Site Plan Snafu Pit Plan FY23 as of 20230322.pdf
PDF 1 MB Posted
- Attached to
- 12970223R0029 - Snafu Pit Crush and Stockpile
- Solicitation number
- 12970223R0029
- Issued by
-
Department of Agriculture Forest Service
About this file
This document package includes plans for a proposed site plan and stockpile project at Snafu Pit on the Coconino National Forest in Arizona. The project involves crush and stockpile operations at the pit including pit expansion and development, road construction, and stockpiling of aggregate materials to a gradation of "G" according to supplied specifications. The site plans depict the proposed pit location and dimensions, roadway typicals, and general notes. Relevant details include seasonal restrictions from March to September to prevent species disturbance, security and spill response requirements for the contractor, survey and reporting obligations, permitting needs, and slope and stockpile specifications. The related solicitation is for the Snafu Pit Crush and Stockpile project identified as solicitation number 12970223R0029 issued by the US Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fire Plan COC Industrial Fire Plan Guidelines 2018.docx | DOCX document | |
| FSSS Snafu Pit 1101114.docx | DOCX document | |
| Location Map Layout Snafu Pit.pdf | ||
| A09 RFP 12970223R0029 Snafu Pit Crush and Stockpile.pdf | ||
| General Decision Number_AZ20230008 06-09-2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PAGE OF1 4
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING
DATE
FOREST SUPERVISOR DATE
RO FACILITIES PROGRAM MANAGER
DATE
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET 3/22/2023
G-02 GENERAL NOTES 3/22/2023
C-01 PROPOSED SITE PLAN 3/22/2023
C-02 ROADWAY TYPICALS 3/22/2023
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SNAFU PIT
CRUSH AND STOCKPILE
(R3) SOUTHWESTERN REGION
COCONINO NATIONAL FOREST
COCONINO COUNTY
ARIZONA
From Flagstaff (Coconino National Forest SO), take a left out of the parking lot onto S Thompson St. and travel 0.1 miles. Turn left onto W University Ave and travel 0.2 miles. Turn right onto W Forest Meadows St and travel 0.5 miles.
Turn right onto S Woodlands Village Blvd and travel 0.5 miles. Turn right onto
S Beulah Blvd and travel 0.3 miles. Turn left onto Lake Mary Rd and travel 48.1 miles. Turn right onto FSR 9363L and travel approximately 0.3 miles. Snafu Pit will be on the left.
FLAGSTAFF
SNAFU PIT
Map Data (C) 2023 Google
GENERAL NOTES:
1. IF FEDERALLY THREATENED/ENDANGERED SPECIES, FOREST SERVICE SENSITIVE
SPECIES, OR BALD OR GOLDEN EAGLES ARE NESTING WITHIN THE VICINITY OF 0.5
MILES OF THE PROJECT AREA, THEN SEASONAL RESTRICTIONS TO OPERATIONS ARE
EFFECTIVE DURING THE BREEDING SEASON (MARCH 1 TO SEPTEMBER 1) TO PREVENT
DISTURBANCE OF THE AFFECTED SPECIES. AT THIS TIME, THERE ARE NO KNOWN
IMPACTS.
2. PROPOSED PIT PLAN LOCATIONS AND DIMENSIONS ARE APPROXIMATE AND WILL BE
FURTHER IDENTIFIED IN THE FIELD BY THE COR.
3. PIT EXPANSION WILL BE ALLOWED IN THIS CONTRACT AND WILL CONTINUE TO
NORTH/NORTHEAST OF THE INDICATED WORK AREA AS SHOWN IN THE SITE PLAN
MAP.
4. WEIGHING PROCEDURES AND DEVICES ARE REQUIRED FOR MEASUREMENT AND
PAYMENT IN ACCORDANCE WITH FP-14 SECTION 109.03 AND SHALL BE CERTIFIED BY
STATE WEIGHTS AND MEASUREMENTS.
5. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR
THIS TYPE OF CONSTRUCTION, INCLUDING ANY ASSOCIATED FEES. ADEQ AIR
QUALITY PERMIT AND NOI (INCLUDING A SWPPP AND EROSION CONTROL PLAN) ARE
REQUIRED.
6. THE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY. A TEMPORARY
FENCE AND GATE CAN BE INSTALLED AND REMOVED UPON COMPLETION OF THE
CONTRACT.
7. THE BOTTOM OF THE PIT SHALL SLOPE A MINIMUM OF 1% TO PROVIDE POSITIVE
DRAINAGE AND SHOULD SLOPE TO THE SOUTHWEST OF THE PROPOSED OPERATING
AREA TO DISCHARGE RUNOFF AWAY FROM THE NEARBY LONG VALLEY DRAW
DRAINAGE. ALL SIDE SLOPES SHALL BE APPROXIMATELY 2:1 AFTER COMPLETION OF
THE CRUSHING OPERATION.
8. ALL EXISTING SLOPES AND ANY NEW SLOPES CREATED DURING OPERATIONS SHALL
BE LAID AT A MAXIMUM 2:1 SLOPE.
9. STOCKPILE SIDE SLOPES SHALL BE NO FLATTER THAN 1V:1.5H AND SHALL BE
STOCKPILED IN ACCORDANCE WITH FP-14 SECTION 314.05.
10. ALL AGGREGATE PRODUCED SHALL MEET THE REQUIREMENTS UNDER FSSS SECTION
703.05B FOR SURFACE COURSE AGGREGATE. GRADATION OF STOCKPILE SHALL BE
"G" PER FP-14 FOREST SERVICE SUPPLEMENTAL SPECIFICATION TABLE 703-3. SEE
SHEET C-01.
11. AGGREGATE SHALL HAVE A MAXIMUM OF 10% FLAT AND ELONGATED PARTICLES. IF
APPARENT FLAT AND ELONGATED PARTICLES ARE OBSERVED IN THE MATERIAL. THE
CONTRACTOR SHALL HAVE THE MATERIAL TESTED FOR FLAT AND ELONGATED
PARTICLES AT THE REQUEST OF THE COR PER ASTM D4791 (1:3 RATIO, PLUS 3/8"
SIEVE, CALCULATED BY MASS, WEIGHTED AVERAGE) AT THE CONTRACTOR'S
EXPENSE.
12. THERE IS NO MOISTURE CONTENT REQUIREMENT FOR STOCKPILED AGGREGATE.
13. THE CONTRACTOR IS ALLOWED TO CAMP AT THE SITE DURING THE
CONSTRUCTION PERIOD. THIS MAY REQUIRE A DISTRICT ISSUED CAMPING PERMIT
AT NOT COST.
14. NO GOVERNMENT WATER SOURCE IS AVAILABLE AT SNAFU PIT.
15. CLEARING AND GRUBBING MAY BE REQUIRED IF ADDITIONAL EXPANSION FOR THE
PIT DEVELOPMENT IS NECESSARY. ALL REFUSE FROM THIS OPERATION SHALL BE
PILED IN LOCATIONS DESIGNATED BY THE COR.
16. MERCHANTABLE TIMBER AS DEFINED BY THE UTILIZATION STANDARDS SHALL BE
HANDLED ACCORDING TO FSSS SECTION 201 AND ALL APPLICABLE SUPPLEMENTS
AND DECKED IN LOCATIONS DESIGNATED BY THE COR.
17. THE CONTRACTOR WILL COMPLY WITH FP-14 SECTION 205, ROCK BLASTING,
DURING BLASTING OPERATIONS.
18. THE CONTRACTOR SHALL PLAN FOR 10 FT DEEP ENTRY FOR INITIAL DRILLING. THE
PROPOSED FOOTPRINT CAN BE MODIFIED AS NECESSARY TO ACCOMMODATE THIS
DEPTH.
19. ALL EXISTING OVERSIZED BOULDERS SHALL BE UTILIZED FOR A VEHICLE BARRIER
AND/OR AGGREGATE PRODUCTION PRIOR TO ANY ROCK BLASTING/ROCK
EXCAVATION AND/OR PIT EXPANSION WITH APPROVAL FROM THE COR. THE
VEHICLE BARRIER SHALL BE PLACED AT ENTRANCE LOCATIONS OF THE PROJECT
SITE DESIGNATED BY THE COR. SPACE BETWEEN THE OVERSIZED BARRIER
MATERIAL SHALL NOT EXCEED 36 INCHES.
20. ALL ADDITIONAL OVERSIZED MATERIAL THAT IS NOT USED TO CREATE A VEHICLE
BARRIER, REGARDLESS OF SIZE, SHALL BE REDUCED TO A MAXIMUM SIZE OF
2'X2'X2' THROUGHOUT THE PROJECT SITE.
21. PROTECT IN PLACE ALL EXISTING EQUIPMENT ON SITE, INCLUDING THE GATE AT
THE JUNCTION OF COC-3 AND FSR 9363L.
22. ONE 50 GALLON SPILL KIT OR TWO 30 GALLON SPILL KITS MUST BE LOCATED
ON-SITE DURING USE OF HEAVY EQUIPMENT.
23. CONSTRUCTION OF PROPOSED ROAD IS INCIDENTAL TO PIT DEVELOPMENT PAY
ITEM. ACCESS ROAD SHALL BE CONSTRUCTED USING THE STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS (FP-14 U.S. CUSTOMARY UNITS) AS WELL AS APPLICABLE
SUPPLEMENTAL SPECIFICATIONS.
24. CONTRACTOR SHALL COMPLETE A TOPOGRAPHIC SURVEY OF SITE PRIOR TO,
DURING AND POST OPERATIONS. THE SURVEY SHALL BE PERFORMED BY A
LICENSED AND INSURED COMPANY AND PAID UNDER LINE ITEM 154 IN THE
SCHEDULE OF ITEMS.
25. THE SITE TOPOGRAPHIC SURVEY DATA SHALL BE DELIVERED TO THE
GOVERNMENT IN THE FOLLOWING FORM: AUTOCAD 2019 SURFACE FILE, OR OTHER
FORMAT APPROVED BY THE COR, CLEARLY STATING THE ANALYZED VOLUME OF
THE STOCKPILE AND VISUALLY REPRESENTATIVE OF THE STOCKPILE THAT WAS
ANALYZED.
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 4:
TR
IS
TA
NL
AR
SO
N C
:\U
SE
RS
\T
RI
ST
AN
LA
RS
ON
\B
OX
\71
E
NG
IN
EE
RI
NG
(C
OC
)\7
0 G
EO
TE
CH
MA
TE
RI
AL
SE
NG
EE
RI
NG
\S
NA
FU
P
IT
\1.
S
OL
IC
IT
AT
IO
N
PA
CK
AG
E\
6.
AC
AD
-D
W
GS
A
ND
P
DF
M
AP
S
PL
AN
S\
SN
AF
U
PI
T
PL
AN
F
Y2 3.D
W G
; R3
SOUTHWESTERN REGION
SNAFU PIT
CRUSH AND
STOCKPILE
COCONINO
NATIONAL FOREST
MOGOLLON RIM
RANGER DISTRICT
GENERAL NOTES
03/22/2023
T. LARSON
T. LARSON
S. UNTALAN
G-02
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
GRADATION SPEC
SIEVE SIZE G
1 1/2 inch
1 inch 100
3/4 inch 97-100
1/2 inch
3/8 inch
70-80 (6)
No. 4 51-63 (7)
No. 8
No. 16 28-39 (6)
No. 40
19-27 (5)
No. 200
10.0-16.0 (4)
GRADATION OF STOCKPILE SHALL BE "G"
PER FP-14 FOREST SERVICE SUPPLEMENTAL
SPECIFICATION TABLE 703-3.
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 4:
TR
IS
TA
NL
AR
SO
N C
:\U
SE
RS
\T
RI
ST
AN
LA
RS
ON
\B
OX
\71
E
NG
IN
EE
RI
NG
(C
OC
)\7
0 G
EO
TE
CH
MA
TE
RI
AL
SE
NG
EE
RI
NG
\S
NA
FU
P
IT
\1.
S
OL
IC
IT
AT
IO
N
PA
CK
AG
E\
6.
AC
AD
-D
W
GS
A
ND
P
DF
M
AP
S
PL
AN
S\
SN
AF
U
PI
T
PL
AN
F
Y2 3.D
W G
; R3
SOUTHWESTERN REGION
SNAFU PIT
CRUSH AND
STOCKPILE
COCONINO
NATIONAL FOREST
MOGOLLON RIM
RANGER DISTRICT
PROPOSED SITE PLAN
AND GRADATION
SPEC
03/22/2023
T. LARSON
T. LARSON
S. UNTALAN
C-01
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NATURAL GROUND
ROAD TEMPLATE
TRAVELED WAY
12' MIN - 14' MAX
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND WITHOUT ROADWAY DITCH
CLEARING WIDTH*
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
M
I N
4" MIN. COMPACTED DEPTH
M
IN
O U
T S
L O
P E
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND ROADWAY DITCH
NATURAL GROUND
4" MIN. COMPACTED DEPTH
ROAD TEMPLATE
M
IN 3%
INSLOPE
TRAVELED WAY
12' MIN - 14' MAX
3'
M
I N
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING,
CROWN, AND ROADWAY DITCH
CLEARING WIDTH*
M
I N
TRAVELED WAY
12' MIN - 14' MAX
MIN 3% MIN 3%
NATURAL GROUND
ROAD TEMPLATE
4" MIN. COMPACTED DEPTH
3'
M
A
X
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
TYPICAL ROADWAY
DITCH
CLEARING WIDTH*
TYPICAL ROADWAY
DITCH
*CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEEL/TOE OF
SLOPE +3 FT.
INTERSECTION GRADING AND SHAPING
INTERSECTING ROAD
4" AGGREGATE SURFACE
DITCH FLOW LINE
C
L
MAINTAIN EXISTING DITCH FLOW LINES
TO ENSURE POSITIVE DRAINAGE AWAY
FROM THE EXISTING INTERSECTING
ROAD.
R O
A D
W I D
T H
X
X
X
X
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
3 1 4:
TR
IS
TA
NL
AR
SO
N C
:\U
SE
RS
\T
RI
ST
AN
LA
RS
ON
\B
OX
\71
E
NG
IN
EE
RI
NG
(C
OC
)\7
0 G
EO
TE
CH
MA
TE
RI
AL
SE
NG
EE
RI
NG
\S
NA
FU
P
IT
\1.
S
OL
IC
IT
AT
IO
N
PA
CK
AG
E\
6.
AC
AD
-D
W
GS
A
ND
P
DF
M
AP
S
PL
AN
S\
SN
AF
U
PI
T
PL
AN
F
Y2 3.D
W G
; R3
SOUTHWESTERN REGION
SNAFU PIT
CRUSH AND
STOCKPILE
COCONINO
NATIONAL FOREST
MOGOLLON RIM
RANGER DISTRICT
ROADWAY TYPICALS
03/22/2023
T. LARSON
T. LARSON
S. UNTALAN
C-02
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| Snafu Pit Plan FY23-COVER |
| Snafu Pit Plan FY23-GEN NOTES |
| OLE1 |
| Snafu Pit Plan FY23-SITE PLAN |
| OLE1 |
Snafu Pit Plan FY23-ROADWAY TYPICALS
File details come from the government source that posted it. Updated .