Sign Shop Windows - Plans.pdf
PDF 489 KB Posted
- Attached to
- Ames Campus: Sign Shop Windows
- Solicitation number
- 645-RFB-2149-2026
- Issued by
- Story County, Iowa
About this file
This architectural plans document outlines the scope of work for the Iowa Department of Transportation's Ames Campus Sign Shop Windows and Doors replacement project located at 800 Lincoln Way in Ames, Iowa. The project involves comprehensive renovation work including removal of existing wall and window materials and replacement with new wall framing, sheathing, siding, and windows. The plans detail entry-level work specifications with floor plan and elevation views at various scales (1/4" = 1'-0" and 3/4" = 1'-0"), depicting the installation of aluminum double-pane sliding windows, thermally broken hollow metal door frames, insulated hollow metal doors with tempered low-E insulating glass, Hardie board siding, gypsum board, vinyl trim, and associated structural elements. The project is scheduled to commence on December 1, 2025, with an expected completion date of June 30, 2026. The solicitation period runs from October 1, 2025, to October 29, 2025, with bid opening scheduled for 1:00 PM CDT. Site visits are optional and can be arranged with Kyle Williams upon 24-hour advance notice.
Qualified contractors must be registered with the Iowa Department of Workforce Development and will be required to provide performance and payment bonds for contracts exceeding $25,000. Evaluation criteria include cost, proposed staffing, time schedule, past work performance, and overall work capacity. The project is funded through the Iowa DOT with F.O.B. Destination delivery terms, and the agency maintains tax-exempt status. Bidders must provide detailed documentation on fabricated materials, lead times, and project timelines. Davis-Bacon wages do not apply to this project, and no specific set-aside designations or incumbent vendors were identified. While a precise budget range was not specified in the plans document, the comprehensive scope of work suggests a significant capital investment for the window and wall renovation at the Sign Shop facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1341581-event.pdf | ||
| Sign Shop Window Replacement Project Manual.pdf | ||
| A101_2017 sample.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A102
A102
A102
8' - 3 13/16" 8' - 3 13/16"
5030 5030 5030
6' - 8 7/8"
F1-D1
EXISTING
CMU
WALL
EXISTING
MASONRY
WALL
EXISTING
MASONRY
WALL
PROPOSED 2X
FRAMED WALL
A102
5030 5030 503032682026
HARDIE REVEAL PANEL SYSTEM
HARDIE REVEAL PANEL SYSTEM
EXISTING BRICK
7'
HORIZ REVEAL TRIM
VERT
REVEAL
TRIM
VERT
REVEAL
TRIM
A102
GYPSUM BD GYPSUM BD
GYPSUM BD
EXIST CMU WALL
4" VINYL TRIM
5/8" GYPSUM BD PRIMED/PAINTED
R-20 BATT INSULATION
RIDGID INSULATION
2X6 STUD @ 24"
O.C.
HARDIE BOARD
PRIMED/PAINTED
WEATHER BARRIER
5/8" PLYWOOD
EXISTING BRICK
2X6 DOUBLE TOP PLATE
EXISTING CONCRETE
ALUMINUM
DOUBLE PANE
SLIIDING WINDOW
2X6 HEADER W/INSUL ABOVE WINDOW/DOOR OPENINGS
EXISTING CEILING
-TRIM ACT AND TRACK
EXISTING STEEL BEAM
0"
REVEAL TRIM
1/4" ⌀ CONCRETE
ANCHORS @ 16"
O.C.
1/4" ⌀ CONCRETE ANCHORS
@ 16" O.C.
FOAM CAPILLARY
BREAK
4" VINYL BASE
HARDIE BOARD
PRIMED/PAINTED 5/8" GYPSUM BD PRIMED/PAINTED
PVC TRIM
PRIMED/PAINTED 5/8" GYPSUM BD SURROUND AT WINDOW
R .O
3'
7'
REVEAL TRIM
HARDIE TRIM
3/4" HAT
CHANNEL
3/4" HAT CHANNEL
REVEAL TRIM
TYPE F1
2" X 7 3/4" THERMALLY BROKEN
HOLLOW METAL DOOR FRAME,
16 GA.,
W/MITERED & WELDED
CORNERS GROUND SMOOTH.
3 ANCHORS PER JAMB.
PRIME & PAINT BOTH SIDES
2" 7'
6' - 8"
3' - 2"3' - 0"
2" 2" 2"
4" 6'
2"
TYPE D1
NO RATING
1 3/4", INSULATED 18 GA.,
HOLLOW METAL DOOR.
PRIME & PAINT.
ENCLOSED TOP RAIL
W/1" TINTED, TEMPERED,
LOW E INSULATING GLASS
7'
3' - 0"
6" 2' - 0" 6"
2'
6"
SHEET
DATE:
x
S he et Io w a
D O
T
R E
V
IS
IO
N
S
Resources & Acquisitions Bureau 800 Lincoln Way Ames, Iowa 50010
(515) 239-1299
COUNTY: DISTRICT:
PROJECT NUMBER:
9/ 5/
:5
6:
P M
S
IG
N S
H O
P D
O O
R A
N D
W
IN
D O
W R
E P
LA
C
E M
E N
T
F
LO
O R
P
LA
N , E
LE
V
A T
IO
N
S , S
E C
T
IO
N S
LI
N
C O
L N
W A
Y A
M E
S
IA
31 AUG 2025
A102
BG-2A13 (017)--80-85
N O
D
A T
E
B Y
D
E S
C R
IP
T
IO
N
1/4" = 1'-0"
1 ENTRY - PLAN
1/4" = 1'-0"
2 ENTRY - EXTERIOR ELEVATION
1/4" = 1'-0"
3 ENTRY - INTERIOR ELEVATION
3/4" = 1'-0"
4 WALL SECTION
1/4" = 1'-0"
5 FRAME AND DOOR ELVATIONS
File details come from the government source that posted it. Updated .