Signed EPS Black Hawk Windows.pdf

PDF 1 MB Posted

Attached to
Open Market Emergency Purchases IL|27-422DNR-REALT-P-100546
Contract number
27-422DNR-REALT-P-100546
Issued by
Illinois

About this file

The document provided is a PDF file that failed to load properly. The content displayed consists only of an Adobe Reader error message indicating that the PDF viewer cannot display the document contents and recommending the user upgrade to the latest version of Adobe Reader. No contract, pricing information, parties involved, goods, services, or other substantive details are readable from this document.

Without access to the actual document content, a comprehensive summary identifying the document type, involved parties, contract terms, pricing, or services cannot be provided.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

EMERGENCY PURCHASE STATEMENT

State of Illinois Chief Procurement Office for General Services Emergency Purchase Statement V.26.1 Page of

EMERGENCY PURCHASE STATEMENT

Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Statement v.26.1 Emergency Purchases are conducted pursuant to 30 ILCS 500/20-30 and 44 Ill. Adm. Code 1.2030.

Emergency Purchase Details Emergency Condition (select the appropriate option from the drop-down menu below):

Provide a description and reasons for needing this emergency purchase:

Provide the conditions and circumstances that led to the need for this emergency purchase:

Reason for selection of this particular vendor:

Description of supplies or services to be provided:

Emergency procurements shall be made with as much competition as is practicable under the circumstances, and agencies shall utilize best efforts to include contractors certified under the Business Enterprise Program in its emergency procurement process. 30 ILCS 500/20-30(a).

Describe the actions taken by the agency to make the emergency purchase with as much competition as is practicable under the circumstances:

List the actions taken by the agency that constitute its best efforts to include contractors certified under the Business Enterprise Program in this emergency purchase:

Is there an active State contract available for the required supplies or services?

If Yes is checked above, explain why the existing contract does not meet the need:

This emergency contract was awarded on the earliest of these dates: (choose one) *Pursuant to 44 Ill. Admin. 1.2030 (f)(5), if Estimated is indicated, an Emergency Final Cost form will be submitted by the State agency and published by the State Purchasing Officer no later than the tenth day of the succeeding month. If Actual is chosen and the total cost differs from the amount on this statement, an Emergency Final Cost form must be submitted and published within the same timeframe.

Select the type of funding to be used:

Signature This emergency purchase was made with as much competition as is practicable under the circumstances. Best efforts were utilized to include contractors certified under the Business Enterprise Program in the process.

I am authorized to make this emergency purchase, and I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.

11.0.0.20130303.1.892433.887364

VendorZip: 61036
VendorState: IL
VendorCity: Galena
VendorAddress: 11672 W. Norris Lane
Vendor: Renaissance Restoration, Inc. (Vendor #V00016678)
AgencyZip: 62702
AgencyState: IL
AgencyCity: Springfield
AgencyAddress: One Natural Resources Way
AgencyDivision: Office of Realty & Capital Planning - Statewide Operations
AgencyUniversity: Illinois Department of Natural Resources
CurrentMasterPage:
MasterPageCount:
ReferenceNumber: 53394
DropDownListQuickPurchase: Immediate expenditure is necessary for repairs to State property to protect against further loss or damage
CheckBox1ProtectingHealth: 0
CheckBox2DiscountedPrice: 0
CheckBox3RareItems: 0
CheckBox4Entertainment: 0
CheckBox5AvoidLapsing: 0
TextField2: Initially, this project’s scope included repairs to failed historic dormer windows at the Black Hawk State Historic Site. Site staff observed water infiltration extensive enough that rainwater was flowing into sills and walls, and even ponding on floors directly above museum space where irreplaceable artifacts are on display. This met the State’s Emergency Criteria, and a procurement resulted in a contract with historic restoration specialists, Renaissance Restoration, Inc. (V00016678). However, as the contractor began assessing the windows (including opening portions of the surrounding walls), additional unforeseen conditions were discovered. What was originally a limited repair to select windows expanded significantly when it became clear the water‑infiltration damage was far more extensive—requiring a scope and cost beyond the $100,000 procurement threshold of the previous project (necessitating a pivot to a more appropriate Procurement method).

The Emergency Criteria project now includes more extensive dormer and wall repairs, requiring in‑house architectural details to properly connect the failed windows and historic dormer structure to the existing stone walls. These expanded repairs include rebuilding a large integral dormer which originally featured massive beam construction—an obsolete construction method. Working with the State Historic Preservation Officers, the Agency has developed a repair detail that blends modern construction techniques with wood cladding to retain the historic appearance of the windows.

The expanded water‑infiltration and historic windows/dormer project continues to meet Emergency Criteria. Immediate expenditure is necessary to prevent further water infiltration damage to the Black Hawk State Historic Site Museum (30 ILCS 500/20‑30, Criteria B). Water infiltration deep into the walls presents a concern for mold growth, creating a threat to public health (Criteria A). Without immediate action, the Agency would need to close the museum to the public and staff, constituting a major disruption of State services (Criteria C). Finally, water infiltration above museum space containing irreplaceable artifacts poses a risk to State records (Criteria D).

In summary, while the project primarily addresses risk to State property—specifically preventing further water infiltration damage—it also meets the remaining three State Emergency Criteria.

TextField4: Initially, site staff reported extensive water infiltration from failed dormer windows at the Black Hawk State Historic Site. As the Agency investigated the issue and procured an initial repair solution, opening the historic walls near the windows revealed more extensive water‑infiltration damage than originally anticipated. The project scope was first expanded through a Change Order; however, as additional repair needs were identified, the project was ultimately abolished in order to pursue a more appropriate procurement method for projects exceeding the $100,000 threshold.

This project continues to meet all four of the State’s Emergency Procurement Criteria (30 ILCS 500/20‑30, Criteria A–D). The water infiltration poses a risk of mold growth beyond healthy levels (Criteria A). Future rain events will result in further damage to State property (Criteria B). There is a risk that the Agency would have to close the site to the public, constituting a disruption of State services (Criteria C). Finally, water infiltration threatens State records, including artifacts in the museum space (Criteria D).

ExplanationForSelectingVendor: Restoration Works, Inc is certified under the Business Enterprise Program as a women owned business.

The Illinois Department of Natural Resources reached out to two (2) other contractors for proposals for specialized historic window restoration services. The Master Contract vendor for region 6 carpentry services did not respond and CAD Construction, Inc, another BEP Certified vendor, was unable to fit the job into their schedule.

Furthermore, as the Agency's selected contractor for the initial project, Restoration Works, Inc. is uniquely knowledgeable about both the original historic window restoration project and the more extensive historic dormer and wall repairs. This includes knowledge of the State Historic Preservation Officers requirements for the modern repairs and cladding (unique to this repair and restoration project).

ExplanationSuppliesServices: All historic window restoration work at the Black Hawk State Historic Site shall be furnished and installed in accordance with the "Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings," US Dept. of Interior, National Park Service, Preservation Assistance Division, Washington D.C .

Included in the supplies and services provided is the full restoration of six (6) failed windows includes:

Dormer Window Repairs:

- Removal of deteriorated sashes & frame components from exterior; board up windows while restoration is completed off site; salvage historic glass for installation into new units.

- Build six (6) new 1-3/4"-thick 30-lite sash from Sapele Mahogany (as required by the State Historic Preservation Officers).

- Replace sills and subsill with Sapele to match original profiles (as required by the SHPO).

- Glaze window with existing (salvaged) glass using Sarco linseed oil-based exterior primer.

- Prime wood with one coat of oil-based exterior primer.

- Finish interior & exterior new wood components with urethane trim enamel (to match existing conditions).

- Clean-up of debris caused by work.

Dormer Trim:

- Replace deteriorated trim on the six (6) dormer units with Sapele mahogany (as required by SHPO).

- Prime wood with one coat of oil-based urethane trim enamel.

- Prime wood with one coat of oil-based exterior primer.

- Finish interior & exterior new wood components with urethane trim enamel (to match existing conditions).

- Clean-up of debris caused by work.

Dormer Beam & Wall Repairs:

- State Historic Preservation Officer (SHPO) approved repair methods to repair the failed wall and dormer beam support connection to the historic stone wall below

- Modern concrete masonry unit block construction with custom wood-cladding detail necessary to preserve this the historic look of the dormer windows and walls (as required by the SHPO) TextField3: The Illinois Department of Natural Resources contacted three contractors to identify a solution for water infiltration at the six (6) failed historic dormer windows at the Black Hawk State Historic Site. However, Renaissance Restoration, Inc. was the only contractor available to mobilize quickly, assess the situation, provide a cost proposal, and begin work immediately. Renaissance Restoration, Inc. is a known contractor that has previously worked with multiple State Agencies (including the DNR) to perform repairs and restorations at Illinois Historic Sites.

Finding a contractor qualified to work on historic structures is challenging and often costly due to the specialized expertise required. The cost proposals received from Renaissance Restoration, Inc. are reasonable given the difficult site access, the deteriorated condition of the historic windows, and the regional context. Additionally, Renaissance Restoration, Inc. is uniquely familiar with the unforeseen conditions discovered (more extensive water‑infiltration damage than anticipated) and the specialized repair and restoration approach approved by the State Historic Preservation Officers.

TextField1: This project exceeds the $100k threshold and would normally require Business Enterprise Program Goals. However, after calculating the goal utilizing the appropriate window repair National Institute of Governmental Purchasing (NIGP) codes, this project as determined to have no applicable goals (see procurement file).
CheckBoxYes: 0
CheckBoxNo: 1
ExplanationDoesNotMeetNeed:
CheckBox1: 1
DateField1: 2026-07-20
CheckBox2: 0
CheckBox3: 0
DateField3:
TextFieldAmountExpenditure: $206,432.00
ActualOrEstimated1: Actual
CheckboxFederalFunds: 0
CheckboxStateAppFunds: 1
CheckBoxStateGrantFunds: 0
CheckBoxOther: 0
AuthorizedSignature:
TitleField: Division Manager of Statewide Operations
PrintedNameField: Erick O. Huck
AuthorizedDateField: 2026-07-20