SF30_SPE4A826Q0043_0002.pdf
PDF 3 MB Posted
- Attached to
- C-FRAME HYDRAULIC PRESS
- Solicitation number
- SPE4A826Q0043_0002
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract, dated June 2, 2026, issued by DLA Aviation's ASC Industrial Plant Equipment office in Richmond, Virginia.
The amendment extends the opening and closing date for solicitation SPE4A8-26-Q-0043 from June 21, 2026 to September 22, 2026 at 4:00 PM. The solicitation seeks procurement of one C-Frame Hydraulic Press in accordance with Purchase Description VIBB 24-25-2002, dated August 27, 2026. The amendment removes the requirement for a geotechnical survey previously specified in paragraph 3.9.1, as this requirement is no longer necessary to meet operational needs. All other terms and conditions remain unchanged. Offers are valid for 120 days from the closing date. Prospective offerors should direct questions to Christina Gibbs at Christina.Gibbs@dla.mil.
The Purchase Description specifies a new, commercially available C-Frame hydraulic press with minimum 350 metric ton force capacity, to be installed at Building A-47 SRF-JRMC in Yokosuka, Japan. Key specifications include bed plate dimensions of 84 inches width by 59 inches depth, open height and stroke of 14.7 inches, ascent speed of 2.0 ±0.5 inches per second, descent speed adjustable from 0.2 to 2.0 inches per second, throat depth of 51 inches or more, and Class 3 accuracy per JIS B 6403. The machine must comply with OSHA 29 CFR 1910, ISO 4413 hydraulic systems standards, NFPA 79 electrical standards, and Japanese standards including JEAC 8001 and JIS B 6403. The contractor must provide complete installation services including foundation work, utility connections, training for five operators over five consecutive eight-hour days in Japanese language, technical documentation in English and Japanese, an Acceptance Test Plan, and a Plan of Action and Milestones using Microsoft Project. Quality assurance includes Contract Quality Assurance Inspection at origin and Final Inspection/Acceptance Test at destination, with audible noise testing limited to 84 decibels at origin only. All marking and labeling shall be bilingual in English and Japanese.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-25-2002
27-AUG-2026
PURCHASE DESCRIPTION FOR THE ACQUISITION OF A C-
FRAME HYDRAULIC PRESS
1.0 SCOPE.
Scope. The content of this specification describes the minimum requirements for a C-frame hydraulic press. Installation shall occur at Bld A-47 SRF-JRMC, Yokosuka, Japan, with a building access dimension of 6.9meters (W) x 6.0meters (H).
2.0 APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed in section 2. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
2.1 Government Documents.
2.1.1 Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein.
STANDARDS – FEDERAL
FED-STD-H28B: Screw Thread Standards for Federal Service
FED-STD-313F: Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S Department of Labor, Occupational Safety and Health Administration
(OSHA)
29 CFR 1910.212 – Occupational Safety and Health Standards Subpart O Machinery and Machine Guarding.
29 CFR 1910.212 – Occupational Safety and Health Standards Subpart J General Environmental Controls.
21 CFR 1040.10 – Laser products.
21 CFR 1040.11 – Specific purpose laser products.
(Copies available online at https://www.ecfr.gov/ or from OSHA Publications Superintendent of Documents P.O. Box 37535 Washington, D.C. 20013-7535)
Environmental Protection Agency (EPA)
SPE4A826Q0043_0002 Page 1 of 16 https://www.ecfr.gov/
40 CFR 82: Protection of Stratospheric Ozone
(Copies available online at https://www.ecfr.gov/ or from riel Rios Building 1200 Pennsylvania Avenue, N.W. Washington, DC 20460)
DEPARTMENT OF DEFENSE
NAVAL FACILITIES ENGINEERING COMMAND
NAV P-307 w/Change 3: Management of Weight Handling Equipment
(Copies available online at or from Naval Inventory Control Point, ATTN:
NAVICP 03334 Room 3200, 700 Robbins Avenue, Philadelphia, PA 19111-5098)
MILITARY STANDARDS
MIL-STD-130N w/Change 1: Identification Marking of U.S. Military Property Item Unique Identification Marking (IUID)
(Application for copies should be addressed to Air Force Product Data Systems Modernization Standards (TMSS) Office, 554 ELSG/SBP, 4375 Chidlaw Road, Bldg. 262, Room S008, Wright-Patterson AFB, OH 45433-5006, Phone (937) 257- 0870 or 0853 or https://quicksearch.dla.mil/qsSearch.aspx)
2.1.2 Other Government Documents, Drawings, and Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
GOVERNMENT DRAWING
2.2 Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
International Organization for Standardization (ISO)
ISO 4413: Hydraulic fluid power-General rules and safety requirements for systems and their components
ISO 4414: Pneumatic Power-General rules and safety requirements for systems and their components
SPE4A826Q0043_0002 Page 2 of 16 https://www.ecfr.gov/ https://quicksearch.dla.mil/qsSearch.aspx
(Application for copies should be addressed to the International Organization for Standardization (ISO) 1 rue de Varembé, Casepostale56, CH211Geneva 20, Switzerland)
National Electrical Manufacturers Association (NEMA)
NEMA 250: Enclosures for Electrical Equipment (1000 V Maximum)
NEMA MG 1: Motors and Generators
(Application for copies should be addressed to the National Electrical Manufacturers Association, 1300 N 17th Street, Rosslyn, VA 22209)
National Fire Protection Association (NFPA)
NFPA 70: National Electrical Code
NFPA 79: Electrical Standard for Industrial Machinery
(Applications for copies should be addressed to the National Fire Protection Association, ATTN: Support Services, 11 Tracy Drive, Avon, MA 02322)
Japanese Industrial Standards (JIS)
JIS B 6403 – Hydraulic Press – Testing of the accuracy
(Copies available at https://www.jisc.go.jp/ )
Japan Electric Association Code (JEAC)
JEAC 8001 – Interior Wiring Code
(Copies available at https://store.denki.or.jp/ )
Japan Environment Governing Standards (JEGS)
(Copies available at https://www.usfj.mil/Resources/JEGS/ )
Manufacturers Association, 1300 N 17th Street, Rosslyn, VA 22209)
2.3 Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.
2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows:
SPE4A826Q0043_0002 Page 3 of 16 https://www.jisc.go.jp/ https://store.denki.or.jp/ https://www.usfj.mil/Resources/JEGS/
a. DIN- German Institute for Standardization
b. EN- European Standard
2.5 Proposal Format. Proposal shall be submitted using the following mathematical conventions:
a. Whole numbers will be expressed where one thousand is written as 1,000.
b. Decimals will be expressed where one-tenth is written as 0.1.
c. Submission of compliance statement and descriptive literature shall be in the same units as the units listed in this document.
d. In accordance with ASME Y14.5, all values listed in parenthesis will be treated as reference units and not the official proposed value in determining acceptability. For example, 300mm (11.8 inches), the 300mm will be used in determination of acceptability, and the measurement in parenthesis will not be considered in determining acceptability.
3.0 REQUIREMENTS.
3.1 Design. The item offered shall be new and a current commercially available model.
A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures.
Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.
3.1.1 Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the Japanese customary units (metric). An electronic control system that demonstrates switching between manufacturer standard units to Japan/United States customary units will be found acceptable.
3.1.2 Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s).
3.1.3 Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
3.1.3.1 Safety Guarding. Covers, guards, or other safety devices shall be provided per 29 CFR 1910 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The safety devices shall not interfere with the operation of the machine. The safety devices shall prevent unintentional contact with the guarded part, and shall be easily removed to facilitate inspection, maintenance, and repair of the parts.
SPE4A826Q0043_0002 Page 4 of 16
3.1.3.2 General Safety. All machine parts, components, mechanisms, and assemblies furnished on the unit shall comply with all specific requirements of OSHA Safety and Health Standard (29 CFR 1910), General Industry. After January 2, 1990, whenever replacement or major repair, renovation or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machine or equipment shall be designed to accept a lockout device.
3.1.4 Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.
3.1.5 Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval of the Government. Radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313F.
Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.
3.1.6 Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, State, or Local statutes in effect at the point of installation.
3.1.7 Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible.
3.1.7.1 Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provided to indicate a low lubrication condition. When a low lubrication condition occurs, the machine shall complete the current operation and come to a complete stop. The machine shall indicate that lubrication is required.
3.1.8 Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement
SPE4A826Q0043_0002 Page 5 of 16 parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts.
Foreign-sourced replacement parts shall either be interchangeable with domestically supplied components or be readily available from a domestic source. The contractor shall have a local Japanese dealer network that provides maintenance services and repair parts.
3.2 Construction. The machine shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.
3.2.1 Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, filling with solder or paste shall be used for reclaiming any defective part.
3.2.2 Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.
3.2.3 Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
3.2.4 Hydraulic System. Under the condition that a machine has a hydraulic system, the system shall conform to ISO 4413 or current equivalent EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The system shall be complete, including all pumps, valves, piping, cylinders, pressure controls, and secondary containment.
3.2.5 Pneumatic System. Under the condition that a machine has a pneumatic system, the system shall conform to ISO 4414 or current equivalent EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls. A machine that does not require a pneumatic system to operate properly shall be considered acceptable.
3.2.6 Gears. All gears of axis drive trains shall conform to or exceed all provisions of EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. All gears shall be of proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure for the expected service life of the machine. Gears in drive trains shall be hardened and ground steel.
3.2.7 Surfaces. All surfaces shall be clean and free of harmful or extraneous materials.
All edges shall be either rounded or beveled unless sharpness is required to perform a
SPE4A826Q0043_0002 Page 6 of 16 necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.
3.2.8 Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part.
3.2.9 Painting. The machine shall be painted in accordance with the manufacturer’s commercial practice. All paint shall be of the lead-free type.
3.2.10 Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.
3.3 Components. The machine shall consist of not less than the following components:
3.3.1 Base. The base shall be a stress relieved, heavy duty, ribbed casting or steel weldment having characteristics that minimize both thermal and vibration effects, while providing the strength and size to assure maximum rigidity and support for any load within the rated capacity of the machine. Means shall be provided for accurate, ease of leveling.
3.3.2 Table. The worktable shall be a casting of iron, or iron alloy, internally ribbed and proportioned to support and withstand the maximum capacity work-piece weights and slide thrust loads. The bed surface shall be provided with T-slots that meet JIS B 0952.
3.3.3 Bed Plate. The bed plate shall be steel plate fabricated in accordance with Government Drawing A. The bed plate shall be replaceable and fixed to the bed. The bed plate surface shall be machine finished for a work mounting surface.
3.3.4 C-Frame. The C-Frame shall be a heavy duty, ribbed casting or steel weldment to withstand the thrust forces. The C-Frame shall provide continuous space in three directions: front, left, and right of the workspace.
3.3.5 Slide. The slide shall be provided with an upper die holder and an upper die in accordance with Government Drawing A. the bottom surface of the slide shall be provided with T-slots that meet JIS B 0952.
3.3.6 Cylinder. Cylinders shall be provided to apply thrust force to slide and maintain the straightness of the slide movement. Four (4) guides shall be provided to make the cylinder movement straight.
3.3.7 Electrical System. The machine shall conform to NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The existing source power available at the facility is 210 volt, 3-phase, 50 Hertz (Hz), 200 amps. The machine’s electrical system shall be tolerant of fluctuation of ± 10 percent. The electrical system shall be complete, including any electrical transformer(s) that may be required to modify
SPE4A826Q0043_0002 Page 7 of 16 the existing source voltage to the proper operating voltage of the equipment. A properly rated, and fused, single disconnect device with Ground Fault Circuit Interrupter (GFCI) shall be utilized on the machine with means of lockout in the off position only. If the required power needs of the machine exceed the available power supply, the contractor shall inform the customer of the required power needs and a time frame of when the upgraded power needs to be ready. This shall be resolved during the solicitation phase.
3.3.7.1 Electrical Enclosures. Construction of the electrical enclosures shall be in accordance with NEMA 250 type 12 or current equivalent ISO/EN/DIN/JIS/IEC standards and shall provide for ventilation of components and shall be designed for an indoor non-hazardous location. All electrical components shall conform to NFPA 79 or equivalent ISO/EN/DIN/JIS standards. The machine shall be provided with interlocks on its electronic cabinet that shall instantly remove power from the equipment when the door is opened in accordance with NFPA 79 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
3.3.7.2 Arc Flash Protection. The machine enclosures shall be marked for arc flash in accordance with NFPA 79 Paragraph 16.2.3 “Safety Signs for Electrical Enclosures” or current equivalent ISO/EN/DIN/JIS/IEC standards for arc flash safety. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
3.3.7.3 Solid-State Components. Electrical devices used to power electrical servo and spindle motors of control voltage delivered to solid-state electrical components shall be solid-state devices. Such devices shall be equipped to handle the electrical load imposed by operation of the machine to its maximum potential. The use of selenium in solid-state components shall be restricted to those devices that protect other solid-state components from voltage surge.
3.3.8 Control Features. Control features shall include inching with two-handed remote control, ascending, emergency stop, stepless thrust force control, and decent speed control. Single stroke and continuous stroke shall not be provided. A movable remote-control stand shall be provided with two-handed control inching buttons, single ascending button, emergency stop button, and 16 feet length signal wire contained in a flexible conduit. A function to switch the decent speed depending on the height of the slide shall be provided. The threshold height of the slide at which the descent speed changes shall be adjustable. When the slide is higher than the threshold height, and the descent speed when the slide is lower than the threshold shall be adjustable with in the ranges specified in Table 1 of paragraph 3.4. A vertical scale in the unit of inches shall be provided. Unless otherwise specified, control devices and indicators shall be installed at easily accessible positions on the C-Frame
3.3.8.1 Control Safety Features A braking system that will stop the slide movement when either of the operators’ hands leave the control button or when an abnormality occurs, to include loss of power or hydraulic pressure. An optical safety device shall be provided.
Sensing light shall be emitted downward from an emitter mounted on the top of the C- Frame. The sensing light shall be limited to Class one lasers specified in JIS C 6802 or
SPE4A826Q0043_0002 Page 8 of 16 light that is less invasive to the eye. A means shall be provided to temporarily disable the optical safety that is key activated. Emergency stop buttons shall be placed in easily accessible and visible locations. At least one on the remote-control panel, the front side of the slide, one each on each of the four (4) corners of the bed plate, and two (2) sides of the C-Frame column. The control shall automatically shut down when internal operating temperatures exceed safe operating limits.
3.3.9 Motors. Motors shall be rated for continuous duty. Alternating-current (AC) motors shall be designed to operate on 50-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors shall meet the requirements of NEMA MG-1 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Each motor shall have an identification plate in accordance with paragraph 3.7 to identify manufacturer, model number, serial number, voltage, amperage, horsepower, phase, frequency, and frame number. Motor horsepower shall be the manufacturer’s standard or standard optional horsepower as indicated on the manufacturer's design and construction drawing(s).
3.3.10 Work light. A work light, whether built-in or added on, shall be provided. The light shall have a protective shield, flexible arm, and provide maximum light to the work area.
3.3.11 Facility Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70 or JEAC 8001.
3.3.12 Hour Meter. The machine shall be equipped with a non-resetting type, hour meter to display accumulated operating time of the drive motor(s), mounted on the main electrical panel visible from the outside, sealed to prevent the entrance of dust and moisture, and shall be mounted to withstand shock and vibration generated by the machine.
The meter shall have a range of 0 to 99,999.9 hours in increments of one (1) tenth of one
(1) hour. A CNC control that tracks and displays total machine on time (a non-resetting type), controller on, program runtime, and run time of the servo motor(s) shall be considered to meet this requirement. The meter shall be sealed to prevent the entrance of dust and moisture and shall be mounted to withstand shock and vibration generated by the machine
3.4 Size and Capacity. The size and capacity of the machine shall be not less than specified in Table I.
Table I Characteristic Specification Minimum thrust force 350 metric ton force Allowable load eccentricity from the center of the cylinder 5.5inches Dimensions of the bed plate 84inchesW x
59inchesD Dimensions of upper die 1.9inches W x
59inches D
SPE4A826Q0043_0002 Page 9 of 16
Throat depth from the center of the cylinder to the inside of C- Frame
51inches or more
Open height and stroke (from the top of the bed plate to the bottom surface of the upper die.)
14.7inches
Height of bed plate top surface from floor level 16+/- 0.5inches Setting range of threshold height 0 to 14.7 inches Setting range of descent speed 0.2 to 2.0 inches/sec Ascent speed 2.0 +/- 0.5 inches/sec Nominal width of T-Slots 22 mm Pitch of T-Slots 250 mm
3.5 Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the machine shall be Class 3 of JIS B 6403 or better.
3.6 Standard Tooling and Equipment. All standard tooling and equipment required for proper operation and maintenance of the machine shall be provided. A list of these items shall be furnished at time of proposal.
3.7 Marking on Instruments, Control Panels, and Plates. All words on plates for guidance of operation and maintenance shall be in the Japanese language. All words on safety labels and stickers shall be in the English and Japanese language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant. All words on plates shall be in the English language.
Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.
3.7.1 Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information.
Points of Lubricant Application Servicing Interval Type of Lubricant Viscosity Military or Federal Specification for Each Lubricant (If available) Size and Type of Each Lubricant Filter
3.7.2 Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine and a suffix identified in the manufacturer's permanent records. All words on the nameplate shall be in the English language.
• Nomenclature
• CAGE Code
• Manufacturer’s Name
SPE4A826Q0043_0002 Page 10 of 16
• Manufacturer’s Model Designation
• Manufacturer’s Serial Number
• Power Input (Volts, Total Amps, Phase, Frequency)
• Contract Number
• Date of Manufacture
• Full-load current for each supply
• Ampere rating of the largest motor or load
• Short-circuit current rating of the industrial control panel
• Max ampere rating of short-circuit and ground fault protective device, where provided
• Electrical diagram number(s) or number of the index to the electrical drawings
3.7.3 Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text. At a minimum this tag shall contain the information listed in paragraph 3.7.2 Nameplate.
3.8 Technical Data. Three (3) hard copies and one (1) electronic copy(s) of technical data shall be provided with the machine. Technical data shall contain specifications, instructions for the operation, maintenance of the machine, lifting plan, as-built drawing of the whole installation site, SDS for all hazardous materials, non -pcb certification, and recommended spare parts list. All copies of technical data shall be legible and written in the English and Japanese language.
3.8.1 Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty (30) calendar days After Contract Award (ACA). The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The Government and the contractor shall review the report on a monthly basis. The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as engineering, procurement of major hardware, assembly, operational debug, factory acceptance, shipment, installation, training, and final acceptance test.
3.8.2 Acceptance Test Plan (ATP). The Contractor shall prepare an Acceptance Test Plan (ATP). The ATP shall be a step-by-step written instruction on how to verify compliance during Contract Quality Assurance Inspection and the Final Inspection/Acceptance Test specified in Sections 4.4 and 4.5. The Contractor shall develop and provide dimensioned drawings of the proposed test part specified in Paragraph 4.7.3. The Manufacture’s standard testing procedures shall be included in the ATP. Any procedures necessary for compliance with Section 4, which are not covered by the Manufacturer’s standard testing procedures, shall be identified and included in the ATP. The initial ATP shall be submitted
SPE4A826Q0043_0002 Page 11 of 16 thirty (30) calendar days ACA for Government review and approval. The accepted test procedures shall become part of this contract.
3.9 Installation. The contractor shall provide complete installation services of the machine to include, but not limited to, transportation of the machine, full foundation, qualified personal and equipment for offloading, rigging, placing the machine on the foundation, all materials and tools for installation and anchoring to the foundation, leveling and connecting to utilities. The contractor shall comply with NAVFAC P-307. The contractor shall supply all equipment necessary to complete the tasks listed above to include all lifting and/or excavation equipment. The contractor shall refer to Government Drawing A for the available installation area. (no fixed components shall be installed in positions that interfere with being accomplished) The contractor shall follow the customers hours of operation;
8:00 am to 4:45 pm (excluding 12:00 to 12:45pm), Monday thru Friday excluding all national, unless informed otherwise. In the event work needs to be performed outside of the customers normal hours of operation, the contractor shall request a change no less than
3.9.1 Foundation The contractor shall be responsible for all of the qualified personnel and machinery for demolition and removal of the existing foundation and installation of the new foundation. The contractor shall be responsible for testing the soil for hazardous materials. When it is determined that hazardous materials have been found, the Government shall be responsible for the disposal of the soil. When no hazardous materials are present then the contractor shall remove and dispose of the soil. The Government shall be responsible for providing a water table determination prior to foundation construction.
3.9.1.1 Reserved.
3.9.1.2 Lead and Asbestos Testing. The Contractor shall be responsible for conducting an onsite survey for Lead Based Paint (LBP) and Asbestos Containing Material (ACM). The onsite survey shall be completed within ninety (90) calendar days ACA;
coordinate with the Contracting Officer. The facility has a known presence of LBP and ACM. A local accredited Asbestos Inspector shall perform the onsite survey for Lead and Asbestos to identify any suspected material that appears to be involved in the project.
Assume the presence of asbestos and lead paint is a possibility and be prepared to do some sampling and analysis. Provide a signed report certifying the inspection. State the findings of the inspection and state if the area appears to be asbestos free or present the results of the sampling and analysis. The report shall be certified by the Asbestos Inspector and include the Inspector's certification number. Show locations of any samples taken in the report and on the Installation Plan. If either of these two substances are found in areas that will be disturbed by the Installation, and will pose a health and safety threat, the contractor must notify the contracting officer. The contractor is not required to remove or abate the lead and asbestos under this contract.
3.9.2 Work Stoppage. For unforeseen issues that are found during installation of the foundation, the contractor shall notify the facility point of contact (POC) and DLA immediately to determine further course of action.
SPE4A826Q0043_0002 Page 12 of 16
3.10 Training. After satisfactory completion of acceptance testing of the system, the services of a qualified representative(s), who is proficient in the Japanese language, shall be provided for specialized training to familiarize Government personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage.
The training shall be for five (5) operators. Training shall be performed at the Government facility and shall not be less than five (5) consecutive eight (8) hour workdays, between 8:00 am and 4:45 pm excluding weekends and federal holidays. The course shall utilize as-built drawings and manuals provided under this contract and shall include both classroom and hands-on portions. All printed training aids shall be supplied for the course, be in the Japanese language, and become the property of the Government.
4.0 QUALITY ASSURANCE.
4.1 Responsibility for Inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein and in accordance with the attached Quality Assurance Provision (QAP). Except as otherwise specified in the contract or purchase order, the contractor may use his own facility for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to witness any inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.1.1 Responsibility for Compliance. All items must meet all requirements of sections 3 and 4.
4.2 Classification of Inspections. The inspection requirements specified herein are classified as follows:
a. Contract quality assurance inspection (Origin) (see 4.4).
b. Final Inspection/Acceptance test (Destination) (see 4.5).
4.3 Inspection Conditions. All inspections, tests, and examinations shall be performed in an indoor facility with ambient temperature conditions in the range of 55° F to 100° F and 10% to 95% relative humidity.
4.4 Contract Quality Assurance Inspection (Origin). Contract quality assurance inspection shall be applied at the contractor’s facility prior to being offered for acceptance under the contract. The machine and all peripheral equipment added to the machine shall be fully assembled and perform all functions in accordance with this specification. Quality conformance inspection shall consist of the examination in 4.6 and the tests in 4.7. The machine shall pass the examination, all tests, and contract quality assurance inspection to be acceptable for shipment.
4.4.1 Exception to Final Inspection/Acceptance Test (Destination). The audible noise level test in paragraph 4.7.4 shall be performed at origin inspection only.
SPE4A826Q0043_0002 Page 13 of 16
4.5 Final Inspection/Acceptance Test (Destination). Final Inspection and acceptance test shall be performed on the machine to ensure conformance with this purchase description. The acceptance test shall be performed only after the machine is installed at its final location. The acceptance test shall consist of the examination in 4.6 and all tests in
4.7. The machine shall pass the examination and all tests to be accepted.
4.6 Examination. The equipment shall be examined for design, dimensions, construction, materials, components, electrical equipment and workmanship to determine compliance with the requirements of this specification.
4.7 Tests. Unless otherwise specified within this document, all programs, instruments, materials, material handling equipment, qualified personnel, and tools required to perform and evaluate the tests shall be furnished by the contractor. All measurement tools and indicating devices shall be calibrated in accordance with the attached QAP. If a malfunction occurs during the test, the test shall be restarted each time until all tests in 4.7 are completed without a malfunction. Three (3) consecutive failures without completion of the test may be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction which requires remedial action to restore the system to full operation in accordance with this specification
4.7.1 Alignment and Accuracy Tests. Tests shall be conducted to ensure the machine meets the alignment and accuracy tolerances specified in paragraph 3.5. The machine repeatability and accuracy for slide motions, descent speed changes, and auxiliary functions shall be checked.
4.7.2 Operational Test. The machine shall be operated under CNC at no-load for not less than four (4) hours. During operational testing the control functions and machine response to commands for slide motions, feed rate changes, and auxiliary functions shall be checked.
The machine shall be run in each mode of operation to test the machine’s response to command inputs. Three (3) failures in a row to complete the run test may be cause for rejection of the entire system. After successful completion of the operational test, proper operation of all controls, motors, adjusting mechanisms, over-travel limits (programmed stops and hard stops), emergency stop devices, and accessories shall be verified. The safety limit stops shall be checked by attempting to exceed the limits of travel of each moving axis.
4.7.3 Performance Test. A test piece shall be pressed slowly up to the maximum thrust force in paragraph 3.4, table 1.
4.7.4 Audible Noise Level Test. The equipment shall be tested for compliance with paragraph 3.1.4. “Audible Noise Level”.
SPE4A826Q0043_0002 Page 14 of 16
INSTALLATION RESPONSIBILITIES
Government Contractor ☐ ☒ a. Provide machine foundation in accordance with the
Manufacturer’s design requirements.
☐ ☒ b. Furnish labor and material handling equipment for off-loading and placing item on foundation.
☐ ☒ c. Provide and install anchor bolts and nuts.
☐ ☒ d. Set and rough level the machine on its foundation ☐ ☒ e. Level and align machine.
☐ ☒ f. Connect machine to the provided utilities hook-up.
☐ ☒ g. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests.
☐ ☒ h. Provide and charge all systems with fluids in accordance with manufacturer's instructions.
☐ ☒ i. Material for performance testing at Government facility ☐ ☒ j. Material for performance testing at Contractor's facility ☐ ☒ k. Material handling, Rigging equipment and Qualified
Personnel for performance testing.
GOVERNMENT RESPONSIBILITIES
☒ Provide utilities hook-up within 20 feet of the machine.
☒ No work shall be performed by customer personnel when the contractor's representative is not in the immediate work area during installation, verification, and initial start-up of the machine.
SPE4A826Q0043_0002 Page 15 of 16
Enclosure 1
Remote control stand n , n
Guides ( 4EA) Notes
1. Unless otherwise specified, allowable tolerances are ±5%.
- -------- i
I I
--t-- 2 II
84"
I l 29½" J 59" l 276" 114" j
Bed Plate
B: �B:
Optical safety device
180" Max.
I
B: B: 24"
I lu �1 ul I I I I I I I I
L A - JI
!- \ Slide
Upper die holder
Upper die
F.L.
AVAILABLE AREA
VAILABLE AREA
Detail A Slide and Upper Die
SPE4A826Q0043_0002 Page 16 of 16
| 782-AMENDED-SOW#1.pdf |
| PURCHASE DESCRIPTION FOR THE ACQUISITION OF A C-FRAME HYDRAULIC PRESS |
| STANDARDS – FEDERAL |
| U.S Department of Labor, Occupational Safety and Health Administration (OSHA) |
| Environmental Protection Agency (EPA) |
| DEPARTMENT OF DEFENSE |
| MILITARY STANDARDS |
| International Organization for Standardization (ISO) |
| National Electrical Manufacturers Association (NEMA) |
| National Fire Protection Association (NFPA) |
| Japanese Industrial Standards (JIS) |
| Japan Electric Association Code (JEAC) |
| Japan Environment Governing Standards (JEGS) |
| 3.0 REQUIREMENTS. |
| 4.0 QUALITY ASSURANCE. |
| INSTALLATION RESPONSIBILITIES |
| Government Contractor |
| GOVERNMENT RESPONSIBILITIES |
| Enclosure 1 |
File details come from the government source that posted it. Updated .