DAF_SBIR_254_R10_PHI.pdf
PDF 398 KB Posted
- Solicitation number
- SF254-01006
About this file
This document is the Department of the Air Force's proposal submission instructions for the Space Force's 25.4 Small Business Innovation Research (SBIR) Phase I program, Release 10. The document clarifies DoD SBIR Broad Agency Announcement requirements and establishes mandatory submission procedures through the Defense SBIR/STTR Innovation Portal (DSIP).
Offerors must submit complete Phase I proposals by the posted deadline, including seven volumes: DoD Proposal Cover Sheet, Technical Volume, Cost Volume, Company Commercialization Report, Supporting Documents, Fraud/Waste/Abuse Training certification, and Foreign Affiliations Disclosures. The Technical Volume is limited to 10-20 pages depending on the topic (minimum 10-point font, one-inch margins) and must include key personnel information, resumes for principal investigators and subcontractors, citizenship status of all team members, visa/work permit details for foreign nationals, and a Phase I Statement of Work outline covering scope, task outline, milestone schedule, deliverables, progress reports, and final report requirements. Cost Volume submissions must provide detailed justifications for direct materials, other direct costs, direct labor, travel, subcontracts (capped at one-third of total contract price excluding profit), special tooling/equipment, and consultants. Proposals exceeding stated award maximums ($50,000-$75,000 depending on topic) or duration limits (45 days to 3 months) will not be considered. The document includes six Space Force topics addressing space logistics, AI-driven automation, thermal protection systems, and separation systems, with Phase I efforts focused on feasibility demonstration and prototype development. The Air Force anticipates evaluation and selection within 90 calendar days of solicitation close. Only Phase I awardees are eligible for Phase II proposals. All proposals must be submitted electronically via DSIP, with no TABA participation permitted, and the Government reserves the right to award all, some, or none of the proposals submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF254-01006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAF 25.4 Release 10 Phase I - 1
DEPARTMENT OF THE AIR FORCE
SPACE FORCE
25.4 SMALL BUSINESS INNOVATION RESEARCH (SBIR)
PHASE I
PROPOSAL SUBMISSION INSTRUCTIONS
Release 10
The Air Force intends these Phase I proposal submission instructions to clarify the Department of Defense (DoD) Broad Agency Announcement (BAA) as it applies to the topics solicited herein.
Offerors must ensure proposals meet all requirements of the SBIR Program BAA posted on the Defense SBIR/STTR Innovation Portal (DSIP) at the proposal submission deadline date/time.
Applicants are encouraged to thoroughly review the DoD Program BAA and register for the DSIP Listserv to remain apprised of important programmatic and contractual changes.
• Full component-specific instructions and topic descriptions are available on DSIP at https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations. Be sure to select the tab for the appropriate BAA cycle.
Please ensure all e-mail addresses listed in the proposal are current and accurate. The DAF is not responsible for ensuring notifications are received by firms changing mailing address/e-mail address/company points of contact after proposal submission without proper notification to the DAF. If changes occur to the company mail or email addresses or points of contact after proposal submission, the information must be provided to the AF SBIR/STTR One Help Desk. The message shall include the subject line, “25.4 Address Change”.
Points of Contact:
General information related to the AF SBIR/STTR program and proposal preparation instructions, contact the AF SBIR/STTR One Help Desk at usaf.team@afsbirsttr.us. All applicants have ample opportunity to request clarifying information. The DAF encourages applicants to request clarifying information as early as possible, as delays in such requests constrain the DAF’s ability to provide satisfactory resolution to applicant concerns.
• Questions regarding the DSIP electronic submission system, contact the DoD SBIR/STTR Help Desk at dodsbirsupport@reisystems.com.
• For technical questions about the topics during the pre-announcement and open period, please reference the DoD SBIR 25.4 BAA.
• Air Force SBIR/STTR Contracting Officer (CO):
o Mr. Daniel J. Brewer, Daniel.Brewer.13@us.af.mil
General information related to the AF Small Business Program can be found at the AF Small Business website, http://www.airforcesmallbiz.af.mil/. The site contains information related to contracting opportunities within the AF, as well as business information and upcoming outreach events. Other informative sites include those for the Small Business Administration (SBA), www.sba.gov, and the Procurement Technical Assistance Centers (PTACs), http://www.aptacus.us.org. These centers provide Government contracting assistance and guidance to small businesses, generally at no cost.
PHASE I PROPOSAL SUBMISSION
The DoD SBIR 25.4 Broad Agency Announcement, https://www.dodsbirsttr.mil/submissions/login, includes all program requirements. Phase I efforts should address the feasibility of a solution to the selected topic’s requirements.
https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations mailto:usaf.team@afsbirsttr.us mailto:dodsbirsupport@reisystems.com http://www.airforcesmallbiz.af.mil/ http://www.sba.gov/ http://www.aptacus.us.org/
DAF 25.4 Release 10 Phase I - 2
PHASE I PROPOSAL FORMAT
Complete proposals must include all of the following:
Volume 1: DoD Proposal Cover Sheet Note: If selected for funding, the proposal’s technical abstract and discussion of anticipated benefits will be publicly released. Therefore, do not include proprietary information in this section.
Volume 2: Technical Volume Volume 3: Cost Volume Volume 4: Company Commercialization Report Volume 5: Supporting Documents Volume 6: Fraud, Waste, and Abuse Training Volume 7: Disclosures of Foreign Affiliations or Relationships to Foreign Countries
DoD PROPOSAL COVER SHEET (VOLUME 1) Complete the proposal Cover Sheet in accordance with the instructions provided via DSIP. The technical abstract should include a brief description of the program objective(s), a description of the effort, anticipated benefits and commercial applications of the proposed research, and a list of key words/terms. The technical abstract of each successful proposal will be submitted to the Office of the Secretary of Defense (OSD) for publication and, therefore, must not contain proprietary or classified information.
TECHNICAL VOLUME (VOLUME 2):
The Technical Volume should include all graphics and attachments but should not include the Cover Sheet, which is completed separately as Volume 1. The Phase I technical volume (uploaded in Volume 2) shall contain the required elements found below. Ensure that all graphics are distinguishable in black and white.
The Phase I Technical Volume page/slide limits identified for the topics do not include the Cover Sheet, Cost Volume, Cost Volume Itemized Listing (a-h). The Technical Volume must be no smaller than 10-point on standard 8-1/2" x 11" paper with one-inch margins. Only the Technical Volume and any enclosures or attachments count toward the page limit. In the interest of equity, pages/slides in excess of the stated limits will not be reviewed. The documents required for upload into Volume 5, “Other”, do not count toward the specified limits.
These instructions supplement the 25.4 SBIR BAA. In addition to the requirements found in the 25.4 SBIR BAA, applicants are required to provide the following information in Volume 2:
Key Personnel: Identify in the Technical Volume all key personnel who will be involved in this project;
include information on directly related education, experience, and citizenship.
• A technical resume of the principal investigator, including a list of publications, if any, must be included. Only one principal investigator/project manager can be designated to a proposal at any given time.
• Concise technical resumes for subcontractors and consultants, if any, are also useful.
• Identify all U.S. permanent residents to be involved in the project as direct employees, subcontractors, or consultants.
• Identify all non-U.S. citizens expected to be involved in the project as direct employees, subcontractors, or consultants. For all non-U.S. citizens, in addition to technical resumes, please provide countries of origin, the type of visa or work permit under which they are performing and an explanation of their anticipated level of involvement on this project, as appropriate. Additional information may be requested during negotiations in order to verify the foreign citizen’s eligibility to participate on a contract issued as a result of this announcement. Note: Do not
DAF 25.4 Release 10 Phase I - 3 upload information such as Permanent Resident Cards (Green Cards), birth certificates, Social Security Numbers, or other PII to the DSIP system.
Phase I Statement of Work Outline NOTE: The DAF uses the work plan outline as the initial draft of the Phase I Statement of Work (SOW).
Therefore, do not include proprietary information in the work plan outline. To do so will necessitate a request for revision, if selected, and may delay award.
Include a work plan outline in the following format:
Scope: List the effort’s major requirements and specifications.
Task Outline: Provide a brief outline of the work to be accomplished during the Phase I effort.
Milestone Schedule Deliverables Progress reports Final report with SF 298
COST VOLUME (VOLUME 3)
Cost information should be provided by completing the Cost Volume in DSIP and including the Cost Volume Itemized Listing specified below. The Cost Volume detail must be adequate to enable Air Force personnel to determine the purpose, necessity and reasonability of each cost element. Provide sufficient information (a.-g. below) regarding funds use. The DSIP Cost Volume and Itemized Cost Volume Information will not count against the specified page limit. The itemized listing also may be submitted in Volume 5 under the “Other” dropdown option.
a. Direct Cost Materials: Justify costs for materials, parts, and supplies with an itemized list containing types, quantities, prices and where appropriate, purpose. Material costs may include the costs of such items as raw materials, parts, subassemblies, components, and manufacturing supplies.
b. Other Direct Costs: This category includes, but is not limited to, specialized services such as machining, milling, special testing or analysis, and costs incurred in temporarily using specialized equipment. Proposals including leased hardware must include an adequate lease v. purchase justification.
c. Direct Labor: Identify key personnel by name, if possible, or by labor category, if not. Direct labor hours, labor overhead and/or fringe benefits, and actual hourly rates for each individual are also necessary for the CO to determine whether these hours, fringe rates, and hourly rates are fair and reasonable.
d. Travel: Travel costs must relate to project needs. Break out travel costs by trip, number of travelers, airfare, per diem, lodging, etc. The number of trips required, as well as the destination and purpose of each, should be reflected. Recommend budgeting at least one trip to the Air Force location managing the contract.
e. Subcontracts: Involvement of university or other consultants in the project’s planning and/or research stages may be appropriate. If so, describe in detail and include information in the Cost Volume. The proposed total of consultant fees, facility lease/usage fees, and other subcontract or purchase agreements may not exceed one-third of the total contract price or cost (do not include profit in the calculation), unless otherwise approved in writing by the CO. The SBIR funded work percentage calculation considers both direct and indirect costs after removal of the SBC’s proposed profit. Support subcontract costs with copies of executed agreements. The documents must adequately describe the work to be performed. At a minimum, include a Statement of Work (SOW) with a corresponding detailed Cost Volume for each planned subcontract.
DAF 25.4 Release 10 Phase I - 4
f. Special Tooling, Special Test Equipment, and Material: The inclusion of equipment and materials will be carefully reviewed relative to need and appropriateness to the work proposed. Special tooling and special test equipment purchases must, in the CO’s opinion, be advantageous to the Government and relate directly to the effort. These toolings or equipment should not be of a type that an offeror would otherwise possess in the normal course of business. These may include items such as innovative instrumentation and/or automatic test equipment.
g. Consultants: Provide a separate agreement letter for each consultant. The letter should briefly state what service or assistance will be provided, the number of hours required, and the hourly rate.
NOTE: If no exceptions are taken to an offeror’s proposal, the Government may award a contract without negotiations. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. If there are questions regarding the award document, contact the Phase I CO identified on the cover page. The Government reserves the right to reopen negotiations later if the CO determines doing so to be necessary.
COMPANY COMMERCIALIZATION REPORT (VOLUME 4)
Completion of the CCR as Volume 4 of the proposal submission in DSIP is required. Please refer to the DoD SBIR 25.4 BAA for full details on this requirement. Information contained in the CCR will not be considered by the Air Force during proposal evaluations.
SUPPORTING DOCUMENTS VOLUME (VOLUME 5)
The following documents may be required if applicable to your proposal:
1. DD Form 2345: For proposals submitted under export-controlled topics, either International Traffic in Arms or Export Administration Regulations (ITAR/EAR), a copy of the certified DD Form 2345, Militarily Critical Technical Data Agreement, or evidence of application submission must be included. The form, instructions, and FAQs may be found at the United States/Canada Joint Certification Program website, http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP/DD23 45Ins tructions.aspx. DD Form 2345 approval will be required if proposal if selected for award.
2. Verification of Eligibility of Small Business Joint Ventures (Attachment 3 to the DOD SBIR 25.4
BAA)
3. Technical Data Rights Assertions (if asserting data rights restrictions)
FRAUD, WASTE, AND ABUSE TRAINING (VOLUME 6)
Fraud, Waste and Abuse training material can be found in the Volume 6 section of the proposal submission module in DSIP and must be thoroughly reviewed once per year to proceed with proposal submission.
DISCLOSURES OF FOREIGN AFFILIATIONS OR RELATIONSHIPS TO FOREIGN
COUNTRIES (VOLUME 7)
Small business concerns must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please be aware that the Disclosures of Foreign Affiliations or Relationships to Foreign Countries WILL NOT be accepted as a PDF Supporting Document in Volume 5 of the DSIP proposal submission. Do not upload any previous versions of this form to Volume 5. For additional details, please refer to the DoD SBIR Program BAA.
DAF 25.4 Release 10 Phase I - 5
DISCRETIONARY TECHNICAL AND BUSINESS ASSISTANCE (TABA)
The Air Force does not participate in the Discretionary Technical and Business Assistance (TABA) Program. Proposals submitted in response to DAF topics shall not include TABA.
AIR FORCE PROPOSAL EVALUATIONS
Proposals will be evaluated for overall merit in accordance with the criteria discussed in the 25.4 BAA. DAF is seeking varying technical/scientific approaches and/or varying and new technologies that would be responsive to the problem statement(s) and area(s) of interest in the topic. Multiple procurements are planned and anticipated to be awarded as a result of the topic, each proposal is considered a separate procurement and will be evaluated on its own merit, and that the Government may award all, some, or none of the proposals. Any per-award or per-topic funding caps are budgetary estimates only, and more or less funding may become available. Funding decisions are made with complete disregard to the other awards under the same topic.
In accordance with 15 USC 638(vv) (Section 4 of the SBIR and STTR Extension Act of 2022), and the Deputy Secretary of Defense Memorandum; Subject: Defense Small Business Innovation Research and Small Business Technology Transfer Due Diligence Program dated May 13, 2024, the DAF will review all proposals submitted in response to this BAA to assess security risks presented by small business concerns seeking a Federally funded award. The DAF will use information provided by the small business concern in response to the Disclosure of Foreign Affiliations or Relationships to Foreign Countries and the proposal to conduct a risk-based due diligence review on the cybersecurity practices, patent analysis, employee analysis, and foreign ownership of a small business concern, including the small business concern and employees of the small business concern to a foreign country, foreign person, foreign affiliation, or foreign entity. The DAF will also assess proposals utilizing open-source analysis and analytical tools, for the nondisclosures of the information set forth in 15 U.S.C. 638(g)(13). If DAF assesses that a small business concern has security risk(s), DAF will review the proposal, the evaluation, and the security risks and may decide not to select the proposal for award based upon a totality of the review.
MAJORITY OWNERSHIP IN PART BY MULTIPLE VENTURE CAPITAL, HEDGE FUND,
AND PRIVATE EQUITY FIRMS
Small business concerns that are owned in majority part by multiple venture capital operating companies (VCOCs), hedge funds, or private equity funds are not eligible to submit applications or receive awards for DAF Topics.
PERFORMANCE OF WORK REQUIREMENTS AND LOCATION OF WORK
For Phase I, a minimum of two-thirds of the research or analytical effort must be performed by the Awardee. The DAF measures percentage of work by both direct and indirect costs, not including profit.
Occasionally, the DAF will consider deviations from this performance of work requirement. Requests for Performance of Work deviations must be made twice: prior to submission during the topic open period and as part of the initial proposal submission. For requests prior to the initial proposal submission, the DAF will consider the request and approve or disapprove requesting applicants to proceed with DSIP submission. Upon proposal receipt, the DAF will again consider such requests for approval for the resultant award.
All R/R&D work must be performed in the United States. Based on a rare and unique circumstance, the DAF may approve a particular portion of the R/R&D work to be performed or obtained in a country outside of the United States. The awarding Funding Agreement officer must approve each specific condition in writing. Applicants seeking this approval must make such a request with their initial proposal submission. The DAF will not consider these requests prior to proposal submission.
DAF 25.4 Release 10 Phase I - 6
DAF USE OF SUPPORT CONTRACTORS
Restrictive notices notwithstanding, proposals may be handled for administrative purposes only, by support contractors. These support contractors may include, but are not limited to TEC Solutions, Inc., APEX, Oasis Systems, Riverside Research, Peerless Technologies, HPC-COM, Mile Two, Montech, Wright Brothers Institute, and MacB (an Alion Company). In addition, only Government employees and technical personnel from Federally Funded Research and Development Centers (FFRDCs) MITRE and Aerospace Corporations working under contract to provide technical support to AF Life Cycle Management Center and Space and Missiles Centers may evaluate proposals. All support contractors are bound by appropriate non-disclosure agreements. Contact the AF SBIR/STTR CO Daniel J. Brewer (Daniel.Brewer.13@us.af.mil) with concerns regarding the use of support contractors.
PROPOSAL STATUS AND FEEDBACK
The Principal Investigator (PI) and Corporate Official (CO) indicated on the Proposal Cover Sheet will be notified by e-mail regarding proposal selection or non-selection. Small Businesses will receive a notification for each proposal submitted. Please read each notification carefully and note the Proposal Number and Topic Number referenced.
Automated feedback will be provided for Phase I proposals designated Not Selected. Additional feedback may be provided at the sole discretion of the DAF.
IMPORTANT: Proposals submitted to the DAF are received and evaluated by different organizations, handled by topic. Each organization operates within its own schedule for proposal evaluation and selection. Updates and notification timeframes will vary. If contacted regarding a proposal submission, it is not necessary to request information regarding additional submissions. Separate notifications are provided for each proposal.
The Air Force anticipates that all proposals will be evaluated and selections finalized within approximately 90 calendar days of solicitation close. Refrain from contacting the BAA CO for proposal status before that time.
Refer to the DoD SBIR Program BAA for procedures to protest the Announcement.
As further prescribed in FAR 33.106(a), FAR 52.233-2, Protests should be submitted to: Air Force SBIR/STTR Contracting Officer Daniel J. Brewer, Daniel.Brewer.13@us.af.mil. The DAF uses its best efforts to resolve concerns raised by interested parties at the contracting officer level through open and frank discussions. For agency protests, the DAF provides for inexpensive, informal, procedurally simple, and expeditious resolution of protests.
DAF SUBMISSION OF FINAL REPORTS
All Final Reports will be submitted to the awarding DAF organization in accordance with Contract instructions. Companies will not submit Final Reports directly to the Defense Technical Information Center (DTIC).
PHASE II PROPOSAL SUBMISSIONS
DAF organizations may request Phase II proposals while Phase I technical performance is ongoing or at any time after the conclusion of the period of performance. This decision will be based on the awardee’s technical progress, as determined by an DAF Technical Point of Contact review using the Phase II review criteria outlined above.
Phase II is the demonstration of the technology found feasible in Phase I. Only Phase I awardees are eligible to submit a Phase II proposal. All Phase I awardees will be sent a notification with the Phase II proposal submittal date and detailed Phase II proposal preparation instructions. If the physical or email mailto:Daniel.Brewer.13@us.af.mil mailto:Daniel.Brewer.13@us.af.mil
DAF 25.4 Release 10 Phase I - 7 addresses or firm points of contact have changed since submission of the Phase I proposal, correct information shall be sent to the DAF SBIR/STTR One Help Desk. Phase II dollar values, performance periods, and proposal content will be specified in the Phase II request for proposal.
NOTE: The DAF primarily makes SBIR Phase I and II awards as Firm-Fixed-Price contracts. However, awardees are strongly urged to work toward a Defense Contract Audit Agency (DCAA)-approved accounting system. If the company intends to continue work with the DoD, an approved accounting system will allow for competition in a broader array of acquisition opportunities, including award of Cost-Reimbursement types of contracts. Please address questions to the Phase II CO, if selected for award.
All proposals must be submitted electronically via DSIP by the date indicated in the Phase II proposal instructions. Note: Only ONE Phase II proposal may be submitted for each Phase I award.
AIR FORCE SBIR/STTR PROGRAM MANAGEMENT IMPROVEMENTS
The DAF reserves the right to modify the Phase II submission requirements. Should the requirements change, all Phase I awardees will be notified. The DAF also reserves the right to change any administrative procedures that will improve management of the DAF SBIR/STTR Program at any time.
DAF 25.4 Release 10 Phase I - 8
SPACE FORCE PHASE I TOPIC INDEX
Release 10
Topic Number
Topic Name Award Maximum Value*
Maximum Duration
Volume 2 Page/Slide Limit***
SF254-01001 Autonomous Space Cargo Network (ASCN): AI-Driven Logistics Automation and Digital Twin Integration for Space Mobility
$75,000.00 3 months 10
SF254-01002 Project SpaceKnight: Interactive AI Simulation for USSF Space Sustainment and Contested Logistics Wargaming
$75,000.00 3 months 10
SF254-01003 Project AXIS 54: AI-Enabled Framework for Space Sustainment Technology Prioritization
$75,000.00 3 months 10
SF254-01004 Quantum for Space Logistics Demand Planning & Optimization
$75,000.00 3 months 10
SF254-01005 Affordable Thermal Protection Solution (ARMREST) $50,000.00 45 days 20
SF254-01006 Low-Cost, Expendable, Launch-Agnostic Space Separation System
$50,000.00 45 days 20
*Proposals in excess of this value will not be considered for award.
**Proposals in excess of this duration will not be considered for award.
***Pages/slides in excess of this number will not be considered during proposal evaluations.
DAF 25.4 Release 10 Phase I - 9
SF254-01001 TITLE: Autonomous Space Cargo Network (ASCN): AI-Driven Logistics Automation and Digital Twin Integration for Space Mobility
OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Sustainment & Logistics
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: The goal for this effort is to develop an Autonomous Space Cargo Network (ASCN) that integrates Artificial Intelligence (AI)-driven automation, autonomous robotics, and digital twin technology to modernize and optimize cargo handling and logistics operations at the Space Joint Movement Complex (SJMC) and across the Department of Defense’s (DoD) space mobility enterprise.
The ASCN will improve operational efficiency, accuracy, and resilience by enabling real-time cargo visibility, autonomous load planning, and adaptive logistics execution. This capability will form the foundation for a scalable, cybersecure, and interoperable logistics framework supporting space sustainment missions in both contested and commercial environments.
DESCRIPTION: The SJMC is envisioned as the central logistics hub for DoD space operations, supporting rapid deployment, sustainment, and agile mobility. Current cargo handling and logistics processes are heavily manual, lack real-time adaptability, and are not optimized for space-based supply chains or contested logistics environments. To address these gaps, the ASCN will deliver an integrated, AI-driven logistics automation platform designed to support the SJMC and broader DoD logistics operations. The ASCN will combine autonomous robotics, intelligent decision-support, and digital twin technology to enable full-spectrum cargo management—from warehouse to orbital interface—while increasing speed, precision, and resilience. Key capabilities include:
1. Autonomous Cargo Handling & Transport Optimization – This includes robotic forklifts and cargo handlers for autonomous loading/unloading, AI-based routing, prioritization, and adaptive logistics workflows, and seamless integration with space, air, and ground mobility operations.
2. AI-Driven Logistics Command & Control – This includes real-time AI controller for cargo flow, load planning, and schedule optimization, weight-based load verification and automated resupply workflows, integration with the Spaceport of the Future’s Common Operating Picture (SPOF COP).
3. Machine Learning for Mission Adaptability – This includes predictive analytics for storage allocation and resource positioning, dynamic mission reprioritization and automated contingency planning, and visibility and orchestration across all classes of supply.
4. Commercial & Military Logistics Interoperability – This includes compatibility with U.S.
Transportation Command (USTRANSCOM), Space Systems Command (SSC), Defense Logistics Agency (DLA), and commercial launch providers, joint DoD-commercial protocol development for space cargo integration, and enhanced operational readiness across government and industry supply chains.
5. Cybersecure & Resilient AI Robotics Architecture – This includes blockchain-secured logistics tracking and tamper prevention, quantum-resistant AI algorithms for autonomy assurance, and Zero Trust cybersecurity framework for secure operations at all classification levels.
DAF 25.4 Release 10 Phase I - 10
This effort will lay the foundation for a future-ready, modular, and scalable space logistics infrastructure, aligned with U.S. Space Force (USSF) sustainment strategy and capable of supporting both terrestrial and extraterrestrial cargo networks.
PHASE I: The Phase I objective is to develop a conceptual design and functional prototype for the ASCN—a system that integrates AI-enabled robotics, cargo handling automation, and logistics optimization for space-focused environments. The effort will evaluate the feasibility of supporting standard DoD platforms, such as fully loaded 463L pallets, and determine the scalability of the solution for future autonomous cargo transport at the SJMC. Technical approach consideration include:
- Simulate AI-enhanced cargo workflows within the SJMC, focusing on load planning, routing, and weight distribution using real-time sensing technologies.
- Design and model robotic automation frameworks for autonomous cargo handling, scheduling, and dynamic load stabilization.
- Assess integration with existing DoD logistics platforms and commercial space operations, including compatibility with USTRANSCOM, DLA, SSC, and commercial launch provider networks.
- Conduct stakeholder engagements with logistics planners and operational units to refine system requirements.
- Execute preliminary load balance and maneuverability testing using 463L pallets to identify mechanical design needs.
- Perform energy efficiency and power requirement analyses to inform autonomous runtime and charging strategies.
Phase I deliverables include:
- Conceptual design document detailing system architecture, autonomy layers, and AI integration pathways.
- Initial prototype demonstration showcasing AI-based cargo management logic, load balancing, and sensing capabilities.
- Feasibility study covering integration potential with DoD systems, environmental resilience, scalability, and power/energy assessments.
- Phase II roadmap outlining test campaigns, system modifications for larger payloads, and milestones for operational prototype development.
PHASE II: The Phase II objective is to design, develop, and demonstrate a fully operational prototype of the ASCN capable of autonomous cargo handling, intelligent logistics coordination, and mission adaptability in contested or austere logistics environments. This phase will validate the system’s ability to improve cargo throughput, reduce human intervention, and integrate with both DoD and commercial logistics systems. Technical focus areas include:
- Build and integrate a full-scale ASCN prototype with autonomous robotic handlers, real-time cargo identification, and secure communications.
- Implement advanced AI models for adaptive cargo prioritization, dynamic routing, and autonomous load planning.
- Integrate with existing DoD logistics platforms such as USTRANSCOM, the Spaceport of the Future’s COP Logistics Module, and commercial systems where applicable.
- Conduct operational testing in representative logistics environments (e.g., Space Launch facilities, Distribution Hubs).
- Collect performance data for load accuracy, handling speed, mission responsiveness, energy usage, and system reliability.
DAF 25.4 Release 10 Phase I - 11
- Demonstrate predictive maintenance and mission adaptability functions under simulated disruption scenarios.
Phase II deliverables include:
- Fully functional ASCN prototype, including AI, autonomy, and system integration components.
- Operational test campaign report, capturing performance metrics, environmental tolerance, and logistics throughput improvements.
- AI performance evaluation, including model training, learning adaptability, and logistics decision support outputs.
- Integration documentation detailing system compatibility with SSC, DLA, USTRANSCOM, and commercial logistics platforms.
- Phase III transition plan, outlining commercialization strategy, scaling pathways, and targeted end-user adoption timelines.
PHASE III DUAL USE APPLICATIONS: For Phase III, military applications include:
- Deploy the ASCN across USSF logistics operations, enabling fully autonomous, AI-enhanced cargo handling at the SJMC and other forward logistics nodes.
- Integrate with DoD logistics ecosystems, including USTRANSCOM, SSC, and the DLA, to support seamless multi-domain cargo movement.
- Provide real-time logistics decision support for Joint Logistics planners, enhancing resilience in contested or degraded environments.
- Improve sustainment for Agile Combat Employment (ACE) and distributed operations through predictive logistics automation and adaptive cargo routing.
- Expand use for mission rehearsal and planning through its integration with the Spaceport of the Future Common Operating Picture (COP) Logistics Module.
Commercial applications include:
- Offer autonomous cargo handling and warehouse robotics solutions to the aerospace and commercial space launch sectors.
- Enable AI-driven logistics optimization for commercial supply chains, launch support, and intermodal transport hubs.
- Deliver cybersecure, AI-managed inventory and transport systems to spaceports, research facilities, and commercial space cargo operators.
- Position the system for future use in lunar and planetary supply chain networks requiring autonomous off-Earth logistics solutions.
Transition plan considerations include:
- Military Transition through operational implementation at SSC logistics nodes and USTRANSCOM-managed facilities, with support from DLA for broad sustainment integration.
- Commercial Licensing to logistics automation firms, aerospace manufacturers, and spaceport operators, supported by targeted pilot deployments.
- Technology Integration with enterprise AI/machine learning (ML) platforms used in military logistics and commercial warehouse management systems.
The anticipated Technology Readiness Level (TRL) for each phase is the following:
- Phase I: TRL 3 to 4 – Analytical and laboratory-based proof of concept
- Phase II: TRL 5 to 6 – System/subsystem prototype demonstrated in relevant environment
- Phase III: TRL 7 to 9 – System demonstration in operational environment and full deployment.
DAF 25.4 Release 10 Phase I - 12
REFERENCES:
1. U.S. Space Force. (2023, March). Mission sustainment strategy. Office of the Deputy Chief of Space Operations for Operations, Cyber, and Nuclear (SF/S4O).
https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%2Missi on%20Sustainment%20Strategy%20efile_signatures.pdf.
2. United States Space Force. (2022, December). Space Doctrine Publication 4-0: Sustainment.
Space Training and Readiness Command (STARCOM).
https://www.starcom.spaceforce.mil/Portals/2/SDP%2040%20Sustainment%20(Signed).pdf?
ver=jFc_4BiAkDjJdc49LmESgg%3D%3D.
KEYWORDS: Autonomous Cargo Logistics for Space; AI-Driven Cargo Management System;
Autonomous Space Mobility & Sustainment; Digital Twin for Space Logistics Optimization; Cybersecure AI Logistics Framework https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%252Mission%20Sustainment%20Strategy%20efile_signatures.pdf https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%252Mission%20Sustainment%20Strategy%20efile_signatures.pdf https://www.starcom.spaceforce.mil/Portals/2/SDP%2040%20Sustainment%20(Signed).pdf?ver=jFc_4BiAkDjJdc49LmESgg%3D%3D https://www.starcom.spaceforce.mil/Portals/2/SDP%2040%20Sustainment%20(Signed).pdf?ver=jFc_4BiAkDjJdc49LmESgg%3D%3D
DAF 25.4 Release 10 Phase I - 13
SF254-01002 TITLE: Project SpaceKnight: Interactive AI Simulation for USSF Space Sustainment and Contested Logistics Wargaming
OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Sustainment & Logistics
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: The goal of this effort is to design and demonstrate the feasibility of an Artificial Intelligence (AI)-enabled, interactive strategy game prototype to support training and simulation for Space Logistics and Sustainment. This Phase I effort will focus on conceptualizing game mechanics, modeling realistic logistics scenarios, and developing a minimal viable simulation environment that integrates decision-support elements, human-machine interaction, and adversarial modeling. The prototype should provide a foundation for immersive training and concept of operations (CONOPS) experimentation aligned with U.S. Space Force (USSF) sustainment strategy.
DESCRIPTION: The USSF requires advanced training tools to prepare Guardians and logistics planners for the complex challenges of space sustainment, including adversarial interference, orbital constraints, and dynamic resupply conditions. Traditional wargaming and training platforms lack the interactivity, realism, and adaptability needed to prepare personnel for next-generation space logistics missions. Project SpaceKnight will address this gap by developing a proof-of-concept, AI-driven strategy game that simulates logistics planning and sustainment in contested space environments. This Phase I effort will focus on:
- Designing core game mechanics for both single-player and multiplayer scenarios;
- Modeling realistic constraints such as launch timing, fuel, orbital mechanics, and adversarial disruption;
- Prototyping AI-driven scenario generation to reflect real-world mission variables;
- Exploring immersive learning options using augmented reality/virtual reality (AR/VR) and advanced human-machine interfaces;
- Demonstrating how the simulation environment can support decision-making, CONOPS exploration, and supply chain risk analysis.
The objective is to establish feasibility, validate early design elements, and lay the groundwork for a full-featured training and wargaming platform in future phases.
PHASE I: The Phase I objective is to establish the feasibility of SpaceKnight as an AI-enabled, game-based training and simulation tool for space logistics and sustainment. This phase will focus on conceptual design, initial prototyping, and early validation of the system's training value and operational relevance. Key activities include:
- Develop the conceptual architecture and game design, including AI logic, user interaction models, and scenario components.
- Create a functional prototype capable of simulating at least one realistic logistics or sustainment scenario, incorporating basic adversary dynamics, launch constraints, or resource limitations.
DAF 25.4 Release 10 Phase I - 14
- Build an AI-driven scenario generation framework that enables dynamic mission variables and training variability.
- Conduct stakeholder interviews with USSF logistics personnel, Space Systems Command (SSC) training teams, and other relevant users to inform use cases and requirements.
- Evaluate and document how the prototype enhances decision-making, CONOPS exploration, and learning outcomes.
Deliverables may include:
- Conceptual game design and system architecture document.
- Prototype demonstration of a simulated logistics/sustainment scenario.
- Initial AI-based scenario generation engine.
- Use case study on training and decision impact.
- Stakeholder interview report and requirements validation summary.
PHASE II: The Phase II objective is to advance SpaceKnight from a Phase I prototype to a fully operational training and simulation platform for space logistics and sustainment. This phase will deliver a complete, AI-enabled game environment capable of supporting multi-user training, immersive planning, and digital decision support aligned with real-world mission variables. Key activities include:
- Develop and deploy a complete version of the SpaceKnight platform, incorporating realistic logistical and operational constraints such as fuel consumption, orbital mechanics, launch windows, and adversary behavior.
- Expand system functionality to support both turn-based and real-time scenarios in single-player and multiplayer formats, enabling distributed team exercises.
- Integrate AR/VR capabilities for enhanced immersion and scenario visualization, with support for advanced human-machine interfaces (e.g., voice, gesture, touchscreen).
- Build a robust analytics dashboard to track user performance, mission outcomes, and training metrics.
- Conduct testing in tabletop exercises (TTX) and wargaming environments to validate training efficacy and operational planning utility.
- Initiate integration with existing DoD training and learning platforms, ensuring alignment with USSF and Joint logistics frameworks.
Deliverables may include:
- Fully operational SpaceKnight simulation platform (unclassified, with capability for classified scenario extensions).
- Multi-user functionality for collaborative, distributed exercises.
- Constraint engines simulating mission realism (e.g., launch infrastructure, ground station coverage, resource availability).
- Immersive AR/VR module and interactive planning interfaces.
- Mission analytics dashboard and performance tracking tools.
- Testing and training report summarizing system effectiveness in operational exercises.
- Transition and deployment plan for DoD adoption and broader training integration.
PHASE III DUAL USE APPLICATIONS: For Phase III military applications, SpaceKnight will transition into an operational training, planning, and wargaming platform for use across SSC, USSF, and broader Joint logistics communities. Key applications include:
- Training Tool for Logistics Forces: Enhances Guardian and Airman readiness through immersive, scenario-based learning focused on contested, orbital sustainment operations.
DAF 25.4 Release 10 Phase I - 15
- Strategic and Tactical Wargaming: Supports CONOPS development and mission rehearsal through dynamic adversary modeling and real-time decision environments.
Integration with Digital Twin Systems: Enables synchronization with broader planning ecosystems (e.g., VS-CDF or the Spaceport of the Future Common Operating Picture (COP) Logistics Module) for end-to-end simulation and decision support.
For commercial applications, the underlying AI-driven simulation engine and gamified interface can be adapted for commercial use in sectors including space logistics, supply chain training, and strategic planning. Use cases include:
- Aerospace & Logistics Workforce Development: Provides high-fidelity, simulation-based training for companies managing spaceport operations, satellite logistics, or intermodal transportation.
- Space Sector Investment & Concept Testing: Serves as a strategic learning environment for commercial space startups, incubators, and venture stakeholders to test logistics models and resiliency planning.
- Academic & Defense Industry Simulation Tools: Offers customizable wargaming environments for defense contractors, think tanks, and universities conducting research on space sustainment and supply chain dynamics.
For the transition plan, SpaceKnight will be transitioned via coordination with SSC, training directorates, and defense education institutions for military use. In parallel, commercial licensing opportunities will be explored with aerospace firms, logistics tech developers, and academic partners seeking simulation-based decision support platforms. The anticipated Technology Readiness Level (TRL) at Phase III Entry is TRL 8 or 9, following successful validation in training environments and operational planning exercises.
REFERENCES:
1. U.S. Space Force. (2023, March). Mission sustainment strategy. Office of the Deputy Chief of Space Operations for Operations, Cyber, and Nuclear (SF/S4O).
https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%20Mission %20Sustainment%20Strategy%20efile_signatures.pdf.
2.
2. United States Space Force. (2022, December). Space Doctrine Publication 4-0: Sustainment.
Space Training and Readiness Command (STARCOM).
https://www.starcom.spaceforce.mil/Portals/2/SDP%204- 0%20Sustainment%20(Signed).pdf?ver=jFc_4BiAkDjJdc49LmESgg%3D%3D.
KEYWORDS: Space Logistics; AI Simulation; Human-Machine Teaming; Training; Games; Digital Wargaming; AR/VR; Logistics CONOPS; Interactive Scenario Planning https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%20Mission%20Sustainment%20Strategy%20efile_signatures.pdf https://www.dau.edu/sites/default/files/webform/documents/26816/2023_%20USSF%20Mission%20Sustainment%20Strategy%20efile_signatures.pdf https://www.starcom.spaceforce.mil/Portals/2/SDP%204-0%20Sustainment%20(Signed).pdf?ver=jFc_4BiAkDjJdc49LmESgg%3D%3D https://www.starcom.spaceforce.mil/Portals/2/SDP%204-0%20Sustainment%20(Signed).pdf?ver=jFc_4BiAkDjJdc49LmESgg%3D%3D
DAF 25.4 Release 10 Phase I - 16
SF254-01003 TITLE: Project AXIS 54: AI-Enabled Framework for Space Sustainment Technology Prioritization
OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Sustainment & Logistics
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: The goal of this effort is to develop a scalable, Artificial Intelligence (AI)-enabled decision-support framework that enables faster, more informed prioritization of emerging technologies across the space sustainment and logistics enterprise. Project AXIS 54 will equip cross-functional teams with structured tools to assess innovation alignment, technical maturity, and operational relevance— reducing transition friction and accelerating mission-impactful capabilities. The Phase I objective is to design and validate core framework components, AI integration pathways, and representative use cases to guide prototype development in Phase II.
DESCRIPTION: Modern defense innovation often excels at the edge but stalls at the center—where promising technologies struggle to transition due to fragmented visibility, misaligned priorities, and lack of actionable evaluation tools. From concept to prototype, many initiatives fail to bridge the gap between innovation and operational impact. Project AXIS 54 addresses this challenge by delivering a practical, AI-enabled framework to assess, prioritize, and align emerging technologies with mission objectives.
Designed for use by capability developers, acquisition teams, and decision-makers across the space logistics and sustainment enterprise, AXIS 54 will support:
- Scoring and visualization of initiatives based on operational relevance, technical maturity, transition readiness, and system feasibility.
- Warfighter-centric planning using intuitive visual models that promote alignment across stakeholders.
- Feedback loops that track early-stage innovations and guide them toward successful integration.
AI will serve as a core enabler, automating pattern recognition across portfolios, flagging integration risks, and surfacing dependencies. Machine learning models will continuously refine prioritization logic using real-world datasets, improving insight fidelity and accelerating informed decision-making. Aligned with the Secretary of Defense’s 17 priority areas—including readiness, innovation speed, and ecosystem resilience—AXIS 54 enables structured yet flexible evaluation of technology portfolios. It empowers leaders to elevate the most mission-relevant innovations, reinforcing readiness and sustainment in support of high-priority U.S. Space Force (USSF) operations. Instead of delivering a rigid platform, AXIS 54 will offer a modular toolkit—scalable for enterprise planning and adaptable for agile experimentation teams. It ensures that initiatives with the greatest potential for lethality, agility, and sustainability are identified early, matured strategically, and transitioned efficiently.
PHASE I: The Phase I objective is to establish the foundational elements of a modular decision-support toolkit that enables cross-functional teams to assess, align, and communicate the operational value of emerging technologies. Phase I focuses on validating a scalable, AI-enabled framework that helps
DAF 25.4 Release 10 Phase I - 17 prioritize innovation efforts in alignment with Space Systems Command (SSC), SpaceWERX, and broader USSF mission objectives. The scope and key tasks for this Phase I effort include:
1. Framework Blueprint Development – Design a practical scoring and assessment model incorporating real-world evaluation criteria—such as value-to-mission, maturity level, transition feasibility, and sustainment impact—used by SSC/S4 and innovation stakeholders.
2. Use Case Mapping – Apply the framework to representative scenarios drawn from current innovation pipelines (e.g., autonomous logistics, orbital intelligence, surveillance, and reconnaissance (ISR), digital sustainment), validating its applicability across diverse technology verticals.
3. Interface Prototypes – Create initial interface mockups or functional wireframes that demonstrate how program managers, acquisition officers, and mission owners would interact with the toolkit for planning and decision-making.
4. AI/machine learning (ML) System Architecture – Define AI design elements, including recommended data structures, training datasets, pattern recognition methods, and inference logic to be developed in Phase II.
5. Transition Touchpoints Identification – Identify ideal pilot environments and stakeholder communities for Phase II implementation, including where and how the system will be integrated into operational workflows.
Deliverables may include:
- Architecture and scoring model documentation.
- Scenario-based walkthroughs illustrating framework…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .