Site Visit Sign In Sheet~2.pdf
PDF 292 KB Posted
- Attached to
- DRM 2026-82 HSU Abatement at MCI-Norfolk
- Solicitation number
- BD-27-1025-DOCFS-9816-132678
- Issued by
- Norfolk County, Massachusetts
About this file
This is a Site Visit Sign In Sheet for a contract opportunity issued by the Massachusetts Department of Correction for HSU (hazardous substance unit) abatement work at Massachusetts Correctional Institution-Norfolk. The project, designated DRM 2026-82, involves the removal and abatement of paint containing RCRA 8 metals at 2 Clark Street, Norfolk, MA, with an estimated contract value of $64,000. A mandatory site visit was scheduled for September 2, 2026 at 9:00 AM at the project location. Bid intent forms were due August 31, 2026 at 9:00 AM, and sealed bids were due September 10, 2026 at 2:00 PM. The contract completion deadline is October 9, 2026, with liquidated damages of $1,000 per day assessed for failure to meet this deadline. All prospective bidders and site visit attendees were required to complete background clearance approval through local police, State Police, FBI, Massachusetts Board of Probation, and Registry of Motor Vehicles, and to sign acknowledgments regarding the Prison Rape Elimination Act.
This is a prevailing-wage public works project under Massachusetts General Law Chapter 149, Section 44A, requiring all general bidders to hold a current Prime/General Contractor Certificate of Eligibility from the Division of Capital Asset Management and Maintenance with a single project limit not less than the bid amount. The project has combined MBE/WBE participation goals of 13% and workforce utilization requirements of 15.3% minority and 6.9% women workers, with a 3% Service-Disabled Veteran-Owned Business Enterprises benchmark encouraged. Bid deposits equal to 5% of the bid amount are required as a bid bond, cash, or certified check. All employees must complete an OSHA-approved construction safety and health course of at least 10 hours prior to work commencement, and prevailing wage rates established by the Massachusetts Department of Labor and Workforce Development apply to all covered workers. The sign-in sheet indicates that Adam Juszczak was disqualified from site visit participation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule for Participation WBE MBE~16.pdf | ||
| Where to get plans and specs~15.pdf | ||
| C.149_General Conditions.pdf | ||
| PW Payroll Report Form~15.pdf | ||
| PW Statement of Compliance~15.pdf | ||
| Plan Holders List DRM 2026 82.docx | DOCX document | |
| Bidder Checklist~16.pdf | ||
| WageSchedule_20260820140731.pdf | ||
| Bid Package~7.pdf | ||
| Bid Intent Form~4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Adam.Juszczak Text Box Disqualified
File details come from the government source that posted it. Updated .