36C26221Q0104 0001_1.docx
DOCX document 35 KB Posted
- Solicitation number
- 36C26221Q0104
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WAGE DETERMINATION RATES SCA WDN 2015-5614 REVISION 16.pdf | ||
| 36C26221Q0104_1.docx | DOCX document | |
| SF1449 RFQ 36C26221Q0104.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation H999 36C26221Q0104 0001_Triennial PMI, Testing, and Certification of Electrical Switchgear, VA Greater Los Angeles HCS
[VAWLAHCS-VASACC-VALAACC]
90815 36C26221Q0104 12-08-2020
10AM
PACIFIC TIME, LOS ANGELES, USA
N
SDVOSBC
811219
DEPARTMENT OF VETERANS AFFAIRS
Network Contracting Office (NCO) 22 4811 Airport Plaza Drive, Suite 600 Long Beach CA 90815 Contracting Officer
NICHOLS, CECIL S.
cecil.nichols@va.gov
(562) 766-2267
DEPARTMENT OF VETERANS AFFAIRS
VA GREATER LOS ANGELES
HEALTHCARE SYSTEM
VAWLAHCS-VASACC-VALAACC
11301 Wilshire Blvd Los Angeles CA 90073-1003
USA
cecil.nichols@va.gov Cecil's VA work email
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF
CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND
DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHAN
GES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer alr eady submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C
. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11/27/2020 None 36C262
DEPARTMENT OF VETERANS AFFAIRS
Network Contracting Office (NCO) 22 4811 Airport Plaza Drive, Suite 600 Long Beach CA 90815 36C262
DEPARTMENT OF VETERANS AFFAIRS
Network Contracting Office (NCO) 22 4811 Airport Plaza Drive, Suite 600 Long Beach CA 90815 To all Offerors/Bidders
36C26221Q0104 11-10-2020
X X X
12/08/2020 NLT 10AM PACIFIC LOCAL TIME
X
AMENDMENT 0001
IS ISSUED TO PROVIDE VA RESPONSE TO VENDOR SUBMITTED REQUEST FOR INFORMATION (RFI) 001, 002 & 003; AND
REPLACE THE TEXT "TRI-ANNUAL" WITH "TRIENNIAL" THROUGHOUT THE SOLICITATION RFQ.
ATTACHMENTS PROVIDED WITH AMENDMENT 0001 INCLUDE:
1) RFI001, RFI002 & RFI003 FOR 36C26221Q0104 WITH VA RESPONSE (pdf).
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX LAST ITEM - ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
NICHOLS, CECIL S.
Contracting Officer See attached document: VENDOR RFI001 with VA REPSONSE.
See attached document: VENDOR RFI002 with VA RESPONSE.
See attached document: VENDOR RFI003 with VA RESPONSE.
RFI FORM
Contractor Name:
Address:
Phone/Fax:
| Send to: cecil.nichols@va.gov |
| RFI |
(REQUEST FOR INFORMATION)
PROJECT NO.:
| RFI NO.: |
| 001 |
PROJECT NAME:
| Triennial PMI, Testing & Certification of Electrical Switchgear, VA Greater Los Angeles |
| DATE REQUESTED: |
| 11/18/2020 |
SOLICITATION NO.:
| 36C26221Q0104 |
| REFERENCE: |
DRAWING:
SPECIFICATION
SECTION:
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. 30 days performance period: Is this period from the date of award or from date of schedule approval? Scheduling could take 30 days especially at West [Los Angeles] VA Medical Center.
2. Several items in the scope of work refers to verifying equipment data against drawings. Will the Contractor be provided electrical single line drawings?
3. Several items in the scope of work refers to verifying protective device settings against the Protective Device Coordination Study. Will the Study be made available to the Contractor?
4. Our business licenses are issued by the city where the Contractor is registered with the Secretary of State as the business address. Will this license be acceptable?
PROJECT MANAGER’S RESPONSE
1. 30-day performance period is from the date of schedule approval.
2. Yes, electrical single line drawings will be made available to awardee.
3. Yes, study will be made available to awardee.
4. Yes
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
Darrell Cathey, Electrician Cecil S. Nichols, Contracting Officer
DATE:
11/24/2020
Contractor Name:
Address:
Phone/Fax:
| Send to: cecil.nichols@va.gov |
| RFI |
PROJECT NO.:
| RFI NO.: |
| 002 |
PROJECT NAME:
| Triennial PMI, Testing & Certification of Electrical Switchgear, VA Greater Los Angeles |
| DATE REQUESTED: |
| 11/18/2020 |
SOLICITATION NO.:
| 36C26221Q0104 |
| REFERENCE: |
DRAWING:
SPECIFICATION
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. Please confirm if the vendor or VA will be performing switching and isolation of equipment?
2. Is a generator for temporary power required?
3. If a generator for temporary power is required, who is responsible for [providing]?
4. Will work be performed during normal time [hours] or after-hours?
5. Based on the equipment list provided, can the VA take an outage on one entire switchgear lineup at a time or only one section at a time?
PROJECT MANAGER’S RESPONSE
1. Vendor will be performing switching and isolation of equipment.
2. VA will be providing their own generators.
3. Refer to line #2 response above.
4. As there is no reference for after-hours or shift related work, a revision to the Solicitation RFQ work hours is required – all work will be after-hours and/or on weekends as coordinated and scheduled with VA POC / COR. Vendor should apply that factor / variable with quoted offer.
5. Outages will have to be performed only one section at a time.
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
Cecil S. Nichols, Contracting Officer
DATE:
Contractor Name:
Address:
Phone/Fax:
| Send to: cecil.nichols@va.gov |
| RFI |
PROJECT NO.:
| RFI NO.: |
| 003 |
PROJECT NAME:
| Triennial PMI, Testing & Certification of Electrical Switchgear, VA Greater Los Angeles |
| DATE REQUESTED: |
| 11/18/2020 |
SOLICITATION NO.:
| 36C26221Q0104 |
| REFERENCE: |
DRAWING:
SPECIFICATION
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. Can the VA specify the outage plan and schedule at each site?
2. Can the VA take large outages or only small outages at a time? Please confirm per site.
3. Can the VA provide old reports performed at each location?
4. Who performed this work in the past?
PROJECT MANAGER’S RESPONSE
1. Yes, upon contract award.
2. Most of the outages will have to be small outages due to the main Hospital and Nursing Home.
3. Yes, upon contract award.
4. Giga Electrical & Technical Services, Inc.
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
DATE:
File details come from the government source that posted it. Updated .