SGL 076 Upper Strasburg Road Project.pdf

PDF 2 MB Posted

Attached to
SC UPPER STRASBURG TRAIL PRJ SGL 076
Solicitation number
6100052910
Issued by
Franklin County, Pennsylvania

About this file

This document is a Request for Bids issued by the Pennsylvania Game Commission's Southcentral Region for a road maintenance project on State Game Lands 076 in Franklin County. The project requires services to maintain approximately 14,000 feet of administrative road, including the furnishing of labor, equipment, stone, cross-pipes, and seed. Bids are due by April 28, 2021, and an optional site visit will be held on April 19, 2021. The contract will be awarded to the bidder with the lowest total price, and the work must be completed by June 25, 2021 with no extensions.

The pricing for the project is based on a lump sum unit price for various work items, including cross-pipe installations, stone delivery and application, and road surface grading and compaction. The contractor is required to provide a $10,000 performance bond. Payment will be made on a reimbursement basis after successful completion of the work. The Pennsylvania Game Commission reserves the right to reject any or all bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southcentral Region 8627 William Penn Hwy

Huntingdon, PA 16652

March 31, 2021

REQUEST FOR BIDS

ROAD IMPROVEMENT PROJECT

PA GAME COMMISSION

SOUTHCENTRAL REGION

Prospective Bidders:

The Southcentral Region of the Pennsylvania Game Commission (PGC) is soliciting bids for road maintenance work on State Game Lands (SGL) 076 located in Franklin County. The location and specifications information of this project are on the Attachments 1 through 5.

Bids are to be submitted electronically thru the Commonwealth’s “PA Supplier Portal” system by April 28nd, 2021. If you have not registered as a vendor with the state, you must first complete this at www.pasupplierportal.state.pa.us prior to submitting an electronic bid. Any questions regarding this may be directed to Bobbi Mercer ( bmercer@pa.gov ) at 717 787-6594.

The bid shall be awarded on a single contract basis. The unit price shall include the cost of labor, materials, insurance, bond and all miscellaneous expenses necessary for the completion of the tasks. Prices bid shall be in dollar and cents only. Payment will be dispersed based on the amount of work completed as per the required specifications. The work may begin after PO is received by the contractor and performance bond is provided to the PGC. Work must be completed by June 25, 2021. No extension of time will be awarded.

The attached documents provide all necessary specifications, instructions, contact information, maps, etc.

Questions can be directed to:

Eric Horsh State Game Warden / Land Management Group Supervisor

(717) 676-8282 Email: ehorsh@pa.gov

Commonwealth of Pennsylvania

Pennsylvania Game Commission Southcentral Region mailto:bmercer@pa.gov mailto:bmercer@pa.gov

GENERAL SPECIFICATIONS

SGL 076 – Upper Strasburg Trail Road Maintenance Project

I. SCOPE OF WORK:

A. The P e n n s y l v a n i a Game C o m m i s s i o n ( PGC), S o u t h c e n t r a l R e g i o n , r e q u i r e s services to maintain approximately 14,000 feet of administrative road on State Game Lands (SGL) 076 in Franklin County. Services shall include, but not be limited to, the furnishing of all labor, superintendence, tools, equipment, stone, cross-pipes, and seed for the road improvement project as per Attachment 1. All Purchase Orders require the contractor to provide the equipment, materials, labor, insurance, and all miscellaneous expenses to complete the operation.

B. This project is being bid as one contract.

Any questions concerning the technical aspects of this project should be directed to the Land Management Group Supervisor (LMGS):

Eric Horsh State Game Warden / Land Management Group Supervisor PA Game Commission, Southcentral Region 8627 William Penn Highway Huntingdon, PA 16652

(717) 676-8282 ehorsh@pa.gov

II. PROJECT LOCATION:

SGL 076 - Upper Strasburg Trail is in Franklin County, Letterkenny Township. Project location is accessed off Upper Strasburg Road (SR 4004). See “Attachment 1” for more details.

Coordinates for project access points are listed below.

Intersection of Upper Strasburg Road and Upper Strasburg Trail -77.747740 40.065837

III. CONTRACT TASKS:

A. The contractor will supply all necessary equipment to complete cross-pipe installations as well as delivery, application, grading and compaction of specified stone. Contractor will deliver and install specified cross-pipes, geotextile fabric and apply stone.

B. Contractor shall comply with all attachments for the Upper Strasburg Trail Road Maintenance Project.

mailto:ehorsh@pa.gov mailto:ehorsh@pa.gov

IV. SITE INSPECTION AND ASSISTANCE:

The PGC will conduct an optional one-time-only tour of the work site for prospective bidders on April 19th, 2021. Attendees will meet on SGL 076 parking area off of Upper Strasburg Road.

Coordinates are listed under Section II.

V. CONTRACT REQUIREMENTS:

A. The project will begin within 10 days of the contractor’s receipt of the Purchase Order that includes a notice to proceed (weather permitting). All work must be completed by June 25, 2021. No extensions will be granted.

B. The contractor agrees to comply with all attachments. The Commission reserves the right to reject any or all bids.

C. The Operator is obligated to furnish equipment, materials, support equipment, and personnel necessary to complete the road improvement project as specified. The Operator maintains responsibility for the entire project even if another organization/subcontractor is providing part of the equipment and/or personnel.

D. As further guarantee of faithful performance of the conditions set forth in this contract, the successful bidder hereby agrees to furnish the PGC with a cashier’s, treasurer’s, or certified bank check, or an Irrevocable Letter of Credit payable to the “Pennsylvania Game Commission”, as bond in the amount of $10,000.00. This bond security may be provided within 7 days of receiving notice and prior to commencing work on the SGL. The check shall be mailed to the address stated above in Section 1. The contractor agrees that said deposit, upon failure on the part of the contractor to fulfill all and singular the conditions and requirements herein set forth or made a part hereof, shall be retained by the Commission to be applied to satisfy the contractors obligations assumed hereunder.

E. Failure to comply with any of the terms or conditions of the Contract may result in cancellation of the agreement.

F. The contractor shall comply with all State Game Lands regulations.

G. Prevailing minimum wages apply to this project. Refer to “Attachment 6” for information on the wage rate specifications.

VI. INSURANCE REQUIREMENTS:

A. The contractor will provide Worker’s Compensation insurance sufficient to cover all of the employees of contractor working to fulfill this contract.

B. Comprehensive General Liability Insurance, including bodily injury and property damage insurance, to protect the Commonwealth and the contractor from claims arising out of the performance of the contract. The amount of Bodily Injury Insurance shall not be less than

$300,000.00 for injury to or death of persons per occurrence. The amount of Property Damage Insurance shall not be less than $300,000.00 per occurrence.

Such policies shall name the Commonwealth as an additional insured. Prior to the commencement of work under this contract, the contractor must provide the Commonwealth with current Certificates of Insurance. These Certificates shall contain a provision that coverage afforded under the policy shall not be canceled or changed until at least thirty (30) days prior written notice has been given to the Commonwealth.

HOLD HARMLESS: The contractor shall be responsible for and agrees to indemnify and hold harmless the Commonwealth from and against damages to property or injuries (including death) to any persons and other losses, damages, expenses, claims, demands, suits, and actions by any party against the Commonwealth.

VII. BID AWARD:

Bidders must offer prices for all items as listed in the electronic bid form.

The bid will be awarded to the bidder with the lowest total price for the project. One purchase order will be awarded for the project.

Bids are to be submitted electronically thru the Commonwealth’s “PA Supplier Portal” system by April 28nd, 2021. If you have not registered as a vendor with the state, you must first complete this at www.pasupplierportal.state.pa.us prior to submitting an electronic bid. Any questions regarding this may be directed to Bobbi Mercer (bmercer@pa.gov) at 717-787-6594.

The Commission reserves the right to reject any and all bids and to choose the bid that, in its sole opinion, best meet the needs of this project.

ALL VENDORS WHO CONDUCT BUSINESS WITH THE PENNSYLVANIA GAME

COMMISSION MUST HAVE A VENDOR NUMBER ASSIGNED TO THEM IN ORDER TO

RECEIVE PAYMENT FROM THE COMMONWEALTH.

Vendors may access the website www.pasupplierportal.state.pa.us or phone (877) 435-7363 or

(717) 346-2676 or email ra-srmhelp@state.pa.us for assistance to register as a new vendor or, if you are an existing vendor, to change a main or remit to address. This is a Dept of General services (DGS) website so you need to contact them directly if you have any problems with the website.

http://www.pasupplierportal.state.pa.us/ http://www.pasupplierportal.state.pa.us/ mailto:bmercer@pa.gov mailto:bmercer@pa.gov http://www.pasupplierportal.state.pa.us/ http://www.pasupplierportal.state.pa.us/ mailto:ra-srmhelp@state.pa.us mailto:ra-srmhelp@state.pa.us

VIII. CONTRACT TERM:

The contract term shall commence upon receipt of required bond, certificate of insurance, signed General Specifications page, and terminate June 25, 2021. No extensions will be granted.

IX. PAYMENT TERMS:

Payment for road maintenance contract: The price shall include all labor, equipment, tools, stone, insurance and all items necessary for the completion of the project.

Roadway improvements shall be paid for based on a Lump Sum (LS) unit price for each of the twelve (12) line items in the contract/purchase order. The Lump Sum unit price for each ‘Work Item’ shall include all labor, equipment, materials, services, and incidental items to complete work required for that ‘Work Item’.

The contractor shall be paid on a reimbursement basis after inspection verifies work was successfully completed to the terms and specifications outlined in the contract.

Attachment 1:

Upper Strasburg Road Maintenance Project – Map

Attachment 2

ATTACHMENT 2

SGL 076 - Upper Strasburg Road Maintenance Project Site Plans

SEGMENT A

Station # Type Size Description

18" Pipe (20')

18" Pipe (30')

18" Pipe (40')

24" Pipe (30')

2RC

(TONS)

AASH

TO #1

(4")

(TONS)

2A

(TONS)

AASH

TO #3

Headwall and Endwall

GATE 8 - LOCATED AT INTERSECTION OF Upper Strasburg Road and Upper Strasburg Trail

1 Cross Pipe 18"x40'

Install 18" by 40' pipe, Headwall and End wall

1 40 2

2 Cross Pipe 18"x30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

3 Cross Pipe 18"x30'

Remove existing pipe, backfill and install new 18"x30' pipe Headwall and End wall

1 40 2

4 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

5 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 40 2

6 Cross pipe 18"x 30'

Remove existing pipe, backfill and install new 18"x30' pipe.

Headwall and End wall

1 40 2

7 Cross pipe 18"x20'

Install 18"x20' pipe perpendicular to road, Headwall and End wall

1 20 2

8 Cross pipe

18" x 30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

9 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

10 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

11 Pull Off 83'x12'

Grade pull off, apply 8" 2A- Roll when project is completed

12 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

13 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 20 2

14 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

15 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and

1 20 2

16 Cross

Install 18" x 20' pipe Headwall and End wall

1 20 2

17 Pull Off

170'x12

Grade pull off, apply 8" 2A- Roll when project is completed

18 Cross pipe

18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

19 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

20 Cross pipe

Remove existing pipe, backfill

21 Cross pipe 18"x20'

Install 18"x20' pipe perpendicular to road, Headwall and End wall

1 30 2

22 Cross pipe 18”x 40'

Construct 18" x 40' crosspipe at an angle across the road. Block ditch adjacent to pipe inlet using and angled headwall.

1 50 2

23 Cross pipe 18"x 30'

Install 18"x30' pipe, Headwall and

1 30 2

24 Cross pipe 18"x 40'

Construct 18" x 40' crosspipe at an angle across the road. Block ditch adjacent to pipe inlet using and angled headwall.

1 50 2

25 Cross pipe 18"x 30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

26 Cut/ Fill

171'x14 'x12"

Apply 12" of

AASHTO #1

14' wide for a length of 171'

27 Cross pipe

18" x 30'

Remove existing pipe, backfill and install new 18" x 30' pipe Headwall and End wall

1 30 2

28 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 20 2

29 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 20 2

30 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and

31 Pull Off

64'x12' x8"

Grade pull off, apply 8" 2A- Roll when project is completed

32 Cross pipe 18"x 30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

33 Cross pipe 18"x 30'

Remove existing pipe, backfill and install new 18" x 30' pipe perpendicular to road, Headwall and End wall

1 30 2

34 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe perpendicular to road, Headwall and End wall

1 30 2

35 Cross pipe 18"x 30'

Remove existing pipe, backfill and install new 18"x30' pipe.

Headwall and End wall

1 30 2

36 Cross pipe 18"x40'

Construct 18" x 40' crosspipe at an angle across the road. Block ditch adjacent to pipe inlet using and angled headwall.

1 50 2

37 Cross pipe 18"x40'

Construct 18" x 40' crosspipe at an angle across the road. Block ditch adjacent to pipe inlet using and angled headwall.

1 50 2

38 Cross pipe 18"x30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

39 Cross pipe 18"x30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

40 Cross pipe 24"x30'

Remove existing pipe, backfill and install new 24" x 30' pipe perpendicular to road, Headwall and End wall

1 30 2

41 Cross pipe 18"x30'

Install 18"x30' pipe, Headwall and End wall

1 30 2

42 Pull Off

170'x20 'x8"

Grade pull off, apply 8" 2A- Roll when project is completed

43 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

Entire road surface - 7000 feet x 14 feet width

Apply 6" of

AASHTO #3

aggregate to road surface. Compact with a vibrating roller, Apply 8" 2A-roll

3750 2813

TOTALS

18 13 5 1 1130 125 3,750 2,813

TOTAL

MATERI

ALS

NOTE:

Aggregate totals are approxi mate

18" Pipe (20')

18" Pipe (30')

18" Pipe (40')

24" Pipe (30')

2RC

AASH

TO #1

(4")

2A AASH

TO #3

Headwall/ Endwall

360 390 200 30 1130 125 4025 2813 76

Linear Feet

Linear Feet

Linear Feet

Feet TONS TONS TONS TONS Each

SEGMENT B

Station # Type Size Description

15" Pipe (20')

15" Pipe (30')

18" Pipe (20')

24" Pipe (20')

2RC

(TONS)

AASH

TO #1

(4")

(TONS)

2A

(TONS)

AASH

TO #3

Headwall and Endwall

Begins at the intersection of Segment A and Segment B

1 Cross Pipe 15"x30'

Install 15" x 30' pipe, Headwall and End wall

1 40 2

2 Cross Pipe 15"x30'

Install 15" x 30' pipe, Headwall and End wall

1 40 2

3 Cross Pipe 15"x30'

Install 15" x 30' pipe, Headwall and End wall

1 40 2

4 Cross pipe

15"x20'

Install 15" x 20' pipe Headwall and End wall

1 20 2

5 Cross pipe 18"x20'

Install 18"x20' pipe, Headwall and Endwall.

1 40 2

6 Cross pipe 18"x20'

Install 18"x20' pipe, Headwall and Endwall.

1 40 2

7 Turn out

Improve existing turnout with new road grade.

8 Cross pipe 15"x20'

Install 15" x 20' pipe Headwall and End wall

1 30 2

9 Cross pipe

15"x20'

Install 15" x 20' pipe Headwall and End wall

1 30 2

10 Cross pipe 15"x20'

Install 15" x 20' pipe Headwall and End wall

1 30 2

11 Cross pipe 24"x20'

Install 24"x20' pipe, Headwall and Endwall.

1 40 2

12 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

13 Cross pipe 24"x20'

Remove existing pipe, backfill and install new 24" x 20' pipe Headwall and End wall

1 40 2

14 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 20 2

15 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and

1 20 2

16 Cross

Install 18" x 20' pipe Headwall and End wall

1 20 2

17 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

18 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

19 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

20 Cross pipe 24"x20'

Remove existing pipe, backfill and install new 24" x 20' pipe Headwall and End wall

1 40 2

21 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

22 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 50 2

23 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

24 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

25 Cross pipe 18"x 20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and

26 Cross

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

27 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

28 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

29 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 20 2

30 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

31 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 40 2

32 Cross pipe

18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

33 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

34 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and End wall

1 30 2

35 Cross pipe 18"x20'

Install 18" x 20' pipe Headwall and

36 Cross pipe 24"x20'

Remove existing pipe, backfill and install new 24" x 20' pipe Headwall and End wall

1 50 2

37 Cross pipe 18"x20'

Remove existing pipe, backfill and install new 18" x 20' pipe Headwall and End wall

1 30 2

Entire road surface - 7000 feet x 14 feet width

Apply 6" of

AASHTO #3

aggregate to road surface.

Compact with a vibrating roller, Apply 8" 2A-roll

3750 2813

TOTALS 4 3 25 4 1140 0 3,750 2,813 72

TOTAL

MATERI

ALS

NOTE:

Aggregat e totals are approxi mate

15" Pipe (20')

15" Pipe (30')

18" Pipe (20')

24" Pipe (20')

2RC

AASH

TO #1

(4")

2A AASH

TO #3

Headwall/ Endwall

80 90 500 80 1140 0 3750 2813 72

Feet

Linear Feet

Linear Feet

Feet TONS TONS TONS TONS Each

Attachment 3:

Upper Strasburg Road Maintenance Project

GENERAL SPECIFICATIONS:

1. Approximately 14,000 feet of existing SGL road will be improved by grading with a dozer with a six-way blade or road grader to a 14-foot running surface, crowned six (6) inches (3/4” of fall per horizontal foot) at the centerline, side ditches established, and positively drained.

Road surface must be crowned as directed to drain all water into the ditches, cross-pipes, and/or turnouts.

2. Site Plans – This project consists of two road segments approximately 7,000 linear feet each.

Those work segments are depicted in ATTACHMENT 1 as Segment A and Segment B.

3. Segment A has 43 work sites where specific work is to be conducted. The sites are marked by 2”x2” wooden stakes with orange paint on the upper portion of the stake. A number (1-43) is located near the top of the stake within the orange painted area. This number corresponds with a numbered work item on the Site Plans sheet. Each itemized plan specifies the type and description of work to be completed as well as materials that will be required to complete the work item. Station 1 is located at the West end of the project area, Station 43 is located at the East end of the project area. Site plans are contained in “Attachment 2”.

Segment B has 38 work sites where specific work is to be conducted. The sites are marked by 2”x2” wooden stakes with orange paint on the upper portion of the stake. A number (1-38) is located near the top of the stake within the orange painted area. This number corresponds with a numbered work item on the Site Plans sheet. Each itemized plan specifies the type and description of work to be completed as well as materials that will be required to complete the work item. Station 1 is located at the West end of the project area at the intersection with Segment A. Station 38 is located at the East end of the project area. Site plans are contained in “Attachment 2”.

4. Prior to grading and surface stone application, the contractor will install with a backhoe or excavator black, plastic, corrugated smooth bore double-walled cross-pipes. The total amount and size of pipes listed below will be supplied and delivered by the contractor on site.

Each culvert will be bedded with 2RC aggregate as per ‘Attachment 4’.

Pipe Dimensions Total Length (ft) Total Pipes

15-inch x 20-feet 80 4 15-inch x 30-feet 90 3

18-inch x 20-feet 860 43 18-inch x 30-feet 390 13 18-inch x 40-feet 200 5 24-inch x 20-feet 80 4

24-inch x 30 feet 30 1

5. Cross-pipes, head walls, and tail walls will be constructed as specified in ‘Attachment 4’.

Stone for head and tail walls is available on site.

6. Approximately 171 feet of AASHTO #1 will be applied at a depth of 12-inches at station number 26 prior to road base material being applied.

7. Upon completion of installation of cross-pipes, establishment/clearing of all ditches, application of AASHTO #1 (station 26) and all grading activities, AASHTO #3 will be spread to a 6” depth and a width of 14 feet over the entire length of road. Stone will be graded to establish positive drainage.

8. Upon the completion of line item 6 above, the road surface will be rolled and compacted to a 4” depth using a 10-ton vibratory roller or similar roller.

9. A final driving surface consisting of 8-inches of 2A limestone will be applied to the entire project area at a width of 14’, road will be graded and rolled with a 10-ton roller or similar roller.

10. The total amount of limestone aggregate is listed below for all road sections to include culvert pipe, parking areas, pull off’s and road surfacing. It will be the responsibility of the contractor to deliver these materials as part of this contract. All figures are approximate, and the actual amount required may differ based on various variables, conditions, and circumstances.

i. AASHTO #1 (4”) – 125 Tons

– 5,626 Tons -

- 7,775 Tons

ii. AASHTO #3

iii. 2A

iv. 2RC – 2,270 Tons

11. All freshly disturbed soil will be seeded with oats at a rate of 30 lbs./acre and mulched with weed-free straw. Areas of freshly disturbed soils that will require seeding and mulching include tail ditches, road-side banks, and other areas of disturbed soil as directed by the

LMGS.

12. Soil erosion and sedimentation (E&S) control measures shall be implemented in accordance with the provisions of the Clean Streams Law and 25 Pennsylvania Code Chapter 102. The Pennsylvania Department of Environmental Protection Erosion and Sediment Program Pollution Control Manual as well as the Commonwealth of Pennsylvania Department of Transportation Publication 408 are the sources for control measures.

Accelerated erosion control shall be accomplished through the rapid stabilization of all disturbed surfaces throughout the project area, use of Best Management Practices (BMPs), and precautions in the use of construction equipment.

13. All work, including site cleanup, must be completed by the expiration date of the project.

14. The Pennsylvania Game Commission reserves the right to inspect/evaluate the equipment which will be used to complete the contract. If in the opinion of the LMGS the equipment is not adequate to meet the specifications of the contract, the contractor will have two (2) options: Option 1 is to secure and utilize other equipment acceptable to the LMGS for the project. Option 2 is to decline the contract. If the contractor does not have adequate equipment to complete the project and does not obtain satisfactory equipment, the contract will be terminated. The decision of the LMGS as it relates to proper equipment and its ability to complete the work will be final.

15. Damage to existing infrastructure (roads, trails, food plots, etc.), private or public, will be the responsibility of the contractor to repair, at their expanse, to the pre-existing or better condition. The need for repair will be determined by the LMGS prior to the conclusion of the project.

16. It is the obligation of the contractor to check with local townships and/or Penn DOT regarding any restrictions on heavy hauling. It is the contractor’s obligation to adhere to any such restrictions and take the necessary action to legally use roads accessing the project area. The bonding of roads is the responsibility of the contractor.

17. The contractor is responsible for contacting PA One Call (8-1-1) at least three (3) business days prior to any earth moving activities or hauling to insure all utility lines are clearly identified. For more information, visit www.pa1call.org. Failure to provide adequate lead time will delay the start of the project.

18. All PGC gates are to be kept closed at all times, except when the contractor is present on the site.

19. The following will be “No-Work Days” during the contract period:

i. The opening day and on all Saturdays during spring gobbler season (May 1 – 31), including the youth spring gobbler hunt (April 24, 2021).

20. Attachments 1 and 2 contain a map and spreadsheets that provide location and specific site information for the project areas.

21. The contractor shall comply with all State Game Lands regulations.

22. Contractors will not remove anything from the property including flora, fauna, or artifacts.

23. The contractor will remove all trash and garbage, personal and otherwise, generated from the work performed. Burning is not permitted on this project.

24. An emergency spill kit, large enough for equipment being used, will be available at all times during active operations on the project site.

http://www.pa1call.org/ http://www.pa1call.org/

25. The contractor will notify the LMGS three days (72 hours) prior to beginning and completion of the project work. The contractor may work at times other than the schedule of the LMGS.

26. The LMGS will inspect the work and may direct contractor to rework certain road areas or other tasks to meet required specifications. Inspection of the project will occur during normal working hours.

27. Final inspection of the project will be conducted by the LMGS. The contractor may be present at the final inspection. Upon successful completion of the required work, final payment will be released to the contractor.

28. Failure to meet and follow the terms and conditions of the project will be grounds to terminate the contract and forfeiture of the bond to the Pennsylvania Game Commission.

Attachment 4

Cross-Pipe Installation

1. GENERAL SPECIFICATIONS:

A. Pipe trench depth will depend on inlet and outlet elevations. Where possible, outlet pipe at natural ground elevation. Bottom of the pipe inlet should be at the same elevation as the ditch. At some stations, the elevation of the ditch at the pipe inlet will be required to be raised to the level of the adjacent ditch line using aggregate. The bottom of the pipe trench should have a minimum 1% fall across the entire length.

B. Approximately 3” of 2RC aggregate (bedding material) is to be placed in the bottom of the trench and smoothed out to achieve proper slope. If additional aggregate is used to level the trench, it should be compacted before pipe placement.

C. Pipe inlets should be placed in the existing ditch line, leaving enough room for a headwall.

Pipe is to have constant contact with the bedding, no voids.

D. Headwalls and end walls are to be constructed after the pipe is placed in the trench and before material is placed around the pipe. Large native rock is available on-site and is to be used to construct headwalls and endwalls. Parabolic-shaped headwalls and endwalls shall be constructed at all inlets and outlets for perpendicular pipes. Angle-shaped headwalls shall be constructed at all inlets for angled pipes. Use native material to back-fill behind angled headwalls.

E. Approximately 8” of 2RC shall be placed on both sides of the pipe and compacted with a

Jumping-Jack or similar device to compact fill. Place and compact fill in stages around and over the pipe until there is 12” of compacted pipe fill over the top of the pipe.

2. SHALLOW PIPE INSTALLATIONS

A. Shallow pipe installations will be required at some stations depending on the elevation of the inlet end of the ditch as well as the elevation of the area at the outlet end of the pipe.

Installation of shallow pipes requires the bottom of the outlet end of the pipe to be at the natural ground elevation. In some cases, the elevation of the existing tail ditch will suffice.

B. This installation method will raise the elevation of the road through the addition of 12” of compacted fill over the top of the pipe. The fill should be tapered into the existing road elevation on either side of the pipe. Transitions should be sufficiently long to accommodate passenger vehicles and truck-trailer combinations. The amount of fill needed, and length of taper will depend on pipe depth and road slope.

Project Name: SGL 076 Road Maintenance Project

Awarding Agency: PA Game Commission

Contract Award Date: 4/29/2021

Serial Number: 21-02718

Project Classification: Heavy/Highway

Determination Date: 4/6/2021

Assigned Field Office: Harrisburg

Field Office Phone Number: (717)787-4763

Toll Free Phone Number: (800)932-0665

Project County: Franklin County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 4/6/2021 Page 1 of 10

Project: 21-02718 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/26/2017 $32.00 $26.51 $58.51

Asbestos & Insulation Workers 7/2/2018 $32.80 $26.76 $59.56

Asbestos & Insulation Workers 7/2/2019 $33.80 $27.26 $61.06

Asbestos & Insulation Workers 6/29/2020 $34.80 $28.01 $62.81

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2017 $28.52 $18.22 $46.74

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2018 $29.52 $18.22 $47.74

Boilermaker (Commercial, Institutional, and Minor Repair Work)

1/1/2019 $29.26 $18.48 $47.74

Boilermakers 1/1/2018 $46.26 $33.36 $79.62

Boilermakers 3/1/2018 $45.89 $33.73 $79.62

Boilermakers 1/1/2019 $45.51 $34.11 $79.62

Boilermakers 8/1/2019 $47.21 $34.11 $81.32

Boilermakers 1/1/2021 $49.32 $34.90 $84.22

Bricklayer (Pointer, Cleaner, Caulker, Cement Mason, Plasterer, Tile Setter)

5/1/2018 $28.15 $22.45 $50.60

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2017 $32.54 $16.06 $48.60

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2018 $32.95 $16.45 $49.40

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2019 $33.43 $16.87 $50.30

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2020 $33.99 $17.31 $51.30

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2021 $34.62 $17.78 $52.40

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2018 $28.51 $15.27 $43.78

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2019 $29.11 $15.92 $45.03

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2020 $29.93 $16.39 $46.32

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2021 $30.77 $16.89 $47.66

Carpenters 6/1/2017 $27.93 $14.79 $42.72

Cement Finishers 5/1/2017 $27.20 $22.45 $49.65

Cement Masons 5/1/2019 $29.05 $22.50 $51.55

Cement Masons 5/1/2020 $29.85 $22.70 $52.55

Dockbuilder, Pile Drivers 1/1/2016 $32.03 $17.53 $49.56

Drywall Finisher 5/1/2017 $23.30 $12.39 $35.69

Drywall Finisher 5/1/2019 $23.82 $14.27 $38.09

Drywall Finisher 5/1/2020 $23.94 $15.30 $39.24

Electricians 6/1/2017 $30.00 $23.06 $53.06

Electricians 6/1/2018 $30.60 $23.63 $54.23

Electricians 6/1/2019 $31.60 $24.37 $55.97

Electricians 6/1/2020 $32.50 $25.20 $57.70

Electricians 6/1/2021 $32.50 $26.90 $59.40

Elevator Constructor 1/1/2017 $43.98 $31.89 $75.87

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 2 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Elevator Constructor 1/1/2018 $45.35 $33.00 $78.35

Elevator Constructor 1/1/2020 $48.33 $39.11 $87.44

Elevator Mechanic 1/1/2019 $46.80 $34.13 $80.93

Elevator Mechanic 1/1/2021 $49.95 $40.35 $90.30

Glazier 5/1/2017 $25.63 $11.45 $37.08

Glazier 5/1/2018 $25.63 $11.95 $37.58

Glazier 5/1/2019 $25.63 $12.45 $38.08

Glazier 5/1/2020 $25.63 $12.95 $38.58

Glazier 5/1/2021 $25.63 $13.45 $39.08

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

1/1/2017 $30.02 $29.42 $59.44

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2020 $33.76 $30.13 $63.89

Iron Workers 7/1/2019 $32.76 $29.88 $62.64

Laborers (Class 01 - See notes) 1/1/2018 $18.47 $16.49 $34.96

Laborers (Class 01 - See notes) 1/1/2019 $19.47 $17.29 $36.76

Laborers (Class 01 - See notes) 1/1/2020 $20.47 $17.29 $37.76

Laborers (Class 01 - See notes) 1/1/2021 $21.47 $17.29 $38.76

Laborers (Class 02 - See notes) 1/1/2018 $18.62 $16.49 $35.11

Laborers (Class 02 - See notes) 1/1/2020 $21.22 $17.29 $38.51

Laborers (Class 02 - See notes) 1/1/2021 $22.22 $17.29 $39.51

Laborers (Class 02 - see notes) 1/1/2019 $20.22 $17.29 $37.51

Laborers (Class 03 - See notes) 1/1/2018 $18.72 $16.49 $35.21

Laborers (Class 03 - See notes) 1/1/2019 $20.32 $17.29 $37.61

Laborers (Class 03 - See notes) 1/1/2020 $21.32 $17.29 $38.61

Laborers (Class 03 - See notes) 1/1/2021 $22.32 $17.29 $39.61

Laborers (Class 04 - See notes) 1/1/2018 $17.47 $16.49 $33.96

Laborers (Class 04 - See notes) 1/1/2019 $18.47 $17.29 $35.76

Laborers (Class 04 - See notes) 1/1/2020 $19.47 $17.29 $36.76

Laborers (Class 04 - See notes) 1/1/2021 $20.47 $17.29 $37.76

Landscape Laborer (Skilled) 1/1/2018 $21.01 $15.31 $36.32

Landscape Laborer (Skilled) 1/1/2020 $21.64 $16.98 $38.62

Landscape Laborer (Tractor Operator) 1/1/2018 $21.31 $15.31 $36.62

Landscape Laborer (Tractor Operator) 1/1/2020 $21.94 $16.98 $38.92

Landscape Laborer 1/1/2018 $20.59 $15.31 $35.90

Landscape Laborer 1/1/2020 $21.22 $16.98 $38.20

Marble Mason 5/1/2017 $29.27 $15.62 $44.89

Marble Mason 5/1/2018 $29.88 $16.01 $45.89

Marble Mason 5/1/2019 $30.46 $16.43 $46.89

Marble Mason 5/1/2020 $31.02 $16.87 $47.89

Marble Mason 5/1/2021 $31.55 $17.34 $48.89

Millwright 5/1/2017 $33.79 $18.16 $51.95

Millwright 5/1/2018 4/30/2019 $34.41 $18.64 $53.05

Millwright 5/1/2019 4/30/2020 $35.30 $18.90 $54.20

Millwright 5/1/2020 $36.04 $19.31 $55.35

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 3 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 01 - see notes) 7/1/2017 $30.17 $17.42 $47.59

Operators (Class 01 - see notes) 7/1/2018 $30.72 $18.12 $48.84

Operators (Class 01 - see notes) 7/1/2019 $31.27 $18.82 $50.09

Operators (Class 01 - see notes) 7/1/2020 $31.87 $19.57 $51.44

Operators (Class 01 - see notes) 7/1/2021 $32.47 $20.32 $52.79

Operators (Class 02 -see notes) 7/1/2017 $26.45 $17.42 $43.87

Operators (Class 02 -see notes) 7/1/2018 $26.75 $18.12 $44.87

Operators (Class 02 -see notes) 7/1/2019 $27.05 $18.82 $45.87

Operators (Class 02 -see notes) 7/1/2020 $27.45 $19.57 $47.02

Operators (Class 02 -see notes) 7/1/2021 $27.85 $20.32 $48.17

Operators (Class 03 - See notes) 7/1/2017 $25.30 $17.42 $42.72

Operators (Class 03 - See notes) 7/1/2018 $25.50 $18.12 $43.62

Operators (Class 03 - See notes) 7/1/2019 $25.70 $18.82 $44.52

Operators (Class 03 - See notes) 7/1/2020 $26.00 $19.57 $45.57

Operators (Class 03 - See notes) 7/1/2021 $26.30 $20.32 $46.62

Operators (Class 04 - Chief of Party (Surveying and Layout))

7/1/2016 $23.65 $16.77 $40.42

Operators (Class 04 - Instrument Person (Surveying & Layout))

7/1/2016 $22.65 $16.77 $39.42

Operators (Class 04 - Rodman/Chainman (Surveying and Layout))

7/1/2016 $22.20 $16.77 $38.97

Painters Class 1 (see notes) 5/1/2017 $23.47 $13.32 $36.79

Painters Class 1 (see notes) 5/1/2018 $23.92 $14.37 $38.29

Painters Class 1 (see notes) 5/1/2019 $24.57 $15.22 $39.79

Painters Class 1 (see notes) 5/1/2020 $25.30 $15.99 $41.29

Painters Class 2 (see notes) 5/1/2017 $25.60 $13.32 $38.92

Painters Class 2 (see notes) 5/1/2018 $26.05 $14.37 $40.42

Painters Class 2 (see notes) 5/1/2019 $26.70 $15.22 $41.92

Painters Class 2 (see notes) 5/1/2020 $27.43 $15.99 $43.42

Painters Class 3 (see notes) 5/1/2017 $31.35 $13.32 $44.67

Painters Class 3 (see notes) 5/1/2018 $31.80 $14.37 $46.17

Painters Class 3 (see notes) 5/1/2020 $33.18 $15.99 $49.17

Pile Driver Divers (Building, Heavy, Highway) 1/1/2018 $50.33 $18.55 $68.88

Pile Driver Divers (Building, Heavy, Highway) 1/1/2019 $51.45 $19.30 $70.75

Pile Driver Divers (Building, Heavy, Highway) 1/1/2020 $53.10 $19.70 $72.80

Pile Driver Divers (Building, Heavy, Highway) 1/1/2021 $54.75 $20.10 $74.85

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 1/1/2018 $33.55 $18.55 $52.10

Piledrivers 1/1/2019 $34.30 $19.30 $53.60

Piledrivers 1/1/2020 $35.40 $19.70 $55.10

Piledrivers 1/1/2021 $36.50 $20.10 $56.60

Piledrivers 1/1/2022 $37.60 $20.50 $58.10

Plasterers (Use Cement Finisher Rates) 5/1/2018 $25.88 $20.58 $46.46

Plasterers 5/1/2017 $25.03 $20.58 $45.61

Plasterers 5/1/2019 $26.73 $20.63 $47.36

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 4 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Plasterers 5/1/2020 $27.48 $20.83 $48.31

Plumber/Pipefitter 5/1/2016 $35.22 $23.61 $58.83

Plumber/Pipefitter 5/1/2017 $35.82 $24.51 $60.33

Plumber/Pipefitter 5/1/2018 $36.87 $25.26 $62.13

Plumber/Pipefitter 5/1/2019 $37.52 $26.41 $63.93

Plumber/Pipefitter 5/1/2020 $37.52 $28.21 $65.73

Roofers (Composition) 5/1/2017 $36.15 $30.22 $66.37

Roofers (Composition) 5/1/2018 $37.15 $31.27 $68.42

Roofers (Composition) 5/1/2019 $38.35 $31.80 $70.15

Roofers (Composition) 5/1/2020 $39.50 $32.30 $71.80

Roofers (Shingle) 5/1/2016 $25.70 $19.17 $44.87

Roofers (Shingle) 5/1/2019 $28.50 $20.87 $49.37

Roofers (Shingle) 5/1/2020 $29.50 $21.25 $50.75

Roofers (Slate & Tile) 5/1/2016 $28.70 $19.17 $47.87

Roofers (Slate & Tile) 5/1/2018 $30.50 $20.37 $50.87

Roofers (Slate & Tile) 5/1/2019 $31.50 $20.87 $52.37

Roofers (Slate & Tile) 5/1/2020 $32.50 $21.25 $53.75

Sheet Metal Workers 6/1/2016 $33.60 $33.43 $67.03

Sheet Metal Workers 6/1/2017 $33.98 $35.40 $69.38

Sheet Metal Workers 6/1/2018 $34.78 $36.45 $71.23

Sheet Metal Workers 6/1/2019 $36.08 $37.65 $73.73

Sheet Metal Workers 6/1/2020 $37.26 $38.97 $76.23

Sheet Metal Workers 6/1/2021 $36.08 $42.65 $78.73

Sprinklerfitters 4/1/2017 $37.40 $21.74 $59.14

Sprinklerfitters 4/1/2018 $38.80 $22.74 $61.54

Sprinklerfitters 4/1/2020 $38.90 $26.42 $65.32

Terrazzo Finisher 5/1/2017 $31.64 $15.62 $47.26

Terrazzo Finisher 5/1/2018 $32.35 $15.91 $48.26

Terrazzo Finisher 5/1/2019 $33.04 $16.22 $49.26

Terrazzo Finisher 5/1/2020 $32.26 $18.48 $50.74

Terrazzo Grinder 5/1/2020 $32.95 $18.48 $51.43

Terrazzo Mechanics 5/1/2020 $32.91 $20.11 $53.02

Terrazzo Setter 5/1/2017 $30.63 $18.85 $49.48

Terrazzo Setter 5/1/2018 $31.23 $19.25 $50.48

Terrazzo Setter 5/1/2019 $31.81 $19.67 $51.48

Tile & Marble Finisher 5/1/2017 $26.89 $13.86 $40.75

Tile & Marble Finisher 5/1/2018 $27.60 $14.15 $41.75

Tile & Marble Finisher 5/1/2019 $28.29 $14.46 $42.75

Tile & Marble Finisher 5/1/2020 $28.96 $14.79 $43.75

Tile & Marble Finisher 5/1/2020 $29.00 $14.75 $43.75

Tile & Marble Finisher 5/1/2021 $29.61 $15.14 $44.75

Tile Setter 5/1/2017 $29.27 $15.62 $44.89

Tile Setter 5/1/2018 $29.88 $16.01 $45.89

Tile Setter 5/1/2019 $30.46 $16.43 $46.89

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 5 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Tile Setter 5/1/2020 $31.02 $16.87 $47.89

Tile Setter 5/1/2020 $31.02 $16.87 $47.89

Tile Setter 5/1/2021 $31.55 $17.34 $48.89

Truckdriver class 1(see notes) 1/1/2016 $27.44 $16.51 $43.95

Truckdriver class 1(see notes) 1/1/2020 $29.79 $20.13 $49.92

Truckdriver class 1(see notes) 1/1/2021 $30.54 $20.88 $51.42

Truckdriver class 1(see notes) 1/1/2022 $31.29 $21.63 $52.92

Truckdriver class 2 (see notes) 1/1/2016 $27.61 $16.61 $44.22

Truckdriver class 2 (see notes) 1/1/2020 $30.25 $20.43 $50.68

Truckdriver class 2 (see notes) 1/1/2021 $31.00 $21.18 $52.18

Truckdriver class 2 (see notes) 1/1/2022 $31.75 $21.93 $53.68

Truckdriver class 3 (see notes) 1/1/2016 $28.10 $16.88 $44.98

Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 6 of 10

Project: 21-02718 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 1/1/2020 $34.77 $18.92 $53.69

Carpenter 1/1/2021 $35.87 $19.32 $55.19

Carpenter 1/1/2022 $36.85 $19.84 $56.69

Carpenter Welder 1/1/2017 $33.10 $17.14 $50.24

Carpenter Welder 1/1/2018 $33.87 $17.77 $51.64

Carpenter Welder 1/1/2019 $34.72 $18.42 $53.14

Carpenter Welder 1/1/2020 $35.72 $18.92 $54.64

Carpenter Welder 1/1/2021 $36.82 $19.32 $56.14

Carpenter Welder 1/1/2022 $37.80 $19.84 $57.64

Carpenters 1/1/2017 $32.15 $17.14 $49.29

Carpenters 1/1/2018 $32.92 $17.77 $50.69

Carpenters 1/1/2019 $33.77 $18.42 $52.19

Cement Finishers 5/1/2017 $30.14 $19.40 $49.54

Cement Finishers 1/1/2018 $31.04 $19.90 $50.94

Cement Finishers 1/1/2019 $31.94 $20.50 $52.44

Cement Finishers 1/1/2021 $32.84 $22.60 $55.44

Cement Finishers 1/1/2022 $33.14 $23.80 $56.94

Cement Masons 1/1/2020 $32.84 $21.10 $53.94

Electric Lineman 5/29/2017 $44.22 $23.94 $68.16

Electric Lineman 5/28/2018 $45.25 $24.94 $70.19

Electric Lineman 5/27/2019 $46.32 $25.97 $72.29

Electric Lineman 6/1/2020 $47.42 $27.04 $74.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2020 $33.76 $30.13 $63.89

Iron Workers 1/1/2017 $30.02 $29.42 $59.44

Laborers (Class 01 - See notes) 1/1/2017 $24.75 $20.95 $45.70

Laborers (Class 01 - See notes) 1/1/2018 $24.75 $22.35 $47.10

Laborers (Class 01 - See notes) 1/1/2019 $24.75 $23.85 $48.60

Laborers (Class 01 - See notes) 1/1/2020 $26.00 $24.10 $50.10

Laborers (Class 01 - See notes) 1/1/2021 $26.80 $24.80 $51.60

Laborers (Class 01 - See notes) 1/1/2022 $27.60 $25.50 $53.10

Laborers (Class 02 - See notes) 1/1/2017 $24.91 $20.95 $45.86

Laborers (Class 02 - See notes) 1/1/2018 $24.91 $22.35 $47.26

Laborers (Class 02 - See notes) 1/1/2019 $24.91 $23.85 $48.76

Laborers (Class 02 - See notes) 1/1/2020 $26.16 $24.10 $50.26

Laborers (Class 02 - See notes) 1/1/2021 $26.96 $24.80 $51.76

Laborers (Class 02 - See notes) 1/1/2022 $27.76 $25.50 $53.26

Laborers (Class 03 - See notes) 1/1/2017 $25.40 $20.95 $46.35

Laborers (Class 03 - See notes) 1/1/2018 $25.40 $22.35 $47.75

Laborers (Class 03 - See notes) 1/1/2019 $25.40 $23.85 $49.25

Laborers (Class 03 - See notes) 1/1/2020 $26.65 $24.10 $50.75

Laborers (Class 03 - See notes) 1/1/2021 $27.45 $24.80 $52.25

Laborers (Class 03 - See notes) 1/1/2022 $28.25 $25.50 $53.75

Laborers (Class 04 - See notes) 1/1/2017 $25.85 $20.95 $46.80

Laborers (Class 04 - See notes) 1/1/2018 $25.85 $22.35 $48.20

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 7 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 04 - See notes) 1/1/2019 $25.85 $23.85 $49.70

Laborers (Class 04 - See notes) 1/1/2020 $27.10 $24.10 $51.20

Laborers (Class 04 - See notes) 1/1/2022 $28.70 $25.50 $54.20

Laborers (Class 05 - See notes) 1/1/2017 $26.26 $20.95 $47.21

Laborers (Class 05 - See notes) 1/1/2018 $26.26 $22.35 $48.61

Laborers (Class 05 - See notes) 1/1/2019 $26.26 $23.85 $50.11

Laborers (Class 05 - See notes) 1/1/2020 $27.51 $24.10 $51.61

Laborers (Class 05 - See notes) 1/1/2021 $28.31 $24.80 $53.11

Laborers (Class 05 - See notes) 1/1/2022 $29.11 $25.50 $54.61

Laborers (Class 06 - See notes) 1/1/2017 $23.10 $20.95 $44.05

Laborers (Class 06 - See notes) 1/1/2018 $23.10 $22.35 $45.45

Laborers (Class 06 - See notes) 1/1/2019 $23.10 $23.85 $46.95

Laborers (Class 06 - See notes) 1/1/2020 $24.35 $24.10 $48.45

Laborers (Class 06 - See notes) 1/1/2021 $25.15 $24.80 $49.95

Laborers (Class 06 - See notes) 1/1/2022 $25.95 $25.50 $51.45

Laborers (Class 07 - See notes) 1/1/2017 $25.75 $20.95 $46.70

Laborers (Class 07 - See notes) 1/1/2018 $25.75 $22.35 $48.10

Laborers (Class 07 - See notes) 1/1/2019 $25.75 $23.85 $49.60

Laborers (Class 07 - See notes) 1/1/2020 $27.00 $24.10 $51.10

Laborers (Class 07 - See notes) 1/1/2021 $27.80 $24.80 $52.60

Laborers (Class 07 - See notes) 1/1/2022 $28.60 $25.50 $54.10

Laborers (Class 08 - See notes) 1/1/2017 $27.25 $20.95 $48.20

Laborers (Class 08 - See notes) 1/1/2018 $27.25 $22.35 $49.60

Laborers (Class 08 - See notes) 1/1/2019 $27.25 $23.85 $51.10

Laborers (Class 08 - See notes) 1/1/2020 $28.50 $24.10 $52.60

Laborers (Class 08 - See notes) 1/1/2021 $29.30 $24.80 $54.10

Laborers (Class 08 - See notes) 1/1/2022 $30.10 $25.50 $55.60

Operators (Class 01 - see notes) 1/1/2017 $30.40 $19.98 $50.38

Operators (Class 01 - see notes) 1/1/2018 $31.00 $20.78 $51.78

Operators (Class 01 - see notes) 1/1/2019 $31.60 $21.68 $53.28

Operators (Class 01 - see notes) 1/1/2020 $32.60 $22.23 $54.83

Operators (Class 01 - see notes) 1/1/2021 $33.60 $22.73 $56.33

Operators (Class 01 - see notes) 1/1/2022 $34.50 $23.33 $57.83

Operators (Class 02 -see notes) 1/1/2017 $30.12 $19.98 $50.10

Operators (Class 02 -see notes) 1/1/2018 $30.72 $20.78 $51.50

Operators (Class 02 -see notes) 1/1/2019 $31.32 $21.68 $53.00

Operators (Class 02 -see notes) 1/1/2020 $32.32 $22.23 $54.55

Operators (Class 02 -see notes) 1/1/2021 $33.32 $22.73 $56.05

Operators (Class 02 -see notes) 1/1/2022 $34.22 $23.33 $57.55

Operators (Class 03 - See notes) 1/1/2017 $26.48 $19.98 $46.46

Operators (Class 03 - See notes) 1/1/2018 $27.08 $20.78 $47.86

Operators (Class 03 - See notes) 1/1/2019 $27.68 $21.68 $49.36

Operators (Class 03 - see notes) 1/1/2020 $28.68 $22.23 $50.91

Operators (Class 03 - see notes) 1/1/2021 $29.68 $22.73 $52.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 8 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 03 - See notes) 1/1/2022 $30.58 $23.33 $53.91

Operators (Class 04 - See notes) 1/1/2017 $25.99 $19.98 $45.97

Operators (Class 04 - See notes) 1/1/2018 $26.59 $20.78 $47.37

Operators (Class 04 - See notes) 1/1/2019 $27.19 $21.68 $48.87

Operators (Class 04 - See notes) 1/1/2020 $28.19 $22.23 $50.42

Operators (Class 04 - See notes) 1/1/2021 $29.19 $22.73 $51.92

Operators (Class 04 - See notes) 1/1/2022 $30.09 $23.33 $53.42

Operators (Class 05 - See notes) 1/1/2017 $25.78 $19.98 $45.76

Operators (Class 05 - See notes) 1/1/2018 $26.38 $20.78 $47.16

Operators (Class 05 - See notes) 1/1/2019 $26.98 $21.68 $48.66

Operators (Class 05 - See notes) 1/1/2020 $27.98 $22.23 $50.21

Operators (Class 05 - See notes) 1/1/2021 $28.98 $22.73 $51.71

Operators (Class 05 - See notes) 1/1/2022 $29.88 $23.33 $53.21

Operators Class 1-A 1/1/2020 $35.60 $22.23 $57.83

Operators Class 1-B 1/1/2020 $34.60 $22.23 $56.83

Painters Class 1 (see notes) 5/1/2018 $23.92 $14.37 $38.29

Painters Class 2 (see notes) 5/1/2018 $26.05 $14.37 $40.42

Painters Class 3 (see notes) 5/1/2018 $31.80 $14.37 $46.17

Painters Class 3 (see notes) 5/1/2019 $32.45 $15.22 $47.67

Pile Driver Divers (Building, Heavy, Highway) 1/1/2017 $49.13 $17.95 $67.08

Pile Driver Divers (Building, Heavy, Highway) 1/1/2018 $50.33 $18.55 $68.88

Pile Driver Divers (Building, Heavy, Highway) 1/1/2019 $51.45 $19.30 $70.75

Pile Driver Divers (Building, Heavy, Highway) 1/1/2020 $53.10 $19.70 $72.80

Pile Driver Divers (Building, Heavy, Highway) 1/1/2021 $54.75 $20.10 $74.85

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 1/1/2017 $32.75 $17.95 $50.70

Piledrivers 1/1/2018 $33.55 $18.55 $52.10

Piledrivers 1/1/2019 $34.30 $19.30 $53.60

Piledrivers 1/1/2020 $35.40 $19.70 $55.10

Piledrivers 1/1/2021 $36.54 $20.06 $56.60

Piledrivers 1/1/2022 $37.63 $20.47 $58.10

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2017 $40.98 $32.53 $73.51

Truckdriver class 1(see notes) 1/1/2017 $27.93 $17.32 $45.25

Truckdriver class 1(see notes) 1/1/2018 $28.36 $18.29 $46.65

Truckdriver class 1(see notes) 1/1/2019 $28.83 $19.32 $48.15

Truckdriver class 1(see notes) 1/1/2020 $29.79 $20.13 $49.92

Truckdriver class 1(see notes) 1/1/2021 $30.54 $20.88 $51.42

Truckdriver class 1(see notes) 1/1/2022 $31.29 $21.63 $52.92

Truckdriver class 2 (see notes) 1/1/2017 $28.10 $17.42 $45.52

Truckdriver class 2 (see notes) 1/1/2018 $28.52 $18.40 $46.92

Truckdriver class 2 (see notes) 1/1/2019 $28.99 $19.43 $48.42

Truckdriver class 2 (see notes) 1/1/2020 $30.25 $20.43 $50.68

Truckdriver class 2 (see notes) 1/1/2021 $31.00 $21.18 $52.18

Truckdriver class 2 (see notes) 1/1/2022 $31.75 $21.93 $53.68

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 9 of 10

Expiration Date

Hourly Rate Fringe Benefits

Total

Truckdriver class 3 (see notes) 1/1/2017 $28.57 $17.71 $46.28

Truckdriver class 3 (see notes) 1/1/2018 $28.98 $18.70 $47.68

Truckdriver class 3 (see notes) 1/1/2019 $29.45 $19.73 $49.18

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/6/2021 Page 10 of 10

SGL 076 Upper Strasburg Trail_specifications_BID (002)
Pennsylvania Game Commission
Southcentral Region

document(1)