SHI SOW 3 March 2020 Port Lavaca.docx
DOCX document 14 KB Posted
- Attached to
- Safe Homes Risk Assessment - Port Lavaca, TX
- Solicitation number
- 70Z029-20-Q-P32010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SHI SOW 3 March 2020 Port Lavaca.docx | DOCX document | |
| 52.212-5.docx | DOCX document | |
| VENDOR PAYMENT INFORMATION.docx | DOCX document | |
| WD-15-5305.docx | DOCX document | |
| 52.212-4.docx | DOCX document | |
| FAR 52.252.docx | DOCX document | |
| The following HSAR Clauses are incorporated into the terms of the Contract when marked.docx | DOCX document | |
| SF18-95a.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
State-Certified Contractor to Conduct Environmental Risk Assessments at CG Housing in Port Lavaca TX.
1.0 Scope: Provide all services necessary to conduct a thorough risk assessment in accordance with EPA and HUD guidelines for (04) housing units/areas at Coast Guard Housing in Union City, TN. for asbestos-containing materials (ACM), lead-based paint (LBP),lead dust, and radon. The risk assessments must include an on-site investigation to determine the presence, type, severity, and location of LBP, lead dust, ACM and Radon hazards (including lead hazards in paint, dust, and soil up to the dripline of the house) and provide recommendations to control or eliminate them. The risk assessments shall be performed only by a certified lead and asbestos risk assessor. Certification as an industrial hygienist, professional engineer, or registered architect is not required to perform these assessments. The risk assessment shall include the home interior and exterior areas out to the drip line of the home.
All samples will be collected following appropriate methods, documented using a chain of custody, and analyzed by appropriately accredited laboratories in accordance with federal/state requirements and industry standards.
| 2.0 | Government Supplied information: Available historical sample data, and inspection and risk assessment reports for lead, asbestos and radon will be provided to the contractor in advance for awareness. Available housing diagrams and floor plans will be made available to the Contractor. |
| 2.1 | Work Required: The contractor shall provide a complete lead risk assessment, asbestos survey, and radon assessment. These findings shall be detailed in a formal report for each housing unit listed below. The report shall follow the format described in the HUD Risk Assessment and Reevaluation publication. |
| 3.0 | Inspection Process: The assessment will follow federal and state requirements for a complete and thorough evaluation and risk determination of ACM, lead and radon hazards. |
| 4.0 | Buildings: Included in this scope are: |
817 Westbrook Street Port Lavaca, TX 77982 1712 Jackson Street Port Lavaca, TX 77982 1121 Brook Hollow Street Port Lavaca, TX 77982 1002 Westwood Street Port Lavaca, TX 77982
Total square footage for all units, roughly 2000sqft
| 5.0 | Schedule: Contractor shall submit a schedule of work to the Contracting Officer for approval. Once the schedule is approved, conformance to the approved schedule is mandatory. CG Housing personnel will make notification to the affected residents of the work schedule. |
| 6.0 | Reporting: Formal assessment reports shall provide a comprehensive risk assessment for each housing unit in accordance with EPA and HUD Guidelines for Risk Assessments. The reports will document detailed findings of material conditions, potential for disturbance, sample results; presence, type, severity, and location of hazards to include diagrams and pictures, and provide recommendations for the control each hazard based on local regulatory requirements. |
| 7.0 | Final Submittal: Assessment reports shall be completed and submitted no more than 14 days after receipt of laboratory sample results. |
| 8.0 | POC & COTR: The POC for this project is Sterling Davis at 504-253-4513. The local COTR at (housing site) is Jamar Parham at 504-253-4564. All work related contact shall be through the COTR. The Contracting Officer will be identified in the contract documents when issued. |