Ship Cove Trail Log.pdf
PDF 183 KB Posted
- Attached to
- Ship Cove Trail Restoration
- Solicitation number
- 1240BJ24Q0009
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a trail log for the Ship Cove Trail Reconstruction Project in the Tongass National Forest. The project involves various trail construction and restoration work, including demolishing an existing bridge, installing new log bridges and steps, adding aggregate surfacing with retainer logs, and completing other trail improvements along the approximately 1.5-mile main trail and a 0.3-mile spur trail. Key details include the precise station-by-station work items, such as sign installations, log bridge removals and replacements, aggregate surface work, and step construction. The related federal contract opportunity is Solicitation Number 1240BJ24Q0009 for the Ship Cove Trail Restoration project, issued by the USDA Forest Service. The solicitation provides additional details on the required work, drawings, wage rates, and other contracting information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship Cove Trail Reconstruction Project
TRAIL LOG
AS AGGREGATE SURFACING
AS-RL AGGREGATE SURFACING WITH RETAINER LOG
DLB DOUBLE LOG BRIDGE
LRS LOG RISER STEP
SIGN SIGN
SP SPLIT PUNCHEON
WORK
AREA
BEGIN
DIST.
AHEAD
WORK
AREA
END
WORK ITEMS
EST. NO.
OF STEPS
NOTES
MAIN TRAIL
0 1 1 SIGN
INSTALL DOUBLE POST-MOUNTED SIGN ON TOP OF GRASSY
RISE ABOUT 30' EAST OF STA. 0+00. SEE DETAIL DRAWING
0 80 80 AS
0+00 IS AT TOP OF GRAVEL BEACH/BOTTOM OF BEACH
GRASS ZONE, LOCATE TRAIL CENTERLINE ON CURVING
ALIGNMENT PASSING MIDWAY BETWEEN SMALL PONDS AND
LARGE POND, FOLLOWING CENTERLINE STAKES. CROSS
HISTORIC TRAIL AT STA. 0+48, NO HISTORIC STRUCTURE AT
THIS LOCATION WILL BE AFFECTED. ELEVATION AT STA.
0+00 IS 9.1' DATUM: PORT ALEXANDER TIDE GUAGE
80 65 145 AS
145 15 160 SP
DEMO EXISTING BRIDGE. CONFIRM LOCATION WITH MIKE
MULLIN AT SITKA RANGER DISTRICT.
160 SIGN INSTALL SINGLE POST-MOUNTED SIGN #3 TO LEFT OF TRAL
160 320 480 AS
CUT THROUGH DOWN LOG AND BEGIN TO FOLLOW EXISTING
TRAIL AT STA 1+01, FOLLOW CENTERLINE STAKES. AT STA
1+45, LEAVE POND AND BEGIN CLIMBING INTO THE WOODS
AT STA 1+64. CROSS PROPERTY BOUNDARY BETWEEN
STATE OF ALASKA AND NATIONAL FOREST SYSTEM LAND AT
STA 3+49 (LINE IS BRUSHED OUT AND PARTIALLY
OVERGROWN)
480 3 483 LRS 3 INSTALL STEPS ONTO NEW BRIDGE
483 14 497 DLB
REMOVE OLD EXISTING LOGS,CLEAR 5' WIDE x 3' DEEP
CHANNEL UNDER BRIDGE TO ENSURE THAT WATER FLOWS
DOWN INTO MUSKEG AND DOES NOT FLOW DOWN TRAIL
BELOW.
497 143 640 AS
EXCAVATE AGAINST BEDROCK BLUFF RUNNING ALONG LEFT
SIDE OF TRAIL AND PLACE TRAIL ADJACENT, SEE DRAWING.
640 11 651 AS
651 12 663 DLB
CUT OUT DOWN LOG AND EXCAVATE 5' WIDE x 2' DEEP FOR
DRAINAGE UNDER BRIDGE
663 103 766 AS
766 100 866 SP CUT MOUNDS WHERE NEEDED FOR SMOOTH GRADE
866 276 1142 AS
1142 16 1157 AS-RL INSTALL RETAINER LOG ALONG LEFT SIDE OF THE TRAIL
WORK
AREA
BEGIN
DIST.
AHEAD
WORK
AREA
END
WORK ITEMS
EST. NO.
OF STEPS
NOTES
1157 16 1173 AS
EXCAVATE AGAINST BEDROCK BLUFF RUNNING ALONG
RIGHT SIDE OF TRAIL AND PLACE TRAIL ADJACENT,
OUTSLOPE AT 10%
1173 28 1201 AS-RL INSTALL RETAINER LOG ALONG LEFT SIDE OF THE TRAIL
1201 11 1212 AS
1212 2 1214 LRS 1
1214 15 1229 AS
1229 13 1242 DLB REMOVE EXISTING COLLAPSED BRIDGE
1242 200 1442 AS
1442 50 1492 AS
SPUR TRAIL (Option Item #1) TAKES OFF TO NEW TRAILHEAD
TO LEFT AT 14+42
1442 1 SIGN
INSTALL SINGLE POST-MOUNTED SIGN #2 TO RIGHT OF
TRAIL FACING SPUR TRAIL
OPTION ITEM #1 - SPUR TRAIL TO NEW TRAILHEAD
0 77 77 AS 0+00 IS ON LEFT SIDE OF MAIN TRAIL AT STA 14+42
77 14 91 DLB
91 200 291 AS FOLLOW CENTERLINE STAKES
291 14 305 NO WORK FOLLOW STEEP BEAR TRAIL DOWN TO GRAVEL BEACH
305 28 333 NO WORK
FOLLOW BEACH GRAVEL JUST BELOW BRUSH LINE TO
"PASS" BETWEEN BEDROCK OUTCROP AND UPLANDS.
333 15 348 BRUSHING ONLY BRUSH OUT "PASS"
348 1 349 SIGN
INSTALL TRAILHEAD MARKER ON 12" SPRUCE TREE
GROWING ON BEDROCK OUTCROP, FLAGGED WITH BLUE
FLAGGING. BOTTOM OF MARKER OT BE 7' ABOVE THE
GROUND. REMOVE BRANCHES BELOW MARKER AND FOR 2'
ABOVE MARKER.