This file contains Standard Form 1442 (Solicitation, Offer and Award) and detailed specifications for a Multiple Award Task Order Contract (MATOC) work plan at Osan Air Base in South Korea. The solicitation (W90VN625R0001) covers two main requirements: 1) Replace leaky roof of Building 949, and 2) Replace deteriorated transformers in multiple east mission critical areas.
The work requires completion within 340 calendar days after notice to proceed, with proposals due by December 27, 2024 at 1300 hours. The contractor must submit technical proposals including design data, drawings, and calculations for each requirement. The transformer replacement includes installing 13 new pad-mounted transformers ranging from 75kVA to 1500kVA capacity. The roof replacement includes installing new standing seam metal roof system and acrylic fluid-applied waterproofing coating. This is a ROK Ministry of National Defense funded contract administered by the 411th Contracting Support Brigade, with eligibility limited to Korean contractors only. Site visits are scheduled for December 10, 2024 at 0900 hours for the roof work and 1000 hours for the transformer work at Building 142, Morin Gate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Item 0001 Drawings.pdf | ||
| Item 0002 Submittal Register.pdf | ||
| Osan AFB Architectural Compatibility Plan 1 Jan 2022.pdf | ||
| Item 0001 Submittal Register.xls | XLS spreadsheet | |
| Item 0002 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) REPLACE LEAKY ROOF OF BLDG#949, OSAN AB. 2) REPLACE DETERIORATED TRANSFORMERS, OSAN AB.
THIS IS LCS MATOC WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY;
W91QVN-24-D- 0059, -0061, -0062, -0063, - 0064, -0065, -0067, -0069, -0070, -0073, -0076, -0078, -0084, -0085.
OFFERORS MUST COMPLY WITH THE FOLLOWING:
A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause in Section L for the schedule.
B. Submission of Proposals
(1) Proposal Packet: It shall be submitted by 1300 hours on the closing date of RFP via email.
a. Pricing Proposal
b. Offer Breakdow n
c. Design Data
d. Completion of Section K (A ttachment: Contractor's Tax Exemption Declaration)
e. Prime Contractor Registration, Stock Change Certif ication. See Section L.
C. If the contractor is unable to submit proposals in response to the RFP, the contractor shall submit a " No Offer Letter" by the date and time specif ied in this solicitation.
MR. YI, CHAE YONG 315-757-6018
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Nov-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________340 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Dec 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO OSAN, UNIT #2039
APO AP 96278-2039
UNITED STATES
W90VN6
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W90VN625R0001 65
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Item #0001
FFP
Replace Leaky Roof for Critical COMM Node Bldg#949, Osan AB. Magnitude of this project is between $500,000 and $1,000,000.
FOB: Destination
NET AMT
0002 1 Job Item #0002
FFP
Repair Deteriorated Transforms on East Mission Critical Areas, Osan AB.
Magnitude of this project is between $1,000,000 and $5,000,000.
0003 2 Lot War Hazard
FFP
Estimated Cost for War Hazard Losses is Zero(0).
Section C - Descriptions and Specifications
ITEM 0001
SPECI
FICAT
IONS
FOR
SMYU 24-1039L, REPLACE LEAKY ROOF FOR CRITICAL
COMM NODE B949
OSAN
AB,
ROK
51ST CIVIL ENGINEER SQUADRON
TABLE OF CONTENTS
SMYU 24-1039L
REPLACE LEAKY ROOF FOR CRITICAL COMM NODE B949
OSAN AB, ROK
Contents
1. GENERAL
2. SCOPE OF WORKS (SOW):
3. REFERENCES AND STANDARDS:
4. CONSTRUCTION SCHEDULE INFORMATION:
5. ADDITIONAL REQUIREMENTS:
6. SECURITY REQUIRMENTS:
7. ENVIRONMENTAL REQUIREMENTS:
8. APPENDIX “A”
Page | 3
STATEMENT OF WORK
REPLACE LEAKY ROOF FOR CRITICAL COMM NODE B949
OSAN AB, ROK
1. GENERAL: The work to be performed for completion of this Work Plan project shall be as described in general below.
1.1 The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
1.2 All work shall be completed IAW specifications and standards referenced in section 3 and drawings associated with this project.
1.3. Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the Government provides 30% of the concept design for the contract, and the contractor is responsible for completing and submitting 100% of the design submittals. The contractor must submit the following proposal submittals for the technical evaluation performed by Government during RFP period:
1.3.1. Design Data for Technical Evaluation (Technical Evaluation Factor):
1.3.1.1. Submittal Drawings (Sub-Factor #1): Provide proposal drawings, including the following: Roof Plan, Building Elevations, Building Sections, Roof Details including details for elements such as rake, eave, ridge, gutter & downspout, Exterior Finish Schedule specifying materials and color codes, SSMR System Detail Isometric Diagram for zone “A” and “B”. *Please note that any submittal drawings that merely reproduce contract drawings without modifications will be considered technically unacceptable.
1.3.1.2. Design Calculations (Sub-Factor #2): Provide design calculations prepared and stamped by a professional engineer specializing in structural engineering verifying that the system supplied and any additional framing meet the design conditions and load criteria indicated in the O&MA Specification and the contract drawing.
2. SCOPE OF WORKS (SOW):
2.1. ARCHITECTURAL WORKS:
2.1.1. Provide double steel pipe scaffolding around the proposed building for temporary works.
2.1.2. Remove existing PTML (Protected Metal) roof sheet, 4” batt insulation, metal flashing and all existing unnecessary roof accessories and sub-materials in the zone “A” of contract drawing A01.
2.1.3. Install new SSMR (Standing Seam Metal Roof) system including SSMR panels, additional purlins (if necessary), metal flashing, 4-1/2” polyisocyanurate rigid board insulation over the existing 4” batt insulation, and all necessary sub‐roof materials/accessories such as floating clips, etc. in the zone “A” of contract drawing A01.
2.1.4. Remove existing built-up roofing sheet, any existing rigid insulation, sheet metal flashing and all existing unnecessary roof accessories and sub-materials in the zone “B” of contract drawing A01.
2.1.5. Install new SSMR system including SSMR panels, metal decks, purlins, metal flashing, 4-1/2” polyisocyanurate rigid board insulation, and all necessary sub-roof materials/accessories such as floating clips, etc. in the zone “B” of contract drawing A01.
2.1.6. Remove laitance, loose aggregate, sharp projections, grease, oil, dirt, curing compounds, and other contaminants from the existing built-up or concrete surfaced area in the zone “C” of contract drawing A01.
2.1.7. Clean and prepare the existing built-up or concrete surfaced area including crack repair and water cleaning to apply acrylic fluid-applied water proofing coating system in the zone “C” of contract drawing A01.
2.1.8. Apply primer of foundation coat – first coat - reinforcing fabric - second coat - finish coat- finish coat on the existing concrete surfaced area according to the manufacturer’s standard procedure of acrylic fluid-applied water proofing coating system in the zone “C” of contract drawing A01. *The total dry film thickness (DFT) required at all locations shall not be less than the thickness required by the manufacturer specification.
Page | 4
2.1.9. Repair/patch/clean the existing deteriorated/damaged fasteners and PTML roof panel before applying acrylic fluid-applied water proofing coating system in the zone “D” of contract drawing A01.
2.1.10. Remove all scale, dirt, any other contaminants and apply metal primer recommended by manufacturer to all entire PTML roof area to prepare surface for applying acrylic fluid-applied water proofing coating system in the zone “D” of contract drawing A01.
2.1.11. Apply one coat of base coat to the substrate especially on the vertical seams, horizontal laps, roof penetrations, joints, and exposed mechanical fasteners in the zone “D” of contract drawing A01.
2.1.12. Lay out fabrics into the wet base coat and apply a second coat of base coat immediately applied over the top to saturate the fabrics fully in the zone “D” of contract drawing A01. * The base coat shall only be applied by manufacture’s recommended/approved tools such as brushes - unapproved rolling and/or spraying are strictly prohibited.
2.1.13. Apply 2 coats of finish coat entirely according to the manufacture’s standard procedure of the acrylic fluid-applied water proofing coating system in the zone “D” of contract drawing A01.
2.1.14. Replace all existing metal gutters and downspouts with new ones, complete with all necessary accessories attached to the building. Additionally, provide concrete splash blocks or metal splash pans.
2.1.15. Perform surface preparation for paint/coating work according to the O&MA specifications, including repairing cracked and damaged concrete and EIFS (Exterior Insulation Finish System) walls. *Apply all paint/coating with a brush or roller. Don’t use spray equipment to reduce air emissions, unless otherwise specified or recommended by the paint manufacturer. Avoid using any LBP (Lead-Based Paint) materials as well.
2.1.16. Apply paint/coating to the exterior metal surface such as steel doors/frames, guard/handrails, panels, stairs, and steel pipe/conduit with MPI 79 (Primer) – MPI 94 (Intermediate) – MPI 94 (Topcoat). *Use epoxy-polyamide primer for PVDF (Polyvinylidene fluoride) coated metal surfaces instead of MPI 79 to strengthen adhesion of intermediate & topcoat.
2.1.17. Apply paint/coating to the exterior concrete and EIFS walls with MPI 10 (Primer) – MPI 10 (Intermediate) – MPI 10 (Topcoat) including repairing of damaged joint sealant and walls.
2.1.18. Remove all debris resulting from this project and clean up the job site (See the para 7. ENVIRONMENTAL REQUIREMENTS for further details).
2.1.19. Remove/reinstall existing mechanical and electrical equipment/unit over the roof necessary. Any damages caused by this project shall be repaired or replaced to match existing condition to adjacent areas by the contractor.
3. REFERENCES AND STANDARDS:
3.1. This project shall comply with the “Standard Technical Specifications and Standard Detail Drawings for OMA Projects, Korea” dated 30 November 2015 issued by the Department of the Army, Installation Management Agency, Korea Region Office. The most current specifications (O&MA Specification 2014, Revision-1) and standard drawings are available at the Engineering Flight, 51st Civil Engineer Squadron, Osan AB, Unit 2129, APO AP 96278-2129 and also are located on the Web Page http://www.usfk.mil/Resources/ContractingwithUSFK.aspx.
3.2. Unified Facility Criteria (UFC): http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
3.2.1. UFC 3-110-03 ROOFING, with Change 5
3.3 Air Force Criteria as published on the Whole Building Design Guide:
http://www.wbdg.org/ccb/browse_org.php?o=33
3.4 The project shall comply with “Osan AB Architectural Compatibility Plan dated 01 January 2022” and “07 14 10 Acrylic Fluid-Applied waterproofing” attached in the Appendix “A”.
4. CONSTRUCTION SCHEDULE INFORMATION:
Page | 5
KEY INFORMATION FOR CONSTRUCTION SCHEDULE
Project Site BLDG Location or Area Base Area: B949
Contract Type MATOC, Work Plan 411TH CSB
Performance of Period (PoP) 240 Days (After NTP issued)
30 Days for Submittal review/approval, TACW/RA and NTP + 60 Days for material procurement + 180 Days for mobilization/construction
Temporary Airfield Construction Waiver Required (TACW)
No If yes, TACW requires minimum 60 days to be approved
Risk Assessment (RA) Required No If yes, RA requires minimum 60 days to be approved
Phasing Work Required No If yes, Will be determined at pre-con meeting
Military Training Event Anticipated Yes Minimum 14 days of Military Training Event anticipated during PoP
Restricted Area Escort Required No
4.1. Working Hours: All work shall be accomplished in such a manner that minimum inconvenience shall be caused to the Government. All work shall be accomplished during normal duty hours from 0730 to 1630 hours, excluding weekends and Federal holidays. See MATOC section H-4 for holiday list. The contractor will only be allowed access to the work area during normal base working hours and when building staff and employees are present. Any requests to work outside of normal working hours must be submitted in writing to the Contracting Officer Representative (COR) at least seven (7) days in advance and approved. The Government reserves the right to change hours of operation due to military training events such as exercises and wing down days.
Contractor will be notified 72 hours in advance of any required changes in work schedule.
4.2. Military Training Events are anticipated to occur during the construction period as indicated in Table above. During Training Event, contractor will not be allowed to access the project site. Contractor shall consider these conditions in their proposal.
Contractors will be given 72 hours’ notice of work stoppage without incurring penalty to the Government.
4.3. Phasing Plan: Phasing plan shall be required for all road work projects or anything interfering with operations/large base functions (Airfield, BX, Gym, etc). Specific phasing shall not be pre-determined but contractor shall submit a plan for approval by construction OIC/NCOIC. If required, three phases shall be planned as a minimum. This minimum can be waived by the construction OIC/NCOIC.
4.4 Time on target of the site release date and phasing work plan will be discussed with user and COR at the pre-con meeting after award.
4.5. Due to the mission requirements on the installation, there may be occasional restrictions on normal working hours and site access.
Please be aware that site access windows are subject to change without prior notice. Contractors are advised to take this work environment into account when preparing their bids.
4.6. The following shall be submitted via email to the COR within 30 days of project acceptance:
4.6.1. Dates of material/product testing
4.6.2. Requests to operate equipment taller than 20 feet (6 meters) with timeline of use and exact height required
4.6.3. Any period of time contractor will not be conducting work (wet season, pavement curing time, etc.)
Page | 6
4.6.4. Any expected utility outages, road closures, or other impacts on base users that could affect their work
4.6.5. Requests for Information
4.7. Any correspondence sent from COR to Contractor via email shall be replied to within one work week.
5. ADDITIONAL REQUIREMENTS:
5.1. Site Orientation will be strongly recommended. The contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the works, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost. This may include restricted access to the site or a higher standard of site cleanliness.
5.2. Submittals: Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES of O&MA Specs:
5.2.1. All submittals shall be submitted to the contracting officer representative with written confirmation of receipt within 30 days after project acceptance. Any rejected submittal will be re-submitted within 10 days. If any submittal is rejected more than once, the contractor shall meet with the contracting officer representative and project engineer to clarify. Any further rejections of the same submittal shall meet with the same action.
5.3. At least one fluent English speaker must be on the site whenever work is being done; Contractor must be able to communicate with project inspectors at any time during approved working hours. Contractor will have the COR’s phone number and shall contact the COR for the following reasons:
5.3.1. Damage caused by Contractor within the installation.
5.3.2. Differing site conditions from Contract documents requiring adjustments.
5.3.3. Any Request for Information (RFI) during project execution.
5.3.4. Changes to project timeline to include weather events, delays in material delivery, or lack of workers shall be relayed to COR within 24 hours.
5.4. Laydown area policy and requirements: Laydown area to be coordinated with construction OIC/NCOIC.
5.5. The contractor shall provide, install, and maintain all necessary signs, lights, flares, barricades, markers, cones and shall take all necessary precautions for the protection and safety of the public and/or military traffic and operations.
5.5.1. The Contractor’s Safety Representative shall be contactable and able to arrive on site within two (2) hours of being requested.
5.6. Site Cleanliness: Contractor shall police their trash and clean up their site to the best extent possible at the end of each working day. In addition, Contractor shall maintain clean and orderly storage areas associated with the project.
5.7. When contractors install new underground infrastructures, they shall notify the government before covering excavated area so that 51st CES GeoBase team can collect as-built geo-referenced data.
5.8. Contractor will coordinate with COR for any construction work on the Airfield or within Restricted Areas for access and/or escort requirements. It is common for users to need partial access to the work site during construction. Contractor shall plan work phasing to facilitate ongoing mission execution upon government request.
5.9. The contractor shall be responsible for verifying the location, size and inverts of all existing utilities and shall protect all such utilities at all times, unless otherwise indicated. Existing utilities whether shown on the drawings or not which have been damaged as a result of the construction work, shall be restored immediately to their original or better condition and shall be paid for by the
Page | 7 contractor.
5.10. Whenever connections to existing utilities or where new utilities cross existing utilities are shown, the contractor shall carefully expose the utility by hand excavation to verify their locations and depths prior to excavating trenches for the new utility lines.
5.11. Whenever any change in alignment or grade for the proposed utilities are required due to unforeseen conflict with other utilities, the contractor shall inform the contracting officer immediately for remedial action.
5.12. As-Built Drawings: The Government will at its discretion withhold a portion or all of the final payment until the As-Built drawings have been submitted.
5.13. Warranty: Upon completion the base contract, warranty will apply unless a different timeframe is listed in the RFP.
5.14. Final Cleanup: Upon completion of work, work site shall be cleaned of any spills and debris, all Contractor equipment shall be removed, and any restoration efforts made to leave the site in a clean and orderly condition.
6. SECURITY REQUIRMENTS:
6.1. Contractor’s personnel or any representative of the contractor entering installation/base shall abide by all security regulations imposed by Installation Commander or Base Commander at all times and shall be subject to security checks. Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of the installation/base, while on, and upon leaving confines of the installation/base.
6.2. The training IWATCH/EAGLE EYES/AT Level I shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.
6.3. ALERTS: During military alerts or special operations, the contractor may not be authorized on base or in the work site. When the contractor is prohibited from access to the base or work site for one (1) day or less per month, no adjustment in the contract time shall be made. When the contractor is prohibited access for more than one (1) day per month, adjustments shall be made in accordance with applicable clauses of the General Provisions.
6.4. Physical Security: The Contractor shall be responsible for safeguarding all government property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured; lights, and water turned off, adjust heat and air conditioning appropriately, and all doors and windows secured.
6.5. BASE PASSES: The contractor shall be required to obtain base passes to Osan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base pass request no later than five (5) calendar days after award of this contract. It should be noted that it can take up to 30 days or more to process base pass paperwork. It shall be the responsibility of the contractor to prepare the necessary base pass paperwork to include USFK Form 82-E, USFK Form 225EK-E, family history register, local register, etc. for each individual requiring access to Osan Air Base. The contractor shall also be authorized to receive vehicle passes for each of the contractor’s vehicles used in the performance of the requirements of this contract. It shall be the responsibility of the contractor to prepare the necessary paperwork to include USFK Form 195EK-E, vehicle registration, vehicle insurance, certificate of safety inspection and a copy of driver’s license for each vehicle requiring access to Osan Air Base. The contractor shall prepare a cover letter listing each individual, skill, escort privileges, vehicle type, vehicle registration number, etc.
The contractor shall also provide the COR with two (2) copies of this request letter, with carbons, to include the top copy with original signatures. Escort privileges will be justified and limited to specific needs for contract completion and at the discretion and approval of the sponsor and requesting authorities identified in Block 13 and Section III of the USFK Form 82- E, Application for Installation/Base Access. The contractor shall not be authorized to perform any portion of the contract requirements until such time that the contractor has processed the necessary base pass paperwork for entry onto Osan Air Base. The COR shall not provide or be responsible to provide the contractor with escorts during performance of any part of this contract. All of the above documents shall be turned in to the COR for processing with the 51st Security Forces.
6.6. AT/OPSEC REQUIREMENTS: The contractor and all associated sub-contractors will practice Operations Security. The contractor shall not talk about work outside of the work area nor discuss the work being performed on social media. The contractor shall not take pictures/video (to include operation of dashcams or other recording devices in contractor operated vehicles) inside
Page | 8 sensitive locations without prior coordination with the organization's OPSEC representative and contracting officer representative. It will be the responsibility of the contractor to safeguard all documents provided. Documents will be stored away from view when not being used. Documents, media, drawings, and other associated material that are no longer needed must be destroyed via approved methods.
6.7. Key Control: The Contractor shall establish and implement methods of ensuring that all keys issued are not lost or misplaced and are not used by unauthorized persons.
6.7.1. The Contractor shall immediately report to the COR any occurrences of lost or duplicated keys. The Contractor shall re-key or replace keys or reimburse the government for replacement of locks or re-key as a result of Contractor losing keys. In the event a master key is lost or duplicated, all keys and locks for that system shall be replaced or reimburse the government for replacement of locks or re-key.
7. ENVIRONMENTAL REQUIREMENTS:
7.1. Construction debris and litter from work areas within the construction limits of the project site shall be collected and placed in watertight dumpsters at least weekly regardless of whether the litter was generated by the Contractor, the public, or others.
Collected litter and debris shall not be placed in or next to drain inlets, storm water drainage systems or watercourses.
7.2. Solid waste storage areas shall be located at least 15 m (50 ft.) from drainage facilities and watercourses and shall not be located in areas prone to flooding or ponding.
7.3. Place hazardous materials/waste containers in secondary containment. Container to store construction debris has to have water-proof and leak-proof lid.
7.4. The contractor shall submit the HAZMAT information (especially all paints/coating) and AF Form 3952 IAW AFMAN 32- 7002, Chemical Hazardous Material Request Authorization along with a copy of Safety Data Sheet to obtain HAZMAT approval from BEE, Safety, and Environmental Office. All paint products should be lead free.
7.5. For welding and brazing: Perform activities indoors. Cover nearby drain inlets and sweep-up metal particulates after each event.
7.6. The Contractor shall comply with USFK Regulation 201-1, Chapter 7, paragraph 7-3.q., specific standards for construction waste. The Contractor shall report the metric tons for construction and demolition (C&D) debris, including cost deposited in a landfill, incinerated, or diverted (recycled), respectively, to Environmental Office thru COR every 30 days for each project site. The Contractor shall use the C&D container (Roll-Off type) with water-proof lid and keep it always covered except when in use.
7.7. Scrap metal, including metal structures, metal roofs, metal roofing part, metal railings, metal beams, copper pipes and tubing, and HVAC equipment (chillers and boilers etc.), shall be collected by the contractor for disposal and sale through the Osan AB Qualified Recycling Program (QRP) in accordance with DOD Instruction 4715.23, which requires the installation’s QRP to receive money through the sale of all installation recyclables. The Contractor shall appropriately segregate and place the scrap metal to the location that QRP manager designates on base. The scrap metal shall be segregated and stored by the contractor for sale through QRP. Reinforcing metal bar in the concrete stuff to be broken on the construction site shall be turned in QRP.
7.8. The contractor shall use lead free coatings and paints. In addition, all surface coating/painting shall be applied by brush or roller. Using spray equipment is prohibited for minimization of air emissions unless otherwise specified or recommended by the paint manufacturer.
7.9. The building contains various of LBP building components. However, removal or replacement is permissible methods of abating lead hazards. Confirmation XRF testing on existing metal roof is not required. If the project includes field activities for repair or repaint such as dry sanding, dry scrapping or abrasive blasting that may disturb existing paint surfaces and release lead paint dust, the presence of LBP for the project areas and methods of abating lead hazards should be confirmed and coordinated with CEIE prior to construction.
7.10. All transformers and electrical equipment shall be properly removed and disposed of IAW USFK Reg 201-1, KEGS.
Page | 9
7.11. The Contractors are prohibited by 10 U.S.C. 2692 from storage, treatment, or disposal of any contractor owned hazardous waste on installation. The Contractors must get approval from HW Program Manager to store Hazardous Waste generated on-site in connection with a contract activity. HW storage will be on a temporary basis prior to disposal from Osan
AB.
7.12. The contractors need either 1) a permit to store hazardous waste while they are working on the installation or 2) they need to remove the hazardous waste from base within 24 hours. In either case, for disposal, the contractor needs to dispose of the waste in accordance with local regulations and provide a stamped manifest or other documentation demonstrating appropriate disposal to Environmental Office.
7.13. The Contractor shall implement Best Management Practices (BMP) specified on Table 4-8 of EGS and paragraph E.7 of the Osan AB Storm Water Pollution Prevention Plan (SWPPP) for outdoor painting/de- painting activities. EGS and Osan SWPPP are available at CE Environmental Office, room #105, building 600, DSN 784-8974.
7.14. A dust controls plan shall be developed/implemented to take appropriate measure to minimize the generation of dust as a result of their works, operations, and activities during and after construction until the site is reclaimed. Standard dust control Best Management Practices (BMPs) for dust generating activities shall be implemented during construction.
Page | 10
8. APPENDIX “A”
LIST OF CONTRACT DRAWINGS
REPLACE LEAKY ROOF FOR CRITICAL COMM NODE B949
OSAN AB,
DWG NO. SHT NO. REF NO. DESCRIPTION
24 – 1039L 1 OF 14 A01 ROOF PLAN B949
24 – 1039L 2 OF 14 A02 BUILDING ELEVATIONS-1 (AS BUILT)
24 – 1039L 3 OF 14 A03 BUILDING ELEVATIONS-2 (AS BUILT)
24 – 1039L 4 OF 14 A04 CROSS SECTION-1 (AS BUILT)
24 – 1039L 5 OF 14 A05 CROSS SECTION-2 (AS BUILT)
24 – 1039L 6 OF 14 A06 WALL SECTION-1 (AS BUILT)
24 – 1039L 7 OF 14 A07 WALL SECTION-2 (AS BUILT)
24 – 1039L 8 OF 14 A08 WALL SECTION-3 (AS BUILT)
24 – 1039L 9 OF 14 A09 MISC. DETAILS-1 (AS BUILT)
24 – 1039L 10 OF 14 A10 GENERAL NOTES, DSG DATA & TYP. DETAILS (AS BUILT)
24 – 1039L 11 OF 14 A11 ROOF FRAMING PLAN (AS BUILT)
24 – 1039L 12 OF 14 A12 STRUCTURAL ELEVATIONS-1 (AS BUILT)
24 – 1039L 13 OF 14 A13 STRUCTURAL ELEVATIONS-2 (AS BUILT)
24 – 1039L 14 OF 14 A14 LIGHTING PROTECTION PLAN (AS BUILT)
PARTICULAR SPECIFICATION
SECTION 07 14 10
Page | 11
ACRYLIC FLUID-APPLIED WATERPROOFING
PART 1 GENERAL
This specification covers a liquid-applied water-dispersed 100 percent acrylic elastomeric latex coating used for roof waterproofing. This specification also covers a water-repellent coating applied to concrete or masonry wall surfaces.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM B 117 Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM C 794 Standard Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants
ASTM D 471 Standard Test Method for Rubber Property - Effect of Liquids E1-1999
ASTM D 522 Rev A Standard Test Method for Mandrel Bend Test of Attached Organic Coatings
ASTM D 523 Standard Test Method for Specular Gloss
ASTM D 562 Standard Test Method for Consistency of Paints Measuring Krebs Unit (KU) Viscosity Using a Stormer-Type Viscometer
ASTM D 624 Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomer
ASTM D 722 Standard Test Method for Grease Resistance of Paper
ASTM D 903 Standard Test Method for Peel or Stripping Strength of Adhesive Bonds
ASTM D 1475 Standard Test Method for Density of Liquid Coatings, Inks, and Related Products
ASTM D 1640 Standard Test Method for Drying, Curing, or Film Formation of Organic Coatings at Room Temperature
ASTM D 1644 Standard Test Method for Nonvolatile Content of Varnishes
ASTM D 1653 Standard Test Method for Water Vapor Transmission of Organic Coated Films E1-1999 R
ASTM D 1712 Standard Practice for Resistance of Plastics to Sulfide Staining
ASTM D 1729 Standard Practice for Visual Appraisal of Colors and Color Differences of Diffusely-Illuminated Opaque Materials
ASTM D 2196 Standard Test Methods for Rheological Properties of Non-Newtonian Materials by Rotational (Brookfield) Viscometer
ASTM D 2244 Standard Test Method for Calculation of Color Differences from Instrumentally
Page | 12
Measured Color Coordinates
ASTM D 2370 Standard Test Method for Tensile Properties of Organic Coatings
ASTM D 2697 Standard Test Method for Volume Nonvolatile Matter in Clear of Pigmented Coatings R
ASTM D 3359 Standard Test Method for Measuring Adhesion by Tape Test
ASTM D 3776 Standard Test Method for Mass Per Unit Area (Weight) of Fabric
ASTM D 3786 Hydraulic Bursting Strength of Knitted Goods
ASTM D 4214 Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D 4798 Standard Test Method for Accelerated Weathering Test Conditions and Procedures for Bitumen Materials (Xenon-Arc Method)
ASTM D 5035 Standard Test Method for Breaking Force and Elongation of Textile Fabrics (Strip Method)
ASTM D 5201 Standard Practice for Calculating Formulation Physical Constants of Paints and Coatings
ASTM D 5733 Standard Test Method for Tearing Strength of Nonwoven Fabrics by the Trapezoid Procedure
ASTM D 6083 Standard Specification for Liquid Applied Acrylic Coating Used in Roofing
ASTM E 96 Standard Test Method for Water Vapor Transmission of Materials
ASTM E 108 Standard Test Methods for Fire Tests of Roof Coverings
ASTM E 514 Standard Test Method for Water Penetration and Leakage Through Masonry.
ASTM G 7 Standard Practice for Atmospheric Environmental Exposure Testing of Nonmetallic Materials
ASTM G 21 Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi
ASTM G 154 Standard Practice for Operating Florescent Light Apparatus for UV Exposure of Nonmetallic Materials
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings Roofing System;
Drawings showing details, flashing details, fastening patterns where applicable for insulation, and expansion joint details.
Page | 13
Detail showing construction of water cutoffs to be used at membrane terminations at the end of a day's work to seal the roofing system from water intrusion.
SD-03 Product Data
Coating System; G.
Application; G.
Manufacturer's instructions for preparing and applying the membrane, flashings, seams, insulation, nailers and other accessories.
Material Safety Data Sheets (MSDS); All materials required to have MSDS.
SD-06 Test Reports Test Reports: G.
Report signed by authorized official of a certified independent testing laboratory verifying conformance of properties as per ASTM D 6083 and class A fire rating as per ASTM E 108/UL 790.
SD-07 Certificates
Applicator's Qualifications; G.
A copy of approved applicator letter and/or certificate as issued by the manufacturer of the elastomeric acrylic coating system.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver waterproofing materials in manufacturer's original, unopened containers, with labels intact and legible.
Containers of materials covered by a referenced specification number shall bear the specification number, type, and class of the contents. Deliver materials in sufficient quantity to continue work without interruption. Store and protect materials in accordance with manufacturer's instructions, and use within their indicated shelf life.
Materials shall be stored in an area specifically designated for that purpose, in accordance with manufacturer's recommendations, where temperatures will not be less than 10 degrees C (50 degrees F) or higher than 38 degrees C (100 degrees F). When hazardous materials are involved, adhere to special precautions of the manufacturer, unless precautions conflict with local, state, and federal regulations. Promptly remove from the site materials or incomplete work adversely affected by exposure to moisture or freezing. Store materials on pallets and cover from top to bottom with canvas tarpaulins.
1.4 JOB CONDITIONS
Do not apply elastomeric acrylic coating system components when the ambient and/or surface temperature is below 10 degrees C (50 degrees F) or above 43 degrees C (110 degrees F), if any surface moisture is present, when the dew point is within 3 degrees C (5 degrees F) of the surface temperature, or when there is a possibility of temperatures falling below 0 degrees C (32 degreesF) within a 24 hour period. Do not apply if weather conditions will not permit complete cure before rain, dew, fog or freezing temperatures occur. Do not spray apply if the wind velocity exceeds 16 kilometer per hour (10 MPH) without taking appropriate precautions to eliminate over-spray. Take all measures necessary to protect unrelated surfaces from coating over-sprays or spillage. Furnish all scaffolding and the necessary equipment to complete the work. Scaffolding shall comply with all requirements as to safety. Provide drop cloths and other forms of protection necessary to protect all adjoining surfaces to render them completely free of overspray and splashes. Any surfaces that have been damaged or splattered shall be cleaned, restored, or replaced.
If sealant is applied prior to sealer, a test must be conducted prior to installation to verify compatibility of the sealer and sealant. For interior application, provide ventilation or forced air circulation during and after interior application of sealer until any odor is no longer evident.
Page | 14
1.5 WARRANTY
Upon completion of the roof coating system, a final inspection shall take place to determine the dry mil thickness of the fluid applied acrylic membrane and to verify that the system meets the manufacturer's requirements and project specifications for warranty. The contractor shall notify all interested parties in advance of said inspection. Upon acceptance, deliver to the COR a copy of the fully executed 20-year for materials and 2-year for labor warranty.
PART 2 PRODUCTS
2.1 ROOF WATERPROOFING SYSTEM MATERIALS
A seamless, fluid applied 100 percent acrylic membrane system designed for application over asphalt built-up roofing, concrete, metal, roof tile, or composite shingle substrates.
2.1.1 Reinforcement Fabric
Non-woven, stitch bonded polyester fabric for reinforcement of joints, horizontal seams, non-crimped vertical seams, damaged areas, roof terminations and flashings, skylights and other openings, vents, conduits, HVAC equipment and other protrusions. Polyester fabric shall meet or exceed the following physical properties:
A. Weight: 3 oz / per square yard (102 grams/m2)
B. Tensile Strength (ASTM D 5034): 33 kg (length), 20 kg (width)
C. Elongation @ Break (ASTM 5034): 23 percent (length), 64 percent (width)
D. Mullen Bursting Strength (ASTM D 3786): 130 lbs per square inch
E. Tearing Strength (Trapezoid, ASTM D 3787): 15 lbf (length), 20 lbf (width)
F. Breaking Force (1" cut strip, ASTM D 5035): 30 lbf (length), 15 lbf (width)
2.1.2 Fluid-Applied Base Coat (Primer or Foundation Coat)
100 percent pure acrylic co-polymer internally plasticized to maintain elastomeric properties, designed for adding film build prior to application of the intermediate and finish coats.
2.1.3 Fluid-Applied Intermediate Coat and Finish Coat
100 percent pure acrylic co-polymer in the specified finish color internally plasticized to maintain elastomeric properties, designed to provide a permanently flexible, weather-resistant topcoat. Coating material and coating shall meet or exceed all properties specified in ASTM D 6083, Table 1, Liquid Property Requirements, and Table 2, Film Physical Property Requirements for Acrylic Roof Coatings, as verified by a certified independent testing agency.
TABLE 1
Liquid Property Requirements
Physical Property ASTM Designation Requirements Viscosity Viscosity D 562 85 to 141 KU Viscosity D 2196 12,000 to 85,000 cps Volume Solids D 2697 greater than 50 percent Weight Solids D 1644 greater than 60 percent
TABLE 2
Film Physical Property Requirements for Acrylic Roof Coatings
Page | 15
Physical Property ASTM Designation Requirements Viscosity
Initial Percent Elongation (break) D 2370 minimum 100 percent @23 degree C (73 degree F)
Initial Tensile Strength (minimum stress)
D 2370 minimum 200 psi (1.38 MPa) @23 degree C (73 degree F)
Final Percent Elongation (break) after accelerated weathering 1000 Hrs.
D 2370 minimum 100 percent @23 degree C (73 degree F)
Presence D 1653 maximum 50 perms (17.2 x 10 - 10 kg/s.m2.Pa)
Water Swelling D 471 maximum 20 percent (mass)
Accelerated Weathering 1000 hours D 4798 No cracking or checking
Adhesion C 794 or D 903 minimum 2.0 pli (350 N/m) wet
Fungi Resistance G 21 Zero Rating
Tear Resistance D 624 >60 lbf/in. (21 kN/m)
Low Temperature Flexibility after 1000 hours accelerated weathering
D 522 minimum pass 1/2 in.
mandrel -18 degree C (-15 degree F)
2.1.4 Fluid-Applied Encapsulation Coat
100 percent pure acrylic co-polymer, low viscosity, designed to saturate through and encapsulate the Reinforcement Fabric on detail areas as well as the body of the roof. It also penetrates into and seals the existing substrate, while blocking asphaltic bleed-through.
2.1.5 Reinforcement Tape for Metal Roof Surface
Self-adhesive, butyl-backed fabric for use as an alternative to reinforcement fabric in reinforcing joints, horizontal seams, non-crimped vertical seams, damaged areas, roof terminations and flashings, skylights and other openings, vents, conduits, HVAC equipment and other protrusions.
2.1.6 Acrylic Mastic
Single package, high tensile acrylic mastic for use in reinforcing crimped vertical seams, and as an alternative to reinforcement fabric or reinforcement tape on other seams and detail areas. Also used for encapsulating and sealing fastener screws of metal roof.
2.1.7 Concrete Repair Material
High strength acrylic polymer concrete renovation and repair material shall be applied, blended with portland cement at the jobsite. It is for use in repairing damaged mortar, filling voids and resurfacing spalled concrete surfaces.
2.1.8 Fluid-Applied Metal Primer
Single package, acrylic metal primer shall be applied to provide corrosion protection, flash rust resistance and enhanced adhesion over steel, aluminum and galvanized metal roof surfaces.
2.2 ROOFING SYSTEM
The roofing system shall have a Class A fire rating on a noncombustible deck when tested according to the procedures outlined in ASTM E 108.
Page | 16
2.3 WATER REPELLENT COATING MATERIALS
2.3.1 Clear Water repellent sealer
Water repellent sealer shall be a water-based, clear blend of reactive silane with a silicone emulsion designed to provide invisible water-repellency and protection from the intrusion of chloride salts, airborne pollution and de-icing chemicals over vertical and horizontal concrete, masonry and brick surfaces. Product is supplied in either a pre-diluted 5 percent solids by volume concentration, or in concentrate form that is diluted at the jobsite to achieve the specified solids, and shall meet the following minimum requirements:
A. Solids by volume: 5 to 10 percent (+/-2) [ASTM D 5201]
B. Viscosity: 1,000 to 1,500 cps at 24 degree C (75 degree F) [ASTM D 2196]
C. Dry time: 15 to 20 minutes at 24 degree C (75 degree F), 50 percent R.H. [ASTM D 1640]
D. Cure time: 1 to 2 hours at 24 degree C (75 degree F), 50 percent R.H. [ASTM D 1640]
E. Temperature Limits for Service Conditions: -56 degree C to 93 degree C (-70 degree F to 200 degree F)
F. Resistance to Accelerated Weathering: Treated specimen shall show no deleterious effects, no surface checking, cracking or delamination after 3,000 hours of testing in accordance with ASTM G 154 in a QUV cabinet.
G. Resistance to Wind Driven Rain: After 40 hours of continuous testing, treated precast concrete panel shall show no apparent moisture penetration into the substrate. Test conducted in a pressurized test chamber producing 12.7 cm (5 inch) of water pressure, equivalent to 100 mph wind pressure (161 km/hr) as per ASTM E 154.
H. Resistance to Salt Spray: Treated sample shall show no deleterious effects, no surface checking, cracking or delamination following 500 hours of continuous exposure. Testing shall be in accordance with ASTM B 117 in a Harshaw Salt Spray Cabinet. Test specimens shall be treated cement asbestos board or equal.
I. Resistance to Sulfide Staining: No discoloration after 15 minutes immersion in saturated hydrogen sulfide gas solution when tested in accordance with ASTM D 1712. Compare with control specimen not exposed to hydrogen sulfide gas solution.
J. Resistance to Chemical Reagents: Specimen shall exhibit none or slight color change and no softening or deterioration after 7 days immersion in the following chemicals: ammonium hydroxide - 10 percent; sodium hydroxide - 10 percent; mineral spirits, KB value 38. Inspection is compared to specimen not exposed to chemical reagents.
K. Verification of Minimum 5-Year Exposure to Appropriate Climate: Sealer shall have been in use in a similar climatic region 5 years or more and show no sign of fading, peeling or flaking. Supply project locations exceeding 5 years of service.
L. Moisture Vapor Transmission: Must allow moisture from building interior to pass through the substrate and stain with a perm rating of greater than 5.00 when tested in accordance with ASTM E 96.
2.3.2 Water repellent stain
Water repellent stain shall be a water-based, modified acrylic, penetrating stain designed to provide long term color uniformity, ultraviolet resistance, alkali and pollution resistance, plus water repellency without disturbing the natural texture of the substrate. It shall be for use over vertical, above- grade, smooth or textured concrete, exposed aggregate concrete, glass reinforced concrete, brick, stone, stucco and other masonry surfaces. Water repellent stain shall meet the following minimum requirements:
Page | 17
A. Solids by volume shall be a maximum of 30 percent (+/-2) [ASTM D 2697]
B. Weight per gallon shall be a minimum of 9.2 (+/-.2) lbs. [ASTM D 1475]
C. Dry time shall be 15 minutes at 24 degree C (75 degree F), 50 percent
R.H. [ASTM D 1640]
D. Cure time shall be 1 hour at 24 degree C (75 degree F), 50 percent R.H. [ASTM D 1640]
E. Gloss (Angular Reflectance) shall be 4 at 60 degree Gardner [ASTM D 523]
F. Adhesion to Concrete shall be a minimum of 700 lbs./sq. in. [ASTM D 3359]
G. Temperature Limits for Service Conditions shall range from -56 degree C to 93 degree C (-70 degree F to 200 degree F).
H. Toning pigments shall be inorganic oxides.
I. Resistance to Accelerated Weathering: Color retention and ultraviolet resistance of the treated specimen shall meet the following requirements after 3,000 hours of testing in accordance with ASTM G 154 in a QUV cabinet.
1. Color Retention: Within five (5) N.B.S. (National Bureau of Standards) units when tested in accordance with ASTM D 2244; or shall show no appreciable…