR

CS

CR

RL

RS

A AMPERES, AREA

ABS ACRYLONITRILE-BUTADIENE-STYRENE

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

APPROX APPROXIMATE(LY)

AS AIR SEPARATOR

AVG AVERAGE

BD BALANCE DAMPER

BDD BACK DRAFT DAMPER

BFP BACK FLOW PREVENTER

BG BELOW GRADE

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CELSIUS

� CENTERLINE

CCW COUNTER CLOCKWISE

CD CEILING DIFFUSER, CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CMPR COMPRESSOR

CONT CONTINUED

CT COOLING TOWER

CU COPPER

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CU FT CUBIC FEET

CU IN CUBIC INCHES

CW COLD WATER, CLOCKWISE

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN,

CWS CONDENSER WATER SUPPLY

CWV COMBINATION WASTE & VENT

D DEPTH

DB DECIBEL, DRY BULB

DEG DEGREE(S)

DIA DIAMETER

DN DOWN

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DS DOWN SPOUT

DWG DRAWING

(E) EXISTING

EA EACH

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST GRILLE

ELEV ELEVATION

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

F FLOW

FACP FIRE ALARM CONTROL PANEL

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN, FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FM FLOW METER

FP FIRE PROTECTION

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSD FIRE/SMOKE DAMPER

FSP FIRE SPRINKLER

FT FOOT, FEET

G GAS

GA GAUGE

GALV GALVANIZED

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPS GALLONS PER SECOND

HD HEAD

HG MERCURY

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HP HORSEPOWER

HR HOSE REEL, HOUR

HT HEIGHT

HVAC HEATING, VENTILATION &CONDITIONING

HW HOT WATER

HWR HOT WATER RETURN

HZ FREQUENCY

ID INSIDE DIAMETER

INVERT INVERT ELEVATION

IW INDIRECT WASTE

KW KILOWATTS

KWH KILOWATTS PER HOUR

L LENGTH

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LF LINEAR FEET

LPG LIQUID PETROLEUM GAS

LTG LIGHTING

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH 1,000 BTUH

MCC MOTOR CONTROL CENTER

MD MOTORIZED DAMPER

MFR MANUFACTURER

MIN MINIMUM, MINUTE

MTD MOUNTED

MUA MAKE UP AIR

(N) NEW

NC NORMALLY CLOSED, NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN, NUMBER

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

ORD OVERFLOW ROOF DRAIN

PB POLYBUTYLENE

PE POLYETHYLENE

PPM PARTS PER MILLION

POC POINT OF CONNECTION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH, ABSOLUTE

PSIG POUNDS PER SQUARE INCH, GAGE

PVC POLYVINYL CHLORIDE

RA RETURN AIR

RD ROOF DRAIN

REQ REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RPS REVOLUTIONS PER SECOND

SAD SEE ARCHITECTURAL DRAWINGS

STD STANDARD

SOV SHUT OFF VALVE

SD SUPPLY DIFFUSER, STORM DRAIN

SS SANITARY SEWER, STAINLESS STEEL

TD TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TOD TOP OF DUCT

TP TOTAL STATIC PRESSURE

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VENT, VOLT

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VP VELOCITY PRESSURE

VTR VENT THROUGH ROOF

W WIDTH

W/ WITH

WB WET BULB

WG WATER GAGE

W/O WITHOUT

WRG WALL RETURN GRILLE

WSR WALL SUPPLY REGISTER

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

XFMR TRANSFORMER

YR YEAR

Z ZONE

10306-10-003

CSH

SAS

CSH

7/23/10

AS NOTED

M0.1 31 47

CO2

(E) CONDENSING UNIT

TO REMAIN

SHEET OF

SCALE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

7/23/10

1/4" = 1'-0"

M2.0 32 47

N

1. REMOVE EXISTING WINDOW MOUNTED AIR

CONDITIONING UNIT.

2. REMOVE EXISTING FLOOR MOUNTED FURNACE, FLUE,

PROPANE PIPING, THERMOSTATS AND ASSOCIATED

APPURTENANCES. CAP PROPANE PIPING BELOW

FLOOR. REPAIR INTERIOR AND EXTERIOR WALL,

ROOF AND/OR CEILING PENETRATIONS TO MATCH

EXISTING FINISH OF SURROUNDING AREA.

3. REMOVE EXISTING ROOF MOUNTED PROPANE FIRED

PACKAGE AIR CONDITIONING UNIT, SUPPORTS,

PROPANE PIPING ABOVE ROOF DECK, CONDENSATE

PIPING AND ASSOCIATED DUCTWORK AND CONTROLS

AND ASSOCIATED APPURTENANCES. REPAIR

EXISTING ROOF STRUCTURE TO MATCH EXISTING.

CAP PROPANE PIPING BELOW ROOF IN ATTIC.

4. REMOVE EXISTING PROPANE FIRED WATER HEATER,

FLUE AND ASSOCIATED APPURTENANCES.

5. REMOVE EXISTING SHOWER FIXTURES, ENCLOSURE,

WATER CLOSET AND LAVATORY WITH CABINET.

6. REMOVE EXISTING ELECTRIC KITCHEN STOVE.

7. REMOVE EXISTING KITCHEN SINK.

8. REMOVE EXISTING MEN'S RESTROOM SERVICE SINK, 2

URINALS AND 2 LAVATORIES. 2 WATER CLOSETS TO

BE SALVAGED OR DISPOSED OF PER COR DIRECTION.

DEMOLITION NOTES

T

CU

2011-3 FC

2011-3

FC

2011-4CU

2011-4

CU

2011-2

FC

2011-2

CU

2011-1

FC

2011-1

M6.1

M6.1

(TYP OF 8)

T

T

T15 T

T

FC

2011-5

FC

2011-6

CU

2011-6

U

LAV

WC

M6.1

M6.1

EF

2011-1

S

T

T

CU

2011-7

M6.1

M6.1

M6.1

M6.1

EF

2011-3

LAV

FC

2011-7

SH

WC

LAV

CU

SH

FC

2011-8

M6.1

M6.1

RH

2011-1 S

EF

2011-2

2011-3

2011-4

2011-5

2011-2

2011-1

2011-6

2011-7

2011-8

(E) CONDENSING

UNIT TO REMAIN

WC

CU

2011-5

2011-8

WH

M6.1

(TYP OF 8)

2011-12011-1

SHEET OF

SCALE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

7/23/10

1/4" = 1'-0"

M2.1 33 47

N

SHEET GENERAL NOTES

1. SEE SHEET M2.2 FOR KEYNOTES.

2. SEE SHEET M6.0 FOR MECHANICAL

SCHEDULES

3. SEE SHEET M6.1 FOR MECHANICAL DETAILS.

4. NO REFRIGERANT OR CONDENSATE PIPING

SHALL BE ROUTED ON THE EXTERIOR OF THE

BUILDING. PENETRATE THE BUILDING WALL

AS CLOSE TO GRADE AS POSSIBLE. ROUTE

HORIZONTAL RUNS IN

BASEMENT/CRAWLSPACE AND/OR ATTIC AS

NOTED. ROUTE VERTICAL RUNS INSIDE STUD

WALL IF AVAILABLE. PROVIDE SHEET METAL

SHROUD PER DETAIL #2, SHEET M5.1 IF STUD

WALL IS NOT PROVIDED AND ROUTING IS ON

INTERIOR SURFACE OF ROOM WALL.

5. PROVIDE NEW SUPPLY STOPS TO FIXTURES.

6. REPAIR EXISTING PIPING AS REQUIRED TO

PROVIDE A FUNCTIONAL PLUMBING SYSTEM.

7. EXTEND PIPING AS REQUIRED TO CONNECT

NEW OR RELOCATED FIXTURES TO EXISTING

PROPANE, CW, HW, SS, AND VENT PIPING

MAINS.

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST1. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

REFRIGERANT AND CONDENSATE PIPING DOWN INTERIOR FACE OF WALL

INTO CRAWLSPACE. TERMINATE THROUGH WALL TO CONDENSING UNIT 6"

AFG. CONCEAL CONDENSATE PIPING BENEATH SHEETMETAL COVER ALONG

WITH REFRIGERANT LINES.

2. KEYNOTE NOT USED.

3. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

REFRIGERANT AND CONDENSATE PIPING DOWN INTERIOR FACE OF WALL

INTO CRAWLSPACE. CONCEAL CONDENSATE PIPING BENEATH SHEETMETAL

COVER ALONG WITH REFRIGERANT LINES.TERMINATE CONDENSATE PIPING

THROUGH WALL 6" AFG. CONTINUE ROUTING OF REFRIGERANT PIPING IN

CRAWLSPACE TO EXTERIOR WALL. TERMINATE AT CONDENSING UNIT 6"

AFG.

4. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

CONDENSATE LINE DOWN INTERIOR FACE OF WALL. TERMINATE THROUGH

WALL 6" AFG. ROUTE LIQUID AND VAPOR REFRIGERANT LINES ABOVE

CEILING IN ATTIC.

5. KEYNOTE NOT USED.

6. INTERLOCK EXHAUST FAN WITH RESTROOM LIGHTING.

7. INSTALL NEW PROPANE FIRED WATER HEATER WITH BOTTOM OF UNIT 36"

AFF. ROUTE FLUE AND INTAKE AIR PIPING THROUGH ROOF. RECONNECT TO

EXISTING CW, HW AND PROPANE PIPING.

8. INSTALL NEW PROPANE FIRED STOVE/OVEN. SEE SPECIFICATION SECTION

113100 FOR APPLIANCE INFORMATION. CONTRACTOR TO FIELD VERIFY

EXACT LOCATION OF PROPANE PIPING POINT OF CONNECTION. EXTEND

PIPING TO NEW APPLIANCE. PROVIDE SHUT OFF VALVE AT APPLIANCE.

9. INSTALL NEW KITCHEN SINK, RECONNECT TO EXISTING CW, HW AND SS

MAINS. CONTRACTOR TO FIELD VERIFY LOCATION.

10. INSTALL NEW SINK, RECONNECT TO EXISTING CW AND SS MAINS.

CONTRACTOR TO FIELD VERIFY LOCATION.

11. INSTALL NEW URINALS, RECONNECT TO EXISTING CW AND SS MAINS.

CONTRACTOR TO FIELD VERIFY LOCATION.

12. INSTALL NEW LAVATORY, RECONNECT TO EXISTING CW, HW AND SS MAINS.

CONTRACTOR TO FIELD VERIFY LOCATION.

13. INSTALL NEW WATER CLOSET, RECONNECT TO EXISTING CW AND SS MAINS.

CONTRACTOR TO FIELD VERIFY LOCATION.

14. INSTALL NEW SHOWER AND CONNECT TO NEAREST CW, HW, AND SS MAINS.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF PIPING.

15. MOUNT REMOTE THERMOSTAT 48" AFF.

16. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF POINTS OF

CONNECTION. EXTEND EXISTING SS AND CW PIPING TO FIXTURE. CONNECT

TO NEAREST (E) SANITARY VENT.

17. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF POINTS OF

CONNECTION. EXTEND EXISTING SS, HW, AND CW PIPING TO FIXTURE.

CONNECT TO NEAREST (E) SANITARY VENT.

18. MOUNT RANGE HOOD WITH REMOTE WALL SWITCH TO UNDERSIDE OF

CABINET CENTERED DIRECTLY ABOVE STOVE AND RANGE. ROUTE 6"

EXHAUST DUCTWORK TO ROOFCAP.

19. ROUTE 6" EXHAUST DUCTWORK TO ROOFCAP.

20. ROUTE 8" EXHAUST DUCTWORK TO ROOFCAP.

21. ROUTE REFRIGERANT LINES DOWN FROM ATTIC IN CLOSET AGAINST INSIDE

FACE OF WALL INTO CRAWLSPACE. TERMINATE THROUGH WALL TO

CONDENSING UNIT 6" AFG.

22. ROUTE REFRIGERANT LINES DOWN FROM ATTIC INTO OFFICE 5 CLOSET

AGAINST INSIDE FACE OF WALL INTO CRAWLSPACE. CONTINUE ROUTING OF

REFRIGERANT PIPING IN CRAWLSPACE TO EXTERIOR WALL. TERMINATE

THROUGH WALL TO CONDENSING UNIT 6" AFG. DO NOT ROUTE

REFRIGERANT PIPING ABOVE CONFERENCE ROOM.

23. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE SERVICE SINK, TWO

URINALS, TWO LAVATORIES, AND WATER CLOSET ABOVE THE CEILING TO A

SINGLE 3" VENT THROUGH ROOF.

24. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE KITCHEN SINK, TWO

LAVATORIES, TWO WATER CLOSETS AND TWO SHOWERS ABOVE THE

CEILING TO A SINGLE 3" VENT THROUGH ROOF.

10306-10-003

CSH

SAS

7/23/10

NONE

M2.2 34 47

KEYNOTES

1 1

SHEET OF

SCALE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

7/23/10

1/4" = 1'-0"

M4.0 35 47

N

1. REMOVE EXISTING WINDOW MOUNTED AIR

CONDITIONING UNIT.

2. REMOVE EXISTING WALL FURNACE, FLUE,

PROPANE PIPING, THERMOSTAT AND ASSOCIATED

APPURTENANCES. CAP PROPANE PIPING BELOW

FLOOR. REPAIR WALL, ROOF AND/OR CEILING

PENETRATIONS TO MATCH EXISTING FINISH OF

SURROUNDING AREA.

3. REMOVE EXISTING CEILING EXHAUST FAN.

4. REMOVE EXISTING PROPANE FIRED WATER

HEATER, FLUE, OUTDOOR ENCLOSURE AND

ASSOCIATED APPURTENANCES. PLUMBING POINTS

OF CONNECTION TO REMAIN.

5. REMOVE EXISTING WASHING MACHINE AND

ELECTRIC DRYER. PLUMBING POINTS OF

CONNECTION TO REMAIN.

6. REMOVE EXISTING KITCHEN SINK.

7. REMOVE EXISTING ELECTRIC KITCHEN STOVE AND

OVEN.

8. REMOVE EXISTING LAVATORY.

9. REMOVE EXISTING SHOWER/TUB FIXTURE AND

SURROUND.

10. REMOVE EXISTING WATER CLOSET, SALVAGE OR

DISPOSE OF PER COR DIRECTION.

11. REMOVE EXISTING FURNACE AND DUCTWORK IN

BASEMENT.

12. EXISTING WATER TREATMENT EQUIPMENT AND

WATER HEATER IN BASEMENT TO REMAIN.

DEMOLITION NOTES

1 2

EF

CU

1004-3

T

T

T

T

T

T

FC

1004-3

CU

1004-2

FC

1004-2

CU

1004-1

FC

1004-1

M6.1

M6.1

SH

WC

M6.1 1004-1

S

LAV

WC

LAV

SH

SH

CU

1004-4

FC

1004-4EF3

M6.1

M6.1 1004-2

EF3

M6.1

M6.1 1004-3

CU

1004-5

FC

1004-5

WC

LAV

WC

LAV

SH

EF3

M6.1

M6.1 1004-4

FC

1004-6

CU

1004-6

SH

T

T

FC

1004-7

CU

1004-7

CU

1004-8

WH

1004-1

M6.1

FC

1004-8

RH

1004-1 14 7

1004-3 1004-4

1004-5

1004-2

1004-1

1004-6

1004-7

1004-8

S

M6.1

M6.1

TYP OF 8

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

M6.1

9 9

SHEET OF

SCALE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

7/23/10

1/4" = 1'-0"

M4.1 36 47

N

SHEET GENERAL NOTES

1. SEE SHEET M4.2 FOR NEW KEYNOTES.

2. SEE SHEET M6.0 FOR MECHANICAL

SCHEDULES

3. SEE SHEET M6.1 FOR MECHANICAL DETAILS.

4. NO REFRIGERANT OR CONDENSATE PIPING

SHALL BE ROUTED ON THE EXTERIOR OF THE

BUILDING. PENETRATE THE BUILDING WALL

AS CLOSE TO GRADE AS POSSIBLE. ROUTE

HORIZONTAL RUNS IN

BASEMENT/CRAWLSPACE AND/OR ATTIC AS

NOTED. ROUTE VERTICAL RUNS INSIDE STUD

WALL IF AVAILABLE. PROVIDE SHEET METAL

SHROUD PER DETAIL #2, SHEET M5.1 IF STUD

WALL IS NOT PROVIDED AND ROUTING IS ON

INTERIOR SURFACE OF ROOM WALL.

5. PROVIDE NEW SUPPLY STOPS TO FIXTURES.

6. REPAIR EXISTING PIPING AS REQUIRED TO

PROVIDE A FUNCTIONAL PLUMBING SYSTEM.

7. EXTEND PIPING AS REQUIRED TO CONNECT

NEW OR RELOCATED FIXTURES TO EXISTING

PROPANE, CW, HW, SS, AND VENT PIPING

MAINS.

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST1. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

REFRIGERANT AND CONDENSATE LINES DOWN INTERIOR FACE OF WALL TO

6” AFG.

2. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

CONDENSATE PIPING DOWN INTERIOR FACE OF WALL TO 6” AFG AND

PENETRATE TO EXTERIOR. ROUTE REFRIGERANT PIPING DOWN INTERIOR

FACE OF WALL INTO CELLAR. ROUTE TO EXTERIOR WALL AT CONDENSING

UNIT AND TERMINATE TO EXTERIOR 6" AFG.

3. INSTALL NEW INTERIOR WALL MOUNTED FAN COIL UNIT 96" AFF. ROUTE

CONDENSATE PIPING DOWN INTERIOR FACE OF WALL TO 6” AFG AND

PENETRATE TO EXTERIOR. INSTALL CONDENSATE DRAIN PER DETAIL #6,

SHEET M6.1. ROUTE REFRIGERANT PIPING UP INTO ATTIC FROM FAN COIL.

ROUTE REFRIGERANT PIPING DOWN TO CONDENSING UNIT IN FURRED WALL

AT 6" AFG.

4. KEYNOTE NOT USED.

5. INTERLOCK EXHAUST FAN WITH RESTROOM LIGHTING.

6. INSTALL NEW PROPANE FIRED WATER HEATER WITH BOTTOM OF UNIT 36"

AFF. RECONNECT TO EXISTING PLUMBING POINTS OF CONNECTION. ROUTE

FLUE AND INTAKE THROUGH ROOF OF OUTDOOR ENCLOSURE.

7. INSTALL NEW PROPANE FIRED STOVE/OVEN. SEE SPECIFICATION SECTION

113100 FOR APPLIANCE INFORMATION. CONTRACTOR TO FIELD VERIFY

EXACT LOCATION OF PROPANE PIPING POINT OF CONNECTION. EXTEND

PIPING TO NEW APPLIANCE. PROVIDE SHUT OFF VALVE AT APPLIANCE.

8. INSTALL NEW KITCHEN SINK, RECONNECT TO EXISTING HW, CW AND SS

MAINS.

9. INSTALL NEW PROPANE FIRED CLOTHES WASHER AND DRYER. SEE

SPECIFICATION SECTION 113100 FOR APPLIANCE INFORMATION. CONNECT

TO EXISTING PLUMBING AND VENT POINTS OF CONNECTION. 4" VENT

THROUGH WALL PER MANUFACTURER VENTING DIAGRAM. CONTRACTOR TO

FIELD VERIFY POINT OF CW, HW AND SS. CONNECT NEW PROPANE PIPING

TO EXISTING PIPING IN CRAWL SPACE.

10. INSTALL NEW LAVATORY. CONTRACTOR TO FIELD VERIFY EXACT LOCATION

OF HW, CW AND SS PIPING IN CRAWLSPACE AND EXTEND PIPING FROM

FIXTURE TO NEAREST MAIN.

11. INSTALL NEW WATER CLOSET. CONTRACTOR TO FIELD VERIFY EXACT

LOCATION OF CW AND SS PIPING IN CRAWLSPACE AND EXTEND PIPING FROM

FIXTURE TO NEAREST MAIN.

12. INSTALL NEW SHOWER. CONTRACTOR TO FIELD VERIFY EXACT LOCATION

OF HW, CW AND SS PIPING IN CRAWLSPACE AND EXTEND PIPING FROM

FIXTURE TO NEAREST MAIN.

13. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF POINTS OF

CONNECTION. EXTEND EXISTING SS, HW, AND CW PIPING TO SHOWER.

14. MOUNT RANGE HOOD WITH REMOTE WALL SWITCH TO UNDERSIDE OF

CABINET CENTERED DIRECTLY ABOVE STOVE AND RANGE. ROUTE

DUCTWORK TO ROOFCAP.

15. MOUNT REMOTE THERMOSTAT 48" AFF.

16. TRANSITION FROM 314" x 10" DUCT FITTING AT TOP OF MICROWAVE TO 6"

DUCT. TERMINATE WITH BROAN ROOF CAP #634.

17. ROUTE 6" EXHAUST DUCTWORK TO ROOFCAP.

18. INSTALL NEW SHOWER/TUBONTRACTOR TO FIELD VERIFY EXACT LOCATION

OF HW, CW AND SS PIPING IN CRAWLSPACE AND EXTEND PIPING FROM

FIXTURE TO NEAREST MAIN.

19. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE KITCHEN SINK,

LAVATORY, SHOWER AND WATER CLOSET ABOVE THE CEILING TO A SINGLE

2" VENT THROUGH ROOF.

20. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE TWO LAVATORIES, TWO

WATER CLOSETS AND TWO SHOWERS ABOVE THE CEILING TO A SINGLE 3"

VENT THROUGH ROOF.

21. COMBINE INDIVIDUAL FIXTURE VENT PIPES FOR THE KITCHEN SINK,

LAVATORY, WATER CLOSET AND TWO SHOWERS ABOVE THE CEILING TO A

SINGLE 2" VENT THROUGH ROOF.

10306-10-003

CSH

SAS

7/23/10

NONE

M4.2 37 47

KEYNOTES

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

CSH

7/23/10

AS NOTED

M6.0 38 47

EXHAUST FAN SCHEDULE

MARK MANUFACTURER MODEL AIRFLOW EXT. STATIC ELECTRICAL ACOUSTIC WEIGHT

REMARKS

(CFM) PRESS. (IN W.G.) WATTS AMPS VOLT PHASE (SONES) (LBS)

EF-2011-1 GREENHECK SP-A290 258 0.25 81 0.7 115 1 2.5 21 1

EF-2011-2 GREENHECK SP-A125 105 0.25 53 0.6 115 1 1.9 15 1

EF-2011-3 GREENHECK SP-A190 167 0.25 113 1.3 115 1 3.1 15 1

EF-1004-1 GREENHECK SP-A125 105 0.25 53 0.6 115 1 1.9 15 1

EF-1004-2 GREENHECK SP-A125 105 0.25 53 0.6 115 1 1.9 15 1

EF-1004-3 GREENHECK SP-A125 105 0.25 53 0.6 115 1 1.9 15 1

EF-1004-4 GREENHECK SP-A125 105 0.25 53 0.6 115 1 1.9 15 1

REMARKS:

1. PROVIDE AND INSTALL GREENHECK RJ - 6x9 ROOF CAP.

INDOOR SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE

AHRI CONDITIONS

ARI COOLING

CAPACITY (MBH)

ARI HEATING

CAPACITY (MBH)

DESIGN COOLING

(MBH)

DESIGN HEATING

(MBH)

ELECTRICAL

COOLING OPERATING CONDENSATE

LINE, OUTSIDE

DIA. (IN.)

OUTDOOR

REMARKSMARK MANUFACTURER MODEL AIRFLOW EFFICIENCY WEIGHT UNIT

(CFM) INDOOR, DB (F°) OUTDOOR, DB (F°) TOTAL TOTAL SENSIBLE TOTAL OUTPUT VOLT PHASE MCA/MOCP (SEER) (LBS)

FC-2011-1 CARRIER 40QNQ018--3 645 80.0 95.0 17.4 17.0 12.3 13.0 7.6 208/230 1 0.48 / 15 13.0 31 3/4 CU-2011-1 1

FC-2011-2 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 6.7 7.1 3.2 35 VDC 1 12 / 20 13.0 25 3/4 CU-2011-2 2

FC-2011-3 CARRIER 40QNQ018--3 645 80.0 95.0 17.4 17.0 13.7 14.3 7.1 208/230 1 0.48 / 15 13.0 31 3/4 CU-2011-3 1

FC-2011-4 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 8.0 8.4 3.2 35 VDC 1 12 / 20 13.0 25 3/4 CU-2011-4 2

FC-2011-5 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 8.4 8.7 4.3 35 VDC 1 12 / 20 13.0 25 3/4 CU-2011-5 2

FC-2011-6 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 8.4 8.8 3.4 35 VDC 1 12 / 20 13.0 25 3/4 CU-2011-6 2

FC-2011-7 CARRIER 40MVQ009--1 325 80.0 95.0 9.4 9.6 7.4 7.7 5.3 35 VDC 1 12 / 20 13.0 25 3/4 CU-2011-7 2

FC-2011-8 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 9.9 10.5 6.4 35 VDC 1 15 / 25 13.0 33 3/4 CU-2011-8 2

FC-1004-1 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 10.7 10.9 7.1 35 VDC 1 15 / 25 13.0 33 3/4 CU-1004-1 2

FC-1004-2 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 11.1 11.2 7.1 35 VDC 1 15 / 25 13.0 33 3/4 CU-1004-2 2

FC-1004-3 CARRIER 40MVQ012--3 425 80.0 95.0 12.0 11.5 11.9 12.2 7.2 35 VDC 1 9 / 15 13.0 33 3/4 CU-1004-3 2

FC-1004-4 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 11.2 11.5 7.6 35 VDC 1 15 / 25 13.0 33 3/4 CU-1004-4 2

FC-1004-5 CARRIER 40MVQ012--3 425 80.0 95.0 12.0 11.5 11.8 12.1 7.6 35 VDC 1 9 / 15 13.0 33 3/4 CU-1004-5 2

FC-1004-6 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 10.5 10.8 6.8 35 VDC 1 15 / 25 13.0 33 3/4 CU-1004-6 2

FC-1004-7 CARRIER 40MVQ012--1 425 80.0 95.0 11.5 11.5 10.1 10.4 7.4 35 VDC 1 15 / 25 13.0 33 3/4 CU-1004-7 2

FC-1004-8 CARRIER 40QNQ030--3 730 80.0 95.0 28.2 27.0 23.0 23.6 13.6 208/230 1 0.48 / 15 13.0 51 3/4 CU-1004-8 1

REMARKS:

1. INDOOR AND OUTDOOR UNITS HAVE DEDICATED POWER SUPPLIES.

2. INDOOR UNIT POWERED FROM OUTDOOR UNIT.

OUTDOOR SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE

ENTERING AIR REFRIGERANT LINES,

OUTSIDE DIAMETER, (IN.)

OPERATING INDOOR

REMARKSMARK MANUFACTURER MODEL SUMMER/WINTER ELECTRICAL WEIGHT UNIT

(DEGREES F) LIQUID VAPOR VOLT PHASE MCA/MOCP (LBS)

CU-2011-1 CARRIER 38QRF018--3 102.1 / 30.0 3/8 5/8 208/230 1 12.1 / 20 167 FC-2011-1 1

CU-2011-2 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-2011-2 2

CU-2011-3 CARRIER 38QRF018--3 102.1 / 30.0 3/8 5/8 208/230 1 12.1 / 20 167 FC-2011-3 1

CU-2011-4 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-2011-4 2

CU-2011-5 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-2011-5 2

CU-2011-6 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-2011-6 2

CU-2011-7 CARRIER 38MVQ009--1 102.1 / 30.0 1/4 3/8 115 1 12 / 20 80 FC-2011-7 2

CU-2011-8 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-2011-8 2

CU-1004-1 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1004-1 2

CU-1004-2 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1004-2 2

CU-1004-3 CARRIER 38MVQ012--3 102.1 / 30.0 1/4 1/2 208/230 1 9 / 15 90 FC-1004-3 2

CU-1004-4 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1004-4 2

CU-1004-5 CARRIER 38MVQ012--3 102.1 / 30.0 1/4 1/2 208/230 1 9 / 15 90 FC-1004-5 2

CU-1004-6 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1004-6 2

CU-1004-7 CARRIER 38MVQ012--1 102.1 / 30.0 1/4 1/2 115 1 15 / 25 90 FC-1004-7 2

CU-1004-8 CARRIER 38QRF030--3 102.1 / 30.0 3/8 3/4 208/230 1 18.4 / 30 187 FC-1004-8 1

REMARKS:

1. INDOOR AND OUTDOOR UNITS HAVE DEDICATED POWER SUPPLIES.

2. INDOOR UNIT POWERED FROM OUTDOOR UNIT.

RANGE HOOD SCHEDULE

MARK MANUFACTURER MODEL AIRFLOW ELECTRICAL SONES DUCT SIZE REMARKS

(CFM) AMP VOLT PHASE RPM (IN)

RH-2011-1 BROAN 403001 160 2.0 120 1 2795 6.5 3.25 X 10 1,2

RH-1004-1 BROAN 403001 160 2.0 120 1 2795 6.5 3.25 X 10 1,2

REMARKS:

1) WHITE FINISH

2) PROVIDE AND INSTALL BROAN ROOF CAP #634

WATER HEATER SCHEDULE

MARK MANUFACTURER MODEL LPG INPUT LPG OUTPUT HOT/COLD WATER GAS PIPE CONNECTION INTAKE CONNECTION FLUE CONNECTION ELECTRICAL WEIGHT REMARKS

(BTH/HR) (BTH/HR) CONNECTION (IN) (IN) (IN) (IN) VOLTS PHASE AMPS (LBS)

WH-2011-1 TAKAGI USA T-K3 11,000 199,000 3/4 3/4 3 4 120 1 0.77 40 1, 2, 3, 4, 5, 6

WH-1004-1 TAKAGI USA T-K3 11,000 199,000 3/4 3/4 3 4 120 1 0.77 40 1, 2, 3, 4, 5, 6

REMARKS:

1. FACTORY SET LIQUID PROPANE GAS

2. PROVIDE AND INSTALL NIBCO T-585-70-UL GAS SHUT-OFF VALVE BEFORE CONNECTION INTO WATER HEATER

3. PROVIDE AND INSTALL TAKAGI USA TK-IV-01-AB ISOLATION VALVES AND PRESSURE RELIEF VALVE ON HOT WATER PIPING. ROUTE HOT WATER PRESSURE RELIEF DISCHARGE PIPING TO 6" ABOVE THE FLOOR INTO DRAIN PAN.

4. PROVIDE AND INSTALL SMITTY DRAIN PAN WITH HOSE BIBB CONNECTION.

5. PROVIDE AND INSTALL TAKAGI USA TH-TV10 DIRECT VENT CONVERSION KIT. ROUTE 3" PVC INTAKE PIPING UP THROUGH ROOF TO GOOSENECK WITH TAKAGI USA TK-KPAR4 ANGLED ROOF FLASHING.

6. PROVIDE AND INSTALL CATEGORY III STAINLESS STEEL TAKAGI USA TK-KPRT4 RAIN CAP FOR FLUE THROUGH ROOF WITH TAKAGI USA TK-KPAR4 ANGLED ROOF FLASHING.

LOCAL CONNECTION SCHEDULE

MARK DESCRIPTION MANUFACTURER MODEL No. WASTE VENT CW HW REMARKS

WC-1 WATER CLOSET AMERICAN STANDARD 2832.128 3" 2" 1" - 1, 6

WC-2 WATER CLOSET AMERICAN STANDARD 2835.128 3" 2" 1" - 1, 6

LAV-1

LAVATORY AMERICAN STANDARD 0641.004

1 1/4" 1 1/2" 1/2" 1/2" 1, 2, 11

FAUCET AMERICAN STANDARD 7385.000

LAV-2

LAVATORY KOHLER K-1997-4

1 3/4" 1 1/2" 1/2" 1/2" 1, 2, 10

FAUCET AMERICAN STANDARD 7385.000

U-1

URINAL ZURN Z5792.205.00

2" 2" 1-1/4" - -

FLUSH VALVE ZURN ZEG6003EV

SH-1 NON-ADA SHOWER

POWERS E425-A-G-1-W

2" 2" 1/2" 1/2" 7

ZURN Z415SL

SH-2 ADA SHOWER

POWERS E425-A-1-2-W

2" 2" 1/2" 1/2" 8

ZURN Z415SL

SH-3 ADA TUB/SHOWER

POWERS E426-A-G-1-S-1-Y

1 1/2" 1 1/2" 1/2" 1/2" 9

AMERICAN STANDARD 0255.202

SH-4 ADA TUB/SHOWER

POWERS E426-A-G-1-S-1-Y

1 1/2" 1 1/2" 1/2" 1/2" 9

AMERICAN STANDARD 0255.102

S-1

SINK ELKAY ELUHAD3216 2" 1 1/2" 1/2" 1/2"

4, 5

FAUCET AMERICAN STANDARD 6274.000

S-2

SINK ELKAY ELUHAD1616 2" 1 1/2" 1/2" 1/2"

4, 5

FAUCET AMERICAN STANDARD 6274.000

S-3

SERVICE SINK AMERICAN STANDARD 7695.008 3" 1 1/2" 1/2" 1/2"

FAUCET AMERICAN STANDARD 8344.112.002

REMARKS:

1. INCLUDE ANGLE STOP & SUPPLY.

2. PROVIDE AND INSTALL 0.5 GPM SPRAY HEAD

3. PROVIDE AND INSTALL AMERICAN STANDARD 7798.020 "P" TRAP

4. PROVIDE AND INSTALL DRAIN LK35L.

5. 5" DEPTH. PROVIDE AND INSTALL WITH AMERICAN STANDARD 172H HANDLES.

6. OLSONITE 10CT SEAT.

7. NO TUB SPOUT, HAND SHOWER OR DIVERTER. MOUNT SHOWERHEAD 78" AFF.

8. NO TUB SPOUT OR DIVERTER. MOUNT BOTTOM OF ADA HAND SHOWER GRAB BAR AT 48" AFF.

9. NO HAND SHOWER. MOUNT DIVERTER 48" AFF. MOUNT SHOWERHEAD 78" AFF.

10. PROVIDE AND INSTALL TRUBRO LAVGAURD.

11. PROVIDE AND INSTALL WITH PEDESTAL.

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O J E C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

CSH

7/23/10

AS NOTED

M6.1 39 47

1 FLUE THRU ROOF NOT TO SCALE 2 REFRIGERANT/CONDENSATE PIPING SHROUD 3 ROOF EXHAUST CAP NOT TO SCALE 4 CONDENSING UNIT MOUNTING PAD NOT TO SCALE

CEILING

EXHAUST GRILLE

STUD

EXHAUST DUCT UP

TO ROOF

EXHAUST CAP

EXHAUST FAN

1-1/4" WOOD

SCREWS, TYP.

OF 2.

EXHAUST DUCT

CONNECTION WITH

BACKDRAFT DAMPER

5 CEILING EXHAUST FAN MOUNTING NOT TO SCALE

8"Ø ANCHOR BOLT

W/ NUT & WASHER AT

EACH CONDENSING

UNIT FOOT. MIN. 3"

EMBEDMENT.

6" THICK CONCRETE

PAD W/ #3 AT 12"

O.C. EA. WAY.

CONCRETE

PAD DIMENSIONS:

FOR UNIT MODELS 38MVQ009 - 44" WIDE BY 24" LONG

FOR UNIT MODELS 38MVQ012 - 48" WIDE BY 24" LONG

FOR UNIT MODELS 38QRF018 - 54" WIDE BY 24" LONG

FOR UNIT MODELS 38QRF024 - 54" WIDE BY 24" LONG

FOR UNIT MODELS 38QRF030 - 70" WIDE BY 24" LONG

CENTER CONDENSING

UNIT ON PAD

WIDTH

FIRE STOP COLLAR

2" BLOCKING

1" MINIMUM

CLEARANCE

ROOFING BY

CONTRACTOR

TO CEILING

EXHAUST FAN OR

RANGE HOOD

GREENHECK OR

BROAN ROOF CAP

PROVIDE ROOF

THIMBLE AS

REQUIRED

1" AIR GAP

FILL WITH GRAVEL

8"X8"

18"

SLOPE 1/8"

PER 1'-0"

3/4" CONDENSATE

DRAIN, TERMINATE

OVER GRAVEL PIPE CLAMP,

SECURE TO WALL

WITH 3/8"Ø X 3"

LAG SCREW

6 CONDENSATE DRAIN NOT TO SCALE

2x6 BLOCKING

ALL AROUND

1" CLEAR MIN

ALL AROUND

4" CATEGORY III STAINLESS

M

IN

RAIN CAP

TAKAGI USA TK-KPRT4

COUNTERFLASHING RING

RUN ROOFING UP UNDER

COUNTERFLASHING RING

TALL CONE FITTING WITH

STEEL VENT TO WATER HEATER

CONTRACTOR

ROOFING BY

7"

4" SHEET METAL

SCREW WITH

COLOR MATCHED

HEADS EVERY 24"

3"

CONDENSATE

PIPING TO

EXTERIOR (BELOW

FLOOR IN

BASEMENT OR

THROUGH WALL TO

EXTERIOR)

REFRIGERANT

LINES TO

OUTDOOR UNIT

(BELOW FLOOR IN

BASEMENT,

ABOVE CEILING

IN ATTIC OR

THROUGH WALL

TO EXTERIOR)

1/8" FORMED

ALUMINUM, SHOP

PAINTED TO MATCH

INTERIOR FINISH

4" TAPCON

MASONRY

ANCHOR, MIN

3" DEPTH,

SPACED

EVERY 24".

1/8" X 1" X 1"

ALUMINUM

ANGLE

DRAWING

CHECKED BY

DATE

CHECKED BY

A/E

DRAWN BY

DESIGNED BY

PROJECT NUMBER

N A M E

P R O

JE

C T

F O R E S T

D R A W

IN

G

N A M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

10306-10-003

CSH

SAS

CSH

7/23/10

AS NOTED

M7.1 40 47

The Principal Mechanical Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in the applicable parts of Sections 100, 101, 102, 110 through 115, 120 through 125, 142, 144 and 145.

The operation & maintenance information meets the requirements of Part 1 (10-103c).

GENERAL INFORMATION

STATEMENT OF COMPLIANCE

BUILDING TYPE

PHASE OF CONSTRUCTION

CERTIFICATE OF COMPLIANCE MECH-1-C(Part 1 of 3)

PROJECT NAME

PROJECT ADDRESS

PRINCIPAL DESIGNER-MECHANICAL

DOCUMENTATION AUTHOR

TELEPHONE

TELEPHONE

DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE

NONRESIDENTIAL

NEW CONSTRUCTION

HIGH RISE RESIDENTIAL

ADDITION ALTERATION

HOTEL/MOTEL GUEST

ROOM

DATE

Building Permit #

Checked by/Date

Enforcement Agency Use

This Certificate of Compliance lists the building features and performance specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements.

The documentation preparer hereby certifies that the documentation is accurate and complete.

DOCUMENTATION AUTHOR SIGNATURE DATE

2005 Nonresidential Compliance Forms January 2006

The plans & specifications meet the requirements of Part 1 (Sections 10-103a).

The installation certificates meet the requirments of Part 1 (10-103a 3).

Please check one: ( These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.)

I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or mechanical engineer, or I am a licensed architect.

I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work.

I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1.

PRINCIPAL MECHANICAL DESIGNER-NAME SIGNATURE DATE LIC. #

INSTRUCTIONS TO APPLICANT MECHANICAL COMPLIANCE & WORKSHEETS (check box if worksheet is included)

MECH-1-C

MECH-2-C

MECH-3-C

MECH-4-C

Certificate of Compliance. Part 1 of 3, 2 of 3, 3 of 3 are required on plans for all submittals

Air/Water/Service/Water Pools Requirements. Part 1 of 3, 2 of 3, 3 of 3 are required for all submittals, but may be on plans.

Mechanical Ventilation and Reheat is required for all submittals with mechanical ventialtion, but may be on plans.

HVAC Misc. Prescriptive Requirements is required for all prescriptive submittals, but may be on plans.

UNCONDITIONED

(file affidavit)

CERTIFICATE OF COMPLIANCE MECH-1-C(Part 2 of 3)

PROJECT NAME DATE

2005 Nonresidential Compliance Forms January 2006

Test Performed By:Test Description

Designer:

This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all the equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.

Building Departments:

Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is oeprated for normal use, all control devices serving the buidling or space shall be certified as meeting the Acceptance

Requirements for Code Compliance.

In addition a Certificate of Acceptance, MECH-1-A, Form shall be submitted to the building department that certifies plans, specifications, installtion certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title 24 Part 6.

� MECH-2-A: Ventilation System Acceptance Document

- Variable Air Volume Systems Outdoor Air Acceptance

- Constant Air Volume Systems Outdoor Air Acceptance

Test required on all New systems both New Construction and Retrofit.

Equipment requiring acceptance testing

MECH-3-A: Packaged HVAC Systems Acceptance Document

Test required on all New packaged systems both New Construction and Retrofit.

Equipment requiring acceptance testing

MECH-4-A: Air-Side Economizer Acceptance Document est required on all New packaged

Test required on all new air-side economizers for both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the Commission do not require equipment testing but do require construction inspection.

Equipment requiring acceptance testing

CERTIFICATE OF COMPLIANCE MECH-1-C(Part 3 of 3)

PROJECT NAME DATE

2005 Nonresidential Compliance Forms January 2006

Test Performed By:Test Description

� MECH-5-A: Air Distribution Acceptance Document This test is required if the unit serves 5,000 ft of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit.

Equipment requiring acceptance testing

MECH-6-A: Demand Control Ventilation Acceptance Document

All new DCV controls installed on new or existing packaged systems must be tested.

Equipment requiring acceptance testing

MECH-7-A: Supply Fan Variable Flow Control Acceptance Document

All new VAV fan volume controls installed on new or existing systems must be tested.

Equipment requiring acceptance testing

� MECH-8-A: Hydronic System Control Acceptance Document Variable Flow Controls, Applies to chilled and hot water systems .

Automatic Isolation Controls, Applies to new boilers and chillers and the primary pumps are connected to a common header .

Supply Water Temperature Reset Controls, Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000

Btu/hr .

Water-loop Heat Pump Controls, Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp .

Variable Frequency Control, Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5hp .

Equipment requiring acceptance testing

AIR SYSTEM REQUIREMENTS MECH-2-C(Part 1 of 3)

2005 Nonresidential Compliance Forms January 2006

PROJECT NAME: DATE:

112(a)

112(a)

112(b)

112(c), 115(a)

121(b)

121(b)

121(c)

121(c)

121(c), 122(e)

122(e)

122(f)

122(g)

Reference on Plans or Specification

AIR SYSTEMS, Central or Single Zone

144(a & b)

144(a & b)

144(a & b)

144(a & b)

144(c)

144(c)

144(c)

144(d)

144(e)

144(f)

144(k)

ITEM or SYSTEM TAG(S)

MANDATORY MEASURES

Heating Equipment Efficiency

Cooling Equipment Efficiency

Heat Pump Thermostat Furnace Controls

Natural Ventilation

Minimum Ventialtion

VAV Minimum Position Control

Demand Control Ventilation

Time Control

Setback and Setup Control

Outdoor Damper Control

Isolation Zones

Pipe Insulation

Duct Insulation

PRESCRIPTIVE MEASURES

Calculated Heating Capacity

Proposed Heating Capacity

Calculated Cooling Capacity Proposed Cooling Capacity

Fan Control

DP Sensor Location

Supply Pressure Reset (DDC only)

Simulataneous Heat/Cool Economizer

Heat and Cool Air Supply Reset Duct Sealing

1: For each central and single zone air systems (or group of similar units) fill in the the reference to sheet number and/or specification section and paragraph number where the required features are documetned. If a requirement is not applicable, put "N/A" in the column.

2: Not required for hydronic heating or cooling. Either enter value here or put in reference to plans and specifications per footnote 1.

T-24

Section

1. THE AIR CONDITIONING UNITS MAY BE INSTALLED ONLY IF THE MANUFACTURER HAS CERTIFIED THAT THE

EQUIPMENT MEETS OR EXCEEDS ALL APPLICABLE EFFICIENCY REQUIREMENTS LISTED IN 112 OF THE ENERGY

EFFICIENCY STANDARDS.

2. PIPING, EXCEPT THOSE CONVEYING FLUIDS AT TEMPERATURES BETWEEN 60 DEG F AND 105 DEG F, OR WITHIN

HVAC EQUIPMENT SHALL BE INSULATED IN ACCORDANCE WITH STANDARDS PAR. 123.

3. AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED, SEALED AND INSULATED AS PROVIDED IN

CHAPTER 10 OF THE CMC.

4. EACH SPACE CONDITIONING SYSTEM SERVING BUILDING TYPES SUCH AS OFFICES AND MANUFACTURING FACILITIES

(AND ALL OTHERS NOT EXPLICITY EXEMPT FROM THE REQUIREMENTS OF SECTION 122(e)OF THE 2001 ENERGY

EFFICIENCY STANDARDS FOR NONRESIDENTIAL BUILDINGS (TITLE 24) SHALL BE INSTALLED WITH AN AUTOMATIC

TIME SWITCH WITH AN ACCESSIBLE MANUAL OVERRIDE THAT ALLOWS OPERATION OF THE SYSTEM DURING

OFF-HOURS FOR UP TO FOUR HOURS. THE TIME SWITCH SHALL BE CAPABLE OF PROGRAMMING DIFFERENT

SCHEDULES FOR WEEKDAYS AND WEEKENDS; INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE THAT

TURNS OFF ALL LOADS FOR AT LEAST 24 HOURS, THEN RESUMES THE NORMALLY SCHEDULED OPERATION, AND

HAS PROGRAM BACKUP CAPABILITIES THAT PREVENT THE LOSS OF THE DEVICE'S PROGRAM AND TIME SETTING

FOR AT LEAST 10 HOURS IF POWER IS INTERRUPTED.

5. EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT TEMPORARILY OPERATE THE

SYSTEM AS REQUIRED TO MAINTAIN A SETBACK HEATING THERMOSTAT SETPOINT.

6. EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL THERMOSTAT CONTROL THAT

RESPONDSTO TEMPERATURE WITHIN THE ZONE. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE

CONTROL SHALL BE CAPABLE OF PROVIDING A DEAD BAND OF AT LEAST 5 DEG F WITHIN WHICH THE SUPPLY OF

HEATING AND COOLING IS SHUT OFF OR REDUCED TO A MINIMUM.

7. THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN DEG F.

8. THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL.

9. CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OR DEVICES TO BE OPERATED AT THE

VENTILATION RATES AS SPECIFIED IN THE PLANS.

10. GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN SHALL BE PROVIDED ON THE

OUTSIDE AIR INTAKES AND DISCHARGES OF ALL SPACE CONDITIONING AND EXHAUST SYSTEMS.

11. ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN

THESE PLANS, IN ACCORDANCE WITH THE NEBB PROCEDURAL STANDARDS OR AABC NATIONAL STANDARDS.

12. THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL AIR CONDITIONING UNIT

SCHEDULES AND SHALL BE MEASURED AND CERTIFIED BY THE INSTALLING LICENSED C-20 MECHANICAL

CONTRACTOR.

SJER BARRACKS SEISMIC UPGRADE

24075 HWY 41 COARSEGOLD, CA 93614

CHRISTOPHER S. HANZEL

CHRISTOPHER S. HANZEL

415-283-4970

415-283-4970

July 23, 2010

CHRISTOPHER S. HANZEL

None

None

None

July 23, 2010

SJER BARRACKS SEISMIC UPGRADE July 23, 2010 SJER BARRACKS SEISMIC UPGRADE July 23, 2010

CU/FC - 2011-1 to 8

CU/FC - 1004-1 to 8 & CU/FC - 2304 - 1 & CU/FC - 1007 - 1 to 3

CONTRACTOR

None

None

None

FC-2011 - 1 to 8 FC-1004 - 1 to 8 FC-2304 - 1 FC-1007 - 1 to 3

M6.0 M6.0 M5.0 M5.0

M6.0 M6.0 M5.0 M5.0

M2.1 M4.1 M1.1 M3.1

N/A N/A N/A N/A

A2.1 & A6.2 A4.2 & A6.2 A1.1 & A6.2 A3.2 & A6.2

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

M6.0 M6.0 M5.0 M5.0

M6.0 M6.0 M5.0 M5.0

M6.0 M6.0 M5.0 M5.0

M6.0 M6.0 M5.0 M5.0

M2.1 & M6.0 M6.0 & M4.1 M1.1 & M5.0 M3.1 & M5.0

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

SJER BARRACKS SEISMIC UPGRADE July 23, 2010

SJER Structural Drawings - Phase 1.pdf
ANCHOR DETAILS phase 1
S01 Structural Notes phase 1
S21
S22
S41
S42
S43
S63
S65
SJER 100% W&K drawings - Phase 1.pdf
1030610003 M0.1 - PH1
1030610003 M0.1 - PH1.dwg
Layout1
1030610003 M2.0
1030610003 M2.0.dwg
Layout1
1030610003 M2.1
1030610003 M2.1.dwg
Layout1
1030610003 M2.2
1030610003 M2.2.dwg
Layout1
1030610003 M4.0
1030610003 M4.0.dwg
Layout1
1030610003 M4.1
1030610003 M4.1.dwg
Layout1
1030610003 M4.2
1030610003 M4.2.dwg
Layout1
1030610003 M6.0
1030610003 M6.0 .dwg
Layout1
1030610003 M6.1
1030610003 M6.1.dwg
Layout1
1030610003 M7.1 - PH1
1030610003 M7.1 - PH1.dwg
Layout1

File details come from the government source that posted it. Updated .