Site Visit (3).doc
DOC document 35 KB Posted
- Solicitation number
- N00173-21-Q-0036
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SECNAV 5512-1 (2020 version) (002).pdf | ||
| SOW PR 1300877255.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 36 JULY 1966
GENERAL SERVICES ADMINISTRATION
FED. PROC. REG. (41 CFR) 1-16.101
| CONTINUATION SHEET |
| REF. NO. OF DOC. BEING CONT’D |
N00173-21-Q-0036
PAGE OF
2 1 OF 2
NAME OF OFFEROR CONTRACTOR
All Quoters
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
REQUEST FOR JOB SITE VISIT
DATE: 16 NOV 20
TIME: 1:00 pm
PLACE: NAVAL RESEARCH LABORATORY
4555 Overlook Ave SW Washington, DC 23075
POINT OF CONTACT:
Bldg. A59 Rm. 4E7
Contractors are required to VISIT the JOB SITE before any quotations are accepted for the acquisition listed on the RFQ/Solication. PROPER ID is REQUIRED. A VALID Driver’s License is sufficient. You are required to report to Bldg. 72 for a proper pass for access to NRL. If a vendor representative does not attend the schedule job site visit, they may be considered ‘Non-Responsive’. At the end of the Job Site Visit, each representative will be informed of the date the quotation must be submitted. If the quotations are not received by that date, they will be considered a “No Bid”. Contact with the End-User is strictly prohibited (other than the job site visit). Any contact may result in the bid being considered ‘tainted’ and subsequently cancelled.
Any questions the Vendor representatives may have after the Job Site Visit must be directed to the Contracting Officer (above) at e-mail address alvin.williams@nrl.navy.mil no later than 11/18/2020 at 4:00 p.m. Eastern Standard Time. Any changes in the description, specifications or drawings after the job site visit will be issued to ALL vendors.
If an emergency arises and the Vendor representative cannot attend the scheduled Job Site Visit, PLEASE call the POC at the above number by the morning of the Job Site Visit to let him/her know you will not be able to attend. The Contractor is required to notifiy the Contracting Officer by 11/13/2020, 12:00 pm of intent to attend the site visit.
Please Google/Mapquest, etc Directions to NRL DC from your entry point location
File details come from the government source that posted it. Updated .