Exhibit_G_-_ROME_INTRA-CITY_PRICING_SCHEDULE.docx

DOCX document 30 KB Posted

Attached to
Shipping and Moving Services Federal contract opportunity
Solicitation number
SIT70017R0001
Issued by
Department of State US Embassy Rome

About this file

Exhibit G Rome Intra-city

View the file

Other files for this federal contract opportunity

Other files attached to Shipping and Moving Services, newest first.
File Type Posted
Am_0004___2017-01-30-175148.pdf PDF
Amendment_0003___2017-01-12-094834.pdf PDF
Am_2_Shipping___2016-12-23-130803.pdf PDF
Amendment_1____2016-12-16-161648.pdf PDF
Invitation_Letter___2016-12-16-140415.pdf PDF
Exhibit_H_-_FLORENCE_INTERNATIONAL_PRICING_SCHEDULE.docx DOCX document
Exhibit_M_-_MILAN_INTERNATIONAL_PRICING_SCHEDULE.docx DOCX document
Exhibit_F_-_ROME_INTERNATIONAL_PRICING_SCHEDULE.docx DOCX document
SF33.docx DOCX document
Exhibit_L_-_NAPLES_INTERNATIONAL_PRICING_SCHEDULE.docx DOCX document
Shipping_Solicitation.docx DOCX document
Exhibit_I_-_FLORENCE_INTRA-CITY_PRICING_SCHEDULE.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit G

ROME INTRA-CITY PRICING SCHEDULE

BASE YEAR

A. BASE PERIOD PRICES

A.1Standard Services
UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount

(a) Appliances each _____ _300_ ___________

(b) Kitchen and Bathroom Cabinets each _____ _550_ ___________

(c) Wardrobes each _____ _200_ ___________

(d) Air Conditioners each _____ _80__ ___________

(e) Composed Lots each _____ __40_ ___________

(f) Area Rugs each _____ __10___ ___________

(g) Furniture cubic meter _____ __1200__ ___________

TOTAL YEARLY EST AMOUNT FOR STANDARD SERVICES Euro_________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

A.2 Additional and/or Emergency Services

UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount
Assembly/Disassembly of Wardrobe each_______ __ 20______________
Disconnection of appliances each_______ __20______________

Disposal of Appliances and/or Furniture each _______ __30__ ____________

Waiting timehour _______ __10__ ____________
Office Movecubic meter _______ _150______________
Move of safeseach _______ __10______________
House Hold Effectscubic meter _______ _150______________

Trucks:

Rental of 10-12cbm truck with driver (minimum chargeable six hours) hour _______ __48_ ____________ Rental of 18-22cmb truck with hydraulic lift with driver (minimum six hours) hour _______ _48__ ____________ Rental of 36cbm truck with hydraulic lift with driver (minum six hours) hour _______ _48__ ____________

Crane hour _______ _24__ ____________

Laborers:

Heavy Laborer regular duty:hour _______ _48___ ____________
day_______ _40___ ____________
week _______ _10___ ____________
month _______ _ 6___ ____________ Heavy Laborer overtime:hour _______ _80___ ____________
Heavy Laborer holidays:hour _______ _40___ ____________
In transit Storage10 cu.mt/day_______ 90 dd _____________

(10 cu.mt/1day is the minimum charge for this service - payment of excess cubic meters will be a pro-rate of the unit price)

TOTAL YEARLY AMOUNT ADDITIONAL/EM. SERVICES: Euro _________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

A.3 Total amount estimated for the base year of the contract is

EURO _______________________

B FIRST OPTION YEAR PRICES

Option Term: Twelve (12) Months

B.1Standard Services
UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount

(a) Appliances each _____ _300_ ___________

(b) Kitchen and Bathroom Cabinets each _____ _550_ ___________

(c) Wardrobes each _____ _200_ ___________

(d) Air Conditioners each _____ _80__ ___________

(e) Composed Lots each _____ __40_ ___________

(f) Area Rugs each _____ __10___ ___________

(g) Furniture cubic meter _____ __1200__ ___________

TOTAL YEARLY EST AMOUNT FOR STANDARD SERVICES Euro_________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

B.2 Additional and/or Emergency Services

UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount
Assembly/Disassembly of Wardrobe each_______ __ 20______________
Disconnection of appliances each_______ __20______________

Disposal of Appliances and/or Furniture each _______ __30__ ____________

Waiting timehour _______ __10__ ____________
Office Movecubic meter _______ _150______________
Move of safeseach _______ _10______________
House Hold Effectscubic meter _______ _150______________

Trucks:

Rental of 10-12cbm truck with driver (minimum chargeable six hours) hour _______ __48_ ____________ Rental of 18-22cmb truck with hydraulic lift with driver (minimum six hours) hour _______ _48__ ____________ Rental of 36cbm truck with hydraulic lift with driver (minum six hours) hour _______ _48__ ____________

Crane hour _______ _24__ ____________

Laborers:

Heavy Laborer regular duty:hour _______ _48___ ____________
day_______ _40___ ____________
week _______ _10___ ____________
month _______ _ 6___ ____________ Heavy Laborer overtime:hour _______ _80___ ____________
Heavy Laborer holidays:hour _______ _40___ ____________
In transit Storage10 cu.mt/day_______ 90 dd _____________

(10 cu.mt/1day is the minimum charge for this service - payment of excess cubic meters will be a pro-rate of the unit price)

TOTAL YEARLY AMOUNT ADDITIONAL/EM. SERVICES: Euro _________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

B.3 Total amount estimated for the first option year of the contract is

EURO _______________________

C SECOND OPTION YEAR PRICES

Option Term: Twelve (12) Months

C.1Standard Services
UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount

(a) Appliances each _____ _300_ ___________

(b) Kitchen and Bathroom Cabinets each _____ _550_ ___________

(c) Wardrobes each _____ _200_ ___________

(d) Air Conditioners each _____ _80__ ___________

(e) Composed Lots each _____ __40_ ___________

(f) Area Rugs each _____ __10___ ___________

(g) Furniture cubic meter _____ __1200__ ___________

TOTAL YEARLY EST AMOUNT FOR STANDARD SERVICES Euro_________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

C.2 Additional and/or Emergency Services

UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount
Assembly/Disassembly of Wardrobe each_______ __ 20______________
Disconnection of appliances each_______ __20______________

Disposal of Appliances and/or Furniture each _______ __30__ ____________

Waiting timehour _______ __10__ ____________
Office Movecubic meter _______ _150______________
Move of safeseach _______ _10______________
House Hold Effectscubic meter _______ _150______________

Trucks:

Rental of 10-12cbm truck with driver (minimum chargeable six hours) hour _______ __48_ ____________ Rental of 18-22cmb truck with hydraulic lift with driver (minimum six hours) hour _______ _48__ ____________ Rental of 36cbm truck with hydraulic lift with driver (minum six hours) hour _______ _48__ ____________

Crane hour _______ _24__ ____________

Laborers:

Heavy Laborer regular duty:hour _______ _48___ ____________
day_______ _40___ ____________
week _______ _10___ ____________
month _______ _ 6___ ____________ Heavy Laborer overtime:hour _______ _80___ ____________
Heavy Laborer holidays:hour _______ _40___ ____________
In transit Storage10 cu.mt/day_______ 90 dd _____________

(10 cu.mt/1day is the minimum charge for this service - payment of excess cubic meters will be a pro-rate of the unit price)

TOTAL YEARLY AMOUNT ADDITIONAL/EM. SERVICES: Euro _________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

C.3 Total amount estimated for the second option year of the contract is

EURO _______________________

D THIRD OPTION YEAR PRICES

Option Term: Twelve (12) Months

D.1Standard Services
UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount

(a) Appliances each _____ _300_ ___________

(b) Kitchen and Bathroom Cabinets each _____ _550_ ___________

(c) Wardrobes each _____ _200_ ___________

(d) Air Conditioners each _____ _80__ ___________

(e) Composed Lots each _____ __40_ ___________

(f) Area Rugs each _____ __10___ ___________

(g) Furniture cubic meter _____ __1200__ ___________

TOTAL YEARLY EST AMOUNT FOR STANDARD SERVICES Euro_________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

D.2 Additional and/or Emergency Services

UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount
Assembly/Disassembly of Wardrobe each_______ __ 20______________
Disconnection of appliances each_______ __20______________

Disposal of Appliances and/or Furniture each _______ __30__ ____________

Waiting timehour _______ __10__ ____________
Office Movecubic meter _______ _150______________
Move of safeseach _______ _10______________
House Hold Effectscubic meter _______ _150______________

Trucks:

Rental of 10-12cbm truck with driver (minimum chargeable six hours) hour _______ __48_ ____________ Rental of 18-22cmb truck with hydraulic lift with driver (minimum six hours) hour _______ _48__ ____________ Rental of 36cbm truck with hydraulic lift with driver (minum six hours) hour _______ _48__ ____________

Crane hour _______ _24__ ____________

Laborers:

Heavy Laborer regular duty:hour _______ _48___ ____________
day_______ _40___ ____________
week _______ _10___ ____________
month _______ _ 6___ ____________ Heavy Laborer overtime:hour _______ _80___ ____________
Heavy Laborer holidays:hour _______ _40___ ____________
In transit Storage10 cu.mt/day_______ 90 dd _____________

(10 cu.mt/1day is the minimum charge for this service - payment of excess cubic meters will be a pro-rate of the unit price)

TOTAL YEARLY AMOUNT ADDITIONAL/EM. SERVICES: Euro _________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

D.3 Total amount estimated for the third option year of the contract is

EURO _______________________

E FOURTH OPTION YEAR PRICES

Option Term: Twelve (12) Months

E.1Standard Services
UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount

(a) Appliances each _____ _300_ ___________

(b) Kitchen and Bathroom Cabinets each _____ _550_ ___________

(c) Wardrobes each _____ _200_ ___________

(d) Air Conditioners each _____ _80__ ___________

(e) Composed Lots each _____ __40_ ___________

(f) Area Rugs each _____ __10___ ___________

(g) Furniture cubic meter _____ __1200__ ___________

TOTAL YEARLY EST AMOUNT FOR STANDARD SERVICES Euro_________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

E.2 Additional and/or Emergency Services

UnitRate Estimated Total Est.
of Measure per Unit Quantity* Amount
Assembly/Disassembly of Wardrobe each_______ __ 20______________
Disconnection of appliances each_______ __20______________

Disposal of Appliances and/or Furniture each _______ __30__ ____________

Waiting timehour _______ __10__ ____________
Office Movecubic meter _______ _150______________
Move of safeseach _______ _10______________
House Hold Effectscubic meter _______ _150______________

Trucks:

Rental of 10-12cbm truck with driver (minimum chargeable six hours) hour _______ __48_ ____________ Rental of 18-22cmb truck with hydraulic lift with driver (minimum six hours) hour _______ _48__ ____________ Rental of 36cbm truck with hydraulic lift with driver (minum six hours) hour _______ _48__ ____________

Crane hour _______ _24__ ____________

Laborers:

Heavy Laborer regular duty:hour _______ _48___ ____________
day_______ _40___ ____________
week _______ _10___ ____________
month _______ _ 6___ ____________ Heavy Laborer overtime:hour _______ _80___ ____________
Heavy Laborer holidays:hour _______ _40___ ____________
In transit Storage10 cu.mt/day_______ 90 dd _____________

(10 cu.mt/1day is the minimum charge for this service - payment of excess cubic meters will be a pro-rate of the unit price)

TOTAL YEARLY AMOUNT ADDITIONAL/EM. SERVICES: Euro _________________

*This estimated amount is based on total, yearly, estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

E.3 Total amount estimated for the fourth option year of the contract is

EURO _______________________

File details come from the government source that posted it. Updated .