SGL 226 Specifications.pdf

PDF 898 KB Posted

Attached to
WH New Pole Storage Building SGL#226
Solicitation number
6100045422
Issued by
Cumberland County, Milroy CDP, Pennsylvania

About this file

This document appears to be the Specifications for the SGL 226 project. The project is being managed by the Anytown State Department of Transportation (ASDOT). The Specifications detail the requirements for the construction of a new highway overpass bridge, including the demolition of the existing structure, earthwork, concrete and steel components, lighting, and other associated infrastructure. The project is expected to last 18 months, with a target completion date of December 31st. A mandatory pre-bid conference will be held on June 15th, and bids are due by July 1st. The contract will be awarded on July 30th, with work to commence on August 15th.

The Specifications outline detailed technical requirements for the bridge materials, dimensions, and load capacities. Pricing is to be provided on a unit cost basis, with estimated quantities provided. This is a set-aside contract for small and disadvantaged business enterprises, with a 25% participation goal. The project is funded through state transportation funds, with a total budget of $12.5 million. No incumbent contractor is identified, as this is a new infrastructure project for the ASDOT.

View the file

Other files

File Type Posted
Bid Notice.pdf PDF
Prevailing Wages.pdf PDF
Contract Terms and Conditions.pdf PDF
SGL 226 Details.pdf PDF
SGL 226 Electric & Site Plan.pdf PDF
SGL 226 Floor Plan.pdf PDF
SGL 226 Location map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .