About this file
This document is a Purchase Description for a sole source acquisition of a DMC 270 FD Portal Series CNC Universal Milling Machine for the Fleet Readiness Center Southwest (FRCSW). The solicitation (Reference Number: SPE4A825R0008) seeks one universal milling machine with specific technical requirements, including 106 inches of X and Y axis travel, 63 inches of Z axis travel, a 360-degree rotary table, 13,200 lbs table max load, and a 56 horsepower spindle with 12,000 rpm standard rotational speed. The machine will be installed in building 472 at NAS North Island, California.
The amendment extends the solicitation closing date to December 23, 2025, and includes several key modifications: upgrading the machine controller from Siemens 840D to Siemens Sinumerik One CNC, increasing the spindle power from 40 to 56 horsepower, and adding safety grating requirements per OSHA standards. The contractor is responsible for complete installation, including foundation preparation, utility hookups, leveling, and performance testing. The procurement includes additional services such as training (5 days for operators/programmers), technical documentation, and a comprehensive acceptance test plan. The estimated delivery date is 365 days after contract award, with the machine to be delivered to FRCSW with all standard tooling, probes, and accessories.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO.
24-13-1027
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE4A8 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE4A825R0008
X
2025 JUN 18
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA AVIATION
ASC INDUSTRIAL PLANT EQUIPMENT
6090 STRATHMORE ROAD
RICHMOND VA 23237
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
12/09/2025
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2025 JUN 18 / 2025 DEC 23
TIME 3:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 9 PAGES
SPE4A825R0008 - 0003
The purpose of this amendment is to:
1. Incorporate the following information into Solicitation SPE4A8-25-R-0008, for One (1) DMC 270 FD Portal Series CNC Universal Milling Machine in accordance with Purchase Description VIBB 24-13-1027, Dated 04 December 2025, with changes to the following:
Before Amendment:
3.3.5 Computer Numerical Control (CNC) Features. Computer Numerical Control (CNC) Features. The machine controllers shall consist of Celos with Siemens 840D CNC incorporating all standard features. The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the machine. Movement in all axes shall be both synchronous and independent positioning. Control features shall include Manual Data Input (MDI), simultaneous control of all axes, linear interpolation, circular interpolation, programmable interface, part program edit, buffer edit capability, part program storage, fixed cycles, and control diagnostics. The CNC shall direct machine functions from command data stored in memory. The data stored in memory shall be input by the media specified herein. The control shall initiate a halt and error signal should a fault condition occur in the control. The control shall automatically shut down when internal operating temperatures exceed safe operating limits. The controller shall have the following features. In addition, the contractor shall identify and provide user interface key for operator and maintenance.
After Amendment:
3.3.5 Computer Numerical Control (CNC) Features. Computer Numerical Control (CNC) Features. The machine controllers shall consist of Celos with Siemens Sinumerik One CNC incorporating all standard features. The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the machine. Movement in all axes shall be both synchronous and independent positioning. Control features shall include Manual Data Input (MDI), simultaneous control of all axes, linear interpolation, circular interpolation, programmable interface, part program edit, buffer edit capability, part program storage, fixed cycles, and control diagnostics. The CNC shall direct machine functions from command data stored in memory. The data stored in memory shall be input by the media specified herein. The control shall initiate a halt and error signal should a fault condition occur in the control. The control shall automatically shut down when internal operating temperatures exceed safe operating limits. The controller shall have the following features. In addition, the contractor shall identify and provide user interface key for operator and maintenance.
Justification For Amendment:
The Vendor is offering an upgraded controller in place of the 840D being that it is discontinued.
Before Amendment:
3.4 Size and Capacity (Table 1), Features Size/Capacity X Axis Travel 106 inches Y Axis Travel 106 inches Z Axis Travel 63 inches C Axis Rotary Table (FD) 360 degrees Table (max load) 13,200 lbs.
Table speed Milling 20 rpm/turning 200 rpm Rotary dresser (Dressing wheel) Diameter of 125mm Universal Milling Head with controlled A Axis Swivel Angle Swivel Angle -125 / +35° degrees (160° Total Swing) Spindle Standard Rotational Speed 12,000 rpm Power (100% power-on time) 40 horsepower (hp) Tool holder HSK-A 100 Other: Function DMC 270 FD Milling, Turning, and profile Grinding
After Amendment:
3.4 Size and Capacity (Table 1), Features Size/Capacity X Axis Travel 106 inches Y Axis Travel 106 inches Z Axis Travel 63 inches C Axis Rotary Table (FD) 360 degrees Table (max load) 13,200 lbs.
Table speed Milling 20 rpm/turning 200 rpm Rotary dresser (Dressing wheel) Diameter of 125mm Universal Milling Head with controlled A Axis Swivel Angle Swivel Angle -125 / +35° degrees (160° Total Swing) Spindle Standard Rotational Speed 12,000 rpm Power (100% power-on time) 56 horsepower (hp) Tool holder HSK-A 100
Justification For Amendment:
PAGE 3 OF 9 PAGES
The current 40 HP rating is for the base machine; 56 HP rating is for the optioned grinding package which is included in the current SOW and quote.
Before Amendment:
N/A
After Amendment:
3.9.1.1 Grating, Support Structure, and Toe boards. Grating, Support Structure, and Toe boards. As defined in 29 CFR 1910 Subpart D, §1910.21 walking-working surfaces (i.e. the grating walkway) shall not have a hole, gap or void >2 inches in its least dimension or an unprotected edge >4 feet above the lower basement level. The grating, supporting I-beams, and toe boards need to be added or modified to meet this requirement. Grating, support structure and toe boards need to be added to cover openings exposed. Any new I-beam grating support shall be coated with an epoxy primer and topcoat to match the color of the existing grating support beams. Any pit area with cover plates/grating that is expected to have forklifts or other heavy moving equipment make contact with the cover plate/grating during the loading or unloading of material, the cover plates/grating shall be designed so it can support a 6K-forklift (Make/ Year: Toyota /2017Model: 8FGU32) with a total loaded weight of 16,360lbs for loading and unloading areas of the machine. Heavy load supporting grating area shall be painted and distinguished with special markings to be clearly identified. Installation of walkways shall comply with OSHA minimum walking/working surface width requirements (see OSHA standard referenced in Section 2.1.1).
Justification For Amendment:
This paragraph needs to be added being that the vendor is providing closure grating around the pit for safety in accordance with OSHA 29 CFR 1910.
2.Extend the solicitation close date. The solicitation close date is extended to COB December 23, 2025.
3.All offers will be considered valid for 120 days from the closing date in this amendment.
4.Before award, direct any questions to Christina Gibbs at Christina.Gibbs@dla.mil.
5.All other terms and conditions remain the same.
List of Attachments:
1. Attachment A: Purchase Description VIBB 24-13-1027, Dated 04 December 2025, for the Acquisition of One (1) DMC 270 FD Portal Series CNC Universal Milling Machine.
PAGE 4 OF 9 PAGES
SUPPLIES/SERVICES: 3417-N30000483
ITEM DESCRIPTION:
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for DMC 270 FD Portal Series CNC Universal Milling Machine.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 3417-N30000483 1.000 EA $ ________________ $ ________________
Milling, Gantry
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
PREP FOR DELIVERY:
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
DELIVER TO: (1 EACH)
FLEET READINESS CENTER SOUTHWEST (FRCSW)
BLDG 472
NAS NORTH ISLAND, CA 92135
DODAAC: N00019
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7011319725 0001 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004594
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Training.
0002 3460-N00004594 1.000 EA $ ________________ $ ________________
IPE - Training
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
PAGE 5 OF 9 PAGES
SUPPLY/SERVICE: 3460-N00004592 CONT'D
ITEM PR PRLI PR PRLI Material Need Ship Date .
0002 7011319725 0002 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004592
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Technical Data.
0003 3460-N00004592 1.000 LT $ ________________ $ ________________
IPE - Technical Data
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0003 7011319725 0003 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004587
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for IUID Tag.
0004 3460-N00004587 1.000 EA $ ________________ $ ________________
IPE - IUID Tag
ACCEPTANCE POINT: DESTINATION
PAGE 6 OF 9 PAGES
SUPPLY/SERVICE: 3460-N00004587 CONT'D
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0004 7011319725 0004 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004584
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Foundation.
0005 3460-N00004584 1.000 EA $ ________________ $ ________________
IPE - Foundation
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0005 7011319725 0005 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004591
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Shipping.
PAGE 7 OF 9 PAGES
SUPPLY/SERVICE: 3460-N00004591 CONT'D
0006 3460-N00004591 1.000 EA $ ________________ $ ________________
IPE - Shipping
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0006 7011319725 0006 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004586
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Installation.
0007 3460-N00004586 1.000 EA $ ________________ $ ________________
IPE - Installation
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
PAGE 8 OF 9 PAGES
SUPPLY/SERVICE: 3460-N00001786 CONT'D
ITEM PR PRLI PR PRLI Material Need Ship Date .
0007 7011319725 0007 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00001786
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Post Processor.
0008 3460-N00001786 1.000 EA $ ________________ $ ________________
IPE - Post Processor
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0008 7011319725 0008 N/A N/A N/A 03/06/2026
SUPPLIES/SERVICES: 3460-N00004590
In accordance with Purchase Description VIBB 23-13-1027 dated 04 December 2025 for Rigging.
0009 3460-N00004590 1.000 EA $ ________________ $ ________________
IPE - Rigging
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 365 DAYS ADO
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 9 PAGES
SUPPLY/SERVICE: 3460-N00004590 CONT'D
BLDG 472
ITEM PR PRLI PR PRLI Material Need Ship Date .
0009 7011319725 0009 N/A N/A N/A 03/06/2026
24-13-1027 4 Dec 2025
PURCHASE DESCRIPTION FOR THE SOLE SOURCE
ACQUISITION OF CNC (COMPUTER NUMERICALLY
CONTROLLED) UNIVERSAL MILLING MACHINE
SCOPE.
Scope. The content of this specification describes the minimum requirements for the sole source acquisition of a DMC 270 FD Portal Series CNC Universal Milling Machine from DMG Mori. The contractor shall be responsible for completing installation and testing services to include shipping, installation, material-handling equipment, any foundation requirements, rigging to final location, leveling, alignment, quality assurance testing, and providing all qualified personnel. This system shall be integrated with other machines and systems. The machine shall be installed at FRCSW North Island building 472.
APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed in section 2.
Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
Government Documents.
Specifications, Standards, and Handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein.
STANDARDS – FEDERAL
FED-STD-H28B: Screw Thread Standards for Federal Service
U.S Department of Labor, Occupational Safety and Health Administration
(OSHA)
29 CFR 1910: General Industry, OSHA Safety and Health Standards
(Application for copies should be addressed to the OSHA Publications Superintendent of Documents P.O. Box 37535 Washington, D.C. 20013-7535)
DEPARTMENT OF DEFENSE
U.S. NAVY
OPNAV 5100.23G w/change 1: Navy Safety and Occupational Health Program Manual
Attachment A: Purchase Description VIBB 24-13-1027, Dated 04 December 2025.
(Application for copies of the OPNAVINST should be addressed to Office of the Chief of Naval Operations, The Pentagon, Washington, DC 20350-2000 or to Commander, Naval Safety Center 375 A Street Norfolk, VA 23511 or on the internet at http://www.public.navy.mil/navsafecen)
MILITARY STANDARDS
MIL-STD-130N w/Change 1: Identification Marking of U.S. Military Property Item Unique Identification Marking (IUID)
(Application for copies should be addressed to Air Force Product Data Systems Modernization Standards (TMSS) Office, 554 ELSG/SBP, 4375 Chidlaw Road, Bldg. 262, Room S008, Wright-Patterson AFB, OH 45433-5006, Phone (937) 257- 0870 or 0853 or https://quicksearch.dla.mil/qsSearch.aspx)
Other Government Documents, Drawings, and Publications. The following other
Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
LOCAL FACILITY DOCUMENTS
Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.
American National Standards Institute, Inc. (ANSI)
B11/STD B11.23: Safety Requirements for Machining Centers and Automatic, Numerically Controlled Milling, Drilling, and Boring Machines
(Address application for copies to the American National Standards Institute, 11 West 42nd Street, New York, NY 10036)
International Organization for Standardization (ISO)
ISO 10791-2: Test Conditions for Machining Centers – Part 2: Geometric Tests for Machines with Vertical Spindle or Universal Heads with Vertical Primary Rotary Axis (Vertical Z-Axis)
ISO 10791-7: Test Conditions for Machining Centers Part 7: Accuracy of Finished Test Pieces
ISO 4413: Hydraulic fluid power-General rules and safety requirements for systems and their components http://www.public.navy.mil/navsafecen https://quicksearch.dla.mil/qsSearch.aspx
ISO 4414: Pneumatic Power-General rules and safety requirements for systems and their components
(Application for copies should be addressed to the International Organization for Standardization (ISO) 1 rue de Varembé, Casepostale56, CH211Geneva 20, Switzerland)
National Electrical Manufacturers Association (NEMA)
NEMA 250: Enclosures for Electrical Equipment (1000 V Maximum)
NEMA MG 1: Motors and Generators
(Application for copies should be addressed to the National Electrical Manufacturers Association, 1300 N 17th Street, Rosslyn, VA 22209)
National Fire Protection Association (NFPA)
NFPA 70: National Electrical Code
NFPA 79: Electrical Standard for Industrial Machinery
(Applications for copies should be addressed to the National Fire Protection Association, ATTN: Support Services, 11 Tracy Drive, Avon, MA 02322)
Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.
2.4 Acronym Definitions Not Explicitly Listed in Text. The following acronyms not explicitly listed in each section text are defined as follows:
a. JIS- Japanese Industrial Standards
b. DIN- German Institute for Standardization
c. EN- European Standard
Proposal Format. Proposal shall be submitted using the following mathematical conventions:
a. Whole numbers will be expressed where one thousand is written as 1,000.
b. Decimals will be expressed where one-tenth is written as 0.1.
REQUIREMENTS.
Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold, or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.
Measuring and Indicating Device Graduations. All measuring and indicating devices on the machine shall be graduated in the United States customary units. An electronic control system that demonstrates switching between manufacturer standard units to United States customary units will be found acceptable.
Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's workstation(s).
Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910 or equivalent ISO/EN/DIN/JIS standards, and the OPNAV 5100.23G w/change 1: Navy Safety and Occupational Health Program Manual. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11.23 or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements. The safety devices shall not interfere with the operation of the machine. The safety devices shall prevent unintentional contact with the guarded part, and shall be easily removed to facilitate inspection, maintenance, and repair of the parts.
Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.
Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval of the Government. Radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313F.
Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.
Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the machine shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effect at the point of installation.
Lubrication. Means shall be provided to ensure proper lubrication for all moving parts in accordance with manufacturer requirements. All oil holes, grease fittings, and filler caps shall be easily accessible.
Lubrication Data. The Contractor shall provide the following information on all liquid or grease lubricants contained within equipment/system or in bulk (5 gallons or more) supplied under this procurement.
a. Liquid Lubricants
i. Viscosity grade in ISO units
ii. Viscosity Index
iii. AGMA and/or SAE classification as applicable
iv. Mil Spec and/or NATO Code as applicable
v. Viscosity in Centistokes (cst) @ 40° C and 100° C
vi. Type Additive package. Example: ZDDP, Rust inhibitors, Foam inhibitors.
vii. Neutralization, the TBN (alkalinity) and/or TAN (acidity).
viii. Flash point
ix. Pour point
b. Grease Lubricants
i. National Lubrication and Grease Institute (NLGI) Number
ii. Type and percent of thickener
iii. Dropping point
iv. Maximum Service Temperature
v. Base oil viscosity range in SUS or centipoise
Recirculating Lubrication. When the machine is equipped with a recirculating lubrication system, it shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. Means shall be provided to indicate a low lubrication condition. When a low lubrication condition occurs, the machine shall complete the current operation and come to a complete stop. The machine shall indicate that lubrication is required.
Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts.
Foreign-sourced replacement parts shall either be interchangeable with domestically supplied components or be readily available from a domestic source.
Construction. The machine shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.
Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, filling with solder or paste shall be used for reclaiming any defective part.
Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.
Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein or equivalent ISO/EN/DIN/JIS standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Hydraulic System. Under the condition that a machine has a hydraulic system, the system shall conform to ISO 4413. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls.
Pneumatic System. Under the condition that a machine has a pneumatic system, the system shall conform to ISO 4414. The system shall be complete, including all pumps, valves, piping, cylinders, and pressure controls.
Gears. All gears shall be of proper width and size to transmit full-rated torque and horsepower throughout the speed ranges without failure for the expected service life of the machine. Gears in drive trains shall be hardened and ground steel.
Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.
Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part.
Painting. The machine shall be painted in accordance with the manufacturer’s commercial practice. All paint shall be of the lead-free type.
Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.
Components. A five (5) axis gantry style machining center shall be provided and shall consist of not less than the following components:
Base. The base shall be a stress relieved, heavy duty, ribbed casting or steel weldment having characteristics that minimize both thermal and vibration effects, while providing the strength and size to assure maximum rigidity and support for any load within the rated capacity of the machine. Means shall be provided for accurate, ease of leveling.
Table. The worktable shall be a casting of iron, or iron alloy, internally ribbed and proportioned to support and withstand the maximum capacity work-piece weights and tool thrust loads. The worktable shall be precision fit to the ways of the saddle and be of the compound type, arranged to provide work-piece travel in the front to rear, and left to right horizontal axes. The top of the worktable shall be machine finished for a work mounting surface. The two (2) mill-turn tables shall be 86.6 inches in diameter.
Axes. All axes of the machine shall be actuated through a closed loop, high-gain electrical servo mechanism. Infinitely variable feed drives shall be provided for all axes.
Axes shall be machined to accept way bearings of a precise fit to their respective ways.
The way bearings shall be an antifriction type and shall be equipped with adjustable gibs, guides, or bearings to maintain and adjust alignment of the component being controlled to the ways and prevent excessive loading of the feed drive motor. Antifriction, re-circulating ball type linear ways are acceptable.
3.3.4 Coolant System. A flood-type coolant system shall be provided per machine. The coolant system shall include a sump or reservoir, a power-driven pump, and all necessary piping. The system shall have means for draining and cleaning. Means shall be provided to permit the operator to direct and control the amount of coolant over the entire work area.
The coolant system shall be equipped with a multi-jet clear view rotating window cleaner that is switchable from coolant to air. The machines shall be equipped with through spindle coolant. The coolant unit shall be equipped with a 660 gallon reservoir with a low-pressure pump that is frequency controlled. Coolant Supply (metal working fluid / cutting fluid) Coolant Type: Grindex 35S Coolant through spindle Tank Capacity: 660 gallons Pump Capacity: 18 gallon/min Coolant tank with integrated paper band filter
Electrical System. The machine shall conform to NFPA 79 or equivalent applicable European or Japanese electrical standards. The existing source power available at the facility is 480 volt, 3-phase, 60 Hertz (Hz), and 400 Amps. The machine’s electrical system shall be tolerant of fluctuation of ± 10 percent. The electrical system shall be complete, including any electrical transformer(s) that may be required to modify the existing source voltage to the proper operating voltage of the equipment. A properly rated, and fused, single disconnect device shall be utilized on the machine with means of lockout in the off position only. Per NEC code, the power designed for the equipment shall be at 125% working load capacity per NEC code with regards to FRCSW facility requirements.
3.3.7.1 Electrical Enclosures. Construction of the electrical enclosures shall conform to NEMA ICS 6 standards or equivalent applicable European or Japanese electrical standards.
The enclosure shall be a NEMA 250 type 12 or equivalent European or Japanese standards and shall provide for ventilation of components and shall be designed for an indoor non-hazardous location. All electrical components shall conform to NFPA 79 or equivalent ISO/EN/DIN/JIS standards. The machine electrical enclosures shall follow access protections in accordance with NFPA 79, section 6.2.3.1. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements
Arc Flash Protection. The machine enclosures shall be marked for arc flash in accordance with NFPA 79 Paragraph 16.2.3 “Safety Signs for Electrical Enclosures” or equivalent European or Japanese standards for arc flash safety.
Solid-State Components. Electrical devices used to power electrical servo and spindle motors of control voltage delivered to solid-state electrical components shall be solid-state devices. Such devices shall be equipped to handle the electrical load imposed by operation of the machine to its maximum potential. The use of selenium in solid-state components shall be restricted to those devices that protect other solid-state components from voltage surge.
Computer Numerical Control (CNC) Features. The machine controllers shall consist of Celos with Siemens Sinumerik One CNC incorporating all standard features.
The CNC unit shall provide programmable automatic control of machine functions, operating modes, axis movement and other part program directed functions for the machine. Movement in all axes shall be both synchronous and independent positioning.
Control features shall include Manual Data Input (MDI), simultaneous control of all axes, linear interpolation, circular interpolation, programmable interface, part program edit, buffer edit capability, part program storage, fixed cycles, and control diagnostics. The CNC shall direct machine functions from command data stored in memory. The data stored in memory shall be input by the media specified herein. The control shall initiate a halt and error signal should a fault condition occur in the control. The control shall automatically shut down when internal operating temperatures exceed safe operating limits. The controller shall have the following features. In addition, the contractor shall identify and provide user interface key for operator and maintenance.
Post Processor. A post processor for the use of NX-2312 CAM software machine control shall be provided. The post processor shall include all files provided that are necessary to generate tool paths and output ASCII format NC files for all available functionality including, but not limited to, simultaneous two (2), three (3), four (4) and five
(5) axis machining including rotary axis positioning and contouring. The post processors shall program all functions such as milling, turning and grinding operations. The files include documentation and be delivered on compact disc. The post processors shall be delivered at final destination, forty-five (45) days prior to the final machining acceptance testing. The contractor shall provide the machine definition data (MDD) files also. Third party software shall not be used to develop the post processor nor required to operate the post processor. The files shall include documentation and be delivered on compact disc.
Motors. Motors shall be rated for continuous duty. Alternating-current (AC) motors shall be designed to operate on 60-Hz and each motor enclosure shall meet the requirements for a drip-proof enclosure. All motors shall meet the requirements of NEMA MG-1 or current equivalent ISO/EN/DIN/JIS/IEC standards. At the time of proposal, the vendor shall indicate which document they will utilize for compliance to the requirements.
Each motor shall have an identification plate in accordance with paragraph 3.7.2 to identify manufacturer, model number, serial number, voltage, amperage, horsepower, phase, frequency, and frame number. Motor horsepower shall be the manufacturer’s standard or standard optional horsepower as indicated on the manufacturer's design and construction drawing(s).
Work light. LED lighting shall be provided, whether built-in or added on, shall be provided. The light shall comply with NFPA 79 requirements or equivalent applicable European or Japanese electrical standards, have a protective shield, and provide maximum light to the work area.
Facility Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70.
Hour Meter. The machine shall be equipped with a non-resetting type, hour meter to display accumulated operating time of the drive motor(s), mounted on the main electrical panel visible from the outside, sealed to prevent the entrance of dust and moisture, and shall be mounted to withstand shock and vibration generated by the machine.
A CNC control that tracks and displays total machine on time (a non-resetting type), controller on, program runtime, and run time of the servo motor(s) shall be considered to meet this requirement.
Size and Capacity. The size and capacity of the machine shall be not less than specified in Table I.
Table I
Features Size/Capacity X Axis Travel 106 inches Y Axis Travel 106 inches Z Axis Travel 63 inches C Axis Rotary Table (FD) 360 degrees Table (max load) 13,200 lbs.
Table speed Milling 20 rpm/turning 200 rpm Rotary dresser (Dressing wheel) Diameter of 125mm Universal Milling Head with controlled A Axis Swivel Angle
Swivel Angle -125 / +35° degrees (160° Total Swing)
Spindle Standard Rotational Speed 12,000 rpm Power (100% power-on time) 56 horsepower (hp) Tool holder HSK-A 100
Alignment and Accuracy Tolerances. The alignment and accuracy tolerances of the machine shall be in accordance as specified in ISO 10791-2.
Standard Tooling and Equipment. All standard tooling and equipment required for proper operation and maintenance of the machine shall be provided. A list of these items shall be furnished at time of proposal. The following shall be supplied with the machine:
a. Universal milling head with controlled A-axis HSK-A 100
b. Taper cleaning unit with rotating brushes for spindle taper “HSK-A 100”
c. 86.6 inch diameter Numerically Controlled Rotary Table
d. Through Spindle Coolant
e. Rotating Clear-View Window
f. Rotary tool magazine with 123 magazine pockets HSK-A 100 spindle taper
g. Control panel for loading station tool magazine with fifteen (15) inch TFT screen
h. Linear Pallet changer system for 2 Pallets with set-up station of pallet endless rotatable by motor and lift–off pallet.
i. 2 (two) 86.6 inch diameter pallets
j. Chip conveyor
k. Upgraded grinding package for profiling grinding including rotary dressing unit . Portal.
l. 2 (two) mill-turn tables at 86.6” diameter
m. Shall have a Rotary Dresser
Tooling and Part Probes. The machines shall be equipped with both BLUM Lasers or equivalent probes and Renishaw PP60 optical probe or equivalent measuring probes for part measurement and tool measurement.
Marking on Instruments, Control Panels, and Plates. All words on plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.
Lubrication Plate. A lubrication plate shall be permanently and securely attached to each machine. The plate shall contain the following information.
• Points of Lubricant Application
• Servicing Interval
• Type of Lubricant
• Viscosity
• Military or Federal Specification for Each Lubricant (If available)
• Size and Type of Each Lubricant Filter
Nameplate. A nameplate shall be permanently and securely attached to each machine. The nameplate data shall meet the requirements of NFPA 79 and contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine, and a suffix identified in the manufacturer's permanent records.
• Nomenclature
• CAGE Code
• Manufacturer’s Name
• Manufacturer’s Model Designation
• Manufacturer’s Serial Number
• Power Input (Volts, Total Amps, Phase, Frequency)
• Contract Number
• Date of Manufacture
• Full-load current for each supply
• Ampere rating of the largest motor or load
• Short-circuit current rating of the industrial control panel
• Max ampere rating of short-circuit and ground fault protective device, where provided
• Electrical diagram number(s) or number of the index to the electrical drawings
Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text. At a minimum this tag shall contain the information listed in paragraph 3.7.2 Nameplate.
Technical Data. Three (3) hard copies and one (1) electronic copy(s) on compact disk (CD) of technical data shall be provided with the machine. All copies of technical data shall be legible and written in the English language. Technical data shall contain specifications, instructions for the operation, maintenance of the machine and recommended spare parts list, and all the additional information listed below.
• Electrical Schematics: Detailed diagrams showing the electrical setup, wiring, and components for the machine’s control systems and power supply.
• Spare Parts Lists: A list of recommended spare parts with part numbers, descriptions, and quantities that are usually needed for maintenance or repairs.
• Consumable Lists: A list of materials like lubricants, cutting tools, and other consumables required for the machine's operation.
• Drawings: Mechanical and assembly drawings (2D and 3D) to support understanding of machine's structure, layout, and how it fits into our current setup.
• Warranty Information: Details on the warranty, including coverage, duration, and exclusions.
• Principle of Operation: Description of how the machine works, covering key operating principles, modes, and setup instructions.
• Operational Manual: A user manual with step-by-step instructions for setting up, operating, and troubleshooting the machine.
• Maintenance Manual: A manual with recommended maintenance steps, schedules, and instructions for part replacements.
Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty (30) calendar days After Contract Award (ACA). The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The Government and the contractor shall review the report on a monthly basis. The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as engineering, procurement of major hardware, assembly, operational debug, factory acceptance, shipment, installation, training, and final acceptance test.
Acceptance Test Plan (ATP). The Contractor shall prepare an Acceptance Test Plan (ATP). The ATP shall be a step-by-step written instruction on how to verify compliance during Contract Quality Assurance Inspection and the Final Inspection/Acceptance Test specified in Sections 4.4 and 4.5. The Contractor shall develop and provide dimensioned drawings of the proposed test part specified in Paragraph 4.6.3.
The Manufacture’s standard testing procedures shall be included in the ATP. Any procedures necessary for compliance with Section 4, which are not covered by the Manufacturer’s standard testing procedures, shall be identified and included in the ATP.
The initial ATP shall be submitted thirty (30) calendar days ACA for Government review and approval. The accepted test procedures shall become part of this contract.
Installation. The contractor shall be responsible for the installation/delivery of all equipment in order to make it operational. The Machine shall be installed in a pit to allow to have height clearance from current hoist of 18.5 feet. In addition, the contractor shall be responsible for the necessary qualified personnel and equipment (forklifts, man lifts, etc.)
required for the off-loading, utility hookups, anchoring, and leveling machines in place and all other requirements necessary such as leveling screws, and related hardware to secure the machines components to a foundation to make the equipment operational prior to the Government acceptance. The contractor shall be responsible for all necessary certifications and permits required, for shipping, EPA, or other, by any government agency, local, state, or national. The minimum installation responsibilities of the contractor are shown on the included Installation Responsibilities sheet. The contractor shall follow the customers’ hours of operation for mid shift; 12pm to 8pm, Monday through Friday excluding all national holidays, unless informed otherwise.
Foundation The contractor shall provide all the qualified personnel, equipment and hardware required for excavation and removal of the present foundation in addition to the installation of a machine foundation in accordance with manufacturer’s requirements. The new foundation shall extend for three (3) feet in all directions outside of the machine’s footprint. The contractor shall provide FRCSW with samples, test reports, and curing times for the concrete and epoxy. Also, FRCSW shall be responsible for testing the soil for hazardous materials. When it is determined that hazardous materials have been found, the Government will be responsible for the disposal of the soil. When no hazardous materials are present then the contractor shall remove and dispose of the soil. The maximum allowable floor space for installation of the machines in this location is 43(L) feet × 43(W) feet see Enclosure 1 for details.
3.9.1.2 Grating, Support Structure and Toe boards. As defined in 29 CFR 1910 Subpart D, §1910.21 walking-working surfaces (i.e. the grating walkway) shall not have a hole, gap or void >2 inches in its least dimension or an unprotected edge >4 feet above the lower basement level. The grating, supporting I-beams, and toe boards need to be added or modified to meet this requirement. Grating, support structure and toe boards need to be added to cover openings exposed. Any new I-beam grating support shall be coated with an epoxy primer and topcoat to match the color of the existing grating support beams. Any pit area with cover plates/grating that is expected to have forklifts or other heavy moving equipment make contact with the cover plate/grating during the loading or unloading of material, the cover plates/grating shall be designed so it can support a 6K-forklift (Make/Year: Toyota /2017Model: 8FGU32) with a total loaded weight of 16,360lbs for loading and unloading areas of the machine. Heavy load supporting grating area shall be painted and distinguished with special markings to be clearly identified. Installation of walkways shall comply with OSHA minimum walking/working surface width requirements (see OSHA standard referenced in Section 2.1.1).
Installation/Foundation Drawings (Preliminary Submission). No later than sixty
(60) working days after an effective date of contract, installation drawings shall be provided with soft metric measurements using the manufacturer’s standard format. An electronic copy shall also be provided in AutoCAD 2023 version. The Government shall notify the contractor in writing within ten (10) working days of receipt of drawing if they comply with this specification. If revisions are required, the contractor has ten (10) working days to make revisions and resubmit for a new review. Rejection of drawings does not relieve the contractor from final delivery date of contract performance period.
Installation/Foundation Drawings (Final submission). Submission of final drawings shall be not later than sixty (60) calendar days of Government acceptance of preliminary drawing. These final drawings shall bear a complete title block with a permanent drawing number, signature, date, and an original stamp or seal of a Professional Engineer (PE) licensed in the state of the receiving activity where the equipment will be installed. The final drawing submission shall include an engineering report with structural calculations used in the design. The engineering report shall also be stamped by a PE. The Government shall notify the contractor in writing within ten (10) working days of receipt of drawing if they comply with this specification. If revisions are required, the contractor has ten (10) working days to make revisions and resubmit for a new review. Rejection of drawings does not relieve the contractor from final delivery date of contract performance period.
Field Supervisor. The contractor shall provide a full-time (start of installation to final acceptance) field supervisor to direct installation and testing of the supplies. The field supervisor shall have full authority to implement field decisions expeditiously. Work shall not be performed when the field supervisor is not in the immediate work area. The field supervisor shall be identified to the receiving activity prior to the start of installation. The field supervisor shall be fluent in the English language. The field supervisor is required to coordinate with the (DGR) Designated Government Representative for any security clearances for all contractor personnel expected to perform on-site work.
3.9.5 Geotechnical Survey. The contractor shall perform a geotechnical survey to determine the location of any buried utilities in the current foundation. The contractor shall provide a copy of the completed survey to DLA. The contractor shall be responsible for identifying and relocating any existing active underground utilities located within the existing foundation. When it is determined to be abandoned, the contractor will need to contact the KO to get approval from the Government to remove it.
Floor Epoxy. The contractor shall use Stonclad GS with Stonkote GS4 and Stonseal PA7, a three-part resinous flooring system.