Sidewalk_Map.pdf
PDF 3 MB Posted
- Attached to
- Berlin Safe Routes to School Sidewalk Project
- Solicitation number
- 2026-04
- Issued by
- Hartford County, Connecticut
About this file
This file is a Sidewalk Map prepared by the Town of Berlin, Connecticut, depicting the town's sidewalk network expansion plan with connections to schools and neighborhoods. The map, produced in May 2025, illustrates existing sidewalks as of 2025 and identifies multiple funding sources and programs supporting sidewalk connectivity improvements, including the Connectivity Program Application, Carbon Reduction Grant Program, Connectivity Grant Awarded in 2023, bonding by developers, Newport Center Rail Trails in Connecticut, and the Community Challenge Grant from 2023. The map displays key municipal facilities including Train Station, Town Hall, Griswold Elementary School, McGee Middle School, Berlin High School, Willard Elementary School, and Hubbard Elementary School, with sidewalk coverage indicated across the town's grid network. The map provides a visual reference at a scale of 0 to 10.5 miles and serves as the inventory basis for real property within Berlin compiled from recorded deeds, plats, tax maps, surveys, planimetric maps, and other public records.
The map includes a disclaimer noting that the Town of Berlin and its mapping contractors assume no legal responsibility for the information contained herein and that users should consult the primary information sources for verification. This mapping document directly supports the Town of Berlin's Berlin Safe Routes to School Sidewalk Project (State Project No. 007-267), a pedestrian improvement initiative funded by the Federal Carbon Reduction Program administered by the Connecticut Department of Transportation. The project encompasses sidewalk installation on six streets near Willard and Hubbard Elementary Schools—Worthington Ridge (1,170 linear feet), Peter Parley Row (730 linear feet), Lower Lane (4,125 linear feet), Toll Gate Road (430 linear feet), Main Street, East Berlin (1,040 linear feet), and Meadow Lane (1,545 linear feet)—with a projected construction cost of $3,050,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sidewalk_Carbo_Reduction_Grant_Scope.xlsx | XLSX spreadsheet | |
| Berlin_Safe_Routes_to_School_Sidewalk_Project_(Addendum_#1_Revision).pdf | ||
| Berlin_Safe_Routes_to_School_Sidewalk_Project.pdf | ||
| Sidewalk_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
71A
TRAIN STATION
TOWN HALL
GRISWOLD
ELEMENTARY
SCHOOL
MCGEE
MIDDLE
SCHOOL
BERLIN
HIGH
SCHOOL
WILLARD
ELEMENTARY SCHOOL HUBBARD
ELEMENTARY
SCHOOL
DISCLAIMER:
THIS MAP IS PREPARED FOR THE INVENTORY OF REAL PROPERTY WITHIN
THE TOWN OF BERLIN AND IS COMPILED FROM RECORDED DEEDS, PLATS,
TAX MAPS, SURVEYS, PLANIMETRIC MAPS AND OTHER PUBLIC RECORDS
AND DATA. USERS OF THIS TAXMAP ARE HEREBY NOTIFIED THAT THE
AFOREMENTIONED PUBLIC PRIMARY INFORMATION SOURCES SHOULD BE
CONSULTED FOR VERIFICATION OF THE INFORMATION CONTAINED
ON THIS MAP. THE TOWN OF BERLIN AND ITS MAPPING CONTRACTORS
ASSUME NO LEGAL RESPONSIBILITY
FOR THE INFORMATION CONTAINED HEREIN.
Map Produced: May 2025
Sidewalks Existing 2025 Connectivity Program Application Carbon Reduction Grant Program
Connectivity Grant Awarded 2023
Bonded by Developer Newport Center Rail Trails, CT Community Challenge Grant 2023
Town of Berlin, Connecticut Berlin Sidewalk Network Expansion Plan
Connections to Schools and Neighborhoods 0 10.5
Miles
File details come from the government source that posted it. Updated .