AF_SBIR_242_PI_DP2.pdf

PDF 803 KB Posted

Attached to
DEMISE - DEploy Material Into Space Experiments
Solicitation number
SF242-D025
Issued by

About this file

This is the Air Force Small Business Innovation Research (SBIR) Phase I Proposal Submission Instructions document for the 24.2 solicitation cycle, supplementing the DoD Broad Agency Announcement (BAA).

Proposals must be submitted electronically via the Defense SBIR/STTR Innovation Portal (DSIP) and include six volumes: (1) DoD Proposal Cover Sheet with technical abstract, (2) Technical Volume with key personnel information and Phase I Statement of Work outline not to exceed 20 pages for most topics, (3) Cost Volume with itemized justification for materials, labor, travel, subcontracts, and consultants, (4) Company Commercialization Report, (5) Supporting Documents including DD Form 2345 for export-controlled topics, and (6) Fraud, Waste, and Abuse Training certification completed prior to submission. All proposals must not exceed $180,000 and 6-month performance periods. The document outlines 20 Air Force topics ranging from digital twins of legacy aircraft to chip-scale resonant sensors, with specific topics (AF242-0010 and AF242-0011) requiring certified DD Form 2345 Militarily Critical Technical Data Agreements at initial proposal submission or facing disqualification. Minimum two-thirds of research and analytical effort must be performed by the awardee, measured by direct and indirect costs excluding profit. All R&D work must be performed in the United States unless specifically approved by the awarding Funding Agreement Officer. The Air Force will evaluate proposals within approximately 90 calendar days of solicitation close, with Phase I awardees eligible for Phase II proposals at the Air Force's discretion based on technical progress. Awards are anticipated as Firm-Fixed-Price contracts, though awardees are encouraged to pursue Defense Contract Audit Agency (DCAA)-approved accounting systems for future DoD competition. Proposals submitted by firms with majority ownership by multiple venture capital, hedge fund, or private equity firms are ineligible.

View the file

Other files

File Type Posted
SF242-D025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VERSION 3

DEPARTMENT OF THE AIR FORCE

24.2 SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE I

PROPOSAL SUBMISSION INSTRUCTIONS

The Air Force intends these Phase I proposal submission instructions to clarify the Department of

Defense (DoD) Broad Agency Announcement (BAA) as it applies to the topics solicited herein.

Offerors must ensure proposals meet all requirements of the SBIR 24.2 BAA posted on the

Defense SBIR/STTR Innovation Portal (DSIP) at the proposal submission deadline date/time.

Applicants are encouraged to thoroughly review the DoD Program BAA and register for the DSIP

Listserv to remain apprised of important programmatic and contractual changes.

• The DoD Program BAA is located at: https://www.defensesbirsttr.mil/SBIR-

STTR/Opportunities/#announcements. Be sure to select the tab for the appropriate BAA cycle.

Please ensure all e-mail addresses listed in the proposal are current and accurate. The DAF is not responsible for ensuring notifications are received by firms changing mailing address/e-mail address/company points of contact after proposal submission without proper notification to the DAF. If changes occur to the company mail or email addresses or points of contact after proposal submission, the information must be provided to the AF SBIR/STTR One Help Desk. The message shall include the subject line, “24.2 Address Change”.

Points of Contact:

General information related to the AF SBIR/STTR program and proposal preparation instructions, contact the AF SBIR/STTR One Help Desk at usaf.team@afsbirsttr.us. All applicants have ample opportunity to request clarifying information. The DAF encourages applicants to request clarifying information as early as possible, as delays in such requests constrain the DAF’s ability to provide satisfactory resolution to applicant concerns.

• Questions regarding the DSIP electronic submission system, contact the DoD SBIR/STTR

Help Desk at dodsbirsupport@reisystems.com.

• For technical questions about the topics during the pre-announcement and open period, please reference the DoD SBIR 24.2 BAA.

• Air Force SBIR/STTR Contracting Officer (CO):

o Mr. Daniel J. Brewer, Daniel.Brewer.13@us.af.mil

General information related to the AF Small Business Program can be found at the AF Small Business website, http://www.airforcesmallbiz.af.mil/. The site contains information related to contracting opportunities within the AF, as well as business information and upcoming outreach events. Other informative sites include those for the Small Business Administration (SBA), www.sba.gov, and the

Procurement Technical Assistance Centers (PTACs), http://www.aptacus.us.org. These centers provide

Government contracting assistance and guidance to small businesses, generally at no cost.

PHASE I PROPOSAL SUBMISSION

The DoD SBIR 24.2 Broad Agency Announcement, https://www.dodsbirsttr.mil/submissions/login, includes all program requirements. Phase I efforts should address the feasibility of a solution to the selected topic’s requirements.

PHASE I PROPOSAL FORMAT

Complete proposals must include all of the following:

Volume 1: DoD Proposal Cover Sheet https://www.defensesbirsttr.mil/SBIR-STTR/Opportunities/%23announcements.

https://www.defensesbirsttr.mil/SBIR-STTR/Opportunities/%23announcements.

mailto:usaf.team@afsbirsttr.us mailto:dodsbirsupport@reisystems.com http://www.airforcesmallbiz.af.mil/ http://www.sba.gov/ http://www.aptacus.us.org/

Note: If selected for funding, the proposal’s technical abstract and discussion of anticipated benefits will be publicly released. Therefore, do not include proprietary information in this section.

Volume 2: Technical Volume

Volume 3: Cost Volume

Volume 4: Company Commercialization Report

Volume 5: Supporting Documents

Volume 6: Fraud, Waste, and Abuse Training

DoD PROPOSAL COVER SHEET (VOLUME 1)

Complete the proposal Cover Sheet in accordance with the instructions provided via DSIP. The technical abstract should include a brief description of the program objective(s), a description of the effort, anticipated benefits and commercial applications of the proposed research, and a list of key words/terms. The technical abstract of each successful proposal will be submitted to the Office of the Secretary of Defense

(OSD) for publication and, therefore, must not contain proprietary or classified information.

TECHNICAL VOLUME (VOLUME 2):

The Technical Volume should include all graphics and attachments but should not include the Cover

Sheet, which is completed separately as Volume 1. The Phase I technical volume (uploaded in Volume 2) shall contain the required elements found below. Ensure that all graphics are distinguishable in black and white.

The Phase I Technical Volume page/slide limits identified for the topics do not include the Cover Sheet, Cost Volume, Cost Volume Itemized Listing (a-h). The Technical Volume must be no smaller than 10-point on standard 8-1/2" x 11" paper with one-inch margins. Only the Technical Volume and any enclosures or attachments count toward the page limit. In the interest of equity, pages/slides in excess of the stated limits will not be reviewed. The documents required for upload into Volume 5, “Other”, do not count toward the specified limits.

These instructions supplement the 24.2 SBIR BAA. In addition to the requirements found in the 24.2

SBIR BAA, applicants are required to provide the following information in Volume 2:

Key Personnel: Identify in the Technical Volume all key personnel who will be involved in this project;

include information on directly related education, experience, and citizenship.

• A technical resume of the principal investigator, including a list of publications, if any, must be included. Only one principal investigator/project manager can be designated to a proposal at any given time.

• Concise technical resumes for subcontractors and consultants, if any, are also useful.

• Identify all U.S. permanent residents to be involved in the project as direct employees, subcontractors, or consultants.

• Identify all non-U.S. citizens expected to be involved in the project as direct employees, subcontractors, or consultants. For all non-U.S. citizens, in addition to technical resumes, please provide countries of origin, the type of visa or work permit under which they are performing and an explanation of their anticipated level of involvement on this project, as appropriate. Additional information may be requested during negotiations in order to verify the foreign citizen’s eligibility to participate on a contract issued as a result of this announcement. Note: Do not upload information such as Permanent Resident Cards (Green Cards), birth certificates, Social

Security Numbers, or other PII to the DSIP system.

Phase I Statement of Work Outline

NOTE: The DAF uses the work plan outline as the initial draft of the Phase I Statement of Work (SOW).

Therefore, do not include proprietary information in the work plan outline. To do so will necessitate a request for revision, if selected, and may delay award.

Include a work plan outline in the following format:

Scope: List the effort’s major requirements and specifications.

Task Outline: Provide a brief outline of the work to be accomplished during the Phase I effort.

Milestone Schedule

Deliverables

Progress reports

Final report with SF 298

COST VOLUME (VOLUME 3)

Cost information should be provided by completing the Cost Volume in DSIP and including the Cost

Volume Itemized Listing specified below. The Cost Volume detail must be adequate to enable Air Force personnel to determine the purpose, necessity and reasonability of each cost element. Provide sufficient information (a.-g. below) regarding funds use. The DSIP Cost Volume and Itemized Cost Volume

Information will not count against the specified page limit. The itemized listing also may be submitted in

Volume 5 under the “Other” dropdown option.

a. Direct Cost Materials: Justify costs for materials, parts, and supplies with an itemized list containing types, quantities, prices and where appropriate, purpose. Material costs may include the costs of such items as raw materials, parts, subassemblies, components, and manufacturing supplies.

b. Other Direct Costs: This category includes, but is not limited to, specialized services such as machining, milling, special testing or analysis, and costs incurred in temporarily using specialized equipment. Proposals including leased hardware must include an adequate lease v. purchase justification.

c. Direct Labor: Identify key personnel by name, if possible, or by labor category, if not. Direct labor hours, labor overhead and/or fringe benefits, and actual hourly rates for each individual are also necessary for the CO to determine whether these hours, fringe rates, and hourly rates are fair and reasonable.

d. Travel: Travel costs must relate to project needs. Break out travel costs by trip, number of travelers, airfare, per diem, lodging, etc. The number of trips required, as well as the destination and purpose of each, should be reflected. Recommend budgeting at least one trip to the Air Force location managing the contract.

e. Subcontracts: Involvement of university or other consultants in the project’s planning and/or research stages may be appropriate. If so, describe in detail and include information in the Cost Volume. The proposed total of consultant fees, facility lease/usage fees, and other subcontract or purchase agreements may not exceed one-third of the total contract price or cost (do not include profit in the calculation), unless otherwise approved in writing by the CO. The SBIR funded work percentage calculation considers both direct and indirect costs after removal of the SBC’s proposed profit. Support subcontract costs with copies of executed agreements. The documents must adequately describe the work to be performed. At a minimum, include a Statement of Work (SOW) with a corresponding detailed Cost Volume for each planned subcontract.

f. Special Tooling, Special Test Equipment, and Material: The inclusion of equipment and materials will be carefully reviewed relative to need and appropriateness to the work proposed. Special tooling and special test equipment purchases must, in the CO’s opinion, be advantageous to the Government and relate directly to the effort. These toolings or equipment should not be of a type that an offeror would otherwise possess in the normal course of business. These may include items such as innovative instrumentation and/or automatic test equipment.

g. Consultants: Provide a separate agreement letter for each consultant. The letter should briefly state what service or assistance will be provided, the number of hours required, and the hourly rate.

NOTE: If no exceptions are taken to an offeror’s proposal, the Government may award a contract without negotiations. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. If there are questions regarding the award document, contact the Phase I

CO identified on the cover page. The Government reserves the right to reopen negotiations later if the CO determines doing so to be necessary.

COMPANY COMMERCIALIZATION REPORT (VOLUME 4)

Completion of the CCR as Volume 4 of the proposal submission in DSIP is required. Please refer to the

DoD SBIR 24.2 BAA for full details on this requirement. Information contained in the CCR will not be considered by the Air Force during proposal evaluations.

SUPPORTING DOCUMENTS VOLUME (VOLUME 5)

The following documents may be required if applicable to your proposal:

1. DD Form 2345: For proposals submitted under export-controlled topics, either International

Traffic in Arms or Export Administration Regulations (ITAR/EAR), a copy of the certified DD

Form 2345, Militarily Critical Technical Data Agreement, or evidence of application submission must be included. The form, instructions, and FAQs may be found at the United States/Canada

Joint Certification Program website, http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP/DD23

45Ins tructions.aspx. DD Form 2345 approval will be required if proposal if selected for award.

a. Topics AF242-0010, AF242-0011 ONLY: the certified and completed DD Form 2345, Military Critical Technical Data Agreement, must be included with the initial proposal submission. Proposals that do not include this document will be disqualified..

2. Verification of Eligibility of Small Business Joint Ventures (Attachment 3 to the DOD SBIR 24.2

BAA)

3. Technical Data Rights Assertions (if asserting data rights restrictions)

FRAUD, WASTE, AND ABUSE TRAINING (VOLUME 6)

Note that the FWA Training must be completed prior to proposal submission. When training is complete and certified, DSIP will indicate completion of the Volume 6 requirement. The proposal cannot be submitted until the training is complete.

DISCRETIONARY TECHNICAL AND BUSINESS ASSISTANCE (TABA)

The Air Force does not participate in the Discretionary Technical and Business Assistance (TABA)

Program. Proposals submitted in response to DAF topics shall not include TABA.

AIR FORCE PROPOSAL EVALUATIONS

Proposals will be evaluated for overall merit in accordance with the criteria discussed in the 24.2

BAA. DAF is seeking varying technical/scientific approaches and/or varying and new technologies that would be responsive to the problem statement(s) and area(s) of interest in the topic. Multiple procurements are planned and anticipated to be awarded as a result of the topic, each proposal is considered a separate procurement and will be evaluated on its own merit, and that the Government may award all, some, or none of the proposals. Any per-award or per-topic funding caps are budgetary estimates only, and more or less funding may become available. Funding decisions are made with complete disregard to the other awards under the same topic.

In accordance with Section 4 of the SBIR and STTR Extension Act of 2022, the DAF will review all proposals submitted in response to this BAA to assess security risks presented by small business concerns seeking a Federally funded award. The DAF will use information provided by the small business concern in response to the Disclosure of Foreign Affiliations or Relationships to Foreign Countries and the proposal to conduct a risk-based due diligence review on the cybersecurity practices, patent analysis, employee analysis, and foreign ownership of a small business concern, including the small business concern and employees of the small business concern to a foreign country, foreign person, foreign affiliation, or foreign entity. The DAF will also assess proposals utilizing open-source analysis and analytical tools, for the nondisclosures of the information set forth in 15 U.S.C. 638(g)(13). If DAF assesses that a small business concern has security risk(s), DAF will review the proposal, the evaluation, and the security risks and may decide not to select the proposal for award based upon a totality of the review.

MAJORITY OWNERSHIP IN PART BY MULTIPLE VENTURE CAPITAL, HEDGE FUND,

AND PRIVATE EQUITY FIRMS

Small business concerns that are owned in majority part by multiple venture capital operating companies

(VCOCs), hedge funds, or private equity funds are not eligible to submit applications or receive awards for DAF Topics.

PERFORMANCE OF WORK REQUIREMENTS AND LOCATION OF WORK

For Phase I, a minimum of two-thirds of the research or analytical effort must be performed by the

Awardee. The DAF measures percentage of work by both direct and indirect costs, not including profit.

Occasionally, the DAF will consider deviations from this performance of work requirement. Requests for

Performance of Work deviations must be made twice: prior to submission during the topic open period and as part of the initial proposal submission. For requests prior to the initial proposal submission, the DAF will consider the request and approve or disapprove requesting applicants to proceed with DSIP submission. Upon proposal receipt, the DAF will again consider such requests for approval for the resultant award.

All R/R&D work must be performed in the United States. Based on a rare and unique circumstance, the

DAF may approve a particular portion of the R/R&D work to be performed or obtained in a country outside of the United States. The awarding Funding Agreement officer must approve each specific condition in writing. Applicants seeking this approval must make such a request with their initial proposal submission. The DAF will not consider these requests prior to proposal submission.

DAF USE OF SUPPORT CONTRACTORS

Restrictive notices notwithstanding, proposals may be handled for administrative purposes only, by support contractors. These support contractors may include, but are not limited to TEC Solutions, Inc., APEX, Oasis Systems, Riverside Research, Peerless Technologies, HPC-COM, Mile Two, Montech, Wright Brothers Institute, and MacB (an Alion Company). In addition, only Government employees and technical personnel from Federally Funded Research and Development Centers (FFRDCs) MITRE and

Aerospace Corporations working under contract to provide technical support to AF Life Cycle

Management Center and Space and Missiles Centers may evaluate proposals. All support contractors are bound by appropriate non-disclosure agreements. Contact the AF SBIR/STTR CO Daniel J. Brewer

(Daniel.Brewer.13@us.af.mil) with concerns regarding the use of support contractors.

mailto:Daniel.Brewer.13@us.af.mil

PROPOSAL STATUS AND FEEDBACK

The Principal Investigator (PI) and Corporate Official (CO) indicated on the Proposal Cover Sheet will be notified by e-mail regarding proposal selection or non-selection. Small Businesses will receive a notification for each proposal submitted. Please read each notification carefully and note the Proposal

Number and Topic Number referenced.

Automated feedback will be provided for Phase I proposals designated Not Selected. Additional feedback may be provided at the sole discretion of the DAF.

IMPORTANT: Proposals submitted to the DAF are received and evaluated by different organizations, handled by topic. Each organization operates within its own schedule for proposal evaluation and selection. Updates and notification timeframes will vary. If contacted regarding a proposal submission, it is not necessary to request information regarding additional submissions. Separate notifications are provided for each proposal.

The Air Force anticipates that all proposals will be evaluated and selections finalized within approximately 90 calendar days of solicitation close. Refrain from contacting the BAA CO for proposal status before that time.

Refer to the DoD SBIR Program BAA for procedures to protest the Announcement.

As further prescribed in FAR 33.106(b), FAR 52.233-3, Protests after Award should be submitted to: Air

Force SBIR/STTR Contracting Officer Daniel J. Brewer, Daniel.Brewer.13@us.af.mil.

AIR FORCE SUBMISSION OF FINAL REPORTS

All Final Reports will be submitted to the awarding DAF organization in accordance with Contract instructions. Companies will not submit Final Reports directly to the Defense Technical Information

Center (DTIC).

PHASE II PROPOSAL SUBMISSIONS

DAF organizations may request Phase II proposals while Phase I technical performance is ongoing or at any time after the conclusion of the period of performance. This decision will be based on the awardee’s technical progress, as determined by an DAF Technical Point of Contact review using the Phase II review criteria outlined above.

Phase II is the demonstration of the technology found feasible in Phase I. Only Phase I awardees are eligible to submit a Phase II proposal. All Phase I awardees will be sent a notification with the Phase II proposal submittal date and detailed Phase II proposal preparation instructions. If the physical or email addresses or firm points of contact have changed since submission of the Phase I proposal, correct information shall be sent to the DAF SBIR/STTR One Help Desk. Phase II dollar values, performance periods, and proposal content will be specified in the Phase II request for proposal.

NOTE: The DAF primarily makes SBIR Phase I and II awards as Firm-Fixed-Price contracts. However, awardees are strongly urged to work toward a Defense Contract Audit Agency (DCAA)-approved accounting system. If the company intends to continue work with the DoD, an approved accounting system will allow for competition in a broader array of acquisition opportunities, including award of

Cost-Reimbursement types of contracts. Please address questions to the Phase II CO, if selected for award.

All proposals must be submitted electronically via DSIP by the date indicated in the Phase II proposal instructions. Note: Only ONE Phase II proposal may be submitted for each Phase I award.

AIR FORCE SBIR/STTR PROGRAM MANAGEMENT IMPROVEMENTS

The DAF reserves the right to modify the Phase II submission requirements. Should the requirements change, all Phase I awardees will be notified. The DAF also reserves the right to change any administrative procedures that will improve management of the DAF SBIR/STTR Program at any time.

Department of the Air Force SBIR 24.2 Phase I Topic Index

Topic

Number

Topic Name

Maximum

Value*

Maximum

Duration**

Technical

Volume

Page

Limit***

AF242-0001 Creating a digital twin of legacy aircraft $180,000.00 6 20

AF242-0002 Modeling and simulation of large scale deployments of autonomous systems

$180,000.00 6 20

AF242-0003 Acoustic Recorders for Persistent High-

Altitude Sensing

$180,000.00 6 20

AF242-0004 Intelligent Traffic Management System

(ITMS)

$180,000.00 6 20

AF242-0005 Next Generation Field Calibration Suite for

Radiometric Sensors

$180,000.00 6 20

AF242-0006 Fast-Response Flow Meters for Onboard

Systems (Harsh Chemicals)

$180,000.00 6 20

AF242-0007 Rotor High Speed Imaging System $180,000.00 6 20

AF242-0008 Fire Ignition Video Analysis Tool $180,000.00 6 20

AF242-0009 Graphene CBRN Overgarment $180,000.00 6 20

AF242-0010 All-Passive Nonreciprocal Power Limiters $180,000.00 6 20

AF242-0011 Chip scale resonant sensors $180,000.00 6 20

AF242-0013 Outer Mold Line Material Condition Probe $180,000.00 6 20

SF242-0014

Topic moved to solicitation

24.B as topic

SF24B-T011

Into the Wild-Transitioning Basic Rsh Algs to Ops

Topic moved to solicitation 24.B as topic

SF24B-T011

$180,000.00

Topic moved to solicitation

24.B as topic

SF24B-

T011

Topic moved to solicitation

24.B as topic

SF24B-

T011

Topic moved to solicitation

24.B as topic

SF24B-

T011

SF242-0015 Programmability of Regional and/or Local

Multi-Source PNT for Joint All-Domain

Operations

$180,000.00 6 20

SF242-0016 Neuromorphic Camera for Space Domain

Awareness

$180,000.00 6 20

SF242-0017 Cover glass solutions $180,000.00 6 20

SF242-0018 Neon recovery and reliquefication for low temperature characterization of infrared focal plane arrays

$180,000.00 6 20

SF242-0019 Hydrogenation for defect passivation in

(Si)GeSn alloys

$180,000.00 6 20

SF242-0020 Exploring Proliferated Warfighter Space

Architecture (PWSA)

$180,000.00 6 20

*Proposals that exceed this amount will be disqualified.

**Proposals that exceed this duration will be disqualified.

***Pages/slides in excess of this count will not be considered during evaluations.

AF242-0001 TITLE: Creating a digital twin of legacy aircraft

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Advanced Computing and Software; Integrated

Sensing and Cyber; Trusted AI and Autonomy; Integrated Network System-of-Systems

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR

Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

OBJECTIVE: The topic objective is to develop a faster, more cost-effective way to integrate new equipment at the system design/digital engineering level by creating a digital twin of the B-52H legacy aircraft system. This digital twin will include CAD models and SysML models, and be connectable to various models in different systems. The end state of this project is to have a digital engineering environment that is dynamically connected to an accredited simulation environment, enabling seamless integration of digital engineering models with other systems/products.

To achieve this objective, applicants are asked to propose a solution for creating a digital twin of a legacy system.

DESCRIPTION: The end state is to solicit industry for innovative approaches of designing Digital Twin

(CAD and SysML files) for the B-52, a legacy aircraft that is planned to continue in service through the

2050's. AFGSC is interested in commercial solutions that develop the CAD and SysML baseline models for the B-52H so that future Non Recurring Engineering costs can be reduced over time as future concepts and systems are developed. This topic is designed to generate demonstrable success with model development, and build momentum with the ultimate success being follow on contract awards to completely develop and integrate these models into digital engineering and accredited digital simulation environments. Any data developed during this project will be government-owned, and that the government will have unlimited rights to use, modify, reproduce, release, perform, display, or disclose such technical data or computer software.

PHASE I: Awardee(s) will define a system concept, perform a feasibility study, and propose an solution for creating a digital twin of the B-52 legacy system. The developed CAD and SysML models developed during this project will be government-owned, and that the government will have unlimited rights to use, modify, reproduce, release, perform, display, or disclose such technical data or computer software.

PHASE II: The objective of the Phase II SBIR will be to further develop the digital twin of a legacy aircraft for equipment integration and testing created in Phase I. The project will focus on refining and improving the digital twin, creating a well-defined deliverable prototype that can be used for commercialization.

The project will involve the following steps:

Refinement of the 3D Model

The 3D model of the aircraft created in Phase I will be refined and improved to enhance its accuracy and functionality. This will involve further validation of the model to ensure its accuracy and the addition of new components to improve its functionality.

Integration of New Equipment

The digital twin will be used to simulate the integration of new equipment with the aircraft. The simulation will involve testing the new equipment in different scenarios to identify potential issues and make necessary modifications.

Testing

The digital twin will undergo rigorous testing to ensure its accuracy and functionality. The testing will involve simulating a wide range of scenarios, including extreme weather conditions, equipment failures, and system malfunctions.

Success Criteria

The success criteria for this project will be the creation of a well-defined deliverable prototype that accurately simulates the installation of new equipment and changes to the aircraft's systems. The prototype should be able to simulate a wide range of scenarios, including equipment integration and testing, extreme weather conditions, equipment failures, and system malfunctions, and be validated through comparison to the actual aircraft.

Commercialization Plan

A commercialization plan will be developed to promote the technology and identify potential licensing and partnership opportunities. A marketing strategy will also be developed to reach potential customers and partners. The proposer will have identified potential customers and partners and have a plan to seek additional funding opportunities to continue the development of the digital twin technology and explore other potential applications in the aerospace industry.

Operating Parameters/Prototyping Expectations

The digital twin prototype will be able to simulate a wide range of scenarios, including equipment integration and testing, extreme weather conditions, equipment failures, and system malfunctions. The prototype will be validated through comparison to the actual aircraft, and its accuracy and functionality will be tested in a wide range of scenarios. The prototype will also be tested to ensure its compatibility with different equipment and systems. Additionally, the prototype will be tested for ease of use and user-friendliness.

Conclusion

The success of the Phase II project will result in a well-defined deliverable prototype of the digital twin of a legacy aircraft for equipment integration and testing. The prototype will be able to simulate a wide range of scenarios and be validated through comparison to the actual aircraft. The prototype will provide a safer, more efficient, and cost-effective way to test and integrate new equipment with legacy aircraft.

Finally, the commercialization potential of this project is significant, with a potential market among aerospace companies, government agencies, and military organizations."

PHASE III DUAL USE APPLICATIONS: The objective of the Phase III/Dual Use SBIR project will be to develop and commercialize the digital twin of a legacy aircraft for equipment integration and testing created in Phase II. The project will focus on transitioning the technology to government and commercial applications and achieving a high technology readiness level (TRL).

Expected Phase III Effort

The expected Phase III effort will involve developing and commercializing the digital twin technology for government and commercial applications. The technology will be refined and optimized to meet the specific requirements of these applications. The project will involve collaboration with potential customers and partners to identify their specific needs and develop a plan for commercialization. The project will also involve seeking additional funding opportunities to further develop the technology and explore other potential applications in the aerospace industry.

Expected TRL at Phase III Entry

The expected TRL at Phase III entry is 9, which means the technology is fully developed, tested, and validated in relevant environments. The digital twin will have been tested and validated in a wide range of scenarios, and its accuracy and functionality will have been demonstrated through comparison to the actual aircraft. The technology will be ready for commercialization and deployment.

Additional Transition Planning

The additional transition planning for this Phase III project will involve identifying the government approvals required for the commercialization of the technology. The project team will work closely with the Department of Defense (DoD) to identify any necessary certifications, approvals, or standards that need to be met for the technology to be deployed in military applications. The project team will also work with potential commercial partners to identify any necessary certifications, approvals, or standards required for commercial deployment.

Known Government Approvals Required

The known government approvals required for this project will vary depending on the specific application and customer. However, potential approvals that may be required include certification by the Federal

Aviation Administration (FAA) or the Department of Defense (DoD), compliance with relevant military standards, and approval by the appropriate government agencies.

Additional DAF Customer Opportunities

The additional DAF customer opportunities for this project include potential applications in military and commercial aviation. The digital twin technology can be used to improve the safety and performance of aircraft, reduce risk, save time and money, and increase efficiency. The technology can also be used for training and maintenance, providing a realistic and accurate representation of the aircraft that can improve safety and reduce errors during actual operations. The project team will work closely with potential customers and partners to identify additional opportunities for deployment and commercialization of the digital twin technology.

REFERENCES:

1. GAO-23-106453;

KEYWORDS: Digital twin; Legacy aircraft; Equipment integration; Testing; Virtual model; Accurate data; Physical dimensions; Risk reduction; Accredited digital simulation; Time and money saving;

Realistic representation; Designing CAD; SysML files; B-52; Non Recurring Engineering cost reduction;

Digital engineering; Model development

AF242-0002 TITLE: Modeling and simulation of large scale deployments of autononomous systems

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Trusted AI and Autonomy; Integrated Network

System-of-Systems; Human-Machine Interfaces

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR

Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the

OBJECTIVE: The objective of this topic are:

1) To further progress towards the vision for swarms of UAVs outlined in the USAF Small UAS

Flight Plan (2016-2036) (reference 1) and the DoD Small UAS Capability Description Document

(draft - 2023). Those documents describe the potential mission impact that large numbers of affordable but capable UAVs could have. The Flight Plan also defines key system attributes and technical challenges as well as acquisition strategies that mitigate those challenges.

2) To further progress in this area the focus of this specific topic is on the modeling and simulation of autonomous systems at large scale in activities such as maritime surveillance, base defense, suppressing enemy air defense systems and supporting air operations.

DESCRIPTION: This topic focuses on modeling and simulation (M&S) of large scale deployments of autonomous system in support of military operations. The M&S efforts will use simple models of the platforms and sensors and focus on command and control (C2), communications requirements, collaboration between autonomous systems, tactics, techniques, and procedures (TTPs) and strategies for employment.

The primary driver for these simulations is the development of approaches to decentralized command and control of these systems including collaboration between small groups of autonomous systems with limited communication to higher level controllers.

The decentralized aspect is important because the goal is for autonomous systems to be able to coordinate their activities in small groups while operating under a set of higher level commands.

The initial use cases involve UAVs for maritime surveillance, but the modeling framework should be extensible to other types of autonomous systems. To stress the generality this topic description uses the phrase “drones” to mean any robotic system with some degree of autonomy.

PHASE I: Phase I award(s) will focus on defining architectures and implementation for modeling and simulation of decentralized command and control of autonomous systems at scale. The goals for this effort include defining an approach that aligns with the USAF primary system simulator, AFSIM. Ideally simulations done using the decentralized C2 simulator can be used to guide the higher fidelity simulations done using AFSIM.

Deliverables from this phase would include designs for simulation frameworks with open interfaces enabling developers of C2 and machine learning algorithms to incorporate their software into the simulations.

PHASE II: Phase II award(s) will focus on development and testing of the modeling and simulation environments, adding visualizations, developing common libraries for integration with data feeds, AI/ML and building human interfaces.

PHASE III DUAL USE APPLICATIONS: Collaborative autonomous systems will have a role in public safety, logistics and other commercial activities. Modeling and simulation of these capabilities will be necessary for successful employment. This technology will likely have a large impact on society in the next 5 to 10 years.

Commercial applications for mission planning, command and control and system test and verification would benefit from having a robust modeling and simulation capability.

1. USAF Small UAS Flight Plan (2016-3036) https://apps.dtic.mil/sti/pdfs/AD1013675.pdf;

2. DoD Small UAS Capability Description Document (DOD SUAS CDD);

3. Papers by PLA researchers;

KEYWORDS: UAV;drone;swarm;digital engineering;mbse;model-based systems engineering;autonomy

AF242-0003 TITLE: Acoustic Recorders for Persistent High-Altitude Sensing

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Integrated Sensing and Cyber

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR

Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the

OBJECTIVE: High altitude balloons occupy the ‘middle ground’ between the Earth’s surface and space because they can capture signatures that are difficult to record from either ground stations or satellites.

Over the last decade, acoustic sensors on high altitude balloons have captured a diverse set of phenomena, including rocket launches, aircraft, spacecraft reentry, ground explosions, earthquakes, thunder, wind turbines, and even freight trains.

However, these sensors have consisted of repurposed ground micro barometers that have relatively high intrinsic noise levels. Currently there are no high quality, low size, weight, power and cost (SWaP-C) commercially available acoustic sensors with the required sensitivity and environmental resilience for use in the low atmospheric pressures and extreme temperatures found at high altitudes.

Adding an acoustic sensor to a HAB sensor suite will enable the detection, tracking and identification of ships and aircraft, even when they maintain radio silence, because their acoustic signatures are detectable at long ranges in the stratosphere. Currently, most acoustic recorders used on HABs were designed for use at the Earth’s surface, where wind noise is much greater and therefore intrinsic sensor noise is less important. In contrast, background noise levels is extremely low on free floating balloons, far lower than would ever be realized on the ground.

This effort is related to existing infrasound detectors deployed around the world at ground level for the detection of explosions (chemical and nuclear) as well as seismic events.

DESCRIPTION: The work that would be accomplished in this specific topic would result in a new class of sensor that when deployed on a high altitude balloon (HAB) would enable the detection and tracking of aircraft, ships and other sources with acoustic signatures such as explosions, rocket launches, space object re-entry.

The proposed work would result in a combined acoustic sensor/accelerometer package meant for high altitude balloons. The sensor would be capable of recording faint sound waves emanating from distant sources and utilizing the accelerometer to determine the direction of origin of the signal. This would permit the detection, tracking, and identification of human and natural phenomena such as chemical and nuclear explosions, aircraft, ships, hypersonic objects, meteors, volcanic eruptions, and earthquakes.

Additional diagnostics such as the existence and state of health of infrastructure such as bridges, dams, and industrial facilities could be collected also.

These acoustic sensors are expected to be lightweight with low power requirements. Most of the sensor data processing can be performed at the sensor reducing the data bandwidth requirements.

These sensors could be an important part of the growing interest in HABs for surveillance, electronic warfare, and communications support. Because of their small size, low weight, low power requirements and low cost, combined with their ability to provide information on a wide range of activity and threats, they could be used on almost all HAB platforms. The intent is to make it simple to add the sensor to existing HABs with larger payloads, thereby developing an acoustic network from already-extant constellations. The sensor package could be flown on small, dedicated balloons as well.

PHASE I: In Phase I, awardee(s) will produce a preliminary design with resource requirements, performance, and cost estimates.

Included in the resource requirements are size, weight and power for both the sensor and any on-board processing. To reduce data communication requirements most signal processing will need to be done on board.

The performance estimates include sensitivity and noise level across from infrasound (0.1 Hz) to the lower-mid range of human hearing (1 kHz), as well as the accuracy of direction of arrival measurements.

Cost estimates should include low volume initial production costs as well as estimates for a commercial product.

PHASE II: During Phase II the awardee(s) would complete its preliminary designs from Phase I, develop prototype that can be evaluated in altitude chambers and on short duration high altitude balloon flights and incorporate the results of these tests into low-rate initial production articles for testing. The proposed high altitude platform is the Sandia heliotrope solar hot air balloon, which can deliver a payload of up to 2 kg at the target altitudes for several hours of level flight. This is a standard platform for high altitude infrasound sensing. Multi-day high altitude balloon flights would be used for operational testing of the test articles. The results of the operational testing would be incorporated into designs that would become commercial products under a Phase III award.

Because these devices should be relatively inexpensive and fairly well understood it is reasonable to accomplish this during a Phase II contract.

PHASE III DUAL USE APPLICATIONS: During Phase III the acoustic sensors would become a commercial product available for use by DoD and IC, and potentially our allies, on high altitude balloon flights to refine their concept of operational employment and tactics, techniques and procedures.

The Army and Navy use of high altitude balloons would likely benefit from incorporating acoustic sensors on their platforms.

Having acoustic sensors on multiple high altitude balloons in a region results in better geolocation of targets. Follow-on efforts to develop algorithms for exploiting acoustic data from multiple sources would enhance the utility of this data.

1. Silber, S. A. and Bowman, D. C. (2023). Detection of the Large Surface Explosion Coupling

Experiment by a sparse network of balloon-borne infrasound sensors. MDPI Remote Sensing 15, 542.

2. Bowman, D. C., Rouse, J. W., Krishnamoorthy, S. and Silber, S. A. (2022). Infrasound direction of arrival determination using a balloon-borne aeroseismometer. The Journal of the Acoustical

Society of America – Express Letters 2 (5)

3. Garcia, R. F., Klotz, A., Hertzog, A., Martin, R., Gérier, S., Kassarian, E., Bordereau, J., Venel, S. and Mimoun, D. (2022) Infrasound from large earthquakes recorded on a network balloons in the stratosphere. Geophysical Research Letters 49 (15), e2022GL098844

4. Bowman, D. C. and Albert, S. A. (2018). Acoustic Event Location and Background Noise

Characterization on a Free Flying Infrasound Sensor Network in the Stratosphere. Geophysical

Journal International 213, p. 1524-1535;

KEYWORDS: high altitude balloons;stratospheric sensors;acoustic sensor;infrasound;microbarometer;remote sensing

AF242-0004 TITLE: Intelligent Traffic Management System (ITMS)

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Advanced Computing and Software; Integrated

Sensing and Cyber; Integrated Network System-of-Systems; Human-Machine Interfaces

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR

Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the

OBJECTIVE: The proposed topic is to develop an integrated Intelligent Traffic Management System

(ITMS) that addresses the complex traffic management needs of Joint Base San Antonio (JBSA) and significantly improves the efficiency and security of base access across 502 ABW installations. The

ITMS will seamlessly integrate with our existing infrastructure, providing real-time, automated gate traffic status updates to base personnel and visitors, while minimizing gate congestion, reducing security risks, and improving the overall user experience.

DESCRIPTION: The ITMS will leverage commercial industry best practices, and be capable of handling high-volume traffic during peak hours, as well as the surges in traffic experienced during our Basic

Military Training Graduation ceremonies. By leveraging geolocation technology, the ITMS will guide personnel and visitors to the most efficient gate based not only on their proximity but also on real-time traffic conditions and wait times. This capability will maximize base access efficiency, reduce congestion, and improve satisfaction among base personnel and visitors alike.

In addition, the system will also enhance base security by detecting and reporting attempted pedestrian and wrong-way entrances, providing invaluable input to the Base Defense Operations Center (BDOC), Crisis Action Team (CAT), Command Post (CP), and Public Affairs (PA).

The ITMS needs to be accessible through the JBSA App or similar API, and will integrate with the AF

Connect application. The system will also ensure compatibility with our existing traffic management systems, such as DBIDS and Cameras, facilitating seamless integration and a more efficient traffic management process.

Finally, the ITMS will be compliant with DoD Cybersecurity Policies, including RMF, NIST 800-53 and

800-171 and incorporate effective user management capabilities, allowing us to establish separate permissions for JBSA personnel and visitors, thereby ensuring appropriate Force Protection. With the capacity to identify or utilize AF Connect for data storage, the system will handle high volumes of traffic data securely and efficiently, enhancing the overall effectiveness and operational security of our base."

PHASE I: The principal objective of Phase I is to gauge the scientific and technical value and feasibility of the proposed Intelligent Traffic Management System (ITMS) within the operational environment of

Joint Base San Antonio (JBSA). This phase involves a rigorous review and evaluation of existing technologies, with the aim of identifying viable solutions that can address the specific needs of JBSA.

Key aspects of this evaluation include real-time traffic management, geolocation-based direction, integration with existing systems, and security enhancements.

Following the comprehensive technology evaluation, the phase moves towards conceptualizing the ITMS.

This involves designing a preliminary model that aligns with JBSA's unique needs, incorporating critical features like real-time traffic reporting, geolocation services, pedestrian and wrong-way detection, as well as seamless integration with systems like DBIDS, Cameras, and platforms such as JBSA App and AF

Connect. The culmination of this phase will be a thorough feasibility analysis of the preliminary ITMS design, providing vital insights for Phase II development.

Examples of information included in the feasibility study:

Current Commercial Solutions Evaluation: The initial part of the project will involve conducting a thorough review of existing traffic management solutions to understand their capabilities and limitations, and to see how they can be applied to JBSA's specific needs.

Requirement Mapping and Technology Evaluation: The project team will match the specific requirements of JBSA to potential technologies that could be part of the ITMS. This step will help identify the best technologies for the project and highlight any areas that might need custom solutions.

Conceptualization and Preliminary Design: A preliminary design for the ITMS will be developed based on the requirements and the identified technologies. This design will include key features like real-time traffic reporting, integration with existing systems like DBIDS, Cameras, and security measures like pedestrian/wrong-way detection.

Feasibility Analysis: An in-depth feasibility analysis will be conducted to identify potential barriers and risks, assess economic viability, and ensure that the design is in alignment with JBSA's operational practices and timelines.

Use Cases: The project will consider various use cases,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .