View the file

Other files

File Type Posted
36C26221Q0104 0001_1.docx DOCX document
WAGE DETERMINATION RATES SCA WDN 2015-5614 REVISION 16.pdf PDF
36C26221Q0104_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. DUNS: DUNS+4:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 73

36C26221Q0104 11-10-2020

NICHOLS, CECIL S. (562) 766-2267 12-01-2020

10AM PST

36C262

DEPARTMENT OF VETERANS AFFAIRS

Network Contracting Office (NCO) 22

4811 Airport Plaza Drive, Suite 600

Long Beach CA 90815

X 100

X

Y

811219

$22 Million

N/A

X

36C691

VA GREATER LOS ANGELES HEALTHCARE SYSTEM

11301 Wilshire Blvd

Los Angeles CA 90073-1003

36C262

Network Contracting Office (NCO) 22

4811 Airport Plaza Drive, Suite 600

Long Beach CA 90815

Financial Services Center

P.O. Box 149971

Austin TX 78714-9971

1-877-353-9791

See CONTINUATION Page

Tri-Annual PMI, Testing, and Certification of Electrical

Switchgear, VA Greater Los Angeles Healthcare System

LOCATION: 11301 Wilshire Blvd, Los Angeles CA 90073

SOLICITATION IS 100% SDVOSB set-aside IAW Public Law 109-461

38 U.S.C. Section 8127

JOB WALK / RFI SUSPENSE - SEE SOLICITATION RFQ

This is a Request for Quote (RFQ)

Quote Suspense: Tuesday, 12/01/2020 NLT 10:00AM Pacific

Applicable NAICS Code: 811219

Small Business Size Standard: $22 Million

Quotes shall be submitted (PDF files only) via email to:

CECIL NICHOLS, Contracting Officer at cecil.nichols@va.gov

This is a Firm-Fixed-Price solicitation; submit pricing on

Price/Cost Schedule.

Applicable Wage Determination Rates:

WAGE DETERMINATION RATES SCA WDN 2015-5614 REVISION 16

See CONTINUATION Page

X X

X 1

NICHOLS, CECIL S.

mailto:cecil.nichols@va.gov

36C26221Q0104

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 52.237-1 SITE VISIT (APR 1984)

B.3 NOTIFICATION TO OFFERORS

B.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)

B.5 Final STATEMENT OF WORK (SOW)

B.6 PRICE/COST SCHEDULE

ITEM INFORMATION

B.7 DELIVERY SCHEDULE

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT

2018)

C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (AUG 2020)

C.3 52.219-13 NOTICE OF SET-ASIDE OF ORDERS (MAR 2020)

C.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (MAR 2020)

C.5 52.219-27 NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL

BUSINESS SET-ASIDE (MAR 2020)

C.6 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

C.7 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA

ACQUISITION OF COMMERCIAL ITEMS (APR 2020)

C.8 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)

C.9 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

C.11 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

C.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

D.1 WAGE DETERMINATION RATES SCA WDN 2015-5614 REVISION 16

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JUN 2020) ..47

E.2 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL ITEMS (AUG 2020)

E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

E.4 52.216-1 TYPE OF CONTRACT (APR 1984)

E.5 52.233-2 SERVICE OF PROTEST (SEP 2006)

E.6 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(OCT 2018)

E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C262 NICHOLS, CECIL S.

Network Contracting Office (NCO) 22

4811 Airport Plaza Drive, Suite 600

Long Beach CA 90815

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] UPON COMPLETION OF JOB WITH APPROVED

INVOICE

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment

Requests.

DEPARTMENT OF VETERANS AFFAIRS

Financial Services Center

P.O. Box 149971

Austin TX 78714-9971

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 52.237-1 SITE VISIT (APR 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

An organized site visit has been scheduled for –

Tuesday, November 17, 2020 at 8:00AM Pacific local

Interested Participants will meet at –

VA Greater Los Angeles Healthcare System located at 11301 Wilshire Blvd, Los

Angeles, CA 90073. Meet in front of Building 63.

Request for Information (RFI) suspense –

Deadline for Request for Information (RFI) Submission is Tuesday, November 18, 2020 NLT 10:00AM Pacific local time. Telephone inquiries will not be accepted.

Request for Quote (RFQ) suspense –

Tuesday, December 1, 2020 NLT 10:00AM Pacific local via email to cecil.nichols@va.gov

(End of Provision)

B.3 NOTIFICATION TO OFFERORS

The following provisions are incorporated into 52.212-1 as an addendum:

1. GENERAL INSTRUCTIONS FOR QUOTE SUBMISSIONS

a. Period of Acceptance of Offers. The Offeror agrees to hold prices in its offer firm for a period of thirty (30) calendar days from the date specified for the receipt of offers.

b. Submitting your quote: Quotes are due on Tuesday, December 1, 2020 NLT 10:00AM Pacific local time. Submit your company’s quote by responding to this RFQ via email only to Cecil S.

Nichols, Contracting Officer at cecil.nichols@va.gov. All quotes/attachments in response to this RFQ shall be in Adobe PDF or Microsoft Office Word Format. It is the offeror’s responsibility to confirm that all required documents are included and received by the solicitation due / suspense date.

c. Inquiry or questions: Suspense for RFIs is Tuesday, November 18, 2020 NLT 10:00AM Pacific local time. Submit RFIs to this RFQ via email only to Cecil S. Nichols, Contracting Officer at cecil.nichols@va.gov.Telephone inquiries will not be accepted.

2. REQUIREMENTS FOR SUBMITTAL: The following sub-sections are the requirements to be submitted by the offeror.

a. Offeror must provide a cover sheet to include the following:

b. Solicitation No. 36C26221Q0104.

c. Company’s name, address, point-of-contact, phone number, email address.

d. DUNS number.

e. Page 1 - SF1449, block 30(a), 30(b) and 30(c).

f. Page 3 - Section B.1(1)(a) Contract Administration Data and paragraph 5 Acknowledgement of

Amendments – SF 30(s), if any, blocks 15A, 15B and 15C completed.

g. Offerors shall complete and submit the Price Schedule in section B.

h. To assist the Contracting Officer in making the determination of responsibility, offerors must provide the following document(s) with their quotes:

1) Contractor’s Business License issued by a U.S. State or Territory in accordance with the current provisions of the State or Territory.

(End of Clause)

B.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(1) Basis of Award. This procurement is being conducted pursuant to FAR Part 13 procedures. Award will be made to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government. Offeror quotes will be evaluated in the following manner. Lowest-priced and special standards of responsibility are the only factors that will be used to evaluate offers (see FAR Provision 52.212-2). The lowest-priced offeror will be evaluated to determine if the quoted price exceeds the amount of funding available for the procurement. If the offered price does not exceed the amount of funding available for the procurement, the quoted price will be evaluated to determine if it is reasonable. If the offered price and special standards of responsibility are found to be reasonable, the offeror who submitted this quote will be identified as the “successful offeror.”

The Contracting Officer will then determine if the successful offeror is responsible using the general standards of responsibility applicable to this procurement. If contract award cannot be made to the successful offeror, the Contracting Officer will evaluate the next lowest-priced offeror following the procedures described above. This process will continue until a contract award can be made or the Contracting Officer determines that no contract award can be made.

The Contracting Officer may find all offeror quotes not acceptable and cancel the solicitation if the lowest-priced offeror exceeds the amount of funding available for the procurement. The

Contracting Officer may likewise find an offeror under evaluation, as well as all remaining offerors, not acceptable and cancel the solicitation if the offered quote currently under evaluation exceeds the amount of funding available for the procurement. The Government intends to evaluate offerors and award a contract without discussions. However, the Government reserves the right to conduct discussions at any time if determined by the Contracting Officer to be in the Government’s best interest. In addition to the General Standards of Responsibility found in FAR 9.104-1 and in accordance with FAR 9.104-2, the following Special Standard of Responsibility applies to this procurement. Offerors who fail to meet the Special Standards of Responsibility will not be eligible to receive contract award.

(2) Special Standards of Responsibility. The following special standards of responsibility apply to this procurement:

SP1: Contractor’s License issued by a U.S. State or Territory in accordance with the current provisions of the State or Territorial Business and Professions Code. Submit with offer.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the

Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of Provision)

B.5 Final STATEMENT OF WORK (SOW)

TRI-ANNUAL PMI, TESTING, AND CERTIFICATION OF

ELECTRICAL SWITCHGEAR

VA GREATER LOS ANGELES HEALTHCARE SYSTEM

1 TITLE:

Tri-Annual PMI, Testing, and Certification of Electrical Switchgear.

2 PLACES OF PERFORMANCE:

The VA Greater Los Angeles Healthcare System (VAGLAHCS) includes:

VA West Los Angeles Healthcare System (VAWLAHCS)

11301 Wilshire Blvd

Los Angeles, CA 90073-1003

VA Sepulveda Ambulatory Care Center (VASACC)

16111 Plummer Street

North Hills, CA 91343

VA Los Angeles Ambulatory Care Center (VALAACC)

351 E. Temple Street

Los Angeles, CA 90012

3 PERIOD OF PERFORMANCE:

Thirty (30) Calendar Days.

4 CONTRACT TYPE:

Firm Fixed Price (FFP).

5 BACKGROUND:

Requirement is for Tri-Annual PMI, Testing, and Certification of electrical switchgear for the

VA Greater Los Angeles Healthcare System per NETA standards, The Joint Commission

(TJC), and VA Directive 1028.

6 OBJECTIVES / SCOPE:

6.1 Contractor shall provide all manner, means, methods, equipment, expertise, incidentals, labor, materials, parts, services, supervision, supplies, tools, transportation, and qualified personnel necessary to perform tri-annual PMI, testing, and certification of electrical switchgear per NETA standards, TJC, and VA Directive 1028 in accordance / compliance with current codes, directives, regulations, industry guidelines / standards, and Statement of Work (SOW) at/for the VA Greater Los Angeles Healthcare System.

Testing shall conform to NETA standards and shall consist of cleaning, lubricating, and calibrating circuit breakers, protective relays, and any associated distribution equipment, including cleaning of all de-energized components, compartments, surfaces of the switchgear and related equipment.

6.2 Before commencement of work, the Contractor shall confer with the VA COR to agree on a sequence of procedures and means of access to premises and building. All work performed shall be made with minimal interference to Government operations and personnel as these are active hospital campuses.

6.3 Records of the “as found” and the “as left” condition shall be provided in a binder.

Three (3) copies of the test reports shall be provided to the VA POC within 30 calendar days of the completion of the testing. A summary of deficiencies and recommendations shall be included with the test report.

6.4 Contractor shall perform electrical testing on 4160 transformers / circuit breakers by performing transformer Turns Ratio Test (TTR) and HiPot testing, all 480V circuit breakers, cleaning and lubrication, tightening all bussing and breaker connections, calibration and testing for correct voltage within GE relays. VAWLAHCS has four

(4) Buildings – 299, 304, 500 and 501; VASACC has two (2) substation locations;

and VALAACC has one (1) substation.

Specifically, the Contractor is required to perform the following to each of the electrical equipment:

FP5000 Protective Relays

I. Visual & Mechanical Inspection

1) Compare equipment nameplate data with drawings and specifications.

2) Inspect relays and cases for physical damage.

3) Verify the unit is clean.

4) Relay case

a) Tighten case connections.

b) Inspect cover for correct gasket seal.

c) Clean cover glass. Inspect shorting hardware, connections paddles, and knife switches, if applicable.

d) Remove any foreign material from case.

e) Verify target reset.

5) Relay

a) Inspect relay for foreign material, particularly in disk slots of the damping and electromagnets, if applicable.

6) Verify the relay settings are in accordance with the coordination study.

Functional Tests (Relays)

51 Time Overcurrent Relay

1) Determine minimum pickup.

2) Determine time delay at least two points on the time current curve

50 Instantaneous Overcurrent Relay

1) Determine pickup.

2) Determine dropout.

3) Determine time delay.

Protective Relays (Electromechanical & Solid State)

I. Visual & Mechanical Inspection

1) Compare equipment nameplate data with drawings and specifications.

2) Inspect relays and cases for physical damage.

3) Verify the unit is clean.

4) Relay case

a) Tighten case connections.

b) Inspect cover for correct gasket seal.

c) Clean cover glass. Inspect shorting hardware, connections paddles, and knife switches.

d) Remove any foreign material from case.

e) Verify target reset.

5) Relay

a) Inspect relay for foreign material, particularly in disk slots of the damping and electromagnets.

b) Verify disk clearance. Verify contact clearance and spring bias.

c) Inspect spiral spring convolutions. Inspect disk and contacts for freedom of movement and correct travel. Verify tightness of mounting hardware and connections. Burnish contacts. Inspect bearings and pivots.

6) Set relays in accordance with coordination study.

Functional Tests (Relays)

51 Time Overcurrent Relay

3) Determine minimum pickup.

4) Determine time delay at least two points on the time current curve

50 Instantaneous Overcurrent Relay

5) Determine pickup.

6) Determine dropout.

7) Determine time delay.

27 Undervoltage Relay

1) Determine dropout voltage

2) Determine time delay.

3) Determine time delay at a second point on the timing curve for inverse time delays.

32 Directional Power Relay

1) Determine minimum pickup at maximum torque angle.

2) Determine closing zone.

3) Determine maximum torque angle.

4) Determine time delay.

5) Verify time delay at a second point on the timing curve for inverse time relays.

40 Loss of field Relay

1) Determine maximum reach.

2) Determine maximum torque angle.

3) Determine offset.

46 Current Balance Relay (if applicable)

1) Determine pickup of each unit.

2) Determine percent slope.

3) Determine time delay.

47 Phase Sequence or Phase Balance Voltage relay

1) Determine positive sequence voltage to close normally open contact.

2) Determine positive sequence voltage to open normally closed contact

(undervoltage trip)

3) Verify negative sequence trip.

4) Determine time delay to close the normally open contact with sudden application of 120% of pickup.

5) Determine time delay to close normally closed contact upon removal of voltage when previously set to rated system voltage.

55 Power Factor Relay

1) Determine tripping angle.

2) Determine time delay.

59 Overvoltage Relay

1) Determine overvoltage pickup.

2) Determine time delay to close the contact with sudden application of 120% of pickup.

60 Voltage Balance Relay (if applicable)

1) Determine voltage difference to close the contacts with one source at rated voltage.

81 Frequency Relay

1) Verify frequency set points.

2) Determine time delay.

3) Determine undervoltage cutoff.

87 Differential

1) Determine operating unit pickup.

2) Determine the operation of each restraint unit.

3) Determine slope.

4) Determine harmonic restraint, if applicable.

5) Determine instantaneous pickup.

5kV Switchgear (Substation 1 & 2)

I. Visual & Mechanical Inspection

1) The equipment nameplate data will be compared with the single line diagram if available.

2) Visually inspect the physical, electrical & mechanical condition including evidence of moisture or corona.

3) Check appropriate anchorage, required area clearances & physical damage.

4) Verify with the single line diagram that the fuses and circuit breakers correspond to the drawings, if available.

5) Verify if the settings of the relays/trip units correspond with the coordination study, if available.

6) Check if the current and voltage transformer ratios correspond to the drawings, if available.

7) Inspect all accessible bus connections for high resistance and verify connections by calibrated torque-wrench method in accordance with manufacturer’s published data or by industry standard.

8) Check insulators for evidence of physical damage or contaminated surfaces.

9) Clean the switchboard prior to testing unless as-found and as-left tests are required.

II. Electrical Tests

1) Perform insulation-resistance tests on each bus section, phase-to-phase and phase-to-ground for one minute, if applicable.

2) Perform low-ohmmeter resistance test on each bus, if applicable.

3) Perform insulation-resistance tests on the control power transformers & voltage

(potential) transformers from winding-to-winding and each winding to ground.

MV Circuit Breakers

I. Visual & Mechanical Inspection

1) The physical and mechanical condition will be inspected.

2) Check alignment, anchorage and grounding.

3) Perform mechanical operational tests on both the circuit breaker and its operating mechanism.

4) Inspect bolted electrical connections for high resistance using low-resistance ohmmeter.

5) Clean unit prior to testing unless as-found and as-left tests are required.

6) Check contact lubricant on moving current-carrying parts.

7) Check lubrication on moving and sliding surfaces.

8) Record as-found and as-left operation counter readings.

II. Electrical Tests

1) Perform contact resistance test.

2) Perform insulation resistance tests pole-to-pole, pole-to-ground, and across open poles at 2500V minimum.

3) Perform vacuum integrity (overpotential) test across each vacuum bottle with the breaker in open position in accordance with the manufacturer’s published data.

5kV Disconnect Switches

I. Visual and Mechanical Inspection

1) Inspect the condition of the disconnect switches physically and mechanically.

2) Check anchorage if suitable and required area clearances.

3) Check equipment grounding.

4) Check blade alignment, blade penetration, travel stops and mechanical operation.

5) Confirm that fuse ratings and types are in accordance with drawings and short-circuit and coordination studies.

6) Confirm that expulsion-limiting devices (if applicable) are in place on all holders having expulsion-type elements.

7) Check all accessible bolted electrical connections for high resistance using calibrated torque wrench method.

8) Test interlocking systems for correct operation and sequencing.

9) Inspect insulating assemblies for evidence of physical damage or contaminated surfaces.

10) Exercise all accessible active components.

11) Check indicating and control devices for correct operation.

12) Verify operation of heaters, if applicable.

13) Thoroughly clean unit prior to testing unless as-found and as-left tests are required.

14) Check proper contact lubricant on moving current carrying parts.

15) Check proper lubrication on moving and sliding surfaces.

II. Electrical Tests

1) Perform insulation-resistance on each pole, phase-to-phase and phase-to-ground with switch closed and across each open pole for one minute, if applicable.

2) Perform resistance measurements through all accessible bolted connections with a low-resistance ohmmeter, if applicable.

3) Measure contact resistance across each switchblade and fuse holder.

4) Verify fuse resistance/continuity.

LV Switchboard & Circuit Breaker

I. Visual & Mechanical Inspection

1) The equipment nameplate data will be compared with the single line diagram if available.

2) Visually inspect the physical, electrical & mechanical condition including evidence of moisture or corona.

3) Check appropriate anchorage, required area clearances & physical damage.

4) Verify with the single line diagram that the fuses and circuit breakers correspond to the drawings, if available.

5) Verify if the settings of the relays/trip units correspond with the coordination study, if available.

6) Check if the current and voltage transformer ratios correspond to the drawings, if available.

7) Inspect all accessible bus connections for high resistance and verify connections by calibrated torque-wrench method in accordance with manufacturer’s published data or by industry standard.

8) Check insulators for evidence of physical damage or contaminated surfaces.

9) Clean the switchboard prior to testing unless as-found and as-left tests are required.

II. Electrical Tests

1) Perform ground fault test, if applicable.

2) Perform insulation-resistance tests on each bus section, phase-to-phase and phase-to-ground for one minute, if applicable.

3) Perform low-ohmmeter resistance test on each bus, if applicable.

4) Perform low-ohmmeter resistance test on each circuit breaker line-to-load side with the breaker closed for Phase A, Phase B, and Phase C.

5) Functionally test by secondary injection the circuit breakers, if applicable.

3-Phase Dry Type Transformers

I. Visual and Mechanical Inspection

1) The physical, electrical, and mechanical condition including evidence of moisture, corona or brittleness will be inspected and evaluated.

2) Check that control and alarm settings on temperature indicators are as specified, if applicable.

3) Check that cooling fans operate, if applicable.

4) Check that the core, frame and enclosure are grounded properly.

5) Check the presence of transformer surge arresters, if applicable.

6) Thoroughly clean unit prior to testing unless as-found and as-left tests are required.

7) Check that the as-left tap connections are as specified.

II. Electrical Tests

1) Perform insulation-resistance tests winding-to-winding and each winding-to-ground.

2) Perform transformer turn’s ratio tests at the designated tap position.

Lightning/Surge Arresters

I. Visual and Mechanical Inspection

1) The physical and mechanical condition will be inspected.

2) Check for proper mounting and adequate clearances.

3) Inspect bolted electrical connections for high resistance using low-ohmmeter resistance method.

4) Check if the ground lead on each device is individually attached to a ground bus or ground electrode.

II. Electrical Tests

1) Perform insulation-resistance test at voltage levels specified by the manufacturer or by NETA specifications.

2) Perform contact resistance test.

3) Test grounding connection.

VA WEST LA HCS:

SUBSTATION #1, BLDG 299: (QTY: 2) EATON FP5000 PROTECTIVE RELAY

CAT# FP5200-00, (QTY: 9) FP4000 PROTECTIVE RELAY CAT# FP4201-01, (QTY:

1) EATON CIRCUIT BREAKER TYPE: 50VCP-W250 4.76KV 2000KVA, (QTY: 9)

EATON CIRCUIT BREAKER TYPE 50VCP-ND250 4.76KV 1200KVA,

SUBSTATION #2, BLDG 304: (QTY:1) EATON FP5000 PROTECTIVE RELAY

CAT# FP5200-00, (QTY: 4) FP4000 PROTECTIVE RELAY CAT#4201-01, (QTY: 5)

EATON CIRCUIT BREAKER TYPE:50VCPW250 4.67KV 1200KVA

BLDG 500: (QTY:10) G.E. VERSATRIP CIRCUIT BREAKER 480V/600AMP,

(QTY:4) G.E. VERSATRIP CIRCUIT BREAKER 480V/800AMP, (QTY:4) G.E.

VERSATRIP CIRCUIT BREAKER 480V/2500AMP, (QTY:1) G.E. VERSATRIP

CIRCUIT BREAKER 480V/3000AMP, (QTY:1) EATON LG30H 480V/400AMP,

(QTY:1) G.E. CIRCUIT BREAKER VERSATRIP CAT#TS20LS1GT2Z1

480V/400AMP, (QTY:3) G.E. VERSATRIP CIRCUIT BREAKER 480V/1200AMP,

(QTY:1) WESTINGHOUSE CIRCUIT BREAKER 480V/225AMP, (QTY:4)

SYLVANIA TRANSFORMER CAT# 36615 1500KVA 4160-480/277V TYPE HWT-1,

(QTY:1) SYLANIA TRANSFORMER CAT#36616 2000KVA 4160-480/277 TYPE

HWT-1, (QTY:7) ZINSCO SWITCH CAT# 2658-D-2429 4.8KV 600AMP,

BLDG 501: (QTY:6)G.E. TIME OVERCURRENT RELAYS TYPE IJD, (QTY:2)IJF,

(QTY:2)ICR, (QTY:1)CFW, (QTY:2)CEH, (QTY:2)GGP, (QTY:6)IJCV, (QTY:52)IAC,

(QTY:5)IAV, (QTY:2)ICW, (QTY:13) ITE POWER CIRCUIT BREAKERS TYPE 5

HK 1200KVA/4.76KV, QTY:2) ITE POWER CIRCUIT BREAKERS TYPE 5 HK

2000KVA/4.76KV, (QTY:1) ZINSCO SWITCH TYPE LI 4.8KV/600AMP,(QTY:1)

G.E. VERSATRIP CIRCUIT BREAKER 480V/800AMP, ) (QTY:1) G.E. VERSATRIP

CIRCUIT BREAKER CAT#S7625S 480V/2500AMP, (QTY:1) G.E. VERSATRIP

CIRCUIT BREAKER 480V/400AMP, (QTY:1) G.E. VERSATRIP CIRCUIT

BREAKER 480V/300AMP, (QTY:1) SYLVANIA TRANSFORMER CAT# 36615

1500KVA 4160-480/277V TYPE HWT-1, (QTY:4) EATON FP6000 PROTECTIVE

RELAY CAT# FP6200-00,

VA SEPULVEDA ACC:

SWITCHGEAR ROOM #1 (QTY: 7) G.E. BREAKERS TYPE AM-13.8-500-7H, (QTY:

8) G.E. RELAYS.

SWITCHGEAR ROOM #2 (QTY: 4) BREAKER TYPE 14HK ITE 13.8KV, (QTY: 8)

G.E. RELAYS.

VA LOS ANGELES ACC:

MSSA LOW VOLTAGE SWITCHBOARD WITH CIRCUIT BREAKERS

7 CONTRACTOR QUALIFICATIONS & OTHER RESPONSIBILITIES:

7.1 Contractor shall be a firm regularly engaged in the servicing, testing, and certification of electrical switchgear. Contractor personnel performing on this contract must be fully qualified and competent to perform the requirements as stated.

7.2 Contractors shall provide proof and adequacy of past performance history, references, and above required qualifications. When combined with Evaluation Factors, it will assist Contracting Officer in making the best value and sound business judgment on behalf of the Government (see evaluation factors in FAR Clause 52.212-2, Section B).

7.3 Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal

Government.

7.4 The Government reserves the right to accept or reject Contractor’s employee for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer.

8 LICENSING REQUIREMENTS:

8.1 Contractor Business License issued by a U.S. State or Territory in accordance with the current provisions of the State or Territory.

9 AUTHORIZED SERVICES / CHANGES:

9.1 The awarded Contractor is advised that only the Contracting Officer, acting within the scope of the contract has the authority to make changes which affect the contract in terms of service, quality, quantity, price or delivery.

9.2 In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment shall be made in the contract terms or price to cover any increase in costs incurred as a result thereof.

10 APPLICABLE DOCUMENTS, STANDARDS, LAWS AND/OR REGULATIONS:

10.1 The Joint Commission.

10.2 VA Directive 1028.

10.3 InterNational Electrical Testing Association (NETA); www.netaworld.org.

10.4 NFPA 70E – Standard for Electrical Safety in the Workplace.

11 SAFETY REQUIREMENTS:

11.1 All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VAGLAHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract.

11.2 Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to

Government equipment. Every effort shall be made to safeguard human life and property.

11.3 Contractor shall comply with all applicable Federal, State, and local requirements regarding workers’ health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal

Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR

1910.132(d)(1)(iii), 29CFR1910.137.

11.4 Contractor shall provide all necessary tools, and Personal Protective Equipment

(PPE) to perform the work safely, effectively, and timely.

12 NOTIFICATION:

Contractor shall notify and coordinate ALL work activities / site access with the VA COR /

POC – ALAN SILVER (310) 268-3424.

13 PERFORMANCE MONITORING, INSPECTION AND ACCEPTANCE:

Routine inspections to include acceptance / certification work was completed in accordance with the SOW will be performed by VA COR / POC – ALAN SILVER and Engineering /

Facilities Personnel. The VA can perform inspection of the work performed without the

Contractor presence and determine whether or not work performed is within standards expressed in this scope of work. It is the VA’s prerogative to hire an independent qualified third party to check the validity of the work conducted.

http://www.netaworld.org/

14 SECURITY REQUIREMENTS:

Contractor WILL NOT have access to patient records, data, or VA computer systems.

15 GOVERNMENT FURNISHED EQUIPMENT (GFE) / GOVERNMENT FURNISHED

INFORMATION (GFI):

NO GFE or GFI will be provided to or used by the Contractor.

16 RISK CONTROL:

Submission of VA “Infection Control Risk Assessment” (ICRA) permit(s) NOT

REQUIRED. Medical services / support services at the designated locations will remain operational during the execution of this work. Contractor shall take all precautions to minimize disruption to daily routine tasks performed in those services. Patient care shall remain a top concern for the Contractor and their employees while performing contracted work.

17 IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

A. Contractor’s shall ALWAYS wear visible identification issued by VA Police during the entire time they are on the VA Healthcare System campus. It is the responsibility of the

Contractor to park only in appropriately designated parking areas.

B. Parking information is available from the VA Police & Security Service Office. The

VA shall not validate, invalidate, or make reimbursement for parking violations of the

Contractor’s personnel under any circumstances.

C. SMOKING IS STRICTLY PROHIBITED on the grounds of any VHA facility and throughout the VA Healthcare System campuses. Per VHA Directive 1085 dated March

5, 2019, it is VHA policy that all VHA health care facilities, including hospitals, community clinics, administrative offices and Vet Centers, will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019.

THERE WILL NO LONGER BE DESIGNATED SMOKING AREAS.

D. Possession of weapons is prohibited while on the ANY VA Healthcare System campus.

Enclosed containers, including tool kits, shall be subject to search / seizure.

E. Violations of VA regulations may result in citation answerable in the United States

Federal District Court, not at/in the local district, municipal, or state court.

18 POINT OF CONTACT (POC):

VA GREATER LOS ANGELES HEALTHCARE SYSTEM POC:

Name: ALAN SILVER

Department: Engineering (138)

Address: 11301 Wilshire Blvd, Los Angeles CA 90073

Phone: (310) 268-3424

Email: alan.silver@va.gov mailto:alan.silver@va.gov

19 NORMAL WORKING HOURS:

Contractor shall perform required services between 7:30AM through 4:00PM Pacific Time local, Monday through Friday with exceptions to National Federal Holidays. All work will be performed during normal hours unless requested in advance and approved by the VA COR –

Alan Silver or his designee with CO approval.

20 OVERTIME AND NATIONAL FEDERAL HOLIDAYS:

Any overtime or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the

Government. When one of the holidays fall on a Sunday, the following Monday will be observed as a National Federal Holiday. When one of the holidays fall on a Saturday, the preceding Friday will be observed as a National Federal Holiday.

Contractor is not required to provide service on U.S. Holidays nor shall the Contractor be paid for these days. National Federal Holiday schedule:

New Year’s Day January 1

Martin Luther King ‘s

Birthday

Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May

Independence Day July 4

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day November 11

Thanksgiving Day Fourth Thursday in November

Christmas Day December 25

21 INFORMATION SECURITY:

In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements DO NOT apply to this requirement, and a Security Accreditation Package IS

NOT required. The nature of this requirement is technical; however, there is no information to be protected.

22 INVOICE AND PAYMENT:

A. Vendor will be paid monthly upon submission of a proper invoice for work completed and accepted. Final payment will be withheld until all noted discrepancies are corrected and as-build drawings are approved by the Government (VA). VA-FSC processes / pays all associated transactions for / on VA orders. To successfully submit an invoice to VA-

FSC please review “How to Create an Invoice” within the how to guides. All invoices submitted to the VA-FSC should mirror your current submission of invoice, with the below items required. The VA-FSC requires specific information in compliance with the

Prompt Pay Act and Business Requirements.

1. Your firm’s Taxpayer ID Number (TIN)

2. Your firm’s “Remit Address” information

3. The VA Purchase Order (PO) number

4. Your firm’s contact information: (Personal Name, Email, and Phone)

5. Your VA point of contact information: (Personal Name, Email, and Phone)

6. The Period of Performance dates (Beginning and Ending)

7. All discount information if applicable (Percent and Date Terms)

For additional information, please contact:

Department of Veteran Affairs Financial Service Center

Phone: 1-877-353-9791

Email: vafsccshd@va.gov

- - - END STATEMENT OF WORK - - -

mailto:vafsccshd@va.gov

B.6 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB ___________ ___________

PERFORM TRI-ANNUAL PMI, TESTING, AND CERTIFICATION

OF ELECTRICAL SWITCHGEAR AT/FOR THE VA GREATER

LOS ANGELES HEALTHCARE SYSTEM (VAGLAHCS) TO

INCLUDE VA WEST LOS ANGELES HEALTHCARE SYSTEM

(VALAHCS), VA SEPULVEDA AMBULATORY CARE CENTER

(VASACC), AND VA LOS ANGELES AMBULATORY CARE

CENTER (VALAACC) PER SOW.

GRAND

TOTAL

B.7 DELIVERY SCHEDULE

ITEM NUMBER QUANTITY

DELIVERY

DATE

1.00

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS

(OCT 2018)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The

Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims

Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the

Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the

Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the

Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by

Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt

Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-

5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting

Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the

Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the

Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The

Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .